C.04BidAbstract2019WestCoastHopper.pdf

PDF 294 KB Posted

Attached to
FY19 West Coast Hopper Dredging
Solicitation number
W9127N19B0008
Issued by

About this file

W9127N19B0008 Bid Abstract Final.

View the file

Other files

File Type Posted
WCH19_BCOES_SPECS.PDF PDF
19B0008_Preliminary_Pre-Solicitation_Minutes.docx DOCX document
WCH19_BCOES_PLANS.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO.2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 2 PAGES

1/29/2019 2/28/2019

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

X (WITHOUT PROFIT) 20% of bid price or $3 million 20% of bid price or $3 million 20% of bid price or $3 million

C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) No Amendments No Amendments No Amendments

6. NUMBER OF ADDENDA ISSUED 4

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE No. 3 vs IGE

0001 Mobilization and Demobilization 1 JOB 7,124,107.00$ 7,124,107.00$ 5,900,000.00$ 5,900,000.00$ 9,300,000.00$ 9,300,000.00$ 7,900,000.00$ 7,900,000.00$ -17.2% 30.5% 10.9%

HUM, Bin Measure to Required Depth, HOODS Ocean Disposal 700000 CY 3.80$ 2,660,000.00$ 4.20$ 2,940,000.00$ 3.90$ 2,730,000.00$ 4.75$ 3,325,000.00$ 10.5% 2.6% 25.0%

HUM, Bin Measure to Required Depth, HOODS Ocean Disposal (OPTIONAL) 200000 CY 3.88$ 776,000.00$ 3.50$ 700,000.00$ 3.90$ 780,000.00$ 3.00$ 600,000.00$ -9.8% 0.5% -22.7%

HUM, Bin Measure to Required Depth, HOODS Ocean Disposal (OPTIONAL) 200000 CY 3.88$ 776,000.00$ 3.50$ 700,000.00$ 3.50$ 700,000.00$ 3.00$ 600,000.00$ -9.8% -9.8% -22.7%

Humboldt Bay Bar and Entrance Channel Contractor Survey 1 JOB 52,000.00$ 52,000.00$ 30,000.00$ 30,000.00$ 49,000.00$ 49,000.00$ 60,000.00$ 60,000.00$ -42.3% -5.8% 15.4%

Humboldt Bay Bar and Entrance Channel Contractor Survey (OPTIONAL) 1 JOB 26,000.00$ 26,000.00$ 12,000.00$ 12,000.00$ 38,000.00$ 38,000.00$ 18,000.00$ 18,000.00$ -53.8% 46.2% -30.8%

Humboldt Bay Bar and Entrance Channel Contractor Survey (OPTIONAL) 1 JOB 26,000.00$ 26,000.00$ 12,000.00$ 12,000.00$ 38,000.00$ 38,000.00$ 18,000.00$ 18,000.00$ -53.8% 46.2% -30.8%

LCR Maintenance, RM 3+00 to RM 25+00, Bin Measure, Flow Lane (FL) Placement 200000 CY 2.94$ 588,000.00$ 2.60$ 520,000.00$ 3.60$ 720,000.00$ 3.50$ 700,000.00$ -11.6% 22.4% 19.0%

LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement 400000 CY 3.09$ 1,236,000.00$ 3.85$ 1,540,000.00$ 6.05$ 2,420,000.00$ 3.60$ 1,440,000.00$ 24.6% 95.8% 16.5%

LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 200000 CY 3.09$ 618,000.00$ 3.50$ 700,000.00$ 6.05$ 1,210,000.00$ 2.45$ 490,000.00$ 13.3% 95.8% -20.7%

LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 200000 CY 3.09$ 618,000.00$ 3.50$ 700,000.00$ 5.35$ 1,070,000.00$ 2.45$ 490,000.00$ 13.3% 73.1% -20.7%

LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth 400000 CY 3.08$ 1,232,000.00$ 3.15$ 1,260,000.00$ 3.65$ 1,460,000.00$ 3.50$ 1,400,000.00$ 2.3% 18.5% 13.6%

Manson Construction Co.

5209 E. Marginal Way S.

Seattle, WA 98134

West Coast Hopper Maintenance Dredging 2019

7B. DESCRIPTION OF OFFERED ITEM

7C. EST D.

Great Lakes Dredge & Dock Company, LLC

2122 York Road Oak Brook, IL 60523

B. BID SECURITY B. BID SECURITY

The Dutra Group 2350 Kerner Boulevard, Suite 200 San Rafael, CA 94901-5595

ABSTRACT OF OFFERS

W9127N19B0008

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth (OPTIONAL) 200000 CY 3.08$ 616,000.00$ 2.90$ 580,000.00$ 3.65$ 730,000.00$ 2.40$ 480,000.00$ -5.8% 18.5% -22.1%

LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth (OPTIONAL) 200000 CY 3.08$ 616,000.00$ 2.90$ 580,000.00$ 3.65$ 730,000.00$ 2.40$ 480,000.00$ -5.8% 18.5% -22.1%

LCR Increment Times Transit Mile for Material Placement Site (other than five miles oneway) (INFORMATIONAL) -$ -$ -$ -$

0015AA Columbia River (LCR) First 400,000 CY 400000 CY*MI 0.20$ 80,000.00$ 0.20$ 80,000.00$ 0.25$ 100,000.00$ 0.10$ 40,000.00$ 0.0% 25.0% -50.0% 0015AB Columbia River (LCR) Over 400,000 CY 500000 CY*MI 0.20$ 100,000.00$ 0.20$ 100,000.00$ 0.25$ 125,000.00$ 0.10$ 50,000.00$ 0.0% 25.0% -50.0%

0016 LCR Intra‐Project Transit Miles (INFORMATIONAL) 150000 CY -$ -$ -$ -$ 0016AA Columbia River (LCR) First 150 Miles 150 CY 589.00$ 88,350.00$ 310.00$ 46,500.00$ 625.00$ 93,750.00$ 290.00$ 43,500.00$ -47.4% 6.1% -50.8% 0016AB Columbia River (LCR) Over 150 Miles 50 CY 534.00$ 26,700.00$ 310.00$ 15,500.00$ 635.00$ 31,750.00$ 290.00$ 14,500.00$ -41.9% 18.9% -45.7%

MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1500000 CY 2.53$ 3,795,000.00$ 2.50$ 3,750,000.00$ 2.60$ 3,900,000.00$ 3.50$ 5,250,000.00$

MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 300000 CY 2.57$ 771,000.00$ 2.10$ 630,000.00$ 2.60$ 780,000.00$ 2.75$ 825,000.00$ -18.3% 1.2% 7.0%

MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 250000 CY 2.47$ 617,500.00$ 2.10$ 525,000.00$ 2.30$ 575,000.00$ 2.00$ 500,000.00$ -15.0% -6.9% -19.0%

MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300000 CY 1.72$ 516,000.00$ 1.80$ 540,000.00$ 1.15$ 345,000.00$ 0.80$ 240,000.00$

MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 300000 CY 1.72$ 516,000.00$ 1.80$ 540,000.00$ 1.15$ 345,000.00$ 0.80$ 240,000.00$ 4.7% -33.1% -53.5%

MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTIONAL) 250000 CY 1.72$ 430,000.00$ 1.80$ 450,000.00$ 1.15$ 287,500.00$ 0.80$ 200,000.00$ 4.7% -33.1% -53.5%

SUBTOTAL FOR MANDATORY LINE ITEMS 17,498,157.00$ 16,722,000.00$ 21,274,500.00$ 20,463,000.00$ -4.4% 21.6% 16.9% SUBTOTAL FOR OPTIONAL LINE ITEMS 6,406,500.00$ 6,129,000.00$ 7,283,500.00$ 4,941,000.00$ -4.3% 13.7% -22.9%

23,904,657.00$ 22,851,000.00$ 28,558,000.00$ 25,404,000.00$ -4.4% 19.5% 6.3%

NSN 7540-01-150-0981 1419-101

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

STANDARD FORM 1419 (10-3)

2019-03-04T13:22:18-0800
LASICH.BRANDON.MATTHEW.1255369012
2019-03-05T06:47:18-0800
KOVAR.KIMBERLY.ANN.1075767583

File details come from the government source that posted it.