C.04BidAbstract2019WestCoastHopper.pdf
PDF 294 KB Posted
- Attached to
- FY19 West Coast Hopper Dredging
- Solicitation number
- W9127N19B0008
About this file
W9127N19B0008 Bid Abstract Final.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WCH19_BCOES_SPECS.PDF | ||
| 19B0008_Preliminary_Pre-Solicitation_Minutes.docx | DOCX document | |
| WCH19_BCOES_PLANS.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NO.2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 2 PAGES
1/29/2019 2/28/2019
4. ISSUING OFFICE
DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3
D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR
A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY
X (WITHOUT PROFIT) 20% of bid price or $3 million 20% of bid price or $3 million 20% of bid price or $3 million
C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) No Amendments No Amendments No Amendments
6. NUMBER OF ADDENDA ISSUED 4
7A.
ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE No. 3 vs IGE
0001 Mobilization and Demobilization 1 JOB 7,124,107.00$ 7,124,107.00$ 5,900,000.00$ 5,900,000.00$ 9,300,000.00$ 9,300,000.00$ 7,900,000.00$ 7,900,000.00$ -17.2% 30.5% 10.9%
HUM, Bin Measure to Required Depth, HOODS Ocean Disposal 700000 CY 3.80$ 2,660,000.00$ 4.20$ 2,940,000.00$ 3.90$ 2,730,000.00$ 4.75$ 3,325,000.00$ 10.5% 2.6% 25.0%
HUM, Bin Measure to Required Depth, HOODS Ocean Disposal (OPTIONAL) 200000 CY 3.88$ 776,000.00$ 3.50$ 700,000.00$ 3.90$ 780,000.00$ 3.00$ 600,000.00$ -9.8% 0.5% -22.7%
HUM, Bin Measure to Required Depth, HOODS Ocean Disposal (OPTIONAL) 200000 CY 3.88$ 776,000.00$ 3.50$ 700,000.00$ 3.50$ 700,000.00$ 3.00$ 600,000.00$ -9.8% -9.8% -22.7%
Humboldt Bay Bar and Entrance Channel Contractor Survey 1 JOB 52,000.00$ 52,000.00$ 30,000.00$ 30,000.00$ 49,000.00$ 49,000.00$ 60,000.00$ 60,000.00$ -42.3% -5.8% 15.4%
Humboldt Bay Bar and Entrance Channel Contractor Survey (OPTIONAL) 1 JOB 26,000.00$ 26,000.00$ 12,000.00$ 12,000.00$ 38,000.00$ 38,000.00$ 18,000.00$ 18,000.00$ -53.8% 46.2% -30.8%
Humboldt Bay Bar and Entrance Channel Contractor Survey (OPTIONAL) 1 JOB 26,000.00$ 26,000.00$ 12,000.00$ 12,000.00$ 38,000.00$ 38,000.00$ 18,000.00$ 18,000.00$ -53.8% 46.2% -30.8%
LCR Maintenance, RM 3+00 to RM 25+00, Bin Measure, Flow Lane (FL) Placement 200000 CY 2.94$ 588,000.00$ 2.60$ 520,000.00$ 3.60$ 720,000.00$ 3.50$ 700,000.00$ -11.6% 22.4% 19.0%
LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement 400000 CY 3.09$ 1,236,000.00$ 3.85$ 1,540,000.00$ 6.05$ 2,420,000.00$ 3.60$ 1,440,000.00$ 24.6% 95.8% 16.5%
LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 200000 CY 3.09$ 618,000.00$ 3.50$ 700,000.00$ 6.05$ 1,210,000.00$ 2.45$ 490,000.00$ 13.3% 95.8% -20.7%
LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 200000 CY 3.09$ 618,000.00$ 3.50$ 700,000.00$ 5.35$ 1,070,000.00$ 2.45$ 490,000.00$ 13.3% 73.1% -20.7%
LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth 400000 CY 3.08$ 1,232,000.00$ 3.15$ 1,260,000.00$ 3.65$ 1,460,000.00$ 3.50$ 1,400,000.00$ 2.3% 18.5% 13.6%
Manson Construction Co.
5209 E. Marginal Way S.
Seattle, WA 98134
West Coast Hopper Maintenance Dredging 2019
7B. DESCRIPTION OF OFFERED ITEM
7C. EST D.
Great Lakes Dredge & Dock Company, LLC
2122 York Road Oak Brook, IL 60523
B. BID SECURITY B. BID SECURITY
The Dutra Group 2350 Kerner Boulevard, Suite 200 San Rafael, CA 94901-5595
ABSTRACT OF OFFERS
W9127N19B0008
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth (OPTIONAL) 200000 CY 3.08$ 616,000.00$ 2.90$ 580,000.00$ 3.65$ 730,000.00$ 2.40$ 480,000.00$ -5.8% 18.5% -22.1%
LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth (OPTIONAL) 200000 CY 3.08$ 616,000.00$ 2.90$ 580,000.00$ 3.65$ 730,000.00$ 2.40$ 480,000.00$ -5.8% 18.5% -22.1%
LCR Increment Times Transit Mile for Material Placement Site (other than five miles oneway) (INFORMATIONAL) -$ -$ -$ -$
0015AA Columbia River (LCR) First 400,000 CY 400000 CY*MI 0.20$ 80,000.00$ 0.20$ 80,000.00$ 0.25$ 100,000.00$ 0.10$ 40,000.00$ 0.0% 25.0% -50.0% 0015AB Columbia River (LCR) Over 400,000 CY 500000 CY*MI 0.20$ 100,000.00$ 0.20$ 100,000.00$ 0.25$ 125,000.00$ 0.10$ 50,000.00$ 0.0% 25.0% -50.0%
0016 LCR Intra‐Project Transit Miles (INFORMATIONAL) 150000 CY -$ -$ -$ -$ 0016AA Columbia River (LCR) First 150 Miles 150 CY 589.00$ 88,350.00$ 310.00$ 46,500.00$ 625.00$ 93,750.00$ 290.00$ 43,500.00$ -47.4% 6.1% -50.8% 0016AB Columbia River (LCR) Over 150 Miles 50 CY 534.00$ 26,700.00$ 310.00$ 15,500.00$ 635.00$ 31,750.00$ 290.00$ 14,500.00$ -41.9% 18.9% -45.7%
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1500000 CY 2.53$ 3,795,000.00$ 2.50$ 3,750,000.00$ 2.60$ 3,900,000.00$ 3.50$ 5,250,000.00$
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 300000 CY 2.57$ 771,000.00$ 2.10$ 630,000.00$ 2.60$ 780,000.00$ 2.75$ 825,000.00$ -18.3% 1.2% 7.0%
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 250000 CY 2.47$ 617,500.00$ 2.10$ 525,000.00$ 2.30$ 575,000.00$ 2.00$ 500,000.00$ -15.0% -6.9% -19.0%
MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300000 CY 1.72$ 516,000.00$ 1.80$ 540,000.00$ 1.15$ 345,000.00$ 0.80$ 240,000.00$
MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 300000 CY 1.72$ 516,000.00$ 1.80$ 540,000.00$ 1.15$ 345,000.00$ 0.80$ 240,000.00$ 4.7% -33.1% -53.5%
MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 250000 CY 1.72$ 430,000.00$ 1.80$ 450,000.00$ 1.15$ 287,500.00$ 0.80$ 200,000.00$ 4.7% -33.1% -53.5%
SUBTOTAL FOR MANDATORY LINE ITEMS 17,498,157.00$ 16,722,000.00$ 21,274,500.00$ 20,463,000.00$ -4.4% 21.6% 16.9% SUBTOTAL FOR OPTIONAL LINE ITEMS 6,406,500.00$ 6,129,000.00$ 7,283,500.00$ 4,941,000.00$ -4.3% 13.7% -22.9%
23,904,657.00$ 22,851,000.00$ 28,558,000.00$ 25,404,000.00$ -4.4% 19.5% 6.3%
NSN 7540-01-150-0981 1419-101
TOTAL
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
STANDARD FORM 1419 (10-3)
| 2019-03-04T13:22:18-0800 | |
| LASICH.BRANDON.MATTHEW.1255369012 |
| 2019-03-05T06:47:18-0800 | |
| KOVAR.KIMBERLY.ANN.1075767583 |
File details come from the government source that posted it.