Am0002.pdf
PDF 112 KB Posted
- Attached to
- Fort George Bank Stabilization Federal contract opportunity
- Solicitation number
- W9128F19B0001
About this file
Amendment #2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Bid_Abstract_Pg2.pdf | ||
| Fort_George_Advertisement_Drawings_Current_(2).pdf | ||
| Am0001.pdf | ||
| Final_Site_Visit_Q&A_Sheet-.pdf | ||
| Fort_George_Advertisement_Drawings_Current.pdf | ||
| Ft_George_Specs.pdf | ||
| Fort_George_Advertisement_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment 0002
Shore Protection Project, Fort George, SD, Missouri River, Big Bend Reach, South Dakota
See attached documentation for content of the amendment revisions
Date for receipt of Bids is 18 December 2018 at 2:00 pm
Government Point of Contact: Tim Boyte (402) 995-2589
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F18B0001
12/12/2018
11/16/2018
12/12/2018
Am #0002 - 2 (Continuation of SF 30)
12 December 2018 Solicitation No. W9128F19B0001
Date of Issue: 16 November 2018 Date of Opening: 18 December 2018
SUBJECT: Amendment No. 0002 to Specifications and Drawings for Construction of Shore Protection Project, Fort George, SD, Missouri River, Big Bend Reach, South Dakota.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
Pages or Sections Deleted Pages or Sections Substituted or Added
Bidding Schedule 00 10 00 – 3 thru 5 Bidding Schedule 00 10 00 – 3 thru 5
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged. If the bids have been mailed prior to receiving this amendment, you will notify the office where bids are opened, in the specified manner, immediately of its receipt and of any changes in your bid occasioned thereby.
a. Hand-Carried Bids shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Bids shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.
3. Bids will be received until 2:00 p.m., local time at place of bid opening, 18 December 2018.
Attachments: Bidding Schedule 00 10 00 Pages 3 thru 5
U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
12 December 2018 MFS/2184
00 10 00 Page 3 Am 0002
BIDDING SCHEDULE
Item Estimated Unit No. Description Quantity Unit Price Amount
BASIC
0001. Entire work, complete, for placement of the Breakwater structure (placement of quarried stone, geotextile, aggregate surface course and random fill (excluding spalls layer)) as shown on the drawings and in the specifications 1230 LF $_________ $___________
0002. Entire work, complete, for the mobilization / demobilization of all equipment as shown on the drawings & in the specifications 1 Job - $___________
0003. Entire work, complete, for the hauling and stockpiling of 6,100 tons of Riprap material as
0004. Entire work, complete, for spalls layer stone as shown on the drawings and in the specifications 2,460 Tons $_________ $___________
0005. All remaining work 1 Job - $___________ Except for Option
Items listed below
TOTAL BASIC AMOUNT (ITEMS 0001 THRU 0005) $_______________
OPTION (1)
0006. Entire work, complete, for placement of the Breakwater structure (placement of quarried stone, geotextile, aggregate surface course and random fill (excluding spalls layer)) as shown on the drawings and in the specifications 400 LF $_________ $___________
00 10 00 Page 4 Am 0002
No. Description Quantity Unit Price Amount
0007. Entire work, complete, for spalls layer stone as shown on the drawings and in the specifications 800 Tons $_________ $___________
0008. Entire work, complete, for the hauling and stockpiling of 2,125 tons of Riprap material as
0009. All remaining work 1 Job - $___________ for Option 1 only
TOTAL OPTION 1 AMOUNT (ITEMS 0006, 0007, 0008 & 0009) $_______________
OPTION (2)
0010. Entire work, complete, for placement of the Breakwater structure (placement of quarried stone, geotextile, aggregate surface course and random fill (excluding spalls layer)) as shown on the drawings and in the specifications 300 LF $_________ $___________
0011. Entire work, complete, for spalls layer stone as shown on the drawings and in the specifications 600 Tons $_________ $___________
0012. Entire work, complete, for the hauling and stockpiling of 1,575 tons of Riprap material as
0013. All remaining work 1 Job - $___________ for Option 2 only
TOTAL OPTION 2 AMOUNT (ITEMS 0010, 0011, 0012 & 0013) $_______________
00 10 00 Page 5 Am 0002
No. Description Quantity Unit Price Amount
OPTION (3)
0014. Entire work, complete, for placement of the Breakwater structure (placement of quarried stone, geotextile, aggregate surface course and random fill (excluding spalls layer)) as shown on the drawings and in the specifications 570 LF $_________ $___________
0015. Entire work, complete, for spalls layer stone as shown on the drawings and in the specifications 900 Tons $_________ $___________
0016. Entire work, complete, for the hauling and stockpiling of 2,400 tons of Riprap material as
0017. All remaining work 1 Job - $___________ for Option 3 only
TOTAL OPTION 3 AMOUNT (ITEMS 0014, 0015, 0016 & 0017) $_______________
TOTAL AMOUNT (BASIC PLUS OPTIONS, ITEMS 0001 THRU 0017) $_______________
Notes:
1. See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO BIDDERS for evaluation of options. The Government reserves the right to exercise the options within 90 days after issuance of Notice to Proceed.
2. The quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun.
3. Bid prices must be entered for all items of the schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit prices and the extensions, the unit prices will be considered the bid. In case of variation between the individual bid item prices and the total amount, the individual bid prices will be considered the bid.
00 10 00 Page 6 Am 0002
4. A modification to a bid which provides for a single adjustment to the total amount bid should state the application of the adjustment to each respective unit price and lump sum price affected.
If the modification is not so apportioned, the single adjustment will be applied to Item No.5.
5. See Section 01 22 00 MEASUREMENT AND PAYMENT for additional information.
6. Each pair of Option Items: 0006 thru 0009, 0010 thru 0013 and 0014 thru 0017, will be awarded together as a pair or not at all.
7. No additional time will be given should any of the option be awarded.
| SF30-good. |