Specs_TDFB16.pdf

PDF 3 MB Posted

Attached to
The Dalles Fish Unit Breaker Replacement Federal contract opportunity
Solicitation number
W9127N-16-R-0011
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

Solicitation Package

View the file

Other files for this federal contract opportunity

Other files attached to The Dalles Fish Unit Breaker Replacement, newest first.
File Type Posted
W9127N-16-R-0011-0004_Final.pdf PDF
W9127N-16-R-0011-0003_Final.pdf PDF
W9127N-16-R-0011-0002.pdf PDF
W9127N-16-R-0011-0002.pdf PDF
specs_Amend_0001.pdf PDF
PPQ_Experience_Forms.pdf PDF
Past_Performance_Questionaire.pdf PDF
Experience_Form.pdf PDF
Dalles_FUB_Contractors_Solicitation_Sign_In_List.pdf PDF
A.07.23_The_Dalles_Fish_Unit_Breakers_Plans_E_Sz_20160728.pdf PDF
A.07.23_The_Dalles_Fish_Unit_Breakers_Reference_Dwgs_20160705.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

W9127N-16-R-0011

THE DALLES DAM

KLICKITAT COUNTY, WASHINGTON

THE DALLES FISH UNIT BREAKER REPLACEMENT

PROJECT MANUAL

TOC-1

PROJECT NAME: THE DALLES FISH UNIT BREAKER REPLACEMENT

LOCATION: KLICKITAT COUNTY, WASHINGTON

MAGNITUDE OF CONSTRUCTION: Betw een $5,000,000.00 and $10,000,000.00

SOCIO-ECONOMIC: UNRESTRICTED

DAVID L DVORAK

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

17-Oct-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________7 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10 Alt1

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________17 Nov 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9127N-16-R-0011 62

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 Mobilization &

Demobilization 1 Job

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0002 Remove

Existing 15 kV Bus and

1 Job

Circuit Breakers, Complete with Conduits and Feeders

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0003 Remove

Existing Fish Unit Generator

1 Job

Neutral Grounding, Neutral Circuit Breaker and Surge Gear, Complete with Conduits and Wire

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0004 Furnish &

Install:

1 Job

New 13.8 kV Switchgear FSJ1 and FSJ 2, Complete with Wiring, Conduits and Feeders.

Funded:

00010-3

0005 Furnish &

Install:

1 Job

New 15kV Bus, CLR's, and Disconnect Switches, Complete with Wiring, Relays, Meters, Controls, Control Board, Autosynchronizers, 15kV Bus Duct Modifications, and Conduits and Feeders to interconnect the T1 and T3 bus with FSJ1 and FSJ2.

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0006 Furnish &

Install:

1 Job

Fish Unit Generator, High Resistance Grounding System.

Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0007 Furnish

Operations and 1 Job

Maintenance Manuals. Funded:

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0008 Furnish As-

Constructed Drawings

1 Job

Funded:

00010-4

0009 Contractor-

Furnished Training of

1 Job

Government Personnel Funded:

TOTAL

TOTAL PROPOSED PRICE FOR ALL LINE ITEMS $___________________

00010-5

Section 00100 - Bidding Schedule / Instructions to Bidders

BASIS OF AWARD

PROJECT BACKGROUND AND OBJECTIVES.

The U. S. Army Corps of Engineers (USACE), Portland District, seeks a contractor to perform the construction of The Dalles Fish Unit Breaker Replacement, and incidental related work. The project will substantially improve safety and management of power distribution from the two fish water generators in The Dalles powerhouse. The upgraded facility will include the following major features:

1. Replace the existing fish water unit 15kV breakers

2. Disconnect the fish water units from Transformer TA and reconnect them to Transformer T3

3. Provide additional breakers and reconfigure the bus for redundancy of the system

4. Replace the current-limiting reactors at the station service taps

5. Replace the fish water neutral breakers with high resistance ground systems

6. Modify the existing switchgear control switchboards

7. Upgrade the surge arresters, instrument transformers, and relays to improve arc flash protection

The work is located at The Dalles Dam, Klickitat County, Washington.

BASIS FOR AWARD.

A. General.

(1) This solicitation is an unrestricted competitive acquisition using Lowest Price Technically Acceptable (LPTA) source selection process for the award of a firm fixed-price contract. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. This acquisition will utilize FAR Part 15 LPTA source selection procedures, leading to selection of the proposal representing the best value to the Government.

(2) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions Offerors are encouraged to include their best pricing in their initial proposal.

(3) In the context of this proposal, the “Offeror” refers to the proposed prime contractor. A major subcontractor is defined as a subcontractor that the Offeror proposes to perform 25% or more of the work required under the solicitation or proposes to perform the Isolated-Phase Bus portion of the work. The Offeror may submit the experience of major subcontractors in order to demonstrate that the Offeror meets the RFP requirements below.

(4) All proposals received will stand alone and be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful Offeror will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. Elaborate proposals, color brochures, and other excesses are discouraged.

(5) Joint Ventures (JV) A joint venture is defined as follows: a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliance” which are not recognized as bona fide joint ventures for the purposes of this solicitation. A company that is part of a joint venture shall submit a legally binding joint venture agreement. Joint ventures shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Page and project form limits apply to the joint venture as a whole.

00100-1

B. Evaluation Ratings

(1) The principle objective of the evaluation process is to make award of a contract to the responsible Offeror whose proposal is determined to be the “best value” to the Government, price and other factors considered. An evaluation of acceptability will be performed on each proposal in accordance with FAR 15.101-2, Lowest Price Technically Acceptable Source Selection Process. Award will be made on the basis of the lowest evaluated price of proposals meeting the acceptability standards of non-cost factors. Tradeoffs are not permitted. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and thus preclude award.

(2) A Technical Proposal will be rated as “Acceptable” or “Unacceptable” based upon whether it demonstrates the minimum requirements of the RFP.

Table 1. TECHNICAL Acceptable/Unacceptable RATINGS

RATING DESCRIPTION

Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

Table 2. Past Performance Acceptable/Unacceptable Rating Method

Adjectival Rating DESCRIPTION

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note above)

Unacceptable Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.

SUBMISSION OF PROPOSALS

A. Administrative Details and General Instructions: Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

(1) General Proposal Format. Submit each copy of the proposal in tabbed, 3-ring binders with a “D” ring or locking closures.

Title Page. Each copy must include the Offeror’s name and address, phone number and email address, title of the solicitation, solicitation number and date of submittal clearly identified on the front cover of the binder.

Table of Contents. Each binder of the proposal shall contain a detailed table of contents. The complete table of contents shall be included in each binder.

Printed Matter Submissions. Pages containing text are expected to be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Paragraphs should be separated by at least one blank line. A standard 11-point font in either Arial or Times New Roman fonts are required.

00100-2

Organization charts or schedules. A folded 11” x 17” format may be used. Larger format drawings or tables may be added by folding them to fit within the binder.

All information must be confined to the appropriate volume. If the materials do not fit within a single volume, they should be separated in additional binders, but clearly identified as such. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.

THE OFFEROR SHALL SUBMIT AN ELECTRONIC VERSION OF EACH PROPOSAL. The electronic version shall be on a readable CD. Any discrepancies between the electronic and paper copies shall give precedence to the paper copy.

(2) Proposal Content Limitations.

The Offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offeror’s are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. The page count is at the discretion of the Offeror, however the proposal may not be more than 25 pages total.

The evaluation panel for the Government is instructed to evaluate the non-price proposal factors on the basis of the information provided. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the Offeror should only provide information that satisfies the solicitation requirements. Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.

DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.

Proprietary information must be clearly marked.

B. Content of Proposals: All proposals must be prepared in two (2) volumes: A technical proposal (Volume I) and a price proposal (Volume II). Each of the volumes shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal must not contain reference to price. The narrative and content structure of the proposal shall follow the format shown in the table for Volume I below. Offeror’s who fail to submit a complete proposal may be excluded and thus receive no further consideration for award.

(1) Technical Proposal, Volume I: Provide one (1) original and four (4) copies and one (1) pdf. file on a CD-ROM. Volume I shall consist of information for the three (3) factors listed in tabular form, as noted below. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.

Volume I – Technical (Non-Price) Factors:

Tab 1 – Factor 1: Experience Tab 2 – Factor 2: Past Performance Tab 3 – Factor 3: Schedule

(2) Price Proposal, Volume II: The Price Proposal shall be submitted on one (1) original copy and one

(1) pdf. file on a CD-ROM. Contractors shall provide pricing and complete all line items on Standard Form 1442 (SF 1442). Your price proposal must be prepared in accordance with below paragraphs and must include:

00100-3

Tab 1 - SF1442, Solicitation, Offer, and Award.

The SF1442 shall be filled out completely by the Offeror and signed by an official that is authorized to bind the company. The Offeror shall also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.

Tab 2 – Section 00010, Proposal Price / Bid Schedule.

The Offeror shall fully complete this section.

Tab 3 - Representations, Certifications and other Statements of Offeror’s.

The Offeror shall complete all representations and certifications in Section 00600 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.

Tab 4 – Banking and Bonding Points of Contact.

The Government is required to determine Contractor’s responsibility; the Offeror shall provide contact information (company name, point of contact, address, email, and phone number) for the Offeror’s bank and bonding institutions.

Tab 5 - Bid/Offer Guarantee. The Bid Bond shall be at least 20% of the bid price, but shall not exceed $3 million. See FAR Clause 52.228-1 – Bid Guarantee.

C. Submission of Proposals: Proposals must arrive at the location designated in the RFP for receipt of such proposals prior to the time and date established in Block 13, SF 1442. There will not be a public proposal opening. In order for the proposal to be considered, it MUST be prepared in ENGLISH, and must be submitted as a hardcopy original (Volume I and II) and four (4) copies (Technical Volume I only) with the required electronic CD-ROM:

BY HAND OR COURIER TO:

U. S. ARMY CORPS OF ENGINEERS, NWP

Block 300 (10th Floor USACE Security Desk)

333 SW First Avenue Portland, Oregon 97204

Attention: David L. Dvorak – CECT-NWP-C

OR SURFACE MAIL ADDRESS:

U. S. ARMY CORPS OF ENGINEERS, NWP

P. O. Box 2946 Portland, OR 97208-2946

Attention: David L. Dvorak – CECT-NWP-C

NOTE: E-MAIL SUBMISSIONS WILL NOT BE CONSIDERED. If the electronic CD-ROM proposal differs from the hard copy, the hard copy will take precedence.

OFFEROR SHALL MARK THE OUTSIDE ENVELOPE(S) AS FOLLOWS:

Envelope(s) shall be plainly marked with the following information:

Solicitation No. W9127N-16-R-0011 Proposal Due Date: ____________________________________ Number of each amendment that has been received: _________

00100-4

EVALUATION FACTORS

Volume I – Technical (Non-Price) Submission Requirements and Evaluation Method:

FACTOR 1 (TAB 1) – Experience

Submission Requirements:

The offeror shall submit information for up to two recent and relevant projects* that demonstrates the Offeror’s experience with:

(1) 5 kV or larger switchgear installation, and

(2) Isolated-Phase Bus installation.

For each project submitted, include the information outlined in Attachment B, Offeror’s Experience Form.

It is up to the offeror to describe each project experience with enough specificity so that the Government can determine whether the acceptability criteria outlined below has been met.

*Recent and relevant projects are those projects completed or substantially completed** in the past 5 years of the date the proposals are due that are similar in scope and complexity with this project, as described in Specification Section 01, 11 00.00 25 SUMMARY OF WORK.

**Substantially complete is defined as being 75% complete by the date that proposals are due. If an offeror submits a project that it represents is “substantially complete,” the offeror must reasonably explain why the project is considered at least 75% complete. If an offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.

***The Government will consider the experience of major subcontractors proposed to meet the RFP requirements. However, in order to be considered, the offeror must submit a letter of commitment for any subcontractor where subcontractor experience is used to demonstrate experience under this factor. Subcontractors proposed to be used may not be substituted upon award without the Contracting Officer’s prior written approval.

A maximum of two recent projects will be evaluated. If an offeror disregards these instructions and submits more than two projects, only the first two projects will be evaluated for meeting the requirements.

Offerors shall describe each project with enough detail to ensure that the Government can meaningfully assess whether the projects submitted meet the minimum evaluation criteria outlined.

Evaluation criteria:

Experience will be rated on an “acceptable” or “unacceptable” basis.

Acceptable: To be determined “acceptable,” the offeror’s proposal must demonstrate the offeror has both of the following experiences:

1. The offeror has experience installing 5 kV or larger switchgear.

2. The offeror has experience installing Isolated-Phase Bus.

Unacceptable: The offeror’s proposal fails to demonstrate that the offeror has both: Experience installing 5 kV or larger switchgear and experience installing Isolated-Phase Bus.

00100-5

Table 1. TECHNICAL Acceptable/Unacceptable RATINGS

RATING DESCRIPTION

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

FACTOR 2 (TAB 2) – Past Performance

Submission Requirements:

The offeror shall provide past performance information for each project listed by the offeror under Factor 1, Experience. Recent and relevant projects are those projects completed or substantially completed** within five years of the date that proposals are due that are similar in size, scope, and complexity to the work within this requirement.

** Substantially completed is defined as having completed more than 75% of the project work at the time proposals are due.

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal. Do not submit a PPQ when a completed CPARS is available.

Completed PPQs should be submitted with your proposal if a CPARS is not available. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, David L. Dvorak, via email at David.L.Dvorak@usace.army.mil prior to proposal closing date. The offerors shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an e-mail confirmation upon receipt. If the offeror does not receive the confirmation, it is their responsibility to follow up to ensure the government has received the information.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.

In addition to the above, the Government may review other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including Contractor Performance Assessment Reporting System (CPARS), using all

00100-6

CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s),FAPIIS, telephone interviews with organizations familiar with the offeror’s performance, Government personnel with personal knowledge of the offeror’s performance capability, and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

Evaluation Criteria:

The past performance evaluation results is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the project outlined in the solicitation requirements.

There are two aspects to the past performance evaluation. The first is to evaluate whether the offeror’s present/past performance is relevant or not relevant to the project.

The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The Government will evaluate the offeror’s past performance to ensure previous work performance satisfactorily met the contract requirements, performance schedules, prescribed quality of work, safety requirements, and other customer expectations on these projects.

The Government reserves the right to obtain or verify offeror’s past performance information from references and other sources available to the Government.

Past performance under Factor 2 shall be evaluated using the following rating of an “acceptable” or “unacceptable” basis using the ratings stated in Table 2:

Table 2. PAST PERFORMANCE EVALUATION RATINGS

RATING DESCRIPTION

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

FACTOR 3 (TAB 3) - Schedule

Submission Requirements:

00100-7

The Offeror shall submit a schedule, in Gantt chart format, for completing the work within the timeframes described in the solicitation requirements. The Gantt chart shall be in calendar days only. At a minimum, the schedule shall include the following:

1. Mobilization,

2. Contractual milestones described in 52.211-10 ALT1,

3. Fish water unit shutdown periods,

4. Main unit shutdown periods,

5. Major features of work as described below:

Replace the existing fish water unit 15kV breakers

Disconnect the fish water units from Transformer TA and reconnect them to Transformer T3

Provide additional breakers and reconfigure the bus for redundancy of the system

Replace the current-limiting reactors at the station service taps

Replace the fish water neutral breakers with high resistance ground systems

Modify the existing switchgear control switchboards

Upgrade the surge arresters, instrument transformers, and relays to improve arc flash protection

6. Demobilization, Note: The Gantt chart schedule shall be in calendar-days format. A working day Gantt chart schedule will not be acceptable for this factor.

Evaluation Criteria:

The Schedule will be rated on an “acceptable” or “unacceptable” basis. The Government will review the offeror’s schedule in order to determine whether the offeror’s schedule includes all of the required schedule submission requirements, as outlined above, and to determine whether the offeror’s schedule for those required items meets the timeframes as required by the solicitation specifications.

Acceptable: To be determined “acceptable,” the offeror’s schedule must include a Gantt chart that includes the work items outlined in the submission requirements above, in a logical sequence, and be completed within the timeframes described in the solicitation specifications, to include the Main unit / Fish water unit shutdown periods.

Unacceptable: The offeror’s schedule fails to include a schedule in Gantt chart format addressing each of the work items contained in the submission requirements. The offeror’s proposed schedule demonstrates an inability to complete the work within the timeframes described in the solicitation specifications or to complete the work on time. The offeror’s proposed schedule fails to complete all work requiring an outage within the timeframes described in the solicitation.

Table 1. TECHNICAL Acceptable/Unacceptable RATINGS

RATING DESCRIPTION

Acceptable The proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

00100-8

Volume II - Price.

Price Evaluation

Award will be made on the basis of the lowest evaluated price (sum of all CLINs) of proposals meeting or exceeding the acceptability standards for non-cost factors.

The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.

The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

ATTACHMENT A

PAST PERFORMANCE QUESTIONNAIRE

1. The USACE Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire.

2. Solicitations:

“Solicitation Submittal Requirements: IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the PPQ included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 3, Recent of Current Past Performance. AN OFFEROR

SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors should follow- up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact David L. Dvorak, via email at David.L.Dvorak@usace.army.mil prior to proposal closing date.

Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs.

However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.”

USACE Form PPQ will be made accessible on FBO website as a separate attachment. (Word version)

ATTACHMENT B

00100-9

OFFEROR’S EXPERIENCE FORM will be made accessible on FBO website as a separate attachment. (Word version)

BIDDER INQUIRY INFORMATION

BIDDER INQUIRIES

(All inquiries regarding this solicitation are to be submitted via ProjNet-Bid. Telephone and email inquiries will not be accepted. ProjNet-Bid is a web-based program that allows offerors to post questions regarding the solicitation, and to view all questions by other offerors, and answers by the U.S. Army Corps of Engineers.

ProjNet-Bid can be accessed through the ProjNet website: https://www.projnet.org/projnet/.

To access the ProjNet-Bid website the first time:

1) Register.

2) Click Quick Add Key. (The Agency is USACE.)

3) Enter the following information for access:

The Bidder Inquiry Key: QZ3D5D-P9BTW9

Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)

Establish secret question and answer which will be used as a password (required on first project only)

4) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet-Bid Module 00100.

5) Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

6) For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the Contract Viewer.

7) For questions about the ProjNet-Bid, please contact the Call Center help desk. The contact information is listed on the ProjNet website.

No response will be posted to inquiries after the Close of Business on the fifth business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bid prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991

00100-10

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

3.8% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published

00100-11 periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Klickitat, WA.

(End of provision)

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

00100-12

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

USACE-Portland District ATTN: CECT-NWP, Chief of Contracting P. O. Box 2946 Portland, Oregon 97208-2946

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

DATE: 27 OCTOBER 2016

00100-13

TIME: 10:00 AM (PST)

(c) Participants will meet at: Once through Security Office/Gate

Westrick Center Building Meeting Room The Dalles Lock and Dam, Exit 88, I-84 The Dalles Lock and Dam, Oregon

REQUIREMENTS: INTERESTED SITE VISIT ATTENDEES ARE REQUIRED TO RSVP YOUR PLANNED

ATTENDANCE WITH THE FOLLOWING INFORMATION TO David L. Dvorak VIA EMAIL:

David.L.Dvorak@usace.army.mil and Dara E. Doty Dara.E.Doty@usace.army.mil; BY 2:00 PM (PST) THE DAY

PRIOR OF THE SITE VISIT.

SUBJECT LINE: W9127N-16-R-0011 SITE VISIT ATTENDEES

NAME

COMPANY NAME

PHONE

EMAIL

DATE OF BIRTH

PLACE OF BIRTH

U. S. CITIZEN (Y/N)

DUE TO SECURITY REQUIRMENTS AT THE POWERHOUSE, YOU MUST RSVP IN ADVANCE TO

ATTEND. HARD HATS, STURDY CLOSED-TOED WORK BOOTS OR SAFETY SHOES, AND PHOTO ID

WILL BE REQUIRED.

PLEASE DO NOT HESITATE TO CONTACT David Dvorak, 503-808-4633, SHOULD YOU HAVE ANY QUESTIONS IN ADVANCE OF THE SITE VISIT. INDIVIDUAL SITE VISITS CAN NOT BE ARRANGED, SO PLEASE MAKE EVERY EFFORT TO ATTEND THIS ONLY OPPORTUNITY TO VIEW THE SITE OF

THE WORK.

(End of provision)

52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including--

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being

00100-14 rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/vffara.htm

(End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

(a) Definitions. As used in this provision—

“System for Award Management (SAM) database” means the primary Government repository for contractor information required for the conduct of business with the Government.

“Commercial and Government Entity (CAGE) code” means—

(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or

(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an “NCAGE code.”

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

00100-15

“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR 32.11) for the same parent concern.

“Registered in the System for Award Management (SAM) database” means that—

(1) The contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and Contractor and Government Entity (CAGE) code into the SAM database; and

(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as part of the SAM registration process; and

(4) The Government has marked the record “Active.”

(b) (1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

00100-16

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .