Am0003.pdf
PDF 2 MB Posted
- Attached to
- Lake WaConDa Levee Repair
- Solicitation number
- W9128F-13-B-0002
About this file
W9128F-13-B-0002 Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_13-B-0002.pdf | ||
| Am0002.pdf | ||
| Am0001.pdf | ||
| WaConDa_Specs.pdf | ||
| Waconda_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Am #0003 - 1
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F 13 B 0002 :all amendments may cause rejec- :
:tion of the bid. See FAR : Date of Issue: 18 Dec 2013 :52.214-3 of Section 00 21 00 : NEW Date of Opening: 05 Feb 2013
Amendment No. 0003 22 January 2013
SUBJECT: Amendment No. 0003 to Specifications and Drawings for Construction of Levee Rehab, Lake Waconda, Cass County, NE.
Solicitation No. W9128F 13 B 0002.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Standard Form SF 1442, Page 00 11 00 -1, delete date and time of bid opening shown and substitute "05 February 2013" at "2:00 pm".
(2) Section 00 21 00, delete REQUIRED CENTRAL CONTRACTOR REGRISTRATION (CCR) page located at end of section and substitute attached REQUIRED CONTRACTOR REGISTRATION page attached to this amendment.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment.
Pages Deleted Pages Substituted or Added
Section 35 31 19 Riprap Section 35 31 19 Riprap
c. Drawings (Reissued). The following drawings are revised with latest revision date of 20 January 2013, and reissued with this amendment.
(1) Sheet B-107.
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the specifications remain unchanged. If the bids have been mailed prior to receiving this amendment, you will notify the office where bids are opened, in the specified manner, immediately of its receipt and of any changes in your bid occasioned thereby.
a. Hand-Carried Bids shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
Am #0003 - 2
b. Mailed Bids shall be addressed as noted in Item 8 on Page 00 11 00-1 of Standard Form 1442.
3. Bids will be received until 2:00 p.m., local time at place of bid opening, 05 February 2013.
Attachments: Required Contractor Registration Spec Pages listed in 1.b. above Dwgs. listed in 1.c above
U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
22 January 2013
MFS/2184
REQUIRED CONTRACTOR REGISTRATION
The System for Award Management (SAM) has replaced the CENTRAL CONTRACTOR REGISTRATION (CCR). Instructions to access SAM are included below.
Register Now: Don’t wait until you submit an offer on a solicitation. You must be registered to receive the contract award. New registrations usually take 1-2 business days to process once completed by the vendor.
Registration Information:
Internet: https://www.sam.gov/portal/public/SAM/
FORMER CCR REGISTRANTS:
If you had an active record in CCR, you have an active record in SAM. You do not need to do anything in SAM at this time, unless a change in your business circumstances requires updates to your Entity record(s) in order for you to be paid or to receive an award or you need to renew your Entity(s) prior to its expiration. SAM will send notifications to the registered user via email 60, 30, and 15 days prior to expiration of the Entity. To update or renew your Entity records(s) in SAM you will need to create a SAM User Account and link it to your migrated Entity records. You do not need a user account to search for registered entities in SAM by typing the DUNS number or business name into the search box.
To create a new SAM Account:
1. Go to https://sam.gov
2. Click on Create an Account
3. Choose Individual account
4. Provide the requested information and submit
5. Receive the email from "notifications" and click through the sam.gov
6. link to validate your account
7. Log in at https://sam.gov with the username and password you created
For SAM Assistance:
Click the ‘HELP’ button on the navigation bar:
or
Contact the Federal Service Desk (8am - 8pm Eastern Time) at:
866-606-8220 334-206-7828
Am #0002
Lake Waconda Levee Repair, Missouri River MRF1
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 31 19
RIPRAP
01/00
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 GENERAL
1.4 LOCATION OF MATERIAL SOURCES
1.5 SAMPLING AND TESTING
1.5.1 General Requirements
1.5.2 Test Results
1.5.3 Tests, service records, and results
1.5.3.1 Bulk Specific Gravity
1.5.3.2 Soundness in Magnesium Sulfate
1.5.3.3 Soundness in Freezing and Thawing
PART 2 PRODUCTS
2.1 STONE
2.1.1 General
2.1.2 Broken Concrete
2.1.3 Stone from Other Existing Federal Projects
2.1.4 Quarried Stone or Field Boulders
PART 3 EXECUTION
3.1 GENERAL
3.2 SURFACE PREPARATION
3.3 PLACEMENT
3.4 SALVAGED STONE
3.5 FIELD GRADATION
3.5.1 General
3.5.2 Field Gradation Test
3.6 PROTECTION
-- End of Section Table of Contents --
SECTION 35 31 19 Page 1 Am0003
SECTION 35 31 19
RIPRAP
01/00
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C88 (2005) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate
ASTM C127 (2007) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate
ASTM D5519 (2007) Particle Size Analysis of Natural and Man-Made Riprap Materials
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 144 (1992) Standard Test Method for Resistance of Rock to Freezing and Thawing
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having no designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Location of Material Sources for Stone; G-AO.
SD-04 Samples
Stone; G-AO.
SD-06 Test Reports
Tests, service records, and results; G-AO.
Field Gradation; G-AO.
Field Gradation Test Results mailed within ten (10) days after completion of the tests.
SECTION 35 31 19 Page 2
SD-07 Certificates
Letter of Clearance; G-AO.
1.3 GENERAL
The work specified herein consists of construction of riprap as shown on the drawings and as direceted by the Contracting Officer. The Contractor shall control operations during production of riprap material so as to ensure that the material delivered and placed will meet all specification requirements. The quarry operators shall be responsible for operating all quarries and for conditioning the area after operations are complete, in accordance with all applicable Federal, State and local laws and regulations.
1.4 LOCATION OF MATERIAL SOURCES
The Contractor shall provide the location of material sources for stone.
The locations shall be described to the quarter-quarter section and shall be clearly delineated on a map with a scale of 1 inch = 2000 feet. The map shall also indicate roads and distances to the nearest cities or town, which would appear on typical highway maps. The Contractor shall also submit a letter of clearance from the State Historic Preservation Officer permitting the quarrying, excavation, or other removal of the required contract materials. Address of the State Officer is as follows:
NEBRASKA IOWA
DR. JAMES A. HANSEN DAVID CROSSUN, SHPO
NEBRASKA STATE HISTORICAL SOCIETY IOWA STATE HISTORICAL SOCIETY
1500 R. STREET, P.O. BOX 82554 EAST 12th AND GRAND AVENUE
LINCOLN, NE 68503 DES MOINES, IA 50319
SOUTH DAKOTA MISSOURI
DR. JUNIUS B. FISHBURNE RON KUCHERA, ACTING DIRECTOR
OFFICE OF CULTURAL PRESERVATION MISSOURI DEPT. OF NATURAL RES.
KNEIP BUILDING P.O. BOX 176
PIERRE, SD 57501 JEFFERSON CITY, MO 65102
NORTH DAKOTA MONTANA
ALIOS B. SPIELMAN MARCELLA SHERFY, SHPO
STATE HISTORICAL SOCIETY MONTANA HISTORICAL SOCIETY
OF NORTH DAKOTA 225 NORTH ROBERTS
HERITAGE CENTER HELENA, MONTANA 59601
BISMARCK, ND 58505
COLORADO WYOMING
BARBARA SUDLER MARY HOPKINS, INTERIM SHPO
COLORADO HERITAGE CENTER STATE HISTORICAL SOCIETY
1300 BROADWAY WYOMING RECREATION COMMISSION
DENVER, CO 80203 122 WEST 25th HERSCHLER BLDG
CHEYENNE, WY 82002
SECTION 35 31 19 Page 3
1.5 SAMPLING AND TESTING
1.5.1 General Requirements
The Contractor shall be responsible for all sampling and testing specified herein. The Government may perform verification tests as determined necessary for final approval of the riprap material. All samples including samples taken during production shall be representative of the riprap material furnished or proposed to the be furnished. No rock shall be furnished from any ledge which has not been sampled, tested and approved for use on this project.
1.5.2 Test Results
Results shall verify that materials comply with this specification. When a material source is changed, the new material will be tested for compliance.
When deficiencies are found, the initial analysis shall be repeated and the material already placed shall be retested to determine the extent of unacceptable material. All in-place unacceptable material shall be replaced or modified as directed by the Contracting Officer.
1.5.3 Tests, service records, and results
Tests for bulk specific gravity, soundness in magnesium sulfate, and soundness in freezing and thawing shall be performed on samples of material obtained from each ledge proposed for use as riprap prior to start of construction. Test results shall describe type of failure of the discrete particles. Tests for these parameters do not need to be performed specifically for this project; if, certified test results performed not longer than 12 months prior to delivery to the project together with the name of the owner of the quarry and the legal description can be submitted.
The Contractor shall submit the name and location of each quarry proposed for use along with a geologic section of each quarry indicating the various rock units identified by geologic name of formation and member and indicate from what ledge the samples were obtained. All tests shall be performed by the Contractor at no cost to the Government. The stone protection material shall meet the following test limits when tested as indicated.
1.5.3.1 Bulk Specific Gravity
Bulk specific gravity shall be computed in accordance with ASTM C127, except that the total sample shall weigh 5,000 grams +2 percent and individual particles shall weigh approximately 300 grams each. Riprap material shall be tested in a saturated surface-dry (SSD) condition. The computed bulk specific gravity so determined shall not be less than 2.50.
1.5.3.2 Soundness in Magnesium Sulfate
Soundness in Magnesium Sulfate shall be determined according to ASTM C88 with test modifications as listed below. The combined loss at 5 cycles shall not be more than 12 percent. The test report shall show the percentages of loss calculated as described herein and the number of pieces affected, classified as to number disintegrating, splitting, crumbling, cracking, flaking, etc.
a. Sample Preparation. The sample shall be prepared by breaking it into fragments reasonably uniform in size and shape and weighing approximately 100 grams each. The test sample shall weigh 5,000 grams + 2 percent. The sample shall be thoroughly washed and dried previous to
SECTION 35 31 19 Page 4 the test.
b. Sample Immersion and Temperature. The sample immersed in the solution shall be maintained at a temperature of 80 degrees F +2 degrees F for the immersion period.
c. Quantitative Examination. At the end of the fifth cycle, the percentage loss shall be determined by the three following methods.
The test report shall show the loss computed by each method; however, only the combined loss shall be used for acceptance or rejection of the material.
1. Loss by Breaking. An individual piece which has broken or split into three or more fragments shall be considered to have failed the test, provided each of the three such fragments is at least 10 percent of the original piece by weight. The total original weight of all pieces failing the test, expressed as percentage of the total original weight of the sample, shall be considered as percentage loss by breaking.
2. Loss by Crumbling and Flaking. After the loss by breaking has been determined, the pieces that have not failed in that determination shall be screened on the 1/2-inch sieve and the material retained on the sieve shall be weighed for purposes required to determine combined losses. The pieces which have failed by breaking shall then be added to the material remaining on the 1/2-inch sieve and screened. The difference between the total original weight of the sample and the total weight of the material retained on the 1/2-inch sieve expressed as percentage of the total original weight, shall be considered as percentage loss by crumbling and flaking.
3. Combined Loss. The difference between the total original weight of the material retained on the 1/2-inch sieve, after screening the pieces which did not fail by breaking, expressed as percentage of the total original weight, shall be considered as percentage combined loss.
d. Report. The report for riprap rock shall show the percentages of loss calculated as described herein before and the number of pieces affected, classified as to number disintegrating, splitting, crumbling, cracking, flaking, etc.
1.5.3.3 Soundness in Freezing and Thawing
The test for freezing and thawing shall consist of COE CRD-C 144, Standard Test Method for Resistance of Rock to Freezing and Thawing. The test shall be conducted on a minimum of three (3) specimens, and the loss at twenty
(20) cycles for each individual specimen shall not exceed twenty-five (25) percent. The test report submitted for approval shall contain information as required by COE CRD-C 144.
PART 2 PRODUCTS
2.1 STONE
2.1.1 General
Whenever "stone" or "riprap" is specified in this contract, it shall be
SECTION 35 31 19 Page 5 durable stone approved by the Contracting Officer and shall conform to all requirements of these specifications. Individual pieces of riprap in-place shall be free from cracks, seams, and other defects that will cause rapid or excessive deterioration or degradation during service. The riprap shall contain no more than 5 percent of undesirable material by weight.
Undesirable material is defined as individual pieces of stone which do not meet the quality requirements when tested as specified herein, and which can be visually differentiated from the satisfactory pieces, including dirt, sand, clay, and rock fines. Additionally, the riprap material shall not contain disintegrated granite or shale.
The Contractor shall select the source or sources they propose to use and perform the initial sampling and testing of the materials well in advance of the time when the material will be required in the work.
In addition to the sampling and test results or service test records required of the Contractor, the Contracting Officer reserves the right to inspect the material source and require additional samples of stone material, selected by the Contracting Officer, be submitted for further evaluation and approval prior to delivery of any material to the site of the work, except for test purposes. These samples, identified by specific location and specific geologic formation shall be obtained by the Contractor and delivered at his expense to a point designated by the Contracting Officer at least 10 days in advance of the time when the placing of the stone protection is expected to begin. The above inspection and sampling may be repeated any time the Contractor changes the location of geological formation from which the material is coming. The Contractor shall not be granted an extension of time or extra compensation due to any delay caused by sampling, testing, approval or disapproval of stone material under the requirements of these specifications.
2.1.2 Broken Concrete
Broken concrete rubble will not be an allowable substitute for stone.
2.1.3 Stone from Other Existing Federal Projects
Stone salvaged from any existing federally constructed erosion control or navigation project is not considerd acceptable for this project.
2.1.4 Quarried Stone or Field Boulders
Stone for riprap should be blockier in shape than elongated and should have sharp, angular, clean edges of relatively flat surfaces. The stone shall consist of broken field boulders or quarried stone meeting the quality requirements above. Neither the breadth nor the thickness of any piece of stone shall be less than one-third of its length. Stone for riprap shall be reasonably well graded from coarse to fine and fall within the minima and maxima bounds of the required gradation range. Dirt and fines of less than 1/2-inch maximum cross section, accumulated from interledge layers or from blasting, breaking, or handling operations shall not exceed five(5) percent by weight.
The stone shall be reasonably well graded between the limits specified in
TABLE 1, RIPRAP GRADATION.
TABLE 1 - RIPRAP GRADATION
Percent Lighter Limit of Stone
SECTION 35 31 19 Page 6
TABLE 1 - RIPRAP GRADATION
by Weight Weight in Lbs.
100 86-35 50 36-17 15 18-5
PART 3 EXECUTION
3.1 GENERAL
Quarry operation shall be controlled to produce a reasonable well graded stone of the required size. The Contracting Officer may require changes as necessary to produce the required product. The Contractor's operations shall be conducted in a manner that will produce stone meeting the requirements specified and shall include selective quarrying, handling, and loading as required.
3.2 SURFACE PREPARATION
The surface on which the riprap will be placed shall be prepared to a relatively smooth surface condition, and shall be free from obstruction, debris, depressions, erosion feature, or vegetation. Any irregularities will be removed so as to ensure continuous, intimate contact of the riprap with the subgrade. Any loose material, soft or low density pockets of material, shall be removed; erosion features such as rills, gullies etc.
must be graded out of the surface before riprap placement.
3.3 PLACEMENT
Riprap shall be placed within the limits shown on the drawings or as directed by the Contracting Officer's Representative. Riprap stone shall be placed in such manner as to produce a reasonably well-graded mass of rock with the minimum practicable percentage of voids. Riprap shall be placed to its full course thickness in one operation to minimize segregation of the riprap. The larger stones shall be well distributed and the entire mass of stones in their final position shall be roughly graded to conform to the gradation specified. The finished riprap shall be free from objectionable pockets of small stones and clusters of larger stones.
Placing riprap in layers will not be permitted. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source; by controlled dumping of successive loads during final placement. Dumping of stone at the top of slopes and rolling or pushing into place will not be permitted. Manipulating or moving stone at any time prior to placement by means of dozers or other blade equipment will not be permitted.
Rearranging of individual stones by mechanical equipment or by hand will be required to the extent necessary to obtain a reasonably well graded distribution of stone sizes as specified above.
3.4 SALVAGED STONE
Excess salvaged stone shall be placed onsite as approved by the Contracting Officer.
SECTION 35 31 19 Page 7
3.5 FIELD GRADATION
3.5.1 General
If the material fails to meet the gradation limits specified, the Contractor shall discontinue placement of the material and adjust their operations or propose another source. The Contractor shall verify with the necessary additional tests that acceptable materials are being produced.
Tests which do not pass the gradation requirements will not be counted in the additional required tests above. All field tests will be performed by the Contractor at their expense.
3.5.2 Field Gradation Test
A field gradation test of riprap material shall be performed by the Contractor to determine if the material delivered to the project site meets the gradation requirements of this specification. A representative stone sample, consisting of 10-12 tons, shall be taken of material delivered to the job and checked for gradation and elongation. The Contractor shall state in writing the method used in blasting, processing, loading and hauling this sample, and shall notify the Contracting Officer's Representative any time production methods are changed. Riprap material shall not be placed until the material delivered to the job has passed a field gradation test. Gradation shall be determined according to ASTM D5519, Test Method A. At the discretion of the Contracting Officer's Representative, random loads will be dumped or the in-place material will be sampled and a gradation control check shall be performed by the Contractor at the discretion and under the supervision of the Contracting Officer's Representative.
The Contractor shall plot the results of each test for gradation in relation to the gradation limits envelope specified. The plots shall be made on Engineering Form 4055, furnished by the Contracting Officer, or on a similar form. Results of the field test and the plots shall be furnished to the Contracting Officer prior to placement of the stone. If at any time the material fails to meet the requirements, the Contractor shall adjust their operations to control the amount of dirt and fines to meet the specifications.
3.6 PROTECTION
The Contractor shall maintain the riprap in place until accepted. Prior to Government acceptance, any material displaced by any cause shall be replaced to the lines and grades shown on the drawings and at the expense to the Contractor.
-- End of Section --
SECTION 35 31 19 Page 8
.0 in
M R
F
B .d g n
G
E D
X C
L R
Y d w g s g e o t e c h
C A
D D
C A
D D
M R
F
B .d g n
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
N
V
W
F
X
C
X X
W
F
X
X
X X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
L A
K E W
A C
O N
D A
L
E V
E E R
E P
A
IR
S
L A
K E W
A C
O N
D A
N E
B R
A S
K A
C L
R
C L
R S
M B
M R
F
C L
R
15+00
20+00
25+
B-107
0 940
E L E
V A
T
IO
N F
E E
T
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30
E L E
V A
T
IO
N F
E E
T
CL
GEOTEXTILE
2.0’
50’ MIN
1 ON 4
DISTANCE IN FEET
GRADE
EXISTING
OF LEVEE
APPROXIMATE TOE
RIVERSIDE LANDSIDE
GRADE
EXISTING
APPROX. 5’
SLOPE TO DRAIN
OF LEVEE ON FACE OF BERM
PLACE RIPRAP REMOVED FROM TOE
ELEVATION 941
SAND FILL
SEE DETAIL THIS SHEET
GEOTEXTILE
TRENCH IN
ELEVATION 935.0 SEE NOTES
ELEVATION 938.85 NORMAL OPERATING POOL
PROJECT COMPLETION
SPONSOR POST
TO BE PLACED BY
6 - 12" OF TOPSOIL
NEW BERM
AND USED WITH
TO BE REMOVED
EXISTING RIPRAP
LANDSIDE SLOPE.
REUSED FROM EXISTING
RIPRAP SHALL BE
.0 in
M R
F
B .d g n
R E
P A
IR
A
R E
A
LEVEE CENTERLINE
LEVEE CENTERLINE
LEVEE CENTERLINE
0 120’60’
SCALE: 1" = 60’ - 0"
SCALE:
HORIZ. 1 INCH =
VERT. 1 INCH =
FT.
FT.10
TYPICAL SECTION 5
B-107
B-107
P L
A N A
N D S
E C
T
IO
N
GEOTEXTILE
RIPRAP
GROUND
EXISTING
GEOTEXTILE TRENCH DETIAL
NO SCALE
3.1
1’
PROJECT COMPLETION
BY SPONSOR POST
TOPSOIL TO BE PLACED
THICK.
EXISTING RIPRAP IS APPROXIMATELY 1.5 FEET
UTILIZED FOR THE FACE OF THE NEW BERM.
SLOPE WITHIN THE CONSTRUCTION AREA SHALL BE
3. ALL EXISTING RIPRAP LOCATED ON THE LANDSIDE
INCHES.
DURING CONSTRUCTION TO BE AROUND 935.00 +/- 6
2. CONTRACTOR CAN ANTICIPATE THE WATER LEVEL
2012.
1. WATER ELEVATION 938.85 SURVEYED IN OCTOBER
NOTES:3
E
D
IT
D
T
S
A
R
A W
IN
G
S M
B
| am_0003 |
| 00 21 00 CR |
| 35 31 19 |
| MRF1-B-107 Amended |
File details come from the government source that posted it. Updated .