C.04 Abstract.pdf

PDF 330 KB Posted

Attached to
LOOKOUT POINT UNIT 2 BUS
Solicitation number
W9127N22B0002
Issued by

About this file

This document is an abstract of offers for a federal solicitation to replace damaged metal-enclosed bus duct at Lookout Point Dam. The U.S. Army Corps of Engineers, Portland District, requires removing existing damaged bus duct and furnishing and installing new metal-enclosed bus duct between the Unit #2 breaker and Generator Step-Up transformer T2. The solicitation also includes options to replace an existing damaged metering current transformer with a government furnished equipment transformer. Three offers were received by the June 10, 2022 deadline from Gardner Zemke Company, Offeror A, and Offeror B. Gardner Zemke Company provided the lowest priced offer of $646,256 to complete the mandatory line items and an additional $5,403 for the optional line items. Offeror A bid $1,333,155 for the mandatory work and $12,586 for the options. Offeror B did not provide pricing. The abstract records all offers received in response to the solicitation and certifies they were opened, read and recorded on the date indicated.

View the file

Other files

File Type Posted
BID RECORD SHEET.pdf PDF
Amendment 02.pdf PDF
Site_Visit_Photos.pdf PDF
Amendment 01.pdf PDF
01 ZA SIG - LOP Unit No 2 Bus Replacement Adv Dwgs.pdf PDF
LOP Unit 2 Bus Replacement BCOES Ref Dwgs.pdf PDF
W9127N22B0002 - LOP Unit 2 Bus.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. PAGE 1 OF 1 PAGES

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

X A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

(WITHOUT PROFIT) 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) YES

6. NUMBER OF ADDENDA ISSUED

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED

NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JOB 184,453.00$ 184,453.00$ 62,672.00$ 62,672.00$ -$ -$ 0002 Remove Existing Metal-Enclosed Bus Duct 1 JOB 87,001.00$ 87,001.00$ 77,222.00$ 77,222.00$ -$ -$ 0003 Furnish and Install New Metal-Enclosed Bus Duct 1 JOB 880,422.00$ 880,422.00$ 399,155.00$ 399,155.00$ -$ -$ 0004 Replace Existing Damaged Metering CT with GFE CT 1 JOB 91,516.00$ 91,516.00$ 64,465.00$ 64,465.00$ -$ -$ 0005 Furnish the Services of the Metal-Enclosed Bus Duct Manufacturer'sField Services Engineer 1 JOB 89,763.00$ 89,763.00$ 37,339.00$ 37,339.00$ -$ -$

SUBTOTAL FOR MANDATORY LINE ITEMS 1,333,155.00$ 640,853.00$ -$ -$

OPTIONAL CLINS

0006 Replace Existing Damaged Metering CT with GFE CT 1 JOB 12,586.00$ 12,586.00$ 5,403.00$ 5,403.00$ -$ -$

SUBTOTAL FOR OPTIONAL LINE ITEMS 12,586.00$ 5,403.00$ -$ -$

1,345,741.00$ 646,256.00$ -$ -$

Lookout Point Unit 2 Bus Replacement

7B. DESCRIPTION OF OFFERED ITEM 7C. EST D.

TOTAL

Gardner Zemke Company 0HDU4 1218 Griegos Rd NW Albuquerque, NM 87107

B. BID SECURITY

ABSTRACT OF OFFERS

W9127N22B0002

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

2022-06-10T15:24:46-0700
MORROW.KRISTINA.KAYE.1290513320

File details come from the government source that posted it. Updated .