A10_Survey_Acceptance_Criteria.pdf

PDF 56 KB Posted

Attached to
Coos Bay Upriver Clamshell Maintenance Dredging 2019
Solicitation number
W9127N19B0012
Issued by

About this file

Attachment A10 - Survey Acceptance Criteria. This attachment shall replace the attachment A10 in the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHANNEL DESRIPTION

PAYMENT

METHOD

REQUIRED

DEPTH (FEET)

ALLOWABLE

OVERDEPTH

(FEET)

REQUIRED

SLOPE ACCEPTANCE

Coos Bay Upriver RM 11+49 to 15+00 Pre/Post will vary between 30 and 36 feet MLLW

Expect 1 foot of paid overdepth

3H:1V unless otherwise stated

Acceptance will be based on multi‐beam survey data processed using a median sort with a 30x30 foot matrix. Volume computations will be run using the 5x5 data set.

COOS BAY UPRIVER CLAMSHELL MAINTENANCE DREDGING 2019

SURVEY ACCEPTANCE CRITERIA

File details come from the government source that posted it.