About this file
Amendment 00004 - Specs and Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127N-16-R-0011-0003_Final.pdf | ||
| W9127N-16-R-0011-0002.pdf | ||
| W9127N-16-R-0011-0002.pdf | ||
| specs_Amend_0001.pdf | ||
| PPQ_Experience_Forms.pdf | ||
| Past_Performance_Questionaire.pdf | ||
| Experience_Form.pdf | ||
| Dalles_FUB_Contractors_Solicitation_Sign_In_List.pdf | ||
| A.07.23_The_Dalles_Fish_Unit_Breakers_Reference_Dwgs_20160705.pdf | ||
| A.07.23_The_Dalles_Fish_Unit_Breakers_Plans_E_Sz_20160728.pdf | ||
| Specs_TDFB16.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to preform the follow ing:
1. Update the sections of the specifications listed in the continuation page.
2. Update draw ings listed in the continuation page.
3. Extend the response date and time of the solicitation.
4. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0011
X 9B. DATED (SEE ITEM 11)
17-Oct-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Nov-2016
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-R-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
CONTINUATION SHEET
The following sections and paragraphs have been updated as stated below. Please see attached specifications for changes.
SPECS
‐ 26 13 13.00 26 paragraph 2.2.1: Add sentence, "The preferred stacking arrangements of the breakers are shown on Contract Drawing Sheet E‐209. This arrangement may be modified by the Contractor if necessary for manufacturing purposes providing the resultant switchgear lineups do not exceed the footprint represented by the preferred stacking arrangement."
‐ 26 13 13.00 26 paragraph 2.3.1: Delete "in accordance with Table 1 of ANSI C37.06"
‐ 26 13 13.00 26 paragraph 2.3.1: Underline the word, "applicable"
‐ 26 13 13.00 26 paragraph 2.3.2.a: Change "15.5" to "15.0"
‐ 26 13 13.00 26 paragraph 2.3.2.b: Change "2000 (all other FSJ breakers) " to "2000 (FXJ1‐6, FXJ1‐7, FXJ2‐6, FXJ2‐7"
‐ 26 13 13.00 26 paragraph 2.3.2.b: Change "1200 (FXJ1‐1, FXJ1‐2, FXJ2‐1, FXJ2‐1)" to "1200 (all other FSJ breakers)"
‐ 26 13 13.00 26 paragraph 2.3.2.f: Change "110" to "110, or 95 with snubbers"
DRAWINGS
‐ E‐602: Change TO3 differential relay CT ratios from 2000:5 to 150:5.
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 30-Nov-2016 02:00 PM to 08-Dec-2016 02:00 PM.
(End of Summary of Changes)
The Dalles Fish Unit Breakers Replacement
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 26 SUMMARY OF WORK
01 22 00.00 26 MEASUREMENT AND PAYMENT
01 30 70.00 26 AS-CONSTRUCTED DRAWINGS
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.10 25 QUALITY CONTROL SYSTEM (QCS)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 82 14.00 25 ASBESTOS ABATEMENT WORK
02 83 13.00 25 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 53.00 26 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 30 70.00 26 CONCRETE FOR MINOR STRUCTURES
03 60 00.00 26 CONCRETE DEMOLITION AND REPAIR
DIVISION 05 - METALS
05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 13.00 26 MISCELLANEOUS METAL FABRICATIONS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 13.00 26 MEDIUM-VOLTAGE CABLE
26 05 19.00 26 INSULATED WIRE AND CABLE
26 05 26.00 26 GROUNDING
26 05 33.00 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 36.00 26 CABLE TRAY FOR ELECTRICAL SYSTEMS
26 08 01.00 26 SYSTEMS COMMISSIONING
26 11 15.00 26 HIGH RESISTANCE GROUNDING SYSTEM (HRG)-MEDIUM VOLTAGE
26 13 13.00 26 METAL-CLAD SWITCHGEAR
26 25 00.00 26 BUS STRUCTURES, DISCONNECT SWITCH AND CURRENT LIMITING
REACTORS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 13.00 40 FIRE DETECTION AND ALARM CONTROL, GUI, AND LOGIC SYSTEMS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 13 13.00 26
METAL-CLAD SWITCHGEAR
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.4.1 General
1.4.2 Delivery, Storage, And Handling
1.4.3 Qualifications
1.5 MATERIALS, EQUIPMENT AND INSTALLATION
1.5.1 Standard Products
1.5.2 Corrosion Prevention
1.5.2.1 General
1.5.2.2 Fastenings and Fittings
1.5.2.3 Corrosion-Resisting Materials
1.5.2.4 Corrosion-Resisting Treatments
1.5.2.5 Finish
1.5.3 Storage and Handling
1.6 As-built Drawings
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
2.1.2 Device Arrangement
2.1.3 Connections
2.2 MEDIUM-VOLTAGE SWITCHGEAR
2.2.1 Configuration
2.2.2 Removable Elements
2.2.3 Housings
2.2.4 Interlocks
2.2.5 Device Arrangement and Marking
2.2.6 Buses
2.2.7 Wiring
2.2.8 Foundations
2.2.9 Grounding
2.2.10 Cable and Metal-Enclosed Bus Entry
2.2.11 Service Conditions
2.2.12 Nameplates
2.2.13 Remote Racking Devices
2.2.14 Infra-Red Viewing Windows
2.2.15 Test Blocks and Accessories
2.2.16 Test Pendant
2.3 BASIC 15 kV SWITCHGEAR AND CIRCUIT BREAKER RATINGS
2.3.1 General
2.3.2 15 kV Breaker Ratings
2.3.3 Breaker Assembly
2.3.3.1 General
2.3.3.2 Interrupter
2.3.4 Rated Transient Recovery Voltage
SECTION 26 13 13.00 26 Page 1
2.3.5 Load Switching Capacity and Life
2.3.6 Rated Control Voltage
2.4 INTERRUPTERS
2.5 OPERATING MECHANISM
2.5.1 General Operating Requirements
2.5.2 Mechanical Requirements
2.5.3 Operating Capacity
2.5.4 Energy Supply and Storage Means
2.5.5 Operating Mechanism Indicators
2.6 CONTROLS AND CONTROL EQUIPMENT
2.6.1 General
2.6.2 Additional Control Requirements
2.6.3 Low-Voltage Wiring Switching and Protection
2.6.4 Control and Instrument Switches
2.6.5 Escutcheons and Nameplates
2.6.6 Indicating Lamp Assemblies
2.6.7 Molded-Case Circuit Breakers
2.6.7.1 Trip Units
2.6.7.2 125-Volt DC Circuits
2.6.8 Terminal Blocks
2.6.9 Test Pendant
2.7 INSTRUMENT TRANSFORMERS
2.7.1 General
2.7.2 Voltage Transformers
2.7.3 Current Transformers
2.7.3.1 General
2.7.3.2 Window or Bushing Type Current Transformers
2.7.3.3 Wound and Bar Type Current Transformers
2.7.3.4 Rating
2.7.3.5 Burden Analysis
2.8 SURGE ARRESTERS AND CAPACITORS
2.9 PAINTING
2.10 DESIGN TESTS
2.11 PRODUCTION TESTS
2.11.1 General
2.11.2 Switchgear Tests
2.11.3 Circuit Breaker Tests
2.11.4 Instrument Transformer Tests
2.12 ACCESSORIES
2.13 SPARE PARTS
PART 3 EXECUTION
3.1 EQUIPMENT INSTALLATION
3.2 FIELD INSPECTION, TESTING AND COMMISSIONING
3.2.1 General
3.2.2 Switchgear and Circuit Breakers
3.3 QUALIFICATIONS OF FIELD SERVICE ENGINEERING PERSONNEL
3.4 CONTRACTOR FURNISHED TRAINING OF GOVERNMENT PERSONNEL
-- End of Section Table of Contents --
SECTION 26 13 13.00 26 Page 2
2.1.3 Connections
All bolts, studs, machine screws, nuts, and tapped holes must be in accordance with ASME B1.1. Threads for sizes 1/4 inch to 1 inch, inclusive, are required to be NC or UNC series. The sizes and threads of all valves, pipe and fittings, conduit and fittings, tubing and fittings, and connecting equipment must be in accordance with ASME B1.20.1.
Manufacturer's standard thread and construction may be used on small items which, in the opinion of the Contracting Officer, are integrally replaceable, except that threads for external connections to these items must meet the above requirements.
2.2 MEDIUM-VOLTAGE SWITCHGEAR
2.2.1 Configuration
The circuit breakers will be drawout cubicle switchgear as indicated on the contract drawings, 36-inch width sections with drawout breakers. The standard phasing within equipment housings for AC power circuits is A-B-C from left to right, A-B-C from top to bottom, or A-B-C from front to back, when facing the front of the equipment. Power cables in conduit and cable tray will enter the switchgear from the top. Furnish all necessary material and instructions for connection of the switchgear to the terminations. Where power cable terminations are indicated, provide sufficient space for terminating the cables with medium-voltage cable terminations. Each breaker must have provisions for remote manual operation. Provide remote racking provisions for the breaker cubicles.
Provide a control pendant for operating circuit breakers in their "test" position. Prepare and submit outline drawings, assembly and detail drawings, schematic diagrams and connection diagrams as described in paragraph "SUBMITTALS". The preferred stacking arrangements of the breakers are shown on Contract Drawing Sheet E-209. This arrangement may be modified by the Contractor if necessary for manufacturing purposes providing the resultant switchgear lineups do not exceed the footprint represented by the preferred stacking arrangement.
2.2.2 Removable Elements
a. For drawout cubicle switchgear, the removable element of each switchgear unit must consist of a 3 pole interrupter type circuit breaker, with an operating mechanism, primary and secondary disconnecting devices, auxiliary switches, operation counter, position indicator, and control wiring, all mounted on a rugged frame suitable for moving the element. If the frame is not equipped with wheels, it must be suitable for supporting and removing the element from the housing by means of a special truck furnished with the accessories as described in paragraph "ACCESSORIES". Each of the 3 poles must be an independently sealed vacuum interrupter. The mechanism for removing the breaker for drawout switchgear must provide for moving the circuit breaker from the operating to the disconnected or test position. All contacts are to be silver-plated and have ample area and spring pressure. Contact parts which carry current may not be used to supply contact-spring pressures. When the circuit breakers are withdrawn to the disconnect position, the circuit breaker bushing must be withdrawn completely from the fixed contact enclosure and automatic shutters must close the openings to prevent accidental contact with live terminals.
All stationary secondary contacts must be readily accessible and be adequately identified to facilitate connection with the control cables. When the circuit breaker is in the disconnect or test
SECTION 26 13 13.00 26 Page 11 aluminum security cover over a 4-inch crystal sightglass. The IR windows may be the switchgear manufacturer's standard product, or a third-party product that is UL certified and arc-flash tested to the kA rating of the breakers or higher, meeting the applicable requirements of IEC 62271-200, and installed with the coordination and approval of the switchgear manufacturer.
2.2.15 Test Blocks and Accessories
Provide test blocks and their associated testing accessories for testing of instruments and protective relays that require periodic testing or calibration in-place, but which are not equipped with integral testing features. Test blocks shall be fully compatible with the existing ABB Type FT-1 tests switches in use at The Dalles Powerhouse. If not fully compatible the Contractor shall provide five (5) complete sets of test plugs and any other necessary appurtenances. Mount test blocks with covers near the base of the switchgear unit beneath the devices to be tested, and provide a nameplate engraved to identify individual current or potential test blocks, or a combination current/potential test block, as applicable.
Combination test blocks may not exceed 10 poles. Current test blocks must be the short-circuiting type. Provide test devices for insertion into the associated test block to permit application of the proper current or potential source for testing and calibration. Test devices must be rated not less than 20 amperes and 125 volts DC.
2.2.16 Test Pendant
Provide a circuit breaker control pendant for operating the circuit breakers while in the "test" position. Pendant shall have a minimum 25-foot cord.
2.3 BASIC 15 kV SWITCHGEAR AND CIRCUIT BREAKER RATINGS
2.3.1 General
Except as otherwise specified, the circuit breakers must conform to the applicable requirements of IEEE C37.010, IEEE C37.013 IEEE C37.04, ANSI C37.06, IEEE C37.09, IEEE C37.20.2, NEMA C37.55, and IEEE C37.100.
Provide documentation substantiating that the circuit breaker design and assemblies are ANSI certified. Each circuit breaker is to be of the electrically operated, metal-clad, vacuum type suitable for indoor 60-Hz service. The full-load temperature rise must not exceed the limits established in IEEE C37.20.2. Ratings are as defined in IEEE C37.04 Part 5, and as supplemented below.
2.3.2 15 kV Breaker Ratings
Each circuit breaker is to be electrically-operated, metal-clad, with vacuum type interrupters, for indoor 60-Hz service. The circuit breakers must be rated on a symmetrical current basis and have characteristics as follows:
a. Rated Maximum Voltage, kV, rms 15.0
b. Rated Continuous Current, Amps, rms 1200 (all other FSJ Breakers)
2000 (FXJ1-6, FXJ1-7
FXJ2-6, FXJ2-7)
SECTION 26 13 13.00 26 Page 17
c. Rated Interrupting Time, cycles 3
d. Rated Short-Circuit Current, kA, Amps, rms 40
e. Closing and Latching Capability, kA, peak 65
f. Impulse withstand Voltage, full wave, kV (BIL) 110, or 95 with snubbers
g. Rated Frequency, Hz 60
h. X/R Ratio 40
2.3.3 Breaker Assembly
2.3.3.1 General
Provide vacuum circuit breakers consisting of a 3-pole vacuum interrupter, an operating mechanism, primary and secondary disconnecting devices, auxiliary switches, operation counter, position indicator, and control wiring, all mounted on a rugged frame with wheels suitable for moving the removable element.
2.3.3.2 Interrupter
Each of the 3 poles is to be an independently sealed vacuum type interrupter. The interrupter contacts must be protected from moisture and contaminated atmosphere. The three poles and auxiliary devices of each circuit breaker must be operated simultaneously by a single operating mechanism from a common shaft. The operating system capacity must be sufficient to perform repeated operating cycles, using a combination of initial stored energy and recharged stored energy, as required below, without mis-operation or thermal or mechanical damage. The circuit breaker, operating mechanism and control design must permit any close or trip switches to remain closed for any length of time without causing damage.
2.3.4 Rated Transient Recovery Voltage
Each circuit breaker must meet the related required transient voltage withstand capabilities as described by IEEE C37.04 paragraph 5.9.1.1 and
IEEE C37.011.
2.3.5 Load Switching Capacity and Life
Required load switching capability and life is to be in accordance with IEEE C37.04 paragraph 5.8.2.3 and with the following:
a. Each breaker must be capable of performing without maintenance or adjustment, 2,000 no-load operations as prescribed in Column 4 of Table 7 per ANSI C37.06 during time periods (between scheduled breaker maintenance) of up to 10 years, when operated under the specified service conditions.
b. Each breaker must be capable of interrupting without maintenance, at least 1000 close-open (CO) operations under full load conditions as prescribed in Column 6 of Table 7 per ANSI C37.06.
c. Each breaker must be capable of performing without maintenance, SECTION 26 13 13.00 26 Page 18
D
C
A
B
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
1 2 3 4 5 6
E
E
S C
R
IP
T
IO
N M
A R
K D
A T
E A
P P
R of Engineers
US Army Corps
D A
T E
DRAWING PLOT SIZE: $BORDER$ DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME BY USERNAME: $USER$ SHEET NAME: $SHEETN$
D E
S
IG
N F
IL
E
P
W D
IR
BORDER VERSION UPDATE [09-2012]
T H
E D
A L L E
S L
O C
K A
N D D
A M
F
IS
H U
N
IT
S
C O
L U
M B
IA
R
IV
E R P
O W
E R
H O
U S
E
B R
E A
K E
R R
E P
L A
C E
M E
N T
A N
S I E
/2
/2
H
R
W
N -1
-R -0
K
R O
B E
R T S
J
U T
E C
H T
S T
E V
E N R
M
IL
E S ,P .E
D D
P -9 -6 -9
A /2
E-602
S
W
T H A
V E
N U
E S
T E
P O
R T
L A
N D
O R
-1
R E
L A
Y
IN
G O
N E
L
IN
E D
IA
G R
A M
F S J A
N D F
S J
PORTLAND DISTRICT
N .T .S
H D
R E
N G
IN
E E
R
IN
G
IN
C
KEY NOTES:
NOTES:
LEGEND:
(1) 800-5
FXJ1-1
FSJ1
2000A BUS
(1) 800-5
FXJ2-1
FSJ2
2000A BUS
(1) 800-5
FXJ1-2
(1) 800-5
FXJ2-2
FXJ1-3
FXJ2-3
FXJ1-4
FXJ2-4
FXJ1-5
FXJ2-5
SPARE
SPARE
FXJ1-6
FXJ2-6
FXJ1-7
FXJ2-7
14.4KV-120V 3Y
14.4KV-120V 3Y
800-5(3)
800-5(3)
2000-5(3)
800-5(3)
800-5(3)
MR
TS
ANN/PLC
115KV LINE 1
THE DALLES
1200-5 (3)
AUX CTS.
87T
(S1)
400-1
64T
(S1)
64L
(S1)
1-5
TN0,TN1
87L
TO BPA
MICROWAVE
(LCBII)
13.2-115KV 60 ~
3 1} 189,000 KVA FOW
TRANSFORMER BANK T1
230KV LINE 3
THE DALLES
1200-5 (3)
AUX CTS.
87T
(S2)
400-1
64T
(S2)
64L
(S2)
1-5
TN0,TN1
87L
TO BPA
MICROWAVE
(LCBII)
13.2-230KV 60 ~
3 1} 189,000 KVA FOW
TRANSFORMER BANK T3
H1,H2,H3
P1,P2,P3,P0 P1,P2,P3,P0
H1,H2,H3
(TC1)
TUBE
PROT.
(TC1)
TUBE
PROT.
120 120
TB TB TB
MR
TS
ANN/PLC
MR
TS
MULTIFUNCTION RELAY
2000-5 (3)
TB TB TB TB
TB TB TBTB TB TB TB
TO T4
TB TEST BLOCK
TEST SWITCH
M M
MR
TBTB
MR
TBTB
NOTE 6 NOTE 6
NOTE 3
NOTE 3
SHT. E-602A
SELECTOR SWITCH
TO SYNC
NOTE 5
NOTE 5
P -1 .1
-E -6
X X
X .d g n
P O
R T
L A
N D D
IS
T R
IC
T
P O
R T
L A
N D
O R
E G
O N
U S A
R M
Y C
O R
P S O
F E
N G
IN
E E
R S
2000-5 (3)1200-5 (3)
THAT WERE REMOVED FROM SAR3.
FEEDER PROTECTION RELAYS SHALL BE THE SEL-387 RELAYS6.
THREE CONDUCTORS.
SEPARATE ZERO-SEQUENCE, 50:5 CT SURROUNDING ALL 5.
SEE SHEET E-209 FOR INTERLOCK SCHEME4.
BUS DIFFERENTIAL RELAY SHALL BE SEL-487B3.
NEW SYNCHRONIZING SCHEMATIC ON OTHER SHEETS2.
NEW EQUIPMENT SHOWN IN BOLD1.
ARE NEW EQUIPMENT IN NEW LOCATIONS FZJ1 AND FCLR1; FZJ2 AND FCLR21.
FSJ12 FSJ13 FSJ14A FSJ14B FSJ11B FSJ15A FSJ15BFSJ11A
FSJ22 FSJ23 FSJ25B FSJ21A FSJ25A FSJ21BFSJ24BFSJ24A
(3) 1200-5
1200-5 (3)
(3) 1200-5
1200-5 (3)
(3) 1200-5
1200-5 (3)
(3) 1200-5
(3) 1200-5
150-5 (3)
(3) 1200-5 (3) 2000-5 (3) 2000-5
(3) 2000-5(3) 2000-5(3) 1200-5
(3) 1200-5
(3) 1200-5
150-5 (3)
1200-5 (3)
(3) 1200-5
1200-5 (3)
(3) 1200-5
1200-5 (3)
(3) 1200-5
S H
E E
T O
F
SHT. E-602A
VOLT. REG.
FU NO. 1
SHT. E-602A
& RELAYS
INST. METERS
FU NO. 1
SHT. E-602A
VOLT. REG.
FU NO. 2
SHT. E-602A
& RELAYS
INST. METERS
FU NO. 2
TO MU 1 & 2 TO MU 5 & 6
B B
B B
TBTBTB TB
TB TB
14.4KV-120V
A-B
A-B
14.4KV-120V
A
M E
N D C
H A
N G
E T
O D
IF
F
R E
L A
Y C
T R
A T
IO
S F
R O
M
:5 T
O
:5
/2
/1
R
C S
13.8-4.16KV
2000 kVA
COMPRESSORS
CONDENSING
SYNCHRONOUS
EXISTING
T02 T03
13.8 - 4.16 kV
3000 kVA
To XP300
FCLR1
FZJ1
FCLR2
FZJ2
SHT. E-602A
CURRENT RELAY
GENERATOR DIFFERENTIAL
TO EXISTING FISH UNIT 1
SHT. E-602A
FISH UNIT 1
TO EXISTING
SHT. E-602A
CURRENT RELAY
GENERATOR DIFFERENTIAL
TO EXISTING FISH UNIT 2
SHT. E-602A
FISH UNIT 2
TO EXISTING
LOCATED IN SP3
SEL-387
TO3 DIFF RELAY
TO EXISTING
B C D
E
F
G
H
I
J
A
| W9127N-16-R-0011-0004 |
| specs_Amend 0004 |
| PROJECT TABLE OF CONTENTS |
| DIVISION 26 - ELECTRICAL |
| 26 13 13.00 26 - METAL-CLAD SWITCHGEAR |
| 26 13 13.00 26 - METAL-CLAD SWITCHGEAR |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.3 Connections |
| 2.2 MEDIUM-VOLTAGE SWITCHGEAR |
| 2.2.1 Configuration |
| 2.2.2 Removable Elements |
| 2.2.15 Test Blocks and Accessories |
| 2.2.16 Test Pendant |
| 2.3 BASIC 15 kV SWITCHGEAR AND CIRCUIT BREAKER RATINGS |
| 2.3.1 General |
| 2.3.2 15 kV Breaker Ratings |
| 2.3.3 Breaker Assembly |
| 2.3.3.1 General |
| 2.3.3.2 Interrupter |
| 2.3.4 Rated Transient Recovery Voltage |
| 2.3.5 Load Switching Capacity and Life |
DDP-1.117-E-602XXX amend5-E-602-000