Amendment #10 Outage date update
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment__9_W9128F-16-T-0044.pdf | ||
| Gavins_Pt_drawing_01_06_2017.pdf | ||
| Gavins_Pt_Ref_01_06_2017.pdf | ||
| Amendment__7_Gavins_Point.pdf | ||
| Contractor_Questions-Amendment25Oct2016.pdf | ||
| Additonal_Specs.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Amendment__6_W9128F-16-T-0044.pdf | ||
| Amendment__5_W9128F-16-T-0044.pdf | ||
| Amendment__4_W9128F-16-T-0044.pdf | ||
| Amendment__1_W9128F-16-T-0044.pdf | ||
| Amendment__2_W9128F-16-T-0044.pdf | ||
| Amendment__3_W9128F-16-T-0044.pdf | ||
| Gavins_Point_reference.pdf | ||
| Gavins_Point_Exciters_Dwgs.pdf | ||
| Gavins_Point_Exciters_Dwgs.7z | 7Z file | |
| Gavins_Point_Exciters_Specs.pdf | ||
| 1442_and_clauses.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W59XQG61116585
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this Amendment is to update outage dates listed in SECTION 01 01 00, Pp 1.10.1 Current outage dates are listed as 01 September through 30 December. The Specs w ill now reflect dates of 15 November 2017 through 15 May 2018. Reference attachment "GP Exciters Schedule Amendment".
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F-16-T-0044
X 9B. DATED (SEE ITEM 11)
08-Sep-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Apr-2017
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F-16-T-0044
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
GP EXCITERS SCHEDULE AMENDMENT
SECTION 01 01 00, Pp 1.10.1
Not later than 90 days notice to proceed, the Contractor shall provide a proposed generator outage schedule for approval. Generator outages are only permitted in the time period from approximately 15 November 2017 through 15 May 2018. Unless otherwise notified by the Contracting Officer, at any given time, only one generator shall be allowed under outage for exciter replacement. A unit receiving an exciter replacement shall be complete and accepted prior to the outage of the next unit. The Government will arrange for the unit outages. The Government reserves the right to require changes to the Contractor's Proposed Outages Schedule.
Power demands and emergency maintenance requirements may limit unit availability. Should this occur, the Contractor will be notified. The first day of availability shall not be a weekend day or on a Friday. Contractor personnel shall not enter the unit until given assurance in writing by the Government that all Safe Clearance steps have been completed.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 15-Mar-2017 02:00 PM to 11-Apr-2017 02:00 PM.
(End of Summary of Changes)