This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information in this notice. This announcement constitutes the only solicitation, quotes are being requested and a written solicitation will not be issued.
***Please read these instructions carefully.***
Solicitation number W9127S20Q0060 is issued as a request for quotation (RFQ).
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-07.
Set Aside, NAICS Code & Size Standard: This solicitation is set-aside for Small Business.
The NAICS Code 561210 and the applicable size standard of$41.5 million.
Description of requirements for the items to be acquired: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide general maintenance, electrical maintenance, and plumbing maintenance services according to the Performance Work Statement found on page 48-132
Date(s) and place(s) of delivery and acceptance and FOB point:
• Base Year - September 01 2020 (or date of award whichever is later) through August 31,
• Option Year I - September 01 2021 through August 31, 2022
• Option Year II - September 01 2022 through August 31, 2023
FOB: destination
SITE VISIT:
When: 1 September 2020 @ 10 AM Where: 1598 Lock and Dam Road, Russellville AR 72802 Offerors will be limited to two representatives and will be required to wear cloth face masks and comply with other social distancing guidelines found at: https://www.cdc.gov/
Contact Jennifer Hoban at 501-340-1747 if you will be attending no later than 31 August 2020. A teleconference option will be available and she will have that information.
The provision at 52.212-1 (Deviation), Instructions to Offerors -- Commercial, applies to this acquisition and a statement regarding any addenda to the provision. Offerors are also required to submit a completed copy of the Request for Quotation cover page and a completed copy of the quote schedule.
The provision at 52.212-2, Evaluation -- Commercial Items, is applicable to this solicitation.
Award will be based off equipment and staffing plan, experience, past performance, and price.
Offerors are required to include a completed copy of the provision at 52.212-3 Alt I, Offeror Representations and Certifications -- Commercial Items, with its quote.
The clause at 52.212-4, Contract Terms and Conditions -- Commercial Items, applies to this acquisition.
The clause at 52.212-5 (Deviation), Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition. Please see the Clauses Incorporated By Reference section for additional FAR Clauses applicable to this acquisition.
Quotes are due on September 11th at 1pm CST . Email submission of quotations are preferred in .pdf form, however Fax or Mail submissions are allowed.
Required Documents to Submit:
1. Request for Quotation cover page ( signed)
2. Completed (filled in) Provisions, as applicable
3. Quote Schedule with unit prices and total prices Offerors may provide a quote for schedule A, schedule B, schedule C or all schedules.
4. Signed Amendments, if applicable
When submitting your quote, be please make sure the solicitation number, W9127S20Q0060, is written in the subject line or on the outside of the envelope.
Email: Shelby .m.henson@usace.army.mil
Fax: (501)340-1249
If sending by mail, please submit your quotes to the following address:
US Army Corps of Engineers, Little Rock District Contracting Division, Attention: Shelby Henson 700 West Capitol A venue, Room 7315 Little Rock, AR 72201
If you have any questions regarding this solicitation, please contact:
Shelby Henson 501-340-1249 Shelby .m.henson@usace.army.mil
Offeror Name:
Offeror Address:
REQUEST FOR QUOTATION COVER PAGE
US Anny Corps of Engineers, Little Rock District
Contracting Division
700 West Capitol A venue Room 7315
Little Rock, AR 72203
W9127S20Q0060, IDIQ General Maintenance, Russellville Project
Office
Submitted by
Street ____________________________ _
City/State __________________________ _
Offeror Email Address:
Cage Code:
DUNS Number:
TIN:
Telephone Number:
Signature:
Date:
3 3
EST. UNIT EST.
CLIN# ITEM # DESCRIPTION QUANT UNIT PRICE $AMT.
0001 A0001 Normal Service Call - General Maintenance 25 EA
0002 A0002 Unscheduled Labor Hours 250 HR
0003 A0003 Material Costs 25000 EA 1.00$ 25,000.00$
0004 A0004 Replace/Install Fire Ring/Grill 25 EA
0005 A0005 Replace/Install Pedestal BBQ Grill 5 EA
0006 A0006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
0007 A0007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
0008 A0008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
0009 A0009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
0010 A0010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
0011 A0011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
0012 A0012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
0013 A0013 Landscape Timbers 2000 LF
0014 A0014 Wall Blocks 4000 LF
0015 A0015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
0016 A0016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
0017 A0017 Debris Removal 250 CY
0018 A0018 Repair/Replace Metal Roofing 3500 SF
0019 A0019 Repair/Replace Conventional (Shingle) Roofing 500 SF
0020 A0020 Removal of Old Roofing 200 CY
0021 A0021 Dump Truck with Operator 80 HR
0022 A0022 Backhoe with Operator 80 HR
0023 A0023 Bull Dozer with Operator 80 HR
0024 A0024 Vibratory Plate Compactor with Operator 25 HR
0025 A0025 Concrete Asphalt Saw with Operator 10 HR
0026 A0026 Mini Excavator with Operator 120 HR
0027 A0027 Man Lift with Operator 40 HR
0028 A0028 Compact Track Loader with Operator 120 HR
0029 A0029 Road Sweeper with Operator 80 HR
0030 A0030 Additional Equipment Attachements 120 HR
0031 A0031 Normal Service Call - Electrical 35 EA
0032 A0032 Emergency Service Call 10 EA
0033 A0033 Unscheduled Labor Hours 250 HR
0034 A0034 Replace/Install RV Electric Pedestal (30 AMP / 50 AMP) 60 EA
0035 A0035 Replace/Install Underground Electrical Lines 2500 LF
0036 A0036 Utility Road Crossing 100 LF
0037 A0037 Normal Service Call - Plumbing 35 EA
0038 A0038 Emergency Service Call 10 HR
0039 A0039 Unscheduled Labor Hours 250 HR
0040 A0040 Repair Underground Water Leak 15 EA
0041 A0041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
0042 A0042 Replace/Install Underground Waterline PEX 1/2" to 4" 1200 LF
0043 A0043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 750 LF
0044 A0044 Replace/Install Freezeless Water Hydrant 20 EA
0045 A0045 Replace/Install Sewer Lift Station Pump 4 EA
0046 A0046 Inspect Reduced Pressure Zone Assemblies (RPZ) 5 EA
0047 A0047 Remove & Clean Silt/Sand from Facilities 2500 SY
0048 A0048 Tractor with Operator 60 HR
BID SCHEDULE
SCHEDULE A (OZARK) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
BASE PERIOD
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
(MKARNS) for the period of 15, September 2020, or date of award which ever is later, through 31 August 2021.
SCHEDULE A - BASE PERIOD - LINE ITEM A0001 - A0048 TOTAL:
0052 B0004 Replace/Install Fire Ring/Grill 25 EA
0053 B0005 Replace/Install Pedestal BBQ Grill 5 EA
0054 B0006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
0055 B0007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
0056 B0008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
0057 B0009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
0058 B0010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
0059 B0011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
0060 B0012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
0061 B0013 Landscape Timbers 2000 LF
0062 B0014 Wall Blocks 4000 LF
0063 B0015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
0064 B0016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
0065 B0017 Debris Removal 250 CY
0066 B0018 Repair/Replace Metal Roofing 3500 SF
0067 B0019 Repair/Replace Conventional (Shingle) Roofing 500 SF
0068 B0020 Removal of Old Roofing 200 CY
0069 B0021 Dump Truck with Operator 80 HR
0070 B0022 Backhoe with Operator 80 HR
0071 B0023 Bull Dozer with Operator 80 HR
0072 B0024 Vibratory Plate Compactor with Operator 25 HR
0073 B0025 Concrete Asphalt Saw with Operator 10 HR
0074 B0026 Mini Excavator with Operator 120 HR
0075 B0027 Man Lift with Operator 40 HR
0076 B0028 Compact Track Loader with Operator 120 HR
0077 B0029 Road Sweeper with Operator 80 HR
0078 B0030 Additional Equipment Attachements 120 HR
0079 B0031 Normal Service Call - Electrical 35 EA
0080 B0032 Emergency Service Call 10 EA
0081 B0033 Unscheduled Labor Hours 250 HR
0082 B0034 Replace/Install RV Electric Pedestal (30 AMP/ 50AMP) 60 EA
0083 B0035 Replace/Install Underground Electrical Lines 2500 LF
0084 B0036 Utility Road Crossing 100 LF
0085 B0037 Normal Service Call - Plumbing 35 EA
0086 B0038 Emergency Service Call 10 HR
0087 B0039 Unscheduled Labor Hours 250 HR
0088 B0040 Repair Underground Water Leak 15 EA
0089 B0041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
0090 B0042 Replace/ Install Underground Waterline PEX 1/2'' to 4'' 1200 LF
0091 B0043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 500 LF
0092 B0044 Replace/Install Freezeless Water Hydrant 20 EA
0093 B0045 Inspect Reduced Pressure Zone Assemblies (RPZ) 8 EA
0094 B0046 Remove & Clean Silt/ Sand from Facilities 800 SY
0095 B0047 Tractor with Operator 60 HR
SCHEDULE B - BASE PERIOD - LINE ITEM B0001 - B0047 TOTAL:
EST. UNIT EST.
CLIN# ITEM # DESCRIPTION QUANT UNIT PRICE $AMT.
0049 B0001 Normal Service Call - General Maintenance 25 EA
0050 B0002 Unscheduled Labor Hours 250 HR
0051 B0003 Material Costs 25000 EA $ 25,000.00 1.00 $
BASE PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., SCHEDULE B (DARDANELLE) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
(MKARNS) for the period of 1 September 2020 through 31 August 2021.
0096 C0001 Normal Service Call - General Maintenance 25 EA
0097 C0002 Unscheduled Labor Hours 250 HR
0098 C0003 Material Costs 25000 EA 1.00$ 25,000.00$
0099 C0004 Replace/Install Fire Ring/Grill 25 EA
0100 C0005 Replace/Install Pedestal BBQ Grill 5 EA
0101 C0006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
0102 C0007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
0103 C0008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
0104 C0009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
0105 C0010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
0106 C0011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
0107 C0012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
0108 C0013 Landscape Timbers 2000 LF
0109 C0014 Wall Blocks 6000 LF
0110 C0015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
0111 C0016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
0112 C0017 Debris Removal 400 CY
0113 C0018 Repair/Replace Metal Roofing 3500 SF
0114 C0019 Repair/Replace Conventional (Shingle) Roofing 500 SF
0115 C0020 Removal of Old Roofing 200 CY
0116 C0021 Dump Truck with Operator 80 HR
0117 C0022 Backhoe with Operator 80 HR
0118 C0023 Bull Dozer with Operator 80 HR
0119 C0024 Vibratory Plate Compactor with Operator 25 HR
0120 C0025 Concrete Asphalt Saw with Operator 10 HR
0121 C0026 Mini Excavator with Operator 120 HR
0122 C0027 Man Lift with Operator 40 HR
0123 C0028 Compact Track Loader with Operator 120 HR
0124 C0029 Road Sweeper with Operator 80 HR
0125 C0030 Additional Equipment Attachements 120 HR
0126 C0031 Normal Service Call - Electrical 35 EA
0127 C0032 Emergency Service Call 10 EA
0128 C0033 Unscheduled Labor Hours 250 HR
0129 C0034 Replace/Install RV Electric Pedestal (30 AMP/ 50AMP) 60 EA
0130 C0035 Replace/Install Underground Electrical Lines 2500 LF
0131 C0036 Utility Road Crossing 100 LF
0132 C0037 Normal Service Call - Plumbing 35 EA
0133 C0038 Emergency Service Call 10 HR
0134 C0039 Unscheduled Labor Hours 250 HR
0135 C0040 Repair Underground Water Leak 15 EA
0136 C0041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
0137 C0042 Replace/ Install Underground Waterline PEX 1/2'' to 4'' 1200 LF
0138 C0043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 500 LF
0139 C0044 Replace/Install Freezeless Water Hydrant 20 EA
0140 C0045 Inspect Reduced Pressure Zone Assemblies (RPZ) 8 EA
0141 C0046 Remove & Clean Silt/Sand from Facilities 3500 SY
0142 C0047 Tractor with Operator 60 HR
TOTAL BASE YEAR -$
SCHEDULE C - BASE PERIOD - LINE ITEM C0001 - C0047 TOTAL:
SCHEDULE C (TOAD SUCK) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
(MKARNS) for the period of 1 September 2020 through 31 August 2021.
BASE PERIOD - BID SHEET
to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 1001 A1001 Normal Service Call - General Maintenance 25 EA
1002 A1002 Unscheduled Labor Hours 250 HR
1003 A1003 Material Costs 30000 EA 1.00$ 30,000.00$
1004 A1004 Replace/Install Fire Ring/Grill 25 EA
1005 A1005 Replace/Install Pedestal BBQ Grill 5 EA
1006 A1006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
1007 A1007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
1008 A1008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
1009 A1009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
1010 A1010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
1011 A1011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
1012 A1012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
1013 A1013 Landscape Timbers 2000 LF
1014 A1014 Wall Blocks 6000 LF
1015 A1015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
1016 A1016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
1017 A1017 Debris Removal 250 CY
1018 A1018 Repair/Replace Metal Roofing 3500 SF
1019 A1019 Repair/Replace Conventional (Shingle) Roofing 500 SF
1020 A1020 Removal of Old Roofing 200 CY
1021 A1021 Dump Truck with Operator 80 HR
1022 A1022 Backhoe with Operator 80 HR
1023 A1023 Bull Dozer with Operator 80 HR
1024 A1024 Vibratory Plate Compactor with Operator 25 HR
1025 A1025 Concrete Asphalt Saw with Operator 10 HR
1026 A1026 Mini Excavator with Operator 120 HR
1027 A1027 Man Lift with Operator 40 HR
1028 A1028 Compact Track Loader with Operator 120 HR
1029 A1029 Road Sweeper with Operator 80 HR
1030 A1030 Additional Equipment Attachements 120 HR
1031 A1031 Normal Service Call - Electrical 35 EA
1032 A1032 Emergency Service Call 10 EA
1033 A1033 Unscheduled Labor Hours 250 HR
1034 A1034 Replace/Install RV Electric Pedestal (30 AMP / 50 AMP) 60 EA
1035 A1035 Replace/Install Underground Electrical Lines 2500 LF
1036 A1036 Utility Road Crossing 100 LF
1037 A1037 Normal Service Call - Plumbing 35 EA
1038 A1038 Emergency Service Call 10 HR
1039 A1039 Unscheduled Labor Hours 250 HR
1040 A1040 Repair Underground Water Leak 15 EA
1041 A1041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
1042 A1042 Replace/Install Underground Waterline PEX 1/2" to 4" 1200 LF
1043 A1043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 750 LF
1044 A1044 Replace/Install Freezeless Water Hydrant 20 EA
1045 A1045 Replace/Install Sewer Lift Station Pump 4 EA
1046 A1046 Inspect Reduced Pressure Zone Assemblies (RPZ) 5 EA
1047 A1047 Remove & Clean Silt/Sand from Facilities 2500 SY
1048 A1048 Tractor 60 HR
SCHEDULE A - OPTION 01 - LINE ITEM A1001 - A1048 TOTAL:
to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
(MKARNS) for the period of 1 September 2021 through 31 August 2022.
BID SCHEDULE
SCHEDULE A (OZARK) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
OPTION 01
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 1049 B1001 Normal Service Call - General Maintenance 25 EA
1050 B1002 Unscheduled Labor Hours 250 HR
1051 B1003 Material Costs 30000 EA 1.00$ 30,000.00$
1052 B1004 Replace/Install Fire Ring/Grill 25 EA
1053 B1005 Replace/Install Pedestal BBQ Grill 5 EA
1054 B1006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
1055 B1007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
1056 B1008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
1057 B1009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
1058 B1010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
1059 B1011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
1060 B1012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
1061 B1013 Landscape Timbers 2000 LF
1062 B1014 Wall Blocks 6000 LF
1063 B1015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
1064 B1016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
1065 B1017 Debris Removal 250 CY
1066 B1018 Repair/Replace Metal Roofing 3500 SF
1067 B1019 Repair/Replace Conventional (Shingle) Roofing 500 SF
1068 B1020 Removal of Old Roofing 200 CY
1069 B1021 Dump Truck with Operator 80 HR
1070 B1022 Backhoe with Operator 80 HR
1071 B1023 Bull Dozer with Operator 80 HR
1072 B1024 Vibratory Plate Compactor with Operator 25 HR
1073 B1025 Concrete Asphalt Saw with Operator 10 HR
1074 B1026 Mini Excavator with Operator 120 HR
1075 B1027 Man Lift with Operator 40 HR
1076 B1028 Compact Track Loader with Operator 120 HR
1077 B1029 Road Sweeper with Operator 80 HR
1078 B1030 Additional Equipment Attachements 120 HR
1079 B1031 Normal Service Call - Electrical 35 EA
1080 B1032 Emergency Service Call 10 EA
1081 B1033 Unscheduled Labor Hours 250 HR
1082 B1034 Replace/Install RV Electric Pedestal (30 AMP/ 50AMP) 60 EA
1083 B1035 Replace/Install Underground Electrical Lines 2500 LF
1084 B1036 Utility Road Crossing 100 LF
1085 B1037 Normal Service Call - Plumbing 35 EA
1086 B1038 Emergency Service Call 10 HR
1087 B1039 Unscheduled Labor Hours 250 HR
1088 B1040 Repair Underground Water Leak 15 EA
1089 B1041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
1090 B1042 Replace/ Install Underground Waterline PEX 1/2'' to 4'' 1200 LF
1091 B1043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 500 LF
1092 B1044 Replace/Install Freezeless Water Hydrant 20 EA
1093 B1045 Inspect Reduced Pressure Zone Assemblies (RPZ) 8 EA
1094 B1046 Remove & Clean Silt/ Sand from Facilities 800 SY
1095 B1047 Tractor with Operator 60 HR to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
(MKARNS) for the period of 1 September 2021 through 31 August 2022.
SCHEDULE B - OPTION 01 - LINE ITEM B1001 - B1047 TOTAL:
SCHEDULE B (DARDANELLE) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
OPTION 01 - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 1096 C1001 Normal Service Call - General Maintenance 25 EA
1097 C1002 Unscheduled Labor Hours 250 HR
1098 C1003 Material Costs 30000 EA 1.00$ 30,000.00$
1099 C1004 Replace/Install Fire Ring/Grill 25 EA
1100 C1005 Replace/Install Pedestal BBQ Grill 5 EA
1101 C1006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
1102 C1007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
1103 C1008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
1104 C1009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
1105 C1010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
1106 C1011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
1107 C1012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
1008 C1013 Landscape Timbers 2000 LF
1109 C1014 Wall Blocks 6000 LF
1110 C1015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
1111 C1016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
1112 C1017 Debris Removal 400 CY
1113 C1018 Repair/Replace Metal Roofing 3500 SF
1114 C1019 Repair/Replace Conventional (Shingle) Roofing 500 SF
1115 C1020 Removal of Old Roofing 200 CY
1116 C1021 Dump Truck with Operator 80 HR
1117 C1022 Backhoe with Operator 80 HR
1118 C1023 Bull Dozer with Operator 80 HR
1119 C1024 Vibratory Plate Compactor with Operator 25 HR
1120 C1025 Concrete Asphalt Saw with Operator 10 HR
1121 C1026 Mini Excavator with Operator 120 HR
1122 C1027 Man Lift with Operator 40 HR
1123 C1028 Compact Track Loader with Operator 120 HR
1124 C1029 Road Sweeper with Operator 80 HR
1125 C1030 Additional Equipment Attachements 120 HR
1126 C1031 Normal Service Call - Electrical 35 EA
1127 C1032 Emergency Service Call 10 EA
1128 C1033 Unscheduled Labor Hours 250 HR
1129 C1034 Replace/Install RV Electric Pedestal (30 AMP/ 50AMP) 60 EA
1130 C1035 Replace/Install Underground Electrical Lines 2500 LF
1131 C1036 Utility Road Crossing 100 LF
1132 C1037 Normal Service Call - Plumbing 35 EA
1133 C1038 Emergency Service Call 10 HR
1134 C1039 Unscheduled Labor Hours 250 HR
1135 C1040 Repair Underground Water Leak 15 EA
1136 C1041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
1137 C1042 Replace/ Install Underground Waterline PEX 1/2'' to 4'' 1200 LF
1138 C1043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 500 LF
1139 C1044 Replace/Install Freezeless Water Hydrant 20 EA
1140 C1045 Inspect Reduced Pressure Zone Assemblies (RPZ) 8 EA
1141 C1046 Remove & Clean Silt/Sand from Facilities 3500 SY
1142 C1047 Tractor with Operator 60 HR
(MKARNS) for the period of 1 September 2021 through 31 August 2022.
SCHEDULE C - OPTION 01 - LINE ITEM C1001 - C1047 TOTAL:
SCHEDULE C (TOAD SUCK) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
OPTION 01 - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
TOTAL OPTION 01
2001 A2001 Normal Service Call - General Maintenance 25 EA
2002 A2002 Unscheduled Labor Hours 250 HR
2003 A2003 Material Costs 30000 EA 1.00$ 30,000.00$
2004 A2004 Replace/Install Fire Ring/Grill 25 EA
2005 A2005 Replace/Install Pedestal BBQ Grill 5 EA
2006 A2006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
2007 A2007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
2008 A2008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
2009 A2009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
2010 A2010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
2011 A2011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
2012 A2012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
2013 A2013 Landscape Timbers 2000 LF
2014 A2014 Wall Blocks 6000 LF
2015 A2015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
2016 A2016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
2017 A2017 Debris Removal 250 CY
2018 A2018 Repair/Replace Metal Roofing 3500 SF
2019 A2019 Repair/Replace Conventional (Shingle) Roofing 500 SF
2020 A2020 Removal of Old Roofing 200 CY
2021 A2021 Dump Truck with Operator 80 HR
2022 A2022 Backhoe with Operator 80 HR
2023 A2023 Bull Dozer with Operator 80 HR
2024 A2024 Vibratory Plate Compactor with Operator 25 HR
2025 A2025 Concrete Asphalt Saw with Operator 10 HR
2026 A2026 Mini Excavator with Operator 120 HR
2027 A2027 Man Lift with Operator 40 HR
2028 A2028 Compact Track Loader with Operator 120 HR
2029 A2029 Road Sweeper with Operator 80 HR
2030 A2030 Additional Equipment Attachements 120 HR
2031 A2031 Normal Service Call - Electrical 35 EA
2032 A2032 Emergency Service Call 10 EA
2033 A2033 Unscheduled Labor Hours 250 HR
2034 A2034 Replace/Install RV Electric Pedestal (30 AMP / 50 AMP) 60 EA
2035 A2035 Replace/Install Underground Electrical Lines 2500 LF
2036 A2036 Utility Road Crossing 100 LF
2037 A2037 Normal Service Call - Plumbing 35 EA
2038 A2038 Emergency Service Call 10 HR
2039 A2039 Unscheduled Labor Hours 250 HR
2040 A2040 Repair Underground Water Leak 15 EA
2041 A2041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
2042 A2042 Replace/Install Underground Waterline PEX 1/2" to 4" 1200 LF
2043 A2043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 750 LF
2044 A2044 Replace/Install Freezeless Water Hydrant 20 EA
2045 A2045 Replace/Install Sewer Lift Station Pump 4 EA
2046 A2046 Inspect Reduced Pressure Zone Assemblies (RPZ) 5 EA
2047 A2047 Remove & Clean Silt/Sand from Facilities 2500 SY
2048 A2048 Tractor with Operator 60 HR
SCHEDULE A - OPTION 02 - LINE ITEM A2001 - A2048 TOTAL:
to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
(MKARNS) for the period of 1 September 2022 through 31 August 2023.
BID SCHEDULE
SCHEDULE A (OZARK) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
OPTION 02
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 2049 B2001 Normal Service Call - General Maintenance 25 EA
2050 B2002 Unscheduled Labor Hours 250 HR
2051 B2003 Material Costs 30000 EA 1.00$ 30,000.00$
2052 B2004 Replace/Install Fire Ring/Grill 25 EA
2053 B2005 Replace/Install Pedestal BBQ Grill 5 EA
2054 B2006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
2055 B2007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
2056 B2008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
2057 B2009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
2058 B2010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
2059 B2011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
2060 B2012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
2061 B2013 Landscape Timbers 2000 LF
2062 B2014 Wall Blocks 6000 LF
2063 B2015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
2064 B2016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
2065 B2017 Debris Removal 250 CY
2066 B2018 Repair/Replace Metal Roofing 3500 SF
2067 B2019 Repair/Replace Conventional (Shingle) Roofing 500 SF
2068 B2020 Removal of Old Roofing 200 CY
2069 B2021 Dump Truck with Operator 80 HR
2070 B2022 Backhoe with Operator 80 HR
2071 B2023 Bull Dozer with Operator 80 HR
2072 B2024 Vibratory Plate Compactor with Operator 25 HR
2073 B2025 Concrete Asphalt Saw with Operator 10 HR
2074 B2026 Mini Excavator with Operator 120 HR
2075 B2027 Man Lift with Operator 40 HR
2076 B2028 Compact Track Loader with Operator 120 HR
2077 B2029 Road Sweeper with Operator 80 HR
2078 B2030 Additional Equipment Attachements 120 HR
2079 B2031 Normal Service Call - Electrical 35 EA
2080 B2032 Emergency Service Call 10 EA
2081 B2033 Unscheduled Labor Hours 250 HR
2082 B2034 Replace/Install RV Electric Pedestal (30 AMP/ 50AMP) 60 EA
2083 B2035 Replace/Install Underground Electrical Lines 2500 LF
2084 B2036 Utility Road Crossing 100 LF
2085 B2037 Normal Service Call - Plumbing 35 EA
2086 B2038 Emergency Service Call 10 HR
2087 B2039 Unscheduled Labor Hours 250 HR
2088 B2040 Repair Underground Water Leak 15 EA
2089 B2041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
2090 B2042 Replace/ Install Underground Waterline PEX 1/2'' to 4'' 1200 LF
2091 B2043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 500 LF
2092 B2044 Replace/Install Freezeless Water Hydrant 20 EA
2093 B2045 Inspect Reduced Pressure Zone Assemblies (RPZ) 8 EA
2094 B2046 Remove & Clean Silt/ Sand from Facilities 800 SY
2095 B2047 Tractor with Operator 60 HR
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
(MKARNS) for the period of 1 September 2022 through 31 August 2023.
SCHEDULE B - OPTION 02 - LINE ITEM B2001 - B2047 TOTAL:
SCHEDULE B (DARDANELLE) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
OPTION 02 - BID SHEET
2094 C2001 Normal Service Call - General Maintenance 25 EA
2095 C2002 Unscheduled Labor Hours 250 HR
2096 C2003 Material Costs 30000 EA 1.00$ 30,000.00$
2097 C2004 Replace/Install Fire Ring/Grill 25 EA
2098 C2005 Replace/Install Pedestal BBQ Grill 5 EA
2099 C2006 Topsoil (Contractor Purchase, Delivered, Spread) 60 TN
2100 C2007 Fill Material (Contractor Purchase, Delivered, Spread) 40 TN
2101 C2008 Screening Material (Contractor Purchase, Delivered, Spread) 180 TN
2102 C2009 Aggregate Base Material (Contractor Purchase, Delivered, Spread) 120 TN
2103 C2010 Sand (Contractor Purchase, Delivered, Spread) 60 TN
2104 C2011 Quarry Run Stone (Contractor Purchase, Delivered, Spread) 100 TN
2105 C2012 B-Stone (Contractor Purchase, Delivered, Spread) 120 TN
2106 C2013 Landscape Timbers 2000 LF
2107 C2014 Wall Blocks 6000 LF
2108 C2015 Four Inch Thick Concrete Slab (Contractor Provided) 3500 SF
2109 C2016 Six Inch Thick Concrete Slab (Contractor Provided) 3000 SF
2110 C2017 Debris Removal 400 CY
2111 C2018 Repair/Replace Metal Roofing 3500 SF
2112 C2019 Repair/Replace Conventional (Shingle) Roofing 500 SF
2113 C2020 Removal of Old Roofing 200 CY
2114 C2021 Dump Truck with Operator 80 HR
2115 C2022 Backhoe with Operator 80 HR
2116 C2023 Bull Dozer with Operator 80 HR
2117 C2024 Vibratory Plate Compactor with Operator 25 HR
2118 C2025 Concrete Asphalt Saw with Operator 10 HR
2119 C2026 Mini Excavator with Operator 120 HR
2120 C2027 Man Lift with Operator 40 HR
2121 C2028 Compact Track Loader with Operator 120 HR
2122 C2029 Road Sweeper with Operator 80 HR
2123 C2030 Additional Equipment Attachements 120 HR
2124 C2031 Normal Service Call - Electrical 35 EA
2125 C2032 Emergency Service Call 10 EA
2126 C2033 Unscheduled Labor Hours 250 HR
2127 C2034 Replace/Install RV Electric Pedestal (30 AMP/ 50AMP) 60 EA
2128 C2035 Replace/Install Underground Electrical Lines 2500 LF
2129 C2036 Utility Road Crossing 100 LF
2130 C2037 Normal Service Call - Plumbing 35 EA
2131 C2038 Emergency Service Call 10 HR
2132 C2039 Unscheduled Labor Hours 250 HR
2133 C2040 Repair Underground Water Leak 15 EA
2134 C2041 Replace/Install Underground Waterline PVC 1/2" to 4" 1000 LF
2135 C2042 Replace/ Install Underground Waterline PEX 1/2'' to 4'' 1200 LF
2136 C2043 Replace/Install Underground Sewer Line PVC 2" to 4" S&D 500 LF
2137 C2044 Replace/Install Freezeless Water Hydrant 20 EA
2138 C2045 Inspect Reduced Pressure Zone Assemblies (RPZ) 8 EA
2139 C2046 Remove & Clean Silt/Sand from Facilities 3500 SY
2140 C2047 Tractor with Operator 60 HR to provide maintenance services as described in the Performance Work Statement at Russellville Site Office
(MKARNS) for the period of 1 September 2022 through 31 August 2023.
SCHEDULE C - OPTION 02 - LINE ITEM C2001 - C2047 TOTAL:
SCHEDULE C (TOAD SUCK) GENERAL MAINTENANCE - RUSSELLVILLE SITE OFFICE
OPTION 02 - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., TOTAL OPTION 02 -$
W9127S20Q0060
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government OCT 1995
(JUN 2020) -- Alternate I 52.203-13 Contractor Code of Business Ethics and Conduct JUN2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality JAN2017
Agreements or Statements 52.204-7 System for Award Management OCT 2018 52.204-10 Reporting Executive Compensation and First-Tier JUN 2020
Subcontract Awards 52.204-13 System for Award Management Maintenance OCT 2018 52.204-15 Service Contract Reporting Requirements for Indefinite- OCT 2016
Delivery Contracts 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and DEC 2014
Certifications.
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and DEC 2019
Video Surveillance Services or Equipment.
52.204-26 Covered Telecommunications Equipment or Services-- DEC 2019
Representation.
52.209-9 Updates of Publicly Available Information Regarding OCT 2018
Responsibility Matters 52.209-10 Prohibition on Contracting With Inverted Domestic NOV 2015
Corporations
W9127S20Q0060
Page 220 of222
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture. [The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: .] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(l) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(l) of this clause.] The Contractor represents that--
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUB Zone representation.
[Contractor to sign and date and insert authorized signer's name and title.]
(End of clause)
52.222-42 STATEMENT OF EQUIVALENT RA TES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION Employee Class Monetary Wage-Fringe Benefits
Laborer Grounds Maintenance $11.23
52.233-2 SERVICE OF PROTEST (SEP 2006)
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.
CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes
No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes
No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
Jennifer Hoban – 501-340-1747 U.S. ARMY CORPS OF ENGINEERS| 1598 LOCK AND DAM ROAD, RUSSELLVILLE, ARKANSAS 72802
GENERAL MAINTENANCE
COUNTIES INCLUDE CRAWFORD, SEBASTIAN, FRANKLIN,
LOGAN, JOHNSON, POPE, YELL, CONWAY, PERRY, FAULKNER,
AND PULASKI
US ARMY CORPS OF ENGINEERS
LITTLE ROCK DISTRICT
RUSSELLVILLE SITE OFFICE
PERFORMANCE WORK STATEMENT (PWS)
GENERAL MAINTENANCE, ELECTRICAL MAINTENANCE, PLUMBING MAINTENANCE
RUSSELLVILLE SITE OFFICE
PART 1 - GENERAL INFORMATION
1. GENERAL:
This is a non-personnel services contract to provide general maintenance, electrical maintenance, and plumbing maintenance services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction:
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform general maintenance, electrical maintenance, and plumbing maintenance services as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background:
The Russellville Site Office and Dardanelle Lock and Dam are located at Arkansas River navigation mile 205.5 in Pope and Yell counties, Arkansas, at the north edge of Dardanelle and the southwest edge of Russellville. The Russellville Site Office has authority over areas located from Murray Lock and Dam located in Little Rock to Trimble Lock and Dam located in Barling Arkansas. The McClellan Kerr Arkansas River Navigation System (MKARNS) is a multipurpose system. It was developed and is maintained for navigation, power generation, environmental stewardship, and recreational purposes.
1.3 Objectives:
Perform general maintenance, electrical maintenance, and plumbing maintenance services in a satisfactorily and timely manner according to the performance work statement.
1.4 Scope:
The intent of this contract is to provide general maintenance, electrical maintenance, and plumbing maintenance services at Russellville Site Office. Services include but not limited to general maintenance, performing electrical and plumbing repairs and installation. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, equipment, transportation, and vehicles, except as otherwise provided for herein, necessary to assure that all services are performed in accordance with the contract specifications, drawings, attachments, exhibits, and all applicable laws, regulations, codes, or directives. The Contractor shall accomplish work in a timely and satisfactorily manner.
1.5 Period of Performance:
The period of performance shall be for one (1) Base Year of approximately 12 months and two (2) 12-month option years. The Period of Performance reads as follows:
Base Year – September 1, 2020 through August 31, 2021 Option Year I – September 1, 2021 through August 31, 2022 Option Year II – September 1, 2022 through August 31, 2023
1.6 General Information
1.6.1 Quality Control (QC):
In order to assure that the desired level of performance of a service is achieved, the contractor shall establish and implement a quality control plan to ensure contract compliance, establish procedures for inspection and monitor and control the quality of the service. The QC Plan shall include the identification of all contractor personnel, organizational structure, lines of authority and services to be performed. Contractor shall provide a Daily Quality Control Inspection schedule to the Government Representative to determine if services meet the contract requirements and specifications. It is the contractor’s responsibility to correct deficiencies and check the consistency of quality throughout each service, and the plan shall outline whatever actions the contractor deems necessary to provide contract standards for quality control throughout all areas of responsibility. The Quality Control Plan shall be submitted to the COR at the Russellville Site Office. An electronic copy of the plan must be submitted and accepted within 2 weeks of award of the contract. Revisions of the QCP shall be submitted to the COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the COR’s acceptance in writing of any proposed change to his QC system.
1.6.1.1 Contractor Quality Control Plan (CQCP):
The contractor shall assume full responsibility for the quality of all services performed under this contract. The contractors’ quality control plan shall provide an effective level of quality control to ensure that all services are performed in accordance with the specifications and requirements, instructions, provisions, drawings and maps herein, of this contract. The contractor shall establish and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
1.6.1.1.1 CQCP Contents:
Contractors Quality Control Plan shall include, as a minimum, the following items:
1. Contractor organizational structure
2. Contractor personnel and qualifications
3. Work schedule
4. Submittals schedule
5. Inspection requirements and schedule
6. Contractors Quality Control Procedures
7. Documentation…