Blair Hangar Q A V.1.pdf

PDF 93 KB Posted

Attached to
Blair Hangar Drainage Correction Federal contract opportunity
Solicitation number
W9127P-12-B-0004
Issued by
Department of the Army Virgin Islands Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Blair Hangar Drainage Correction, newest first.
File Type Posted
OP1419 Abstact for Blair Hangar.pdf PDF
Site Visit Blair Hangar attendance.pdf PDF
Blair Hanger Drainage SOW V.1.pdf PDF
1442 for W9127P-12-B-0004 - Blair Hangar Project.pdf PDF
Blair Hanger Drainage SOW.pdf PDF
BLAIR HANGER DWGs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL GUARD BUREAU

UNITED STATES PROPERTY AND FISCAL OFFICE

FOR THE U.S. VIRGIN ISLANDS

RURAL ROUTE 2, BOX 9200

KINGSHILL, VI 00850-9731

25 July 2012

QUESTIONS AND ANSWERS V.1

BLAIR HANGAR PROJECT

1. New curb and fencing/gate will require work on secure side of airport. Will Customs Bond be required for this? Will there be any additional security related requirements?

a. There will be a requirement to comply with the Port Authority access requirements for that side.

2. Will temp security fencing be required during construction of new curb and fence?

a. Yes, 6" of construction barrier is acceptable.

3. Route from parking lot through middle of the hangar appears to be the easiest route for equipment and trucks (backhoe, concrete truck, etc.). Please confirm this access will be allowed, or specify alternate access route.

a. Yes coordinated access through there is acceptable except for tracked equipment. If tracked equipment is used then we will open the fence on the East side of the Hanger.

4. Bid form has not been distributed. Please provide or advise if we can submit our own format.

a. Please use the 1442 form that was uploaded.

5. Is the design intent to utilize the existing gate operator and controls? If not, please advise of the type of system required.

a. Yes

6. Contract term (time) was not specified. Please advise. Alternately, please advise if contractor is to propose project duration.

7. Will liquidated damages be assessed?

a. The only ‘damages’ are if the runway access is denied longer than agreed and scheduled.

See the Statement of Work under Hours of Work.

8. Is a bid guarantee required?

9. Will payment and performance bonds be required?

10. Please confirm contractor is not responsible for permits

a. Contractor not responsible for permits.