14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
BASE CIVIL ENGINEER ADMINISTRATION FACILITY
ELLSWORTH AFB, SOUTH DAKOTA
See attached documentation for content of the amendment to the RFP.
Date for receipt of Proposals is 08 August 2008
Government Point of contact: Polina Poluektova (402) 995-2091
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
MODIFICATION OF CONTRACTS/ORDER
NO.
E. IMPORTANT: Contractor
15B. CONTRACTOR/OFFEROR
is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
is extended, B.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
2. AMENDMENT/MODIFICATION NO.
6. ISSUED BY
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is required to sign this document and return
15A. NAME AND TITLE OF SIGNER (Type or print)
PAGE OF PAGES 1. CONTRACT ID CODE
5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
7. ADMINISTERED BY (If other than Item 6)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY
16C. DATE SIGNED
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10B. DATED (SEE ITEM 13)
CODE CODE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
is not ex-copies to the issuing office.
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
(Signature of person authorized to sign) (Signature of Contracting Officer)
USAPPC V1.00
10A.
30-105-02
See Item 6U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA, NE 68102-4901
CODE
W9128F
FACILITY CODE
J 1
0002 31 July 2008
W9128F-08-R-0035
02 Jul 2008
31 July 2008
Am #0002 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 106 South 15th Street Omaha, Nebraska 68102-1618
:NOTICE: Failure to acknowledge : Solicitation No. W9128F 08 R 0035 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 02 July 2008 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:
08 August 2008
Amendment No. 0002 31 July 2008
SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Design and Construction of BASE CIVIL ENGINEER ADMINISTRATION FACILITY
ELLSWORTH AFB, SOUTH DAKOTA.
Solicitation No. W9128F 08 R 0035.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 00 22 00, Page 9, Para. 8.2.1., line 7, after “...date that proposals are due” add new sentence: “Designs completed and currently under construction are acceptable project examples for design experience.”
(2) Section 00 22 00, Page 10, Para. 8.2.2., last two sentences delete “four” in 3 places and substitute “three” in 3 places.
(3) Section 01 35 26, Page 5, Para. 1.5.1.1, starting on line 3, delete “The Contractor Quality Control (QC) person can be the SSHO on this project.”
(4) Section 01 83 00, Page 6, Para. 1.2.3 Floor Live Loads: Add the following to the end of the sentence: “(e.g. high density shelving, Room 218A)”.
(5) Section 01 84 00, Page 9, Add to the end of Para. 1.5.2: “See Section 01 84 01: Furniture Installation for additional requirements.”
(6) Section 01 89 00, Page 15, Delete contents of Para. 1.9.2:
Overexcavation and substitute: "Based on the Preliminary Geotechnical Evaluation in Appendix D, overexcavate the areas below the building floor and footings to a depth of 4 feet. Oversize the foundation overexcavation 1 foot laterally beyond each side of the footing for every 1 vertical foot of overexcavation. Backfill the overexcavation with base course as described in paragraph Aggregate Base Course in this section. To prevent the effect of differential settlement on the south half of the building, one of the following options may be utilized: surcharge the site prior to construction, install cast-in-place drilled pier foundation system, or limit exterior fills and install geofoam, or other structural lightweight fill material, under the
Am #0002 - 3 building footprint a minimum depth of 4 feet. Compact the backfill as required in the Final Geotechnical Report provided by the Contractor."
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment.
Pages Deleted Pages Added Section 00 11 00: Pricing Schedule Pages 3 and 4
Section 00 11 00: Pricing Schedule Pages 3 and 4
Section 01 84 01: Furniture Installation
c. Drawings (Not Reissued). The following drawings of drawing code AF610-21-01 are revised as indicated below with latest revision date of 31 July 2008. These drawings are not reissued with this amendment.
(1) Drawing Sheet i-112, at Room 218A at drawing coordinate A1, delete leader note as follows:
“This area high density shelving (HDS). See attached manufacturer's drawings and bill of materials.” and substitute: “This area high density shelving (HDS). See Appendix H for manufacturer's drawing and bill of materials.”
(2) Drawing Sheet A-600, Interior Finish Legend, row four, Carpet (Broadloom) CPT-2, under Size/Finish column: Delete “24x24” and substitute “12 feet”.
(3) Drawing Sheet A-600, under Remarks: Add the following:
“3. Stair nosing and stringer to match the resilient base in the room.”
(4) Drawing Sheet A-600, at Room Finish Schedule, Room 110 EOC, Remarks column: Add “3”.
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00010-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 08 August 2008.
Amendment Attachments:
Sections listed in 1 b. above
Am #0002 - 4
For Information Only Attachments:
Attached Questions and Responses
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
31 July 2008 mrp/2775
BASE CIVIL ENGINEERING ADMINISTRATION FACILITY (FXBM003007)
ELLSWORTH AFB, SOUTH DAKOTA
00 11 00 - 3 W9128F-08-R-0035
Am_0002
PRICING SCHEDULE
ITEM
NO.
DESCRIPTION QUANTITY UNIT AMOUNT
BASIC ITEMS
0001 All work complete for the Base Civil Engineering Admin Facility excluding items below.
Job
L.S.
0002 All design work complete for Item 0001 above.
TOTAL BASIC (ITEMS 0001 AND 0002) $_________________________
OPTION ITEMS
Option 1 - All work complete for Haz-Mat removal and demolition of Bldg. 8201 (See Dwg. C-111)
Option 2 - All work
Bldg. 8202 (See Dwg. C-111)
Option 3 - All work
Bldg. 8203 (See Dwg. C-111)
Option 4 All work complete to design and construct Bergstrom Court road extension shown on Dwg.
C-121.
Option 5 All work complete to provide and place O&M furniture. For types and locations see Attachment CID Furniture Package.
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________
BASE CIVIL ENGINEERING ADMINISTRATION FACILITY (FXBM003007)
ELLSWORTH AFB, SOUTH DAKOTA
00 11 00 - 4
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS for evaluation of options. The Government reserves the right to exercise Options in accordance with the schedule below:
OPTIONS ITEMS CALANDER DAYS AFTTER NTP
Option 1 390 Option 2 360 Option 3 390 Option 4 120 Option 5 420
Note: Upon BOD of the Base CE Admin Facility and any award of Options 1, 2 and 3, the Contractor shall allow 30 calendar days for Air Force personnel to move from buildings 8201, 8202 and 8203 to the new facility.
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be considered non-responsive and subject to rejection. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected.
BCE Administration Facility, Ellsworth AFB, SD EL62
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 84 01
FURNITURE INSTALLATION
10/04
PART 1 GENERAL
1.1 COMPREHENSIVE INTERIOR DESIGN (CID) DOCUMENTS
1.2 SERVICES
1.2.1 Field Measurements
1.2.2 Delivery, Storage and Handling
1.2.2.1 New Furniture
1.2.3 Furniture Inspection
1.2.4 Furniture Staging Area
1.2.5 Qualifications - Certified Installers and Licensed Electricians
1.3 WARRANTY
PART 2 PRODUCTS
2.1 FURNITURE
PART 3 EXECUTION
3.1 INSTALLATION PROCEDURES
3.2 BUILDING EXAMINATION AND PROTECTION
3.3 CLEANING
-- End of Section Table of Contents --
SECTION 01 84 01 Page 1
SECTION 01 84 01
FURNITURE INSTALLATION
10/04
PART 1 GENERAL
See Comprehensive Interior Design (Under Separate Cover) for furniture to be furnished under this contract (Option 5). The Contractor is encouraged to solicit and provide GSA pricing on furniture. Furniture manufacturer's are allowed to give contractors GSA pricing and direct purchase on Government projects. Note: Furniture will be subject to FAR 52.236-5
MATERIALS AND WORKMANSHIP.
1.1 COMPREHENSIVE INTERIOR DESIGN (CID) DOCUMENTS
Refer to the Comprehensive Interior Design (CID) Procurement Information documents and Furniture Illustration Sheets that are issued as part of the
RFP.
1.2 SERVICES
The contractor shall provide installation services for furniture, to include installation drawings if required by manufacturers, installation instructions, purchase of furniture, field measuring, shipping and delivery coordination, receiving, inspection, submitting and processing freight and warranty claims, unpacking, storing, and assembly and installing.
Contractor representative and Contracting Officer Representative shall identify any damage, scratches, soiling, etc. to existing furniture prior to handling and provide a report identifying damaged furniture. The report shall be agreed upon and signed by the Contractor and Contracting Officer Representative. This report shall be used to identify new damage.
1.2.1 Field Measurements
The Contractor shall verify dimensions in the field and shall advise the Contracting Officer of any discrepancies before purchasing furniture.
1.2.2 Delivery, Storage and Handling
Furniture shall be stored in an environment in accordance with furniture manufacturers instructions; in a dry location that is adequately ventilated and free from dirt and dust, water, and other contaminants, and in a manner that permits easy access for inspection and handling.
1.2.2.1 New Furniture
New furniture shall be delivered to the jobsite. If off-site storage is needed, the storage location shall be coordinated with and approved by the Contracting Officer. It is the responsibility of the Contractor to transport stored furniture from off-site storage to the facility project site for installation. Cost of off-site storage shall be the responsibility of the Contractor. Furniture shall be delivered in manufacturer's original packaging or be blanket wrapped. Original packaging shall be marked with the manufacturer, item identification, and project reference clearly marked.
SECTION 01 84 01 Page 2
1.2.3 Furniture Inspection
Furniture inspection and notification of damage shall be completed within the time frame required by the shipping company while carrier is still on site. Claims for concealed damage shall be completed within the time frame required by the shipping company and furniture manufacturer. A claim file shall be maintained by the Contractor that documents each claim. Copies of claims shall be forwarded to the Contracting Officer on a daily basis. The contractor will be held responsible for any loss, damage or destruction occurring after shipment has been received from the carrier by the contractor and prior to acceptance of the installation by the Contracting Officer if it is demonstrated that such action is due to negligence and/or direct action by the contractor.
1.2.4 Furniture Staging Area
Location for the furniture staging area shall be on-site.
1.2.5 Qualifications - Certified Installers and Licensed Electricians
When recommended by the furniture manufacturer, furniture shall be delivered and installed by an authorized dealer with a certified installation crew. All furniture with an electrical system requiring hardwiring shall be completed by a licensed electrician provided by the Contractor, the certified installers shall be on site if questions arise.
1.3 WARRANTY
Manufacturer's standard performance guarantees or warranties that extend beyond a 1 year period shall be provided for new furniture.
PART 2 PRODUCTS
2.1 FURNITURE
See CID Package, Appendix H
PART 3 EXECUTION
3.1 INSTALLATION PROCEDURES
Installation shall be completed in accordance with manufacturer's installation instructions and furniture installation drawings, and final design drawings. Material handling equipment shall have rubber wheels.
Components shall be installed level, plumb, square, and with proper alignment with adjoining furniture. Upon completion of installation, all furniture shall be completely finished, operational and functional per assembly manuals. The furniture components shall be securely interconnected and securely attached to the building where required. Three sets of special tools and equipment necessary for the relocation of panels and disassembly/reassembly of components from each manufacturer shall be furnished. Artwork shall be installed with security mount hardware provided by manufacturer.
SECTION 01 84 01 Page 3
3.2 BUILDING EXAMINATION AND PROTECTION
Contractor shall become familiar with details of the work, inspect all areas and conditions under which furniture is to be installed, and coordinate scheduling of dedicated elevators and docks with Contractor.
Contractor shall notify the Contracting Officer in writing of any conditions detrimental to the proper and timely completion of the installation. Work will proceed only when conditions have been corrected.
Building surfaces shall be protected to prevent soiling and damage during delivery and installation. Any soiling or damage that occurs to the building during the installation of furniture shall be cleaned and repaired by the Contractor and approved by the Contracting Officer.
3.3 CLEANING
All packing materials and other trash shall be removed from jobsite.
Contractor shall ensure that, after items have been installed, the area is clean and free of any debris. Upon completion of installation, all products shall be cleaned and polished per maintenance manuals and the area shall be left in a clean and neat condition . Any defects in material and installation shall be repaired. Damaged products that cannot be satisfactorily repaired shall be replaced. Furniture shall be protected from damage prior to acceptance by the Contracting Officer.
-- End of Section --
SECTION 01 84 01 Page 4
Base CE Admin Facility Ellsworth AFB, SD
Page - 2
QUESTIONS/RESPONSES/CLARIFICATIONS:
1. Question: Section 01 82-00/1.7.3 Exterior Glazing: Calls for the low 'e' coating to be on the #2 surface which puts the low 'e' on the grey pane of glass. Other projects have been changed to have the low 'e' coating on the #3 surface which puts the low 'e' on the clear laminated surface. Is this acceptable to do the same thing on this project? Having the low 'e' on the #2 surface is not readily available in this region.
Response: Placing the low 'e' coating on the #3 surface of the Insulated glazing unit results in a 20% reduction in performance of the units. Provide the low 'e' coating on the #2 surface as specified.
2. Question: Section 01 82 00/1.7.8 Exterior Doors and 01 82 00/1.7.3 Exterior windows: Exterior doors call for champagne anodized and exterior windows call for champagne metalic anodized. Are both finishes to be used or just one? Also our aluminum manufacturer does not anodize champagne finish any longer due to finish variances. Is painted champagne finish acceptable?
Response: Champagne 'Metalic' Anodized is incorrect. Replace with Champagne Anodized. A Painted champagne finish is not acceptable. Provide the Champagne Anodized finish as specified in Am_0001.
3. Question: Is aluminum soffit acceptable in lieu of the cement board soffit called for in section 01 82 00? Aluminum is a maintenance free material that will match closely with other architectural metals.
Response: Aluminum soffits are not acceptable.
4. Question: Option numbers per keynotes 2, 3, and 4 on plan sheet C111 do not match the option numbers and buildings on the price breakout sheet. The building numbers are different for each option. Please verify.
Response: Revised by Am_0002. See Reissued Pricing Schedule.
5. Question: Confirm that the furniture listed in appendix H is to be included in the contractor’s price proposal associated with solicitation W9128F-08-R- 0035. Also please confirm that the suppliers/manufactures specified are to base their pricing on current GSA schedules. We assume the government will purchase using the GSA price.
Response: Per Specifications Section 01 84 00, Page 9, paragraph 1.5.2:
furniture and installation of furniture, included in Appendix H is to be included in the contractor's proposal. Furniture price is Bid Option #5. See Section 01 84 01: Furniture Installation issued by Am_0002 for additional requirements.
6. Question: In section 00 22 00 page section 8.2.1 calls for a minimum of three sample projects while paragraph 8.2.1 indicates that proposal with fewer than four will reduce our rating. How many sample projects are required?
Response: Revised by Am_0002.
Page - 3
7. Question: Verify that the SSHO and CQC can be the same individual.
Response: Section 01 35 26 is revised by Am_0002. CQC Shares no other duties per Section 01 45 01
8. Question: Verify scope of commissioning.
Response: Commissioning is an assessed LEED point. Ultimately it is up to the Contractor to do final assessments to determine final point totals. Project is not required to have actual certification, but should have requirements (point totals) to achieve Silver Certification.
9. Question: Section 01-81-00, Summary of Work, Para. 1.2.4 discusses LEED requirements. It stated that the contractor must meet all prerequisites and those credits identified with a “Y” in the first column, as identified in Appendix A. Silver Certification requires 33-38 points. Is the contractor free to choose which credits are going to be obtained to achieve Silver Certification from the 40 pointes identified?
Response: Yes. The Contractor is the DOR and will make the final decisions and point assessments for achieving Silver Certification LEED point totals. Project is not required to have actual certification, but must be considered certifiable at a Silver Certification level.
10. Question: Verify that the steel material supplier is required to be AISC certified.
Response: See Unified Facilities Guide Specification Division 05, Part 1, Paragraph 1.5, AISC Certification is required.
11. Question: No mention of radon protection is mentioned. Are we required to provide a passive radon exhaust system for this building?
Response: None is required.
12. Question: Soils reports talks of varying ways to correct the existing soil condition and elevation charge which include a surcharge, drilled piers, or lowering building floor elevation. What is the minimum acceptable building floor elevation for the end user? Currently the FFE is 3240.
Response: The minimum acceptable building floor elevation is 3240.
13. Question: Specification Section 01-83-00, Para. 1.2.15.1 states in part that the foundation type proposed to be built by the contractor shall be based on recommendations contained in the Final Geotechnical Investigation Report, which shall be provided by the contractor. There is also a similar statement in Para. 1.2.15.3. Section 01-89-00, Para. 1.9.2 discusses requirements for Over-excavation. If the recommendations in our Final Geotechnical Investigation Report differ from what is described in Para.
1.9.2, are we at liberty to base our proposal on our Final Geotechnical Investigation Report?
Response: Yes. Para. 1.9.2. is revised by Am_0002. Recommendations are stated, however Contractor’s Final Geotechnical Report shall be basis of his design and construction (Note: Contractors Final Geotechnical Report will be reviewed under design process for demonstrating sound engineering practices).
Page - 4
14. Question: Confirm that Autocadd software (not Microstation) is acceptable for design documentation.
Response: Provide AutoCAD per Section 01 33 00.32, Para. 1.5.4.1.
15. Question: Is Specintact specification software required? Can we use a commercial format such as Masterformat spec writing software?
Response: Provide UFGS Guides in Specintact per Section 01 33 00.32, Para.
3.2.1.2. Requirements to exception of UFGS use stated in Para. 3.2.1.4
16. No criteria were provided for seed vs sod area or shrubbery or trees counts for the landscaping design. Are there any?
Response: Refer to Section 01 89 00, Para. 1.7.6 Landscaping Page 10. There are no trees or shrubbery required.
17. Question: The carpet descriptions seem to be conflicting. Are both CPT 1 and CPT 2 a 24"x24" tiles - CPT 2 states that it's a broadloom and also a 24"x24".
Response: Revised by Am_0002. CPT-2 is broadloom.
18. Question: The only place that Resiliant Sheet Vinyl is called out is in Common Stair C. Is this accurate? If so what materials are being used or specs for the stringers stringers, the stair nosing, and finally what base material is to be used (not specified on the finish schedule)?
Response: RSV-1 is used only on the Central Stair. Materials selection for stringer, nosing and base will follow after stair has been completely designed in the next phase of the project.
19. Question: In the readiness room there are risers, and the flooring material is carpet. What type of stair nosing and stringer material is to be spec'ed for this area?
Response: Revised by Am_0002. In room 110 EOC, the stair nosing and stringer shall match the resilient base in the room.
| SF30 (Am_0002) |
| Am_0002 Narrative |
| Section 00 11 00, Pricing Schedule - Pages 3 and 4 |