CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Dock and Undock Vessel; accomplish | 5.1.1 | 1 | Job | $ - 0 | $ - 0 |
| Drydock Lay Day Services; provide | 5.1.2 | 30 | Day | $ - 0 | $ - 0 |
| Wet Berth for Vessel; provide | 5.1.3 | 44 | Day | $ - 0 | $ - 0 |
| Electrical Power; provide | 5.1.5 | 1 | Job | $ - 0 | $ - 0 |
| Steam Service; provide | 5.1.6 | 1 | Job | $ - 0 | $ - 0 |
| Compressed Air Service; provide | 5.1.7 | 1 | Job | $ - 0 | $ - 0 |
| Potable Water Service; provide | 5.1.8 | 1 | Job | $ - 0 | $ - 0 |
| Sanitation Service; provide | 5.1.9 | 1 | Job | $ - 0 | $ - 0 |
| Internet Service; provide | 5.1.10 | 1 | Job | $ - 0 | $ - 0 |
| Vessel Services; connect and disconnect | 5.1.11 | 1 | Job | $ - 0 | $ - 0 |
| Transportation; provide | 5.1.12 | 1 | Job | $ - 0 | $ - 0 |
| Crane Service; provide | 5.1.13 | 1 | Job | $ - 0 | $ - 0 |
| Office Space; provide | 5.1.14 | 74 | Day | $ - 0 | $ - 0 |
| Parking Spaces; provide | 5.1.15 | 34 | Each | $ - 0 | |
| Underwater Hull; pressure wash | 5.2.1 | 1 | Job | $ - 0 | $ - 0 |
| Chain lockers; open, clean, and inspect | 5.2.2 | 1 | Job | $ - 0 | $ - 0 |
| Slops and Dirty Oil Tanks; clean and gas free | 5.2.4 | 1 | Job | $ - 0 | $ - 0 |
| Bilges; clean and maintain | 5.2.5 | 1 | Job | $ - 0 | $ - 0 |
| ABS Survey Support; provide | 5.2.8 | 1 | Job | $ - 0 | $ - 0 |
| Incline Test Support; Provide | 5.2.9 | 1 | Job | $ - 0 | $ - 0 |
| Dock and Sea Trials; accomplish | 5.2.10 | 1 | Job | $ - 0 | $ - 0 |
| Hull Anoeds; Replace | 5.3.3 | 1 | Job | $ - 0 | $ - 0 |
| Keel Cooler Anodes; replace | 5.3.4 | 1 | Job | $ - 0 | $ - 0 |
| Engine Room Hatch and Weather Deck; preserve | 5.3.5 | 1 | Job | $ - 0 | $ - 0 |
| Forecastle Weather Deck: Preserve | 5.3.6 | 1 | Job | $ - 0 | $ - 0 |
| Trunnion Spaces; preserve | 5.3.7 | 1 | Job | $ - 0 | $ - 0 |
| Crane Catwalk Frame; Preserve | 5.3.8 | 1 | Job | $ - 0 | $ - 0 |
| Bow Thruster Tunnel; repair | 5.3.9 | 1 | Job | $ - 0 | $ - 0 |
| Steel Deck Insert (Swell Comp); Accomplish | 5.3.10 | 1 | Job | $ - 0 | $ - 0 |
| Hopper & Hopper Void Steel Repairs; Accomplish | 5.3.11 | 1 | Job | $ - 0 | $ - 0 |
| Deck Drain Install | 5.3.12 | 1 | Job | $ - 0 | $ - 0 |
| Fire Suppression Equipment; inspect and repair | 5.4.1 | 1 | Job | $ - 0 | $ - 0 |
| Life Raft Annual Certification; accomplish | 5.4.2 | 1 | Job | $ - 0 | $ - 0 |
| Launch Davit; Inspect & Repair | 5.4.3 | 1 | Job | $ - 0 | $ - 0 |
| Rescue Boat Davit; Inspect & Repair | 5.4.4 | 1 | Job | $ - 0 | $ - 0 |
| Rescue Boat Davit Break Lining; Replace | 5.4.5 | 1 | Job | $ - 0 | $ - 0 |
| Port Anchor Windlasses; overhaul | 5.4.6 | 1 | Job | $ - 0 | $ - 0 |
| Watertight Doors; Replace | 5.4.7 | 1 | Job | $ - 0 | $ - 0 |
| Interior Overhead Panels Renew | 5.4.8 | 1 | Job | $ - 0 | $ - 0 |
| Trunnion Winch Assemblies; Overhaul | 5.5.1 | 1 | Job | $ - 0 | $ - 0 |
| Hopper Overflow Pipe Seal; Replace | 5.5.2 | 1 | Job | $ - 0 | $ - 0 |
| Hopper Door Bearing Support Beam; Renew | 5.5.3 | 1 | Job | $ - 0 | $ - 0 |
| Sluice Valves; replace | 5.5.6 | 1 | Job | $ - 0 | $ - 0 |
| Main Propulsion Shafting & Rudder Clearances; measure | 5.6.1 | 1 | Job | $ - 0 | $ - 0 |
| Main Propulsion CPP HUB End Plates; Replace | 5.6.2 | 1 | Job | $ - 0 | $ - 0 |
| Emergency Generator Service; provide | 5.6.4 | 1 | Job | $ - 0 | $ - 0 |
| Dredge Engines; Inspect, Servie, & Repair | 5.6.5 | 1 | Job | $ - 0 | $ - 0 |
| House HVAC; Inspect & Repair | 5.6.8 | 1 | Job | $ - 0 | $ - 0 |
| Bow Thruster ; Inspect & Maintain | 5.6.9 | 1 | Job | $ - 0 | $ - 0 |
| Navigation, Comms, GMDSS Electronics; test and assess | 5.7.1 | 1 | Job | $ - 0 | $ - 0 |
| Propulsion Plant Monitoring System; Repair | 5.7.3 | 1 | Job | $ - 0 | $ - 0 |
| Main Propulsion Control (PMC) System; Inspect & Calibrate | 5.7.4 | 1 | Job | $ - 0 | $ - 0 |
| FO Tank Level Indicators and Cable; replace | 5.7.5 | 1 | Job | $ - 0 | $ - 0 |
| Crane Catwalk Supports; Replace | 5.7.6 | 1 | Job | $ - 0 | $ - 0 |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Services; provide | 5.1.4 | 1 | Job | $ - 0 | $ - 0 |
| Temporary Heaters; provide | 5.1.16 | 1 | Job | $ - 0 | $ - 0 |
| Tanks, Voids, & Double Bottoms; Open, Clean and Gas Free | 5.2.3 | 1 | Job | $ - 0 | $ - 0 |
| Tower Staging; provide | 5.2.6 | 1 | Job | $ - 0 | $ - 0 |
| Tower staging; provide | 5.2.7 | 20 | Each | $ - 0 | $ - 0 |
| Hull Above Waterline; apply coatings | 5.3.1 | 1000 | SqFt | $ - 0 | $ - 0 |
| Hull Below Waterline; apply coatings | 5.3.2 | 1000 | SqFt | $ - 0 | $ - 0 |
| Hopper Door Hinge Bushings; renew | 5.5.4 | 1 | Each | $ - 0 | $ - 0 |
| Hopper Door Frame Hinges; renew | 5.5.5 | 1 | Job | $ - 0 | $ - 0 |
| Suction Inlet Hull Rings and Pipe Liners; replace | 5.5.7 | 1 | Job | $ - 0 | $ - 0 |
| Main Propulsion CPP Blades; replace | 5.6.3 | 1 | Job | $ - 0 | $ - 0 |
| Engine Room Ventilation Exhaust Fan; overhaul | 5.6.6 | 1 | Each | $ - 0 | $ - 0 |
| Galley Ventilation Fan; overhaul | 5.6.7 | 1 | Each | $ - 0 | $ - 0 |
| Dredge Controls (ILS)System; inspect & test | 5.7.2 | 1 | Job | $ - 0 | $ - 0 |
| Audio Video Cable; Install | 5.7.7 | 1 | Job | $ - 0 | $ - 0 |
| Navigation Radars; Replace | 5.7.8 | 1 | Job | $ - 0 | $ - 0 |
| Fire Detection & Alarm System Cable; Replace | 5.7.9 | 1 | Job | $ - 0 | $ - 0 |
| TOTAL CATEGORY B: | $ - 0 |
Over & Above Work
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 11,500 | $0.00 | ||
| Materials & Subcontractor | 6.1 | 11,500 | $ 600,000.00 | $600,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $600,000.00 |