specs_Amend_0001.pdf
PDF 71 KB Posted
- Attached to
- The Dalles Fish Unit Breaker Replacement Federal contract opportunity
- Solicitation number
- W9127N-16-R-0011
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127N-16-R-0011-0004_Final.pdf | ||
| W9127N-16-R-0011-0003_Final.pdf | ||
| W9127N-16-R-0011-0002.pdf | ||
| W9127N-16-R-0011-0002.pdf | ||
| PPQ_Experience_Forms.pdf | ||
| Past_Performance_Questionaire.pdf | ||
| Experience_Form.pdf | ||
| Dalles_FUB_Contractors_Solicitation_Sign_In_List.pdf | ||
| A.07.23_The_Dalles_Fish_Unit_Breakers_Reference_Dwgs_20160705.pdf | ||
| A.07.23_The_Dalles_Fish_Unit_Breakers_Plans_E_Sz_20160728.pdf | ||
| Specs_TDFB16.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT NAME: THE DALLES FISH UNIT BREAKER REPLACEMENT
LOCATION: KLICKITAT COUNTY, WASHINGTON
1. The purpose of this amendment is to revise section 01 10 10, paragragh 1.23 of the specifications.
2. All other terms and conditions of the solicitation remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0011
X 9B. DATED (SEE ITEM 11)
17-Oct-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Nov-2016
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The Dalles Fish Unit Breakers Replacement
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 26 SUMMARY OF WORK
01 22 00.00 26 MEASUREMENT AND PAYMENT
01 30 70.00 26 AS-CONSTRUCTED DRAWINGS
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.10 25 QUALITY CONTROL SYSTEM (QCS)
01 57 20.00 25 ENVIRONMENTAL PROTECTION
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 82 14.00 25 ASBESTOS ABATEMENT WORK
02 83 13.00 25 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 53.00 26 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 30 70.00 26 CONCRETE FOR MINOR STRUCTURES
03 60 00.00 26 CONCRETE DEMOLITION AND REPAIR
DIVISION 05 - METALS
05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 13.00 26 MISCELLANEOUS METAL FABRICATIONS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 13.00 26 MEDIUM-VOLTAGE CABLE
26 05 19.00 26 INSULATED WIRE AND CABLE
26 05 26.00 26 GROUNDING
26 05 33.00 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 36.00 26 CABLE TRAY FOR ELECTRICAL SYSTEMS
26 08 01.00 26 SYSTEMS COMMISSIONING
26 11 15.00 26 HIGH RESISTANCE GROUNDING SYSTEM (HRG)-MEDIUM VOLTAGE
26 13 13.00 26 METAL-CLAD SWITCHGEAR
26 25 00.00 26 BUS STRUCTURES, DISCONNECT SWITCH AND CURRENT LIMITING
REACTORS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 13.00 40 FIRE DETECTION AND ALARM CONTROL, GUI, AND LOGIC SYSTEMS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 10.00 25
CONTRACTOR'S OPERATIONS AND REQUIREMENTS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 SCHEDULE FOR CONSTRUCTION
1.5 INTERIM CONSTRUCTION COMPLETION DATES
1.6 PERMITS AND RESPONSIBILITIES
1.7 INCLEMENT WEATHER CONSTRUCTION
1.8 IN-WATER WORK
1.8.1 In-Water Work (IWW) Periods
1.8.2 In-Water Work Activities
1.9 NOTIFICATION OF EQUIPMENT OUTAGE
1.10 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK
1.11 WEEKLY COORDINATION MEETINGS
1.12 PARTNERING
1.13 CONTRACTOR EMPLOYEES
1.14 PAGERS
1.15 ACCESS AGREEMENTS AND WORK AREAS
1.15.1 Access Agreements
1.15.2 Work Areas
1.15.3 Employee Access and Parking
1.16 SECURITY PROCEDURES
1.16.1 Project Security
1.16.2 Contractor's General Personnel
1.16.3 Identification of Employees
1.16.4 Foreign Born Employees
1.16.5 Identification of Contractor Vehicles
1.16.6 Use of Private Vehicles
1.17 SUPPLEMENTAL SECURITY REQUIREMENTS
1.17.1 Personnel Risk Assessment
1.17.2 Authorized Unescorted Access Requirements
1.17.3 Security Programs
1.17.3.1 Quarterly Security Awareness Program
1.17.3.2 Annual NERC Mandated Cyber Infrastructure Protection
Training Program
1.18 ANNUAL ANTITERRORISM AND OPERATIONS SECURITY TRAINING
1.19 DECK ACCESS RESTRICTIONS
1.20 CONSTRUCTION PROJECT IDENTIFICATION SIGN
1.21 UTILITIES
1.21.1 Sanitary Facilities
1.21.2 Electrical Power
1.21.2.1 General
1.21.2.2 Temporary Electrical Wiring
1.21.3 Telephone
1.21.4 Water
1.22 CONTRACTOR'S EQUIPMENT
1.22.1 Contractor's Planned Equipment Methods
SECTION 01 10 10.00 25 Page 1
1.22.2 Plant and Equipment List
1.22.3 Movement of Equipment by the Contractor
1.23 CONTRACTOR USE OF GOVERNMENT CRANES
1.24 CRANES AND HEAVY EQUIPMENT
1.24.1 Contractor Crane Safety
1.24.2 Contractor Crane Testing
1.24.3 Contractor's Cranes and Heavy Equipment
1.25 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS
1.26 GAS, VAPOR, FUME, DUST, AND MIST CONTROL IN POWERHOUSE
1.26.1 General
1.26.2 Additional Provisions
1.27 NOISE CONTROL
1.27.1 General
1.27.2 Nighttime Noise Limitations
1.28 USE OF EXPLOSIVES
1.29 DISPOSITION OF MATERIALS
1.29.1 Daily Cleanup and Disposal
1.29.2 Disposal of Equipment and Miscellaneous Materials
1.30 LEAD BASED PAINT
1.31 PRESERVATION OF HISTORICAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES
1.32 PROTECTION OF MATERIAL AND WORK
1.33 PROTECTION OF EXISTING UTILITIES
1.34 PROTECTION AND RESTORATION OF EXISTING FACILITIES
1.35 RESTORATION OF PROJECT ROADS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
-- End of Section Table of Contents --
SECTION 01 10 10.00 25 Page 2
1.22.2 Plant and Equipment List
Within seven days prior to commencing site operations, provide a complete list of all plant and equipment to be used on the job site, exclusive of shop equipment. Throughout the life of the Contract, submit an up-to-date plant and equipment list with each progress payment request. Include rented equipment as well as lease purchase or sale leaseback equipment on the lists. Initial list and the revised monthly lists must indicate dates equipment is assigned to or removed from the project; deadline dates for repairs and returned for use; dates of the most recent and planned inspections; and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.
1.22.3 Movement of Equipment by the Contractor
a. Unless otherwise noted, any vehicle crossing a project bridge is limited to AASHTO LRFDUS, HL-93 vehicle and load requirements. Submit a loading diagram for approval showing wheel loads, wheel spacing, and travel speed a minimum of 30 days prior to operating any equipment or vehicles in excess of 72,000 pounds gross vehicle weight (GVW) and axle loads of 32,000 pounds. Prior coordination and approval for such loads must be obtained before proceeding. No exclusion trucks, multi-axle specialized hauling vehicles (SHV) or mobile cranes will be allowed on a bridge deck without prior review and approval. At a minimum, the loading diagram must include but not be limited to the following information:
(1) A typical section and plan view of the bridge, the position of the wheel loads and wheel spacing of the truck or crane.
(2) The GVW of the vehicle and all axle weights.
(3) For cranes, the location and weight of axles before and after counter weights are installed, all outrigger loads, required crane boom length, weight and location of center of gravity. This should also include the effects of guy lines, upper spreader and jib mast. If using a jib, show the length, weight, and location of the center of gravity.
b. Any SHV's authorized to drive on the bridge deck must have all lift axles lowered and fully engaged while the vehicle has any load. For cranes, all specialized boom trailers must be engaged until a final set up with the outriggers are made and approved.
1.23 CONTRACTOR USE OF GOVERNMENT CRANES
The Contractor will not be allowed to use Government cranes for any work or access. Powerhouse bridge crane will be made available by request and operated by the Government. Contractor must provide planned lifting requirements in weekly construction meeting. Request for crane assistance must be finalized no less than one week in advance for non emergency lifts. All requests must be scheduled during regular project work hours.
SECTION 01 10 10.00 25 Page 15
| W9127N-16-R-0011-0001 |
| specs_amendment_0001 |
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| PART 1 GENERAL |
| 1.22 CONTRACTOR'S EQUIPMENT |
| 1.22.2 Plant and Equipment List |
| 1.22.3 Movement of Equipment by the Contractor |
1.23 CONTRACTOR USE OF GOVERNMENT CRANES
| [1]: [1] |
| Amd0001: AMD #0001 |