B.08 Solicitation W9126G22Q0007 Amend 0001.pdf
PDF 3 MB Posted
- Attached to
- Herbicide Services Somerville Lake, Texas
- Solicitation number
- W9126G22Q0007
About this file
This solicitation is for herbicide services at Somerville Lake in Texas. The U.S. Army Corps of Engineers is seeking a contractor to provide herbicide application to recreational facilities, embankments, roads, parking areas and other areas around the lake. Services include non-selective post-emergent application to kill all vegetation, and selective pre-emergent and post-emergent applications to prevent seed germination and kill target grassbur species without damaging bermudagrass. Offerors must have a National Institute of Standards and Technology score in the Supplier Performance Risk System to be considered responsive. The performance work statement specifies application areas and methods, schedules, reporting requirements, and other details. The period of performance is a one year base period and up to five one-year options. The government will award a firm-fixed price contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add attachment 4 and attachment 5 to PWS.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Oct-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G22Q0007
X 9B. DATED (SEE ITEM 11)
19-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Oct-2021
CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G22Q0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
PERFORMANCE WORK STATEMENT
Herbicide Application Capital Regional Office
Somerville Lake
1. GENERAL: This is a non-personal services contract to provide herbicide application to recreational park facilities, embankment, riprap, roads, parking areas, guardrails, pipe fences and associated areas of dam. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, travel, supervision, and other items and non-personal services necessary to perform herbicide application at Somerville Lake as defined in this Performance Work Statement (PWS), except for those items specified as Government-furnished property and services. The Contractor shall perform to the standards within this PWS.
1.1.1 Definitions
a) Contractor: Company structure, including all partners, officers and employees with interest in this contract.
b) Government: Government of the United States of America.
c) Contracting Officer (KO): Person executing this contract on behalf of the Government.
d) Contracting Officer’s Representative (COR): Person designated by letter of designation from KO. The COR monitors all technical aspects of the contract and assists in contract administration.
The COR is authorized to perform the following functions: assures that the Contractor performs the technical requirements of the contract, performs inspections necessary in connection with contract performance, maintains written and oral communications with the Contractor concerning technical aspects of the contract, issues written interpretations of technical requirements; including Government drawings, designs, specifications, monitors Contractor’s performance and notifies both the KO and Contractor of any deficiencies, coordinates availability of Government furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions of the contract.
e) Safety Manual: EM 385-1-1, Corps of Engineers Safety and Health Requirements Manual, current edition.
f) Performance Standard: Describes the desired results that are to be achieved.
g) Quality Control: Action taken by the Contractor and/or their personnel to document, inspect and control performance of services to ensure specifications and requirements of this PWS are met.
h) Quality Assurance: Action taken by the Government to ensure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this PWS.
i) Quality Assurance Representative (QAR): Person designated by the Lake Manager to perform Quality Assurance Inspections, review invoices, and perform strict contract oversight. The QAR does not have authority to change any terms of the contract.
AMENDMENT 0001
j) Quality Assurance Surveillance Plan (QASP): Plan developed by the Government depicting means Quality Assurance will be controlled.
k) Contract Discrepancy Report (CDR): Written record of unsatisfactory performance by the Contractor as observed by the QAR, issued to the Contractor when the performance threshold does not meet the minimum requirements.
1.1.2 Basic Requirements: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with the DOD Government.
1.1.3 All offerors are required to obtain a Data Universal Numbering System (DUNS) number by visiting www.dnb.com.
1.1.4 All prospective Contractors must be registered in System for Award Management (SAM) database prior to any award resulting from this solicitation. If at time of award, Contractor is not registered, award will be made to the next successful “registered” offer. Registration may be accomplished via the internet at www.sam.gov.
1.1.5 All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”.
1.1.6 Permits: The Contractor will, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits and letters of certification. The Contractor will comply with any applicable Federal, State, County, and Municipal laws, codes and regulations in connection with the performance of the work specified under this contract.
1.1.7 Veterans Employment Emphasis: In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) Contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE Contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE Contractors in their outreach efforts:
U.S. Department of Labor Veterans employment, www.vets.gov/ Federal veteran employment information, www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS) , http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program, http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index, wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans, www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-guide_to_hiring_veterans_0.pdf
1.2 Scope: The objective of these services, dependent upon the designated area for the application, is to:
a) kill all existing vegetation, including woody and non-woody vegetation, through non-selective, post-emergent liquid herbicide application within designated areas as described in this PWS,
b) prevent seed germination of existing grassbur species (common names may include Grassbur, Sandbur, Field Sandbur, Common Sandbur, Longspine Sandbur, Coastal Sandbur, Spiny Burrgrass and Southern Sandbur), Cenchrus spp., (target species) through selective, pre-emergent liquid herbicide application, without detrimental damage to existing bermudagrass, within designated recreation areas as described in this PWS.
c) kill all existing grassbur species (common names may include Grassbur, Sandbur, Field Sandbur, Common Sandbur, Longspine Sandbur, Coastal Sandbur, Spiny Burrgrass and Southern Sandbur), Cenchrus spp., (target species) through selective, post-emergent liquid herbicide application, without detrimental damage to existing bermudagrass, within designated recreation areas as described in this PWS.
The Contractor is responsible for proper application under this PWS, per the product manufacturer’s product label instructions, and meet all local, state and federal regulations. Work under this PWS requires the following herbicide applications:
a) Guardrail and Pipe Fence Herbicide Application
b) Road Herbicide Application
c) Riprap Herbicide Application
d) Unpaved Parking Area Herbicide Application
e) Recreational Area Herbicide Application: Pre-emergent
f) Recreational Area Herbicide Application: Post-emergent
Herbicide application areas include Rocky Creek Park (RCP), Yegua Creek Park (YCP) and along dam embankments, riprap, roads, parking areas, guardrails, pipe fences and other associated areas. The Contractor is responsible for proper application under this PWS, per the product manufacturer’s product label instructions, in accordance with all local, state and federal regulations.
1.2.1 Herbicide Application Requirements
1.2.1.1 The Contractor shall select liquid herbicides and dye suitable for on-site environmental conditions and achieve the requirements of this PWS as specified in Paragraph 1.2.1.10 and Performance Requirements Summary (PRS) (Attachment 1). Herbicides shall be applied in accordance to manufacturer’s product label to achieve results for the target species. Herbicide shall not be applied immediately adjacent to lake shoreline so as to prevent contact with lake or standing water. Extreme care shall be exercised during herbicide application to prevent drift or runoff into lake or standing water.
1.2.1.2 Dye shall be used on all applications to verify one-hundred (100) percent coverage of the designated area for all products applied in liquid form.
1.2.1.3 The Contractor shall submit product manufacturer’s product label for each selected herbicide and dye to the COR at the Pre-work Conference.
1.2.1.4 Certified applicator(s) shall explicitly follow all product manufacturer’s product label requirements during the transporting, mixing, spraying and disposal of herbicide and dye products.
Certified applicator(s) shall follow all application and safety requirements as stated on product manufacturer’s product label. If not in conflict with manufacturer’s product label recommendations, post-emergent liquid herbicide application shall not be permitted when rain is forecasted within twenty-four (24) hours, heavy dew is present, or when wind speed exceeds ten
(10) MPH. Pre-emergent liquid herbicide application shall be performed in accordance to product manufacturer’s product label, specifically in regard to soil temperature. Additionally, if not in conflict with product manufacturer’s product label recommendations, pre-emergent liquid herbicide application shall not be permitted when heavy dew is present or when wind speed exceeds ten (10) MPH.
1.2.1.5 No equipment or materials shall be stored overnight within the boundaries of Government lands.
1.2.1.6 Certified applicator(s) shall ensure the disposal of excess herbicide, containers, contaminated clothing, and other disposal materials involved in the transport, mixing and applications shall be made off Government lands and waters in an approved disposal site.
1.2.1.7 Work Plan: The Contractor shall provide a work plan that describes planned approach to accomplishing the work described in this PWS. The Contractor shall include safety requirements incidental to the work. Work Plan shall be submitted to COR at Pre-work Conference.
1.2.1.8 Site Visit: The Government requires each prospective bidder to attend a site visit in order to ensure all potential bidders have a thorough understanding of this PWS and to allow potential bidders the opportunity to ask questions regarding requirements of the specified work. A formal site visit will be scheduled as indicated on the KO’s Request for Quote. At the discretion of the Government, the site visit may be scheduled as a virtual meeting.
1.2.1.9 Pre-work Conference: The Pre-work Conference will be conducted by COR within fourteen (14) calendar days of contract award. As a minimum, the Contractor shall be represented by the officer of the company that signed the contract and the on-site supervisor. The Pre-work Conference will be held at Somerville Lake or may be performed telephonically at the agreement of all parties. The Government will discuss the provisions of this PWS and the Contractor's required submittals listed in Paragraph 1.9.2.
1.2.1.10 Herbicide Application Descriptions
a) Guardrail and Pipe Fence Herbicide Application: Uniform application of non-selective, post-emergent liquid herbicide application, with dye, to kill all vegetation, including woody and non-woody vegetation, in accordance to manufacturer’s product label, along guardrails and pipe fences on main dam embankment road (LBJ Road) and visitor’s overlook. Attachment 4A, Map 1 & 2 depicts designated herbicide application areas for guardrails and pipefence. Specific application area delineation is entire area within the following:
1) Guardrail: Extends from paved road or parking area edge to a line six (6) inches from backside of guardrail support post.
2) Pipe fence: Extends from paved road or parking area edge to a line three (3) inches from backside of pipe fence support post.
b) Road Herbicide Application: Uniform application of non-selective, post-emergent liquid herbicide application, with dye, to kill all vegetation, including woody and non-woody vegetation, in accordance to manufacturer’s product label, at North Embankment Road. Attachment 4A, Map 3 depicts designated herbicide application areas for road.
Specific application area delineation is entire area from paved road edge to paved road edge, with one exception. When riprap is adjacent to paved road edge, the application area is extended from paved road edge to edge of riprap.
c) Riprap Herbicide Application: Uniform application of non-selective, post-emergent liquid herbicide application to kill all vegetation, including woody and non-woody vegetation, in accordance to manufacturer’s product label, within entire designated riprap areas along embankment, spillway, levee and outlet works. Attachment 4A, Map 4 through Map 7 depict designated herbicide application areas. Typical vegetative species include, but not limited to, Johnson Grass, Willow Baccharis, Mesquite and, King Ranch Bluestem and Greenbriar. Turf areas within dam embankments shall not be treated unless specified.
d) Unpaved Parking Area Herbicide Application: Uniform application of non-selective, post-emergent liquid herbicide application, with dye, to kill all vegetation, including woody and non-woody vegetation, in accordance to manufacturer’s product label, at three
(3) unpaved parking areas in Yegua Creek Park. Attachment 4A, Map 8 depicts designated herbicide application areas for unpaved parking areas. Application area is entire area from paved road edge to edge of parking area delineated by pipe fence or limestone blocks.
e) Recreational Area Herbicide Application - Pre-emergent: Uniform application of selective, pre-emergent liquid herbicide application, with dye, to prevent seed germination of existing grassbur species (common names may include Grassbur, Sandbur, Field Sandbur, Common Sandbur, Longspine Sandbur, Coastal Sandbur, Spiny
Burrgrass and Southern Sandbur), Cenchrus spp., (target species), in accordance to manufacturer’s product label, within Yegua Creek Park and Rocky Creek Park.
Attachment 4A, Map 9 and Map 10 depict designated herbicide application areas.
Herbicide shall not be detrimental to existing bermudagrass. Application shall be performed before soil temperatures rise above manufacturer’s product label recommendation. Irrigation shall be responsibility of the Government.
f) Recreational Area Herbicide Application - Post-emergent: Uniform application of selective, post-emergent liquid herbicide application, with dye, to kill Grassbur species (common names may include Grassbur, Sandbur, Field Sandbur, Common Sandbur, Longspine Sandbur, Coastal Sandbur, Spiny Burrgrass and Southern Sandbur), Cenchrus spp., (target species), in accordance to manufacturer’s product label, within Yegua Creek Park and Rocky Creek Park. Attachment 4A, Map 9 and Map 10 depict designated herbicide application areas. Herbicide shall not be detrimental to existing bermudagrass.
1.2.1.11 Performance Standard/Threshold
1.2.1.11.1 Uniform post-emergent liquid herbicide, with dye, application to all woody and non-woody vegetation within designated areas effectively killing all vegetation in accordance to product manufacturer’s product label. One-hundred (100) percent of designated areas shall receive uniform herbicide application and vegetation kill rate for non-selective, post-emergent liquid herbicide application is a minimum of ninety-five (95) percent for each herbicide application. Any area not showing "stressed" or dead vegetation within two (2) weeks after initial application shall be re-treated at the Contractor's expense. Herbicide applied must be of proper strength to prevent killing or “browning” of only the exposed portion of vegetation and have sufficient residual action to prevent re-growth for up to two (2) months. Payment will not be made until minimum results have been achieved.
1.2.1.11.2 Uniform pre-emergent liquid herbicide, with dye, application within designated recreations areas to prevent grassbur seed germination in accordance to manufacturer’s product label. One-hundred (100) percent of designated areas shall receive uniform herbicide application. Due to conditions out of Contractor’s control for effectiveness of pre-emergent herbicide application, no other threshold is designated.
1.2.1.12 Estimated Work Requirements: Table below provides a summary of estimated annual application areas for the convenience of the Contractor in preparing a bid. This tabulation depicts current conditions on-site within designated areas and does not reflect any future improvements or work, including, but not limited to, new construction, renovation and demolition, which may occur within designated areas during performance of this PWS. The Government reserves the right to perform any future work at its discretion.
1.2.1.13 Work Sequence: The Contractor shall develop a work sequence for herbicide application designating the order in which herbicide application will occur for each application type.
Sequence shall be submitted to COR at the Pre-work Conference and the Contractor shall adhere to this sequence. Unless otherwise approved by the COR, all herbicide application requirements for an area shall be completed before beginning work in another area. In all cases, the Contractor
Application Type Estimate of Annual Application Area
Guardrail & Pipe Fence Herbicide Application 63,810 Square Feet Road Herbicide Application 377,564 Square Feet Riprap Herbicide Application 37 Acres Unpaved Parking Area Herbicide Application 20,383 Square Feet Recreational Area Herbicide Application: Pre-Emergent 94 Acres Recreational Area Herbicide Application: Post-Emergent 94 Acres shall assure that sufficient personnel and equipment are available to finish each area within the time limitation.
1.2.1.14 Schedule of Services: Herbicide applications shall be made in accordance to product manufacturer’s product label as follows in table below. The Contractor shall provide written notice of work commencement to the COR at least forty-eight (48) hours in advance of anticipated herbicide application. The Contractor shall have ten (10) calendar days, excluding Federal Holidays, to complete herbicide application.
Application Type Application Schedule Guardrail & Pipe Fence Herbicide Application One Application
Between June 1 through June 30
Road Herbicide Application One Application Between June 1 through June 30
Riprap Herbicide Application One Application Between June 1 through June 30
Unpaved Parking Area Herbicide Application One Application Between June 1 through June 30
Recreational Area Herbicide Application: Pre-emergence One Application in January thru February Before Soil Temperatures Rise Above Label’s Recommendation
Recreational Area Herbicide Application: Post-emergence One Application Between April 1 thru May 15
1.2.1.15 Rain Days: Rain days are delays in service requiring an extension due to inclement weather or conditions beyond the Contractor’s control. They may only be allowed with concurrence and approval of the COR. The Contractor is responsible to notify the COR on days when weather or poor ground working conditions prohibit performance of services. The Contractor shall ascertain if the workday is considered a rain day by COR. In no instance may the Contractor operate equipment during conditions that shall result in damage to turf or ground surfaces on Government property.
1.2.1.16 After each application, the Contractor shall complete Herbicide Application Record (Attachment 4) and provide to the COR no later than ten (10) calendar days, excluding Federal Holidays, after herbicide application.
1.2.1.17 Reports: The Contractor shall develop and provide their own Daily Activity Report.
Daily Activity Report shall be submitted to COR at Pre-work Conference for approval. Daily Activity Reports shall provide sufficient information to summarize Contractor’s service activities for the day and shall include the following information at a minimum: date, time work began, time work end, work location(s), name and quantities of herbicide(s)/dye applied, name of employees working, notes/comments and include capabilities to record information as directed within the PWS. A Daily Activity Report shall be completed each day services are performed and submitted to the COR no later than the following business day, excluding Federal Holidays. A Quality Control Report shall be completed at the end of the week when services are performed and submitted to the COR no later than the following business day, excluding Federal Holidays. All submitted reports shall be complete, legible and comprehensible.
1.2.1.18 Safety: The Contractor shall perform all services in full compliance with the safety requirements set forth in latest edition of EM 385-1-1, Safety and Health Requirements Manual (Safety Manual) found at https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf. The Contractor shall develop an Abbreviated Accident Prevention Plan (AAPP) in accordance with requirements of Appendix A of Safety Manual. AAPP shall be outlined as shown in Safety Inspection Checklist Abbreviated Accident Prevention Plan Form A-1 of Appendix A to ensure each area of information has been provided. AAPP shall be submitted to the COR for review and approval within fourteen (14) calendar days after Pre-work Conference. Activity Hazard Analysis (AHA) shall be included with the AAPP for each definable feature of work. A sample AHA can be found in Figure 1-2 of the Safety Manual. Safety Data Sheets (SDS) shall also be included with AAPP.
1.2.1.19 The Contractor shall provide traffic control on public roads in accordance with the most current EM-385-1-1 Safety Manual.
1.2.1.20 Damage to Government or Private Property: The Contractor shall be responsible for any damage to Government or private property and/or injury to any person as a result of the Contractor’s operation(s). The Contractor shall notify the COR immediately of damage to Government and/or private property or injury to any person resulting from Contractor’s operations. Ground rutting caused by Contractor activity shall be repaired to Government specifications (including, but not limited to: ground leveling and reseeding with native vegetation) by Contractor at no additional expense to the Government.
1.2.1.21 Insurance: The Contractor shall furnish the original Insurance Certificates, as specified below, to the COR at Somerville Lake Office within fourteen (14) calendar days of Pre-work Conference, excluding Federal Holidays, or sooner as required by Solicitation. The Contractor shall maintain, during the entire period of performance under this PWS, the following minimum insurance requirements below.
1.2.1.21.1 Certified applicator(s) shall hold at least the minimum amount of liability insurance coverage as required by the Texas Department of Agriculture when conducting herbicide control work on the aforesaid areas. Contractor shall hold and save the United Sates free from claims that may occur from the herbicide application operations carried out under this PWS.
1.2.1.21.2 Automobile Liability: Minimum State liability insurance is required for the operation of all automobiles utilized in the performance of this PWS.
1.2.1.21.3 Workermen’s Compensation and Employer’s Liability Insurance: Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000, or in compliance with applicable State statutes, is required in the performance of this PWS.
1.2.1.21.4 Endorsement: An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the KO.
1.2.1.22 Payments: All payments shall be made based upon line item pricing for the contract base and any option years, as submitted by the Contractor and accepted at contract award. Payment will not be made until minimum results have been achieved.
1.3 Sustainability Requirements
1.3.1 The Contractor shall meet the recycled content requirements set forth by the Environmental Protection Agency (EPA) and shall make maximum use of products containing recovered materials that are EPA-designated Items unless the product cannot be acquired;
a) Competitively within a timeframe providing for compliance with this PWS performance schedule;
b) Meeting this PWS performance requirements; or
c) At a reasonable price.
Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The list of EPA-designated Items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products. Items may include, but are not limited to the following products used on-site in execution of this PWS: binders, clipboard and plastic trash bags. All deliverables shall be printed double-sided on paper that contains post-consumer fiber.
1.3.2 The Contractor shall meet the BioPreferred Program requirements set forth by the USDA at https://www.biopreferred.gov/BioPreferred/faces/Welcome.xhtml. The list of USDA-designated product categories may be found at https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#.
1.3.3 As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of this PWS will be at least the amount required by the applicable PWS specifications or other contractual requirements.
1.3.4 References: FAR Provision 52.223-1 – Biobased Product Certification, FAR Clause 52.223-2 – Affirmative Procurement of Biobased Products Under Service and Construction Contracts, FAR Provision 52.223-4 – Recovered Material Certification, FAR Clause 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA-Designated Items, and FAR Clause 52.223-17 – Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts.
1.4 Period of Performance: Period of performance under this PWS shall be a one (1) base year (03 JAN 2022 through 02 JAN 2023), four (4) one-year options and a six (6) month option (03 JAN 2027 through 30 June 2027).
1.5 General Information
1.5.1 Quality Control: The Contractor’s Quality Control (QC) program is the means by which Contractor assures work complies with the requirement of this PWS. The Contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. QCP shall include procedures to identify, prevent and correct defective services and ensure non-recurrence of defective services. QCP shall also include development of Quality Control Report which shall be completed at the end of each week that services was performed. The QCP shall be submitted to the COR at the Pre-work Conference for review. After acceptance of the QCP, the Contractor shall submit in writing for any proposed QCP changes to the COR for KO’s review and approval.
1.5.2 Quality Assurance: The Government shall evaluate the Contractor’s performance under this PWS in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and the minimum acceptable defect rate(s). The Lake Manager will designate a Quality Assurance Representative (QAR) who will perform Quality Assurance Inspections, review invoices, and perform strict PWS oversight. Any deficiencies will be annotated on the Contractor’s Deficiency Report (CDR). The QAR does not have authority to change any terms of this PWS.
1.5.3 Federal Holidays: No work shall be performed on a Federal Holiday.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day
Memorial Day Thanksgiving Day Independence Day Christmas Day
1.5.4 Hours of Operation: Work shall only be performed weekdays 7:00 AM to 4:00 PM. The Contractor may submit request to perform work on weekends, excluding holiday weekends, in writing to the COR for consideration. Work performed on weekends shall only be performed with COR approval. Lake Office operational hours are weekdays, 8:00 AM to 4:00 PM, excluding Federal Holidays.
1.5.5 Place of Performance: The work under this PWS will be performed at Somerville Lake (Burleson County, Texas and Washington County, Texas).
1.5.6 Type of Contract: The Government will award a firm-fixed price contract.
1.5.7 Security Requirements
1.5.7.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.5.7.2 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.5.7.2.1 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.5.7.2.2 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
1.5.7.3 Antiterrorism/Operations Security
1.5.7.3.1 AT Level I Training: All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
1.5.7.3.2 Access and General Protection/Security Policy and Procedures: All Contractor and all associated subcontractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
1.5.7.3.3 For Contractors Who Do Not Require CAC, But Require Access to a DoD Facility or Installation: All Contractor and all associated sub-Contractor’s employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.5.7.3.4 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): The Contractor and all associated sub-Contractor’s employees shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program.
This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Lake Manager NLT 5 calendar days after the completion of the training.
1.5.7.3.5 E-Verify Verification of Eligibility: The Contractor must use the US Department of Homeland Security E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must provide to the Government two valid forms of Government-issued identification prior to beginning work to ensure the correct information is entered into the E-Verify system. An initial list of verified/eligible candidates must be provided to the COR if applicable, or the Contracting Officer no later than 3 business days after the initial contract award. When Contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contacting Officer and shall become part of the official contract file.
1.5.8 Special Qualifications: Herbicide applicator(s) shall be State certified applicator(s) and shall conform to all applicable Texas Department of Agriculture rules and regulations as contained in the latest revision of the Texas Herbicide Law and Regulations on lands and waters located within the State of Texas, inclusive of Federal projects lands and waters. Certified applicator(s) shall hold at least the minimum amount of liability insurance coverage as required by the Texas Department of Agriculture when conducting work on the aforesaid areas. The Contractor shall hold and save the United States free from claims that may occur from the control operations carried out under this PWS. A copy of applicator’s certification shall be submitted to the COR at the Pre-work Conference and will become part of the contract documents.
1.5.9 Post-award Conference/Periodic Progress Meetings/Contractor Deficiency Report Meetings: The Contractor agrees to attend any post-award conference, periodic or CDR meetings convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the
Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.5.10 Contracting Officer Representative: A COR will be designated for this PWS and COR shall perform duties and responsibilities as defined by letter of designation from KO.
1.5.11 Contractor Key Personnel: The following personnel are considered key personnel by the Government: Contractor, field supervisor, and QC personnel The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this PWS.
1.5.12 Identification of Contractor Employees:
“Identification of Contractor Employees in the Federal Workplace (Aug 2008):
a) The Contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with an identification (ID) badge. The ID badge shall clearly display the Contractor’s name and the employee’s name and color photograph. The Contracting Officer or his/her designee shall approve the ID badge before the commencement of contract performance. It is the Contractor’s responsibility to ensure that all Contractor personnel wear the ID badge at all times when performing work under this contract at a Government facility.
Unless otherwise specified in the contract, each Contractor employee shall wear the ID badge in a conspicuous place on the front of their clothing and above their waist, except when safety or health reasons prohibit such placement. This requirement is in addition to any Government facility security provisions that require that a Government-issued security badge also be worn.
b) Contractor personnel shall clearly identify themselves to all attendees as a Contractor employee before the commencement of meetings with Government or other Contractor personnel.
Contractor personnel shall clearly and immediately identify themselves as a Contractor employee when placing, answering or participating in telephone/VTC conversations with Government or other Contractor personnel.
c) When Contractor personnel send e-mail messages from or to a Government-owned computer, they shall include a signature block that includes their employer’s name and the employee’s full name and e-mail address.
d) Each of the requirements set forth in paragraphs a-c above, must be included in all subcontracts at any tier.”
1.5.13 Contractor Travel: Not applicable.
1.5.14 Data Rights: Not applicable.
1.5.15 Organizational Conflict of Interest: In the event an organizational conflict of interest exists, such as the discovery of Contractor or subcontractor business of familial relations with a USACE employee, the Government will take steps to mitigate the conflict, up to and including termination of the Contractor or subcontractor.
1.6 Government Furnished Items and Services
1.6.1 Facilities: Not applicable
1.6.2 Equipment: Not applicable
1.6.3 Materials: The Government will provide application area maps (Attachment 3) and Herbicide/Pesticide Report Form (Attachment 4). Both attachments are provided in a separate pdf document.
1.7 Contractor Furnished Items and Responsibilities
1.7.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Paragraph 1.6 of this PWS.
1.7.2 Equipment: The Contractor shall furnish all equipment necessary to accomplish the requirements under this PWS. All equipment used to perform work under this PWS shall be in good operating and mechanical condition and comply with the Safety Manual. Vehicles used by the Contractor will be identified. The Contractor shall ensure leaking and unsafe equipment is repaired immediately and shall be responsible for containment and cleanup of leaks
1.7.3 Materials: The Contractor shall provide herbicides, dye and other materials necessary to meet the requirements under this PWS.
1.8 Contractor Management Reporting (CMR): Not applicable.
1.9 Applicable Publications (Current Editions)
1.9.1 The Contractor shall abide by all applicable local, state, and federal regulations, publications, manuals, policies and procedures, to include the Safety and Health Requirements Manual (EM385-1-1).
1.9.2 Submittals: Government Approval is required for submittals with a "GA" designation. When “GA” designation is used, the designation will state the office that will review the submittal for the Government.
All submittals not requiring Government Approval will be For Information Only (FIO) and are considered to be "Product Data" that meet the terms of the PWS. Submittals FIO will not be returned. COR approval is not required for FIO submittals; however, the Government reserves the right to require the Contractor to resubmit any item found not to comply with this PWS. This does not relieve the Contractor from the obligation to furnish products conforming to the federal and local laws/regulations and will not prevent the COR from requiring herbicide reapplication if nonconforming products are used in the herbicide application. Attachment 2/Technical Exhibit 2: Deliverables Schedule provides requirements for all submittals.
1.10 Attachment/Technical Exhibit List
1.10.1 Attachment 1/Technical Exhibit 1: Performance Requirements Summary
1.10.2 Attachment 2/Technical Exhibit 2: Deliverables Schedule
1.10.3 Attachment 3/Technical Exhibit 3: Herbicide Application Record
1.10.4 Attachment 4: Somerville Lake Herbicide Application Overall Map
1.10.5 Attachment 4A: Somerville Lake Herbicide Application Maps
1.10.6 Attachment 5: Contract Discrepancy Report (Example)
TECHNICAL EXHIBIT 1/ATTACHMENT 1
Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Performance Standard Performance Threshold
Method of Surveillance
PRS 1: Guardrail and Pipe Fence Herbicide Application Uniform application of non-selective, post-emergent liquid herbicide application, with dye, to kill all vegetation, including woody and non-woody vegetation, in accordance to manufacturer’s product label, along guardrails and pipe fences on main dam embankment road (LBJ Road) and visitor’s overlook.
Refer to PWS Paragraph 1.2.1.1 thru 1.2.1.6, 1.2.1.10(a) and 1.2.1.11.1.
Uniform post-emergent liquid herbicide application, with dye, to all woody and non-woody vegetation within entire designated areas effectively killing all vegetation.
Refer to PWS Paragraph 1.2.1.11.1.
Application shall result in one-hundred
(100) percent coverage of the designated areas. A minimum of ninety-five (95) percent vegetation kill shall be the result in the application areas.
One-hundred
(100) percent QA inspection of services, customer complaints and COR review of all Daily Activity Reports and final inspection.
PRS 2: Road Herbicide Application Uniform application of non-selective, post-emergent liquid herbicide application, with dye, to kill all vegetation, including woody and non-woody vegetation, in accordance to manufacturer’s product label, at North Embankment Road.
Refer to PWS Paragraph 1.2.1.1 thru 1.2.1.6, 1.2.1.10(b) and 1.2.1.11.1.
Uniform post-emergent liquid herbicide application, with dye, to all woody and non-woody vegetation within entire designated areas effectively killing all vegetation.
Refer to PWS Paragraph 1.2.1.11.1.
Application shall result in one-hundred
(100) percent coverage of the designated areas. A minimum of ninety-five (95) percent vegetation kill shall be the result in the application areas.
One-hundred
(100) percent QA inspection of services, customer complaints and COR review of all Daily Activity Reports and final inspection.
PRS 3: Riprap Herbicide Application Uniform application of non-selective, post-emergent liquid herbicide application, with dye, to kill all vegetation, including woody and non-woody vegetation, in accordance with product manufacturer’s product label, within designated riprap areas of embankment, spillway, levee and outlet works. Turf areas within dam embankments shall not be treated. All applications shall contain an approved dye material to aid identification of applied areas.
Refer to PWS Paragraph 1.2.1.1 thru 1.2.1.6, 1.2.1.10(c) and 1.2.1.11.1.
Uniform post-emergent liquid herbicide application, with dye, to all woody and non-woody vegetation within entire designated areas effectively killing all vegetation.
Refer to PWS Paragraph 1.2.1.11.1.
Application shall result in one-hundred
(100) percent coverage of the designated areas. A minimum of ninety-five (95) percent vegetation kill shall be the result in the application areas.
One-hundred
(100) percent QA inspection of services, customer complaints, and 100 percent review by COR of Daily Activity Reports and final inspection.
Performance Objective Performance Standard Performance Threshold
Method of Surveillance
PRS 4: Unpaved Parking Area Herbicide Application Uniform application of non-selective, post-emergent liquid herbicide application, with dye, to kill all vegetation, including woody and non-woody vegetation, in accordance with manufacturer’s product label, at three
(3) unpaved parking areas in Yegua Creek Park.
Refer to PWS Paragraph 1.2.1.1 thru 1.2.1.6, 1.2.1.10(d) and 1.2.1.11.1.
Uniform post-emergent liquid herbicide application, with dye, to all woody and non-woody vegetation within entire designated areas effectively killing all vegetation.
Refer to PWS Paragraph 1.2.1.11.1.
Application…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .