B.08 Price List Amendment 0001.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
FY23 Yaquina Overhaul
Solicitation number
W9127N22B0014
Issued by

View the file

Other files

File Type Posted
B.07ProjNet Bidder Q_A.pdf PDF
USACE_Yaquina_Ceilings.pdf PDF
Y-2272-2 Rev.B - Arrangement & Details, Anchor Handling.pdf PDF
A004654 Rev.A Bow Thruster Pod.pdf PDF
Y-1034-7__Catwalks_Above_Weather_Deck.pdf PDF
FA_SystemMaterial_Listspdf.pdf PDF
B.08 Price List Amendment 0003.xlsx XLSX spreadsheet
New England Trawler Equipment Co. R-12475_Anchor_Windlass.pdf PDF
B.08W9127N22B0014 Yaquina FY23 Overhaul Amewndment 003.pdf PDF
Actual Capstan Windlass Manual.pdf PDF
A004673 Tunnel.pdf PDF
369-01_Rev_C_Bow_Thruster_Propulsion_Mods.pdf PDF
B.08W9127N22B0014 Yaquina FY23 Solicitation Amendment 002.pdf PDF
5.3.8 NORSHIPCO Y-1034-7, Catwalks Above Weather Deck.pdf PDF
B.08W9127N22B0014 Yaquina FY23 Solicitation Amendment 001.pdf PDF
5.2.3 Tanks - Y-2232-11 Floors Forward and Aft of Tank Top.pdf PDF
5.1.1 Dock and Undock Vessel - Y-1034-17 Docking Plan.pdf PDF
5.5.7 Sluice Valves - IHC 50412077 RR Gate Valve.pdf PDF
5.3.4 Main Reduction Gear Foundations - 353-E330-024 Gear Foundation Mods-PDF.pdf PDF
5.3.1 Steering Gear Room - Y-1032-16 General Arrangement - Copy.pdf PDF
5.1.16 Temporary Heaters - Y-1032-16 General Arrangement.pdf PDF
5.4.7 Fire Suprresion Equipment - Red Hawk FA-000 Fire Alarm System, General Notes.pdf PDF
5.3.15 Crane Base and Cab - Y-2276-1 Crane FDN.pdf PDF
5.2.6 Hopper Staging - Y-2494-3 Hopper Framing.pdf PDF
5.3.7 Tanks Voids and Double Bottoms - Y-2232-23 Rev D Misc Flats Plating and Beam.pdf PDF
5.3.4 Main Reduction Gear Foundations - Y-2232-29 Prop Eng & Red Gear Fdn (Eng Room).pdf PDF
5.6.4 Main Propulsion Shaft and CPP Hub Assembly - Hundested 0-002-020932-2 MP700 Propeller Hoved Samling.pdf PDF
5.3.8 Steel Plating - Y-2232-9 Tank Top Plating - Copy.pdf PDF
5.3.7 Tanks Voids and Double Bottoms - Y-2232-19 Upper Deck Plating & Beams.pdf PDF
5.6.11 Ventilation Fan - Y-3878-11 HVAC Equipment.pdf PDF
5.3.7 Tanks Voids and Double Bottoms - Y-2232-8 CVK and Longl Girders.pdf PDF
USACE Yaquina Ceilings (Scope).pdf PDF
5.2.4 Slops and Dirty Oil Tanks - Y-2232-42 Misc. Tanks.pdf PDF
5.6.2 Main Propulsion Shafting and Rudder Clearnces - Y-2274-2 Arrangement and Details of Rudder Stock.pdf PDF
5.6.4 Main Propulsion Shaft and CPP Hub Assembly - Hundested 0-002-020933-2 MP700 Propeller Hoved Samling.pdf PDF
5.5.9 Suction Inlet Hull Rings and Pipe Liners - DTC 5241115 - Trunnion Hull Fitting and Guide Tracks.pdf PDF
5.5.1 Draghead Winch Assemblies - Houston Systems A-19697 FMC Bearing.pdf PDF
5.3.1 Steering Gear Room - Y-1030-9 Sheet 2.PDF PDF
5.4.5 Vent Piping Terminals - Y-3878-16 HVAC Focsle.PDF PDF
5.3.3 Engine Room Cofferdam and Trunk Steel Plating - Y-2232-16 Misc Stl Bhd Below Upper and Foc'sle Dk.pdf PDF
5.3.9 Hull Anodes - Y-1052-1 Zinc Anodes.pdf PDF
5.2.3 Tanks - Y-2232-23 Rev D Misc Flats Plating and Beam.pdf PDF
5.6.4 Main Propulsion Shaft and CPP Hub Assembly - 2-022-021318 Rev 1 Shafting.pdf PDF
5.2.3 Tanks - Y-1032-16 General Arrangement.pdf PDF
5.6.2 Main Propulsion Shafting and Rudder Clearnace - Y-2636-1 Shaft Struts.pdf PDF
5.3.2 Engine Room Cofferdams and Trunk - Y-1032-16 General Arrangement - Copy - Copy.pdf PDF
5.3.1 Steering Gear Room - Y-1030-9 Sheet 3.PDF PDF
5.3.7 Tanks Voids and Double Bottoms - Y-1034-2 List of Doors, Hatches, Scuttles - Copy.pdf PDF
5.3.7 Tanks Voids and Double Bottoms - Y-2232-19 Upper Deck Plating & Beams - Copy.pdf PDF
5.2.6 Hopper Staging - Y-2496-2 Hopper Door Operating Gear.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAT A

Category A Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Dock and Undock Vessel; accomplish5.1.11Job$ - 0$ - 0
Drydock Lay Day Services; provide5.1.230Day$ - 0$ - 0
Wet Berth for Vessel; provide5.1.344Day$ - 0$ - 0
Electrical Power; provide5.1.51Job$ - 0$ - 0
Steam Service; provide5.1.61Job$ - 0$ - 0
Compressed Air Service; provide5.1.71Job$ - 0$ - 0
Potable Water Service; provide5.1.81Job$ - 0$ - 0
Sanitation Service; provide5.1.91Job$ - 0$ - 0
Internet Service; provide5.1.101Job$ - 0$ - 0
Vessel Services; connect and disconnect5.1.111Job$ - 0$ - 0
Transportation; provide5.1.121Job$ - 0$ - 0
Crane Service; provide5.1.131Job$ - 0$ - 0
Office Space; provide5.1.1474Day$ - 0$ - 0
Parking Spaces; provide5.1.1534Each$ - 0
Underwater Hull; pressure wash5.2.11Job$ - 0$ - 0
Chain lockers; open, clean, and inspect5.2.21Job$ - 0$ - 0
Slops and Dirty Oil Tanks; clean and gas free5.2.41Job$ - 0$ - 0
Bilges; clean and maintain5.2.51Job$ - 0$ - 0
ABS Survey Support; provide5.2.81Job$ - 0$ - 0
Incline Test Support; Provide5.2.91Job$ - 0$ - 0
Dock and Sea Trials; accomplish5.2.101Job$ - 0$ - 0
Hull Anoeds; Replace5.3.31Job$ - 0$ - 0
Keel Cooler Anodes; replace5.3.41Job$ - 0$ - 0
Engine Room Hatch and Weather Deck; preserve5.3.51Job$ - 0$ - 0
Forecastle Weather Deck: Preserve5.3.61Job$ - 0$ - 0
Trunnion Spaces; preserve5.3.71Job$ - 0$ - 0
Crane Catwalk Frame; Preserve5.3.81Job$ - 0$ - 0
Bow Thruster Tunnel; repair5.3.91Job$ - 0$ - 0
Steel Deck Insert (Swell Comp); Accomplish5.3.101Job$ - 0$ - 0
Hopper & Hopper Void Steel Repairs; Accomplish5.3.111Job$ - 0$ - 0
Deck Drain Install5.3.121Job$ - 0$ - 0
Fire Suppression Equipment; inspect and repair5.4.11Job$ - 0$ - 0
Life Raft Annual Certification; accomplish5.4.21Job$ - 0$ - 0
Launch Davit; Inspect & Repair5.4.31Job$ - 0$ - 0
Rescue Boat Davit; Inspect & Repair5.4.41Job$ - 0$ - 0
Rescue Boat Davit Break Lining; Replace5.4.51Job$ - 0$ - 0
Port Anchor Windlasses; overhaul5.4.61Job$ - 0$ - 0
Watertight Doors; Replace5.4.71Job$ - 0$ - 0
Interior Overhead Panels Renew5.4.81Job$ - 0$ - 0
Trunnion Winch Assemblies; Overhaul5.5.11Job$ - 0$ - 0
Hopper Overflow Pipe Seal; Replace5.5.21Job$ - 0$ - 0
Hopper Door Bearing Support Beam; Renew5.5.31Job$ - 0$ - 0
Sluice Valves; replace5.5.61Job$ - 0$ - 0
Main Propulsion Shafting & Rudder Clearances; measure5.6.11Job$ - 0$ - 0
Main Propulsion CPP HUB End Plates; Replace5.6.21Job$ - 0$ - 0
Emergency Generator Service; provide5.6.41Job$ - 0$ - 0
Dredge Engines; Inspect, Servie, & Repair5.6.51Job$ - 0$ - 0
House HVAC; Inspect & Repair5.6.81Job$ - 0$ - 0
Bow Thruster ; Inspect & Maintain5.6.91Job$ - 0$ - 0
Navigation, Comms, GMDSS Electronics; test and assess5.7.11Job$ - 0$ - 0
Propulsion Plant Monitoring System; Repair5.7.31Job$ - 0$ - 0
Main Propulsion Control (PMC) System; Inspect & Calibrate5.7.41Job$ - 0$ - 0
FO Tank Level Indicators and Cable; replace5.7.51Job$ - 0$ - 0
Crane Catwalk Supports; Replace5.7.61Job$ - 0$ - 0
Total Category A Work Items$ - 0

CAT B

Category B Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Tug Services; provide5.1.41Job$ - 0$ - 0
Temporary Heaters; provide5.1.161Job$ - 0$ - 0
Tanks, Voids, & Double Bottoms; Open, Clean and Gas Free5.2.31Job$ - 0$ - 0
Tower Staging; provide5.2.61Job$ - 0$ - 0
Tower staging; provide5.2.720Each$ - 0$ - 0
Hull Above Waterline; apply coatings5.3.11000SqFt$ - 0$ - 0
Hull Below Waterline; apply coatings5.3.21000SqFt$ - 0$ - 0
Hopper Door Hinge Bushings; renew5.5.41Each$ - 0$ - 0
Hopper Door Frame Hinges; renew5.5.51Job$ - 0$ - 0
Suction Inlet Hull Rings and Pipe Liners; replace5.5.71Job$ - 0$ - 0
Main Propulsion CPP Blades; replace5.6.31Job$ - 0$ - 0
Engine Room Ventilation Exhaust Fan; overhaul5.6.61Each$ - 0$ - 0
Galley Ventilation Fan; overhaul5.6.71Each$ - 0$ - 0
Dredge Controls (ILS)System; inspect & test5.7.21Job$ - 0$ - 0
Audio Video Cable; Install5.7.71Job$ - 0$ - 0
Navigation Radars; Replace5.7.81Job$ - 0$ - 0
Fire Detection & Alarm System Cable; Replace5.7.91Job$ - 0$ - 0
TOTAL CATEGORY B:$ - 0

Over & Above Work

SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphRequired Level
Of Effort HoursMaterialsFully Burdened
Labor RateMaterial Burden RateTotal Cost
Ship Repair Labor Rate6.111,500$0.00
Materials & Subcontractor6.111,500$ 600,000.00$600,000.00
SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphQtyUnitUnit PriceTotal Cost
Dry-Docking Extension Cost6.110Days$ - 0
Pier Side Extension Costs6.114Days$ - 0
Total Over & Above Work Items$600,000.00

File details come from the government source that posted it. Updated .