AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: JOHN DAY 500KV DISCONNECT REPLACEMENT

This amendment is issued to update the follow ing:

1. The proposal due date is extended from 15 August 2016 to 2 September 2016 at 4:00pm.

2. Section 00800: FAR 52.211-10, Commencement, Prosecution, and Completion of Work has been updated.

3. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0072

X 9B. DATED (SEE ITEM 11)

14-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Aug-2016

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-16-R-0072

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 14-Jul-2016 04:00 PM to 02-Sep-2016 04:00 PM.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within TEN calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than:

A. CONSTRUCTION COMPLETION DATE for Work Activities:

a. LINE 2 OUTAGE (Units 5-8): The Contractor will have access to Line 2 from December 4, 2018 thru January 12, 2019. All work associated with Line 2 must be completed by January 12, 2019.

b. LINE 3 OUTAGE (Units 9-12): The Contractor will have access to Line 3 from January 22, 2019 thru March 2, 2019. All work associated with Line 3 must be completed by March 2, 2019.

c. LINE 4 OUTAGE (Units 13-16): The Contractor will have access to Line 4 from December 4, 2017 thru January 12, 2018. All work associated with Line 4 must be completed by January 12, 2018.

d. LINE 1 OUTAGE (Units 1-4): The Contractor will have access to Line 1 from January 22, 2018 thru March 2, 2018. All work associated with Line 1 must be completed by March 2, 2018.

e. OUTAGE WORK: All work associated with each line must be completed during the specified outage window. The Contractor will not be allowed to demolish existing items until the start of each respective line outage.

B. FINAL CONSTRUCTION PHYSICAL COMPLETION: All construction, features in the Plans and Specifications, temporary construction supports, construction aids and construction debris shall be removed from the site by 16 March 2019. The date stated for completion shall include all work and final cleanup of the premises.

C. CONTRACT END DATE: Preliminary O&M Manuals must be submitted by 15 December 2016. Preliminary As-Built Drawings must be submitted no later than 30 days following the completion of each line outage. All submittals, As-Build Drawings, O&M Manuals and all other requirements submitted and approved by 31 May 2019.

(End of clause)

(End of Summary of Changes)