PWS.pdf
PDF 163 KB Posted
- Attached to
- Waste Pumping and Portable Unit Rental
- Solicitation number
- W9127N18Q0021
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.01.30_PWS_(Amd_0001_12Apr18).pdf | ||
| A.07.24_Amendment_0001.pdf | ||
| SYNOP_SOL.pdf | ||
| PPQ_and_Rating_Forms.pdf | ||
| WVP_Waste_Site_Maps.pdf | ||
| Binding_Price_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Septic Tank, Chemical and Vault Toilet Waste Pumping - Willamette Valley Project
1.0 GENERAL INFORMATION
The Contractor shall provide all labor, equipment, and supplies necessary for the performance of this contract in the Willamette Valley Project (WVP) areas shown on the attached contract drawings. All work performed shall be in strict accordance with these specifications.
Site maps attached to these specifications are not necessarily to scale. Driving directions are recommendations only. Legends showing locations are approximations.
This is a performance based contract for providing pumping and disposal service of septic tanks, chemical toilet, and vault toilet waste products, and for the rental and servicing of disabled/non-disabled portable units. All services to be performed are located within the WVP in Oregon. The following US Army Corps of Engineers (USACE) projects within the WVP will be covered under this contract: Fern Ridge, Lookout Point, Dexter, Fall Creek, Hills Creek, Dorena, Cottage Grove, Foster, Green Peter, Big Cliff, Cougar, and Detroit.
This is a Firm Fixed Price (FFP) contract for a base year plus two option years to be exercised per the Government’s discretion.
The period of performance for the base year will be from time of award through 30 April 2019. The following option year period of performance, if exercised, will be:
1st Option Year Period: 1 May 2019 through 30 April 2020 2nd Option Year Period: 1 May 2020 through 30 April 2021
2.0 DEFINITIONS
2.1 Contracting Officer (KO): The individual with the authority to enter into, administer, change, and or/terminate contracts.
2.2 Contracting Officer’s Representative (COR): The individual designated to oversee the day-to-day operations of this contract. The COR may not direct the Contractor to perform any work which would commit the Government to any additional cost or performance not specifically stated in the contract.
2.3 Government Quality Assurance Evaluator (GQAE): The Government representative who will be observing the day to day work of the Contractor to assure compliance with the specifications stated within the contract.
2.4 QASP: Quality Assurance Surveillance Plan.
2.5 Contract Discrepancy Report (CDR): A written record of unsatisfactory performance by the contractor as observed by the Quality Assurance Evaluator (QAE).
2.6 Discrepancy: Services that do not conform to contract requirements in which the government may require the contractor to perform the services again in conformity with the contract requirements, at no increase in contract amount.
2.7 Emergency: An emergency request response is defined as a need initiated by a mechanical alarm located at the vault/septic tank in the location area. This alarm indicates that the vault/septic pumping mechanisms have malfunctioned; and that material and sewage holding capacities are at maximum threshold requiring a timely response to empty the vault/septic tank to inhibit public safety concerns.
3.0 CONTRACTOR SHALL FURNISH
3.1 The Contractor shall furnish all materials and cleaning supplies to include the following:
a. Toilet paper
b. Paper towels, to include dispensers in the bathroom
c. Cleaning agents
d. Germicidal disinfectants
e. Deodorizers
f. Hand soap
3.2 The contractor shall furnish a local point of contact that has the authority to address deficiencies identified by the COR.
3.3 The Contractor shall furnish all labor and equipment necessary to perform the work required under these specifications.
3.4 All equipment used by the Contractor or the Contractor’s employees shall meet all applicable safety requirements. This equipment shall operate at full rated performance levels.
3.5 The Contractor shall insure that all employees are capable of demonstrating adequate knowledge of chemicals, tools, equipment, and techniques necessary to competently perform the work.
4.0 SERVICE REQUIREMENTS
4.1 Waste Pumping. The contractor shall pump all septic tanks, chemical toilets, and vault toilets, otherwise known as facilities. All facilities shall be emptied completely of all liquid and solid sewage. All debris and spillage shall be removed and cleaned up by the Contractor. Spillage shall be considered hazardous waste as prescribed by law and cleanup shall be in accordance with applicable federal, state and local laws. When concluded with pumping a particular facility, the facility area shall be left in its previous state of condition. The Contractor shall be held responsible for any change in site conditions that occurred during the contracted process. All pumped sewage shall be removed from the premises of the WVP and shall be disposed of in accordance with applicable laws and regulations.
4.2 Rental and Servicing of Portable Units.
4.2.1 Chemical Toilets. Hereinafter referred to as units, shall be chemical type toilets which shall be placed on site by the contractor at specific locations upon the COR request. These services shall be either permanent or temporary in time. On call services may be provided for special events, emergency situations, and other unknown events requiring such a service. The COR may delay the placement or extend the operating season due to unknown factors. These events will be adjusted in accordance with the bid schedule.
4.2.2 Specifications. Units requested may be either serviceable for handicap accessible (disabled) or non-handicap (non-disabled). For handicap units, one (1) urinal and an accessible ramp shall be provided. All handicap units shall provide for handrails inside the urinals.
4.2.3 Unit Servicing. Units shall be serviced in the quantity specified in the bid schedule. The servicing schedule shall be coordinated with the COR. During the scheduled services, the unit shall be cleaned to include the removal of all material from the unit’s storage compartment. The unit shall be cleaned inside and out to include the removal of all dirt, cobwebs, and other debris. The unit’s interior surfaces shall be cleaned with a mild detergent and disinfectant. The Contractor shall be responsible for supplying and filling the toilet paper dispensers. Any emptied rolls shall be changed out for a new roll. The unit shall have sufficient deodorizing chemicals placed into the unit’s storage compartment to assist eliminating odors. The Contractor shall be responsible for all repairs to the units as needed. All requirements listed in Section 4.3 shall also be adhered to.
4.3 Task Operation Criteria. Each actual pumping operation is therefore broken into two categories or appraisal criteria as follows:
a. The actual removal of the material from the septic tanks, chemical and vault toilets.
b. The cleanup of the area around the pumping operation.
4.4 General Collection Requirements.
4.4.1 Schedules. All non-emergency waste removal pumping shall occur from 7:00am – 5:30pm. These services shall be provided only on weekdays unless otherwise approved by the COR. Upon notification, the Contractor will have three working days to perform the service, excluding the weekends as part of that three (3) days. The quantity listed in this contract is based on historical data.
4.4.2 Inclement Weather Schedule. The Contractor shall perform all services during periods of inclement weather.
In cases of severe weather, the COR may authorize exceptions. When exceptions are granted, the Contractor shall make up all missed collections within 24 hours after the severe weather has terminated, unless the COR authorizes additional time.
4.4.3 Emergency Pumping. Response to an emergency call shall be within 4 hours of request from the COR.
Emergency pumping operations may be conducted any day of the week upon the COR’s request but will only be conducted between the hours of 7:00am and 7:00pm.
4.4.4 Locations. Below are all locations required for vault sewage pumping services within this performance work statement, as well as the vault size, quantities, vault/septic type, type, and frequency of services to be rendered.
Fern Ridge Locations Area Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
West Kirk Park 3 2 1000 Gallons CXT Unit- Single
As Needed
East Kirk Park 1 1 1000 Gallons CXT Unit- Single
As Needed
Shorelane Park 1 1 1000 Gallons CXT Unit- Single
As Needed
West Abutment 1 1 1000 Gallons CXT Unit- Single
As Needed
North Jeans 2 1 1000 Gallons CXT Unit- Single
As Needed
South Jeans 2 1 1000 Gallons CXT Unit- Single
As Needed
West Spillway (Rental and Servicing)
South Applegate Unit (Rental and Servicing)
NA
1 Non- Handicap Accessible Unit
1 Non- Handicap Accessible Unit
01 May - 30 Sep Servicing2x Per Month
Year Round Servicing 2x Per Month
Dexter Locations Area Quantity of
Number of Vaults
Vault/Septic Size
Type Frequency
South Shore 2 1 1000 Gallons CXT Unit- Single
As Needed
Middle Fork 2 1 1000 Gallons CXT Unit- As Needed
Single Orchard Park 1 1 1000 Gallons CXT Unit-
Single As Needed
Dexter Powerhouse 2 1 500 Gallons Septic Tank 1x Per Year Dexter Conference Room 1 1 1000 Gallon Septic Tank 1xPer Year Dexter Conference Room 1 1 500 Gallons Septic Tank 2xPer Year
Lookout Point Locations Area
Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Meridian Park 1 1 1000 Gallons CXT Unit- Single
As Needed
Signal Point 1 1 1000 Gallons CXT Unit- Single
As Needed
Ivan Oakes Campground Double
2 2 1000 Gallons each
CXT Unit- Double
As Needed
Ivan Oakes Campground Single
2 1 1000 Gallons CXT Unit- Single
As Needed
Ivan Oakes Campground Host
2 1 1500 Gallons Vault As Needed
Lookout Point Powerhouse 1 1 2300 Gallons Septic Tank 1x Per Year WVP Office 1 1 1000 Gallons Septic Tank 1x Per Year WVP Office- Garage 1 1 1000 Gallons Septic Tank 1x Per Year
Hills Creek Locations Area
Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Hills Creek Powerhouse 1 1 1800 Gallons Septic Tank 1x per year
Fall Creek Locations Area Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Tufti 1 1 1000 Gallons CXT Unit- Single
As Needed
Fall Creek Dam 1 1 750 Gallons Septic Tank 1x Per Year Fall Creek Fish Facility 3 1 1500 Gallons Septic Tank As Needed
Cottage Grove Locations Area
Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Lakeside Boat Ramp 2 1 1000 Gallons CXT Unit- Single
As Needed
Lakeside Park North 2 2 1000 Gallons each
CXT Unit- Double
As Needed
Lakeside Park South 2 2 1000 Gallons each
CXT Unit- Double
As Needed
Riverside Park 1 1 1000 Gallons CXT Unit- Single
As Needed
Wilson Creek Park Boat Ramp
2 1 1000 Gallons CXT Unit- Single
As Needed
Primitive Campground 2 2 1000 Gallons each
CXT Unit- Double
As Needed
Shortridge Park (FY 18) 3 2 1000 Gallons each
CXT Unit- Double
Dorena Locations Area Quantity of
Number of Vaults
Vault/Septic Size
Type Frequency
Schwarz Campground CXT 2 1 1000 Gallons CXT Unit- Single
As Needed
Harms Park 2 1 1000 Gallons CXT Unit- Single
As Needed
Bake Stewart Park 4 2 1000 Gallons CXT Unit- Single
As Needed
Bake Stewart Park Host 2 1 1500 Gallons Septic Tank As Needed
Green Peter Locations Area
Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Green Peter Dam 10 1 2000 Gallons Septic Tank As Needed
Overlook 2 2 1000 Gallons each CXT Unit- Double
As Needed
Billings Creek 2 1 1000 Gallons CXT Unit- Single
As Needed
Whitcomb Bridge 2 1 1000 Gallons CXT Unit- Single
As Needed
2-Mile Site (Rental and Servicing)
NA NA NA 1 Non- Handicap Accessible Unit
01 May - 30 Sep Servicing 2x Per Month
Foster Locations Area Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Andrew S. Wiley Park CXT (Beginning FY 18)
2 2 1000 Gallons each
CXT Unit- Double
Detroit Locations Area Quantity of
Number of Vaults
Vault/Septic Size
Type Frequency
Detroit Dam 4 1 1000 Gallons CXT Unit- Single
As Needed
Detroit Powerhouse 1 1 1250 Gallons Septic Tank 1x Per Year Detroit Dam- South Side (Rental and Servicing)
NA NA NA 1 Handicap Accessible Unit
01 May - 30 Sep Servicing 1x Per Week
Big Cliff Locations Area Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Big Cliff Powerhouse 1 1 900 Gallons Septic Tank 1x Per Year Big Cliff Boat Ramp (Rental and Servicing)
NA NA NA 1 Non- Handicap Accessible Unit
01 May - 30 Sep Servicing 1x Per Week
Cougar Locations Area Quantity of Pumps Per Year
Number of Vaults
Vault/Septic Size
Type Frequency
Cougar Fish Facility 2 2 1500 Septic Tank 2x Per Year Cougar Powerhouse 2 2 2500 Septic Tank 2x Per Year
***Cougar & Hill Creek Powerhouses are unique systems where a USACE employee will need notice from pumping contractor and need to be onsite to assist. At both powerhouses the septic tank actually sits underneath the powerhouse and additional hose and vacuum truck are required to pump.
Septic Tanks. The following areas are to be serviced during the specified year. These items are septic tanks which by permit are to be pumped every five (5) years. These services shall be coordinated with the COR prior to commencing work. This list includes vaults and septic tanks.
Area Septic Tank Size Year Pine Meadows South Restroom 5500 Gallons 2018 Pine Meadows Maintenance Shed 750 Gallons 2018 Pine Meadows Dump Station 4000 Gallons 2018 Wilson Creek Park 1500 Gallons 2018 Cottage Grove Office 2000 Gallons 2018 Schwarz Shower Restroom 10000 Gallons 2018
Emergency Pumps and Portable Units per Location Area. The following location areas are to be allotted emergency services per year; this service is defined as an emergency pump and/or emergency portable unit as defined in sections 3.2.1 and 3.4.3.
Cottage Grove Location Area
Emergency Pumps
Type of Portable Units Year
Pine Meadows Campground
Servicing weekly 1 - Handicap Accessible; 2 Non-Handicap Accessible
2018/2019
Dorena Location Area Emergency Pumps
Type of Portable Units Year
Schwarz Campground 1
Servicing Weekly 1 - Handicap Accessible;
2 Non-Handicap Accessible
2018/2019
4.5. Public Safety. The Contractor shall maintain the public use areas to provide the best possible conditions for safe use by visitors. All areas in which the Contractor performs work shall be cleaned and disinfected in such a manner that no person entering the area will be subject to exposure to any contaminates held within the sewage containment tank. Furthermore, no solid waste products from sewage containment tanks, including but not limited to, cans, bottles and recreational type trash, shall be disposed of in refuse cans within the area. The fore mentioned trash shall be placed in government furnish plastic bags by the contractor, and disposed of by the contractor at an offsite location approved by the COR. All sewage, liquid and solid, removed from sewage storage tanks shall be removed from the WVP and shall be disposed of as dictated by federal, state and local laws at a facility properly licensed for such disposal.
4.6. Subcontracting. The Contractor shall notify the COR in writing, of any work to be subcontracted.
Compliance with the provisions of this contract by subcontractors shall be the responsibility of the Contractor.
4.7 Permits and Responsibilities. The Contractor shall, without additional expense to the Government, be responsible for obtaining all necessary licenses and permits, and for complying with any applicable Federal, State, County, and Municipal laws, codes, and regulations, in connection with the services of the work within this requirement.
5.0 PERFORMANCE REQUIREMENTS SUMMARY TABLE
It is intended to ensure that the Government receives the services for which it contracted. The Government will only pay for services received. The Performance Requirements Summary (PRS) determines if the Contractor meets the performance standards of the contract, as well as provides guidelines for how and when surveillance will be performed. It ensures timeliness, effectiveness, and that the contractor is delivering the results specified in the contract. Government contract quality assurance will be performed at such times and/or places as may be necessary to determine the services conform to contract requirements.
5.1 If the Contractor fails to perform at any time and the work is deemed critical by the COR, Government forces may be assigned to perform the work. If this occurs, the Contractor shall be required to reimburse the Government for the full costs of the work performed including labor, materials, transportation, and supervision.
5.2 Performance Requirements Summary. These are the criteria against which the performance will be evaluated. Work shall be considered not to have been performed when any one of the following conditions exists in accordance to the Quality Assurance Surveillance Plan (QASP).
Performance Requirements Summary Table These are the criteria against which the performance shall be evaluated.
Performance Objective
Performance Standard Allowed Number of Discrepancies
Surveillance Validated Complaints
Waste Pumping, 4.1 Removal of all materials from the vault, with all vaults being emptied of all liquid and sewage; All debris and spillage created by the pumping shall be removed by the contractor, and the site shall be returned to its natural state prior to the spill.
Not to exceed 1 per quarter
100 % Inspection 0 Validated Complaints Allowed
Rental and Servicing of portable units, 4.2.3
The unit's interior and exterior is cleaned, stocked, and deodorized in accordance with PWS
Not to exceed 1 per quarter
100 % Inspection 0 Validated Complaints Allowed
Emergency Pumping, 4.4.3
Emergency pumping services provided within the stated timeframe of
PWS
Not to exceed 1 per quarter
100 % Inspection 0 Validated Complaints Allowed
Contractor has provided ACTIVITY REPORT FORM as required within the
PWS
Contractor has provided
ACTIVITY REPORT
FORM as required within the PWS
Not to exceed 1 per quarter
100 % Inspection 0 Validated Complaints Allowed
5.3 Surveillance. Periodic surveillance by the QAE or COR, in addition to complaints from project personnel will serve as the surveillance method. If the QAE or COR discovers deficiencies and/or receives complaints, the QAE or COR will pass them on to the contractor's Quality Control Inspector (QCI) for correction.
5.4 Quality Control. The contractor, not the Government is responsible for quality control actions necessary to meet the quality standards set forth by the contract. The Contractor shall develop and submit his Quality Control Plan (QCP) for Government approval after award in compliance with the statement of work. Once accepted, the QCP becomes a part of the Quality Control Surveillance Plan (QASP). The QASP is made part of the solicitation but not a part of the resultant contract. The QASP is not a contractual instrument and may be changed at the Contracting Officer’s discretion. The Contractor then uses the QASP to guide and document the implementation of the required management and quality control actions to achieve the specified results. The Government reserves the right under the Contract Terms and Conditions--Commercial Items (FAR Clause 52.212-4) to inspect and test the services called for by the contract, to the extent practicable at all times and places during the term of the contract. Non-conforming services shall be rejected.
5.5 Unacceptable Performance. When performance is determined unacceptable, as defined in the Performance Requirements Summary, the Government Quality Assurance Evaluator (GQAE) will inform the contractor’s on-site representative that performance is unacceptable and provide written documentation by use of the form DD Form 2772, Contract Discrepancy Report. By initialing and dating the form, the contractor is only acknowledging notification of unacceptable performance. Disputes in surveillance should be referred to the Contracting Officer.
5.6 The GQAE will notify the COR and the Contracting Officer of less than acceptable performance. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. Due to the hazardous nature of this requirement, in order for re-performance to be an acceptable resolution to the less than acceptable performance, then the Contractor has to be able to perform services again within an hour or less.
When the defect(s) in services cannot be corrected by re-performance, the Government may:
a. Require the Contractor to take necessary action to ensure future performance conforms to contract requirements.
b. Reduce the contract price to reflect the reduced value of the services performed.
c. If the Contractor fails to promptly re-perform the services, or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may:
1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or
2) Issue Cure Notice
3) Terminate the contract for Cause.
5.7 Correction of Non-Performance of Work. The Contractor shall employ an adequate quantity of personnel to insure that any area found to be not in compliance and therefore not acceptable, shall be made acceptable by the performance or re-performance of the work, where such re-performance is possible, during the first business day after noncompliance has been observed by or reported to and verified by the COR.
5.8 Standard. Recurring defects are not permitted for any of the above service items. For example, if the COR discovers trash left in an area covered under the contract, the contractor is required to correct the defect through re-performance. No defect is recorded against the contractor's performance. However, if this same situation occurs again during the contract period, a defect will be recorded and reported to the Contracting Officer for appropriate action in accordance with FAR 52.212.4, Contract Terms and Conditions-Commercial Items (May 1997).
6.0 SAFETY AND ENVIRONMENTAL REGULATIONS
6.1 Safety Standards. The Contractor shall comply with applicable Occupational Safety and Health Act
(OSHA) standards as well as the Corps of Engineers Safety Requirements, EM 385-1-1, dated 15 September 2008. The OSHA standards are subject to change and such changes may affect the Contractor in his performance under the contract. It is the Contractor's responsibility to know such changes and effective dates of changes.
6.2 Accident Prevention Plan. As prescribed in EM 385-1-1 the Contractor shall prepare an Accident Prevention Plan. Those areas applicable to the job being performed shall be addressed. In addition to general safety policies and procedures, the plan shall be job-specific and shall also address any unusual or unique aspects of the project or activity for which it is written. This plan will be presented with deliverables required in the Pre-Work Meeting.
6.3 Accidents. In the event that an accident or injury should occur to either Contractor personnel or the public on Government lands, the Contractor shall first notify the appropriate emergency agency, the appropriate local authorities, and then the COR.
6.4 Vehicles/Equipment. The Contractor shall provide and maintain all equipment and vehicles necessary to perform the requirements of this contract. The Contractor may perform only minor repairs of equipment and vehicles on site. Major repairs shall be performed off-site. Contractor’s vehicles shall have the company name prominently displayed on both sides of the vehicle and be maintained clean to present a professional appearance.
Contractor vehicles shall be used solely for the intended purpose of performing services in the PWS during normal hours of operation.
All equipment and vehicles used in the performance of this contract shall be in good operable condition and meet the local, state, and federal safety requirements. Equipment and vehicles found to be unsafe and unable to function as designed, shall be removed from the site and replaced at the Contractor’s expense. The COR may inspect the Contractor’s equipment and vehicles at any time and direct the removal of any unsafe or unusable equipment or vehicle form the installation.
All vehicles shall be registered, licensed, insured, and operated in accordance with site traffic regulations by a licensed driver. All local, state and Corps regulations found in EM 385-1-1 apply.
6.5 Personnel/Security. The Contractor shall supply a list of names to the COR designating the contract manager and an alternate manager. These names shall be designated in writing to the COR, no later than five (5) days prior to on-site work. Contractor personnel shall present a neat appearance and be easily recognized as Contractor’s employees (clear company markings on both sides of trucks required).
The Contractor shall ensure employees or subcontractors have current and valid driver’s licenses for the appropriate vehicle. The COR retains discretion to ask and see the appropriate documentation. The Contractor's vehicles shall be maintained with current and proper state inspection and registration.
6.5.1 Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicles while on Government property.
6.5.2 Government Furnished Items. All required Corps regulations, directives, and forms shall be furnished by the Government. A reasonable number of keys, necessary to accomplish required work will be furnished. Return of these keys to the Government prior to the completion of this contract is essential. Failure to return all keys issued may require the Government to re-key the project for security reasons; therefore, the Contractor shall be held responsible for all costs incurred in the replacement of Project key/core system.
7.0 ANTITERRORISM OPERATION SECURITY (AT/OPSEC)
7.1 AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
7.2 Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
7.3 For contractors who do not require CAC, but require access to a DOD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available) or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
7.3 Suspicious Activity Reporting Training. The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
7.4 For Contracts that Require OPSEC Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
7.5 Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
8.0 GENERAL
8.1 Wage Determination.
The current wage determination is WD 15-5569 (Rev 5) first posted and accessible on www.wdol.gov on 01/16/2018.
8.2 Insurance.
The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance, in accordance with Clause 52.228-5, as follows:
http://www.uscis.gov/e-verify http://www.wdol.gov/
Type Amount
1) Workman's Compensation and Employer's As legally required by the State wherein the work Liability (including Federal Longshoremen and is being performed.
Harbor Worker's Insurance).
2) Comprehensive General Liability Insurance Personal Injury Liability:
$1 million per person $1 million per occurrence
Property Damage (may be included in general aggregate limits or combined single unit coverage):
3) Automobile Liability Personal Injury Liability:
$1 million per person
Property Damage (may be included in general aggregate limits or combined single unit coverage):
4) If single general aggregate limits or combined single unit coverage is obtained for General Liability and/or Automobile Liability coverage, minimum amounts shall be the sum of the personal injury and property damage coverage required above. Umbrella Form Excess Liability insurance coverage shall be added to general liability and automobile liability coverage to determine if minimum insurance limits are met.
5) Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
6) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
8.3 Contract Administration.
Contract will be administered by the following:
Department of the Army, Portland District, Corps of Engineers PO Box 2946 Attn: CECT-NWP-S Portland, Oregon 97208-2946
Dawn Simpson, Purchasing Agent, 503-808-4607 Dawn.R.Simpson@usace.army.mil
8.4 Invoice Submittals.
mailto:Dawn.R.Simpson@usace.army.mil
Send original to:
U.S. Army, COE, Finance Center Attn: CEFC-AO-P 5722 Integrity Drive Millington, TN 38054-5005
Email a copy to:
Raymie Briddell, (541) 349-3041 Raymie.L.Briddell@usace.army.mil
9.0 WALSH-HEALEY PUBLIC CONTRACTS ACT OR THE MCNAMARA-O'HARA SERVICE
CONTRACT ACT (SCA)
Every employer performing work covered by the Walsh-Healey Public Contracts Act or the McNamara-O'Hara Service Contract Act (SCA) is required to post a notice of the compensation required (including, for service contracts, any applicable wage determination) in a prominent and accessible location at the worksite where it may be seen by all employees performing on the contract.
A copy of the poster is available in two versions at the following DOL website:
http://www.dol.gov/whd/regs/compliance/posters/sca.htm. The rest of the content is subjective to each locations needs. There are the additional requirements that are to be observed by the contractor.
10.0 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
a. U.S. Department of Labor Veterans employment: www.vets.gov/
b. Federal veteran employment information: www.fedshirevets.gov/index.aspx
c. Veterans' Employment and Training Service (VETS): http://www.dol.gov/vets/
d. Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/
e. U.S. Army Warrior Transition Command Employment Index:
http://www.wct.army.mil/modules/employers/index.html
f. Hiring Our Heroes initiative: www.uschamberfoundation.org/hiring-our-heroes
g. Guide to Hiring Veterans:
www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
11.0 FORMS
Go the websites as indicated below to find the respective forms.
Contractor Discrepancy Form:
http://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2772.pdf
Activity Hazard Analysis Form:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf mailto:Raymie.L.Briddell@usace.army.mil http://www.dol.gov/whd/regs/compliance/posters/sca.htm http://www.vets.gov/ http://www.fedshirevets.gov/index.aspx http://www.dol.gov/vets/ http://benefits.va.gov/vow/ http://www.wct.army.mil/modules/employers/index.html http://www.uschamberfoundation.org/hiring-our-heroes http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_guide_to_hiring_veterans_0.pdf http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_guide_to_hiring_veterans_0.pdf http://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2772.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
| 3.0 CONTRACTOR SHALL FURNISH |
| 3.1 The Contractor shall furnish all materials and cleaning supplies to include the following: |
File details come from the government source that posted it.