Q-A_V-1.pdf
PDF 182 KB Posted
- Attached to
- Leadership Challenge Workshop
- Solicitation number
- W9127P19P005A
About this file
Questions & Answers Version 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q-A_V-3.pdf | ||
| Q-A_V-2.pdf | ||
| A01_-_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W9127P-19-Q-005A
Q&A V-1
1. With regards to the facility, are you anticipating that the Contractor provide meals to the attendees during each session?
A: There is no anticipation for the contractor to provide meals. The only anticipated expectation would be for them to provide coffee/tea throughout the workshops.
2. Are you referring to the prerequisite work?
If so: No prerequisite work can be administered without the contract being completed.
3. Are the workshop participants supposed to be assembled in teams or should the focus be on targeted training from an individual's perspective?
The workshops themselves focus on the Individual perspective. The prerequisite work for LCP II requires some peer to peer work before the workshop. Which will be conducted by the VI
ARNG.
4. With regard to this solicitation, will the customer provide the classroom or is this something the vendor will need to provide?
The venue will be provided by the contractor.
5. Is there is an incumbent contractor currently performing these services, if similar services have been performed in the past, or if this is a new requirement. If there is an incumbent, could you please provide the contract or task order number?
There is no current contractor – this is a one-time training event.
File details come from the government source that posted it.