CHANNEL DESRIPTION
PAYMENT
METHOD
REQUIRED
DEPTH (FEET)
ALLOWABLE
OVERDEPTH
(FEET)
REQUIRED
SLOPE ACCEPTANCE
Coos Bay Upriver RM 11+49 to 15+00 Pre/Post will vary between 30 and 36 feet MLLW
Expect 1 foot of paid overdepth
3H:1V unless otherwise stated
Acceptance will be based on multi‐beam survey data processed using a median sort with a 30x30 foot matrix. Volume computations will be run using the 5x5 data set.
COOS BAY UPRIVER CLAMSHELL MAINTENANCE DREDGING 2019
SURVEY ACCEPTANCE CRITERIA