CSI_MasterFormat_Cost_Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Generator Excitation Systems for Big Bend Dam, SD Federal contract opportunity
Solicitation number
W9128F-15-R-0015
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Spreadsheet Format Example

View the file

Other files for this federal contract opportunity

Other files attached to Generator Excitation Systems for Big Bend Dam, SD, newest first.
File Type Posted
AMENDMENT_7.pdf PDF
W9128F-15-R-0015_AMD-6.pdf PDF
Generator_Switchyard(Updated).pdf PDF
CT_Information_Document.pdf PDF
Slip_Ring_Drawings.pdf PDF
W9128F-15-R-0015_AMD-5.pdf PDF
W9128F-15-R-0015_AMD-4.pdf PDF
Past_Performance_Questionnaire.pdf PDF
W9128F-15-R-0015_AMD-3.pdf PDF
Special_Field_Test.pdf PDF
Big_Bend_BCOE_Reference_Dwgs_Revised_by_TRM_12-23-14.pdf PDF
W9128F-15-R-0015_AMD-2.pdf PDF
Big_Bend_Exciter_Drawings.pdf PDF
W9128F-15-R-0015_AMD-1.pdf PDF
W9128F-15-R-0015.pdf PDF
UPDATED_Big_Bend_Exciters_Specs.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

General Requirements Subgroup
DivisionDescriptionTotal Cost
Division 01General Requirements
Division 02Existing Conditions (Ex. Alterations to existing natural conditions)
Division 03Concrete (Ex. Footings)
Division 04Masonry (ex. Concrete block and brick work)
Division 05Metals (Ex. Steel Framing)
Division 06Wood, Plastics, and Composites (Ex. House framing)
Division 07Thermal and Moisture Protection (Ex. Insulation and water barriers)
Division 08Openings
Division 09Finishes
Division 10Specialities
Division 11Equipment
Division 12Furnishings
Division 13Special Construction
Division 14Conveying Equipment
Facility Services Subgroup
DivisionDescriptionTotal Cost
Division 21Fire Suppression
Division 22Plumbing
Division 23Heating, Ventilating, and Air Conditioning (HVAC)
Division 25Integrated Automation
Division 26Electrical
Division 27Communications
Division 28Electronic Safety and Security
Site and Infrastructure Subgroup
DivisionDescriptionTotal Cost
Division 31Earthwork
Division 32Exterior Improvements
Division 33Utilities
Division 34Transportation
Division 35Waterway and Marine Construction
Process Equipment Subgroup
DivisionDescriptionTotal Cost
Division 40Process Integration
Division 41Material Processing and Handling Equipment
Division 42Process Heating, Cooling, and Drying Equipment
Division 43Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44Pollution and Waste Control Equipment
Division 45Industry-Specific Manufacturing Equipment
Division 46Water and Wastewater Equipment
Division 48Electrical Power Generation
Subtotal:$ - 0
Markups
Insurance Rate:0.00%
Insurance Cost:$ - 0
Payment and Performance Bond Rate:0.00%
Payment and Performance Bond Cost:$ - 0
General and Administrative Expense Rate:0.00%
General and Administrative Expense Cost:$ - 0
Profit Rate:0.00%
Profit:$ - 0
Subtotal Markups:$ - 0
Total Project Price:$ - 0
Offerors will only provide information in the "yellow" highlighed cells.

File details come from the government source that posted it. Updated .