This solicitation document outlines a requirements contract opportunity for hydrology and hydraulic studies support services. The U.S. Army Corps of Engineers Engineering District Fort Worth seeks a contractor to provide personnel, equipment, facilities, and other items to perform hydrology and hydraulic studies, as well as review previously completed studies and reports, in the state of Texas over a one-year base period and five one-year option periods. Key tasks include loss rate study expansion, technical review of reports, rare storm data collection, regional regression analyses, and updating parameters. Quotes were due by September 28, 2020 for award of a firm-fixed price purchase order contract based on past performance and price. The incumbent contractor is unspecified as prior work was completed through cooperative agreements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS revised 9Oct20 .pdf | ||
| Post Closing Amendment.pdf | ||
| Combined Synopsis Solicitation 0092.pdf | ||
| Bid Schedule 0092.pdf | ||
| RFQ W9126G20Q0092.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W9126G-20-Q-0092.
Project: Water Resources Review and Research, Hydrology and Hydraulic Studies – FEMA Funded.
CLIN Schedule (CLIN = Contract Line Item Number)
BASE Period: 30 September 2020 – 29 September 2021
CLIN Task PoP Months Perform Total
0001 Base Task 1 – Loss Rate Study Expansion 18 Base $ 0002 Base Task 2 – Technical Review of Hydrology and Hydraulic Reports 12 Base $ 0003 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 0004 Contractor Manpower Reporting – BASE Period 1 Each $
Total $
Option Period 1: 30 September 2021 – 29 September 2022
Months Perform Total
1001 Base Task 3 – Rare and Extreme Storm Data Collection 12 Base $ 1002 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 1003 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 1004 Optional Task 4 – Regional Regressions for Trinity & Guadalupe Basins 12 Optional $ 1005 Contractor Manpower Reporting – Option Period 1 1 Each $
Option Period 2: 30 September 2022 – 29 September 2023
Months Perform Total
2001 Base Task 3 – Rare and Extreme Storm Data Collection 12 Base $ 2002 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 2003 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 2004 Optional Task 5 – Update of Snyder’s Parameters 24 Optional $ 2005 Contractor Manpower Reporting – Option Period 2 1 Each $
Option Period 3: 30 September 2023 – 29 September 2024
Months Perform Total
3001 Base Task 3 – Rare and Extreme Storm Data Collection 12 Base $ 3002 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 3003 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 3004 Optional Task 6 – Watershed Characteristics for USGS Gages 12 Optional $ 3005 Contractor Manpower Reporting – Option Period 3 1 Each $
Option Period 4: 30 September 2024 – 29 September 2025
Months Perform Total
4001 Base Task 3 – Rare and Extreme Storm Data Collection 12 Base $
4002 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 4003 Optional Task 2 – Technical Review of Hydrology & Hydraulic Reports 12 Optional $ 4004 Contractor Manpower Reporting – Option Period 4 1 Each $
[End of CLIN Schedule]