Section 1: General
1.
2.
3.
4.
5.
6. Please select all of the following categories that apply to your firm:
Woman Owned Small Business Large business
Service Disabled Owned Small Business HUBZone
Section 2: Capability & Experience Please answer by selecting Yes or No from the drop down list in the gray box, or provide the required narrative.
1.
1a. Does your firm have an aggregate bonding capability of at least $150 million?
1b . Does your firm have an single contract bonding capability of at least 50 million?
2.
2a. Contract #:
2b. Name of Project:
2c. Project Location:
2d. Contract Award / Bid Schedule: __________________________________________________________________
2e. Contract Price:
2f. Brief Project Describtion:
2g. Contracting Agency Reference Information : __________________________________________________________
2h. Performance Rating (if any) Assigned by the Project Owner: ______________________________________________
Bonding Capability:
Past Performance Rating of Satisfactory or above on horizontal construction projects submitted in response to this announcement.
(In accordance with the Prequalification of Sources List Announcement on www.FBO.gov, your firm will be required to provide a surety letter confirming this bonding capability.)
(Name, email, & Phone #)
FT Worth District ~ US Army Corps of Engineers Prequalification of Sources
List Establishment Questionnaire Please submit to Craig Harper at craig.d.harper@usace.army.mil not later than 1700 CST 19 OCT 2018
Company Name:
Company Point of Contact:
POC email:
Company Address:
DUNS Number:
Has your firm completed a Horizontal Construction contract in the Contiguous United States with a contract price of at least $10 million in the last 5 years?
Small Business
8(a)
1.
1. Offerors must affirmatively respond to this question and provide the requested information. To receive an ACCEPTABLE rating the past experience project must represent a single undertaking with a contract price of $10M or more and having at least 100,000 CY of engineered fill placement, that was completed or substantially completed in the last 5 years (as early as September 2013), and that received a satisfactory rating of 3 or higher on CPARS reports or equivalent.. The Government may contact the Offeror’s provided project reference toverify the accuracy of the contract and project information provided and to verify the accuracy of the provided performance report.
Acceptable Past Performance information shall be provided in the form of CCASS or CPARS reports, or the Questionnaire included herein.The evaluation process will consider only past performation that meets the requirement stated above (a civil works contract with a price of at least $10 million and having at least 100,000 CY of engineered fill placement that was completed or substantially completed in the last 5 years—as early as September 2013).
Experience and Narrative on Features of Work/ Operations: Offerors are required to prepare a narrative for each of the listed features of work/operations to include a description of past experience as described or similar, and identifying technical and operational considerations for safely and successfully completing the feature of work as described. Include the applicable contract name and number and contracting agency contact information for each referenced experience and identify how past experience deviates from the listed feature of work or operation. Each narrative (including project identification and contact information) shall not exceed a total of 3 pages (this includes front and back with a font no smaller than 10):
Features of Work/Operations:
a) Engineered fill construction consisting of fine, coarse, and cohesive materials placed in discrete layers without mixing or cross-contamination.
b) Constrained project limits with limited work areas, stockpiling areas, long hauls, and public motorist and foot traffic.
c) Benching existing slopes and placing cohesive engineered fill in a strictly controlled manner while limiting slope exposure.
d) Excavating trenches at least 5-foot wide through a saturated area while using a wellpoint system for dewatering.
e) Conducting operations safely (according to OSHA or EM 385-1-1 requirements) and simultaneously at multiple sites and keeping on schedule when the work sites are separated from one another and from the borrow source by considerable distance.
Each of the above Features of Work/Operations will be rated separately against the standard of acceptability. If one Feature of Work/Operation fails to meet the acceptability standard and is deemed Unacceptable then the entire Criteria is Unacceptable and is no longer considered for the prequalification of sources list. Note that offeror’s narratives may reference sections to avoid repeating information relevant to multiple Features of Work/Operations.
Standard of Acceptability:
Standard of acceptability for each Feature of Work/Operation is met with the offeror demonstrating (1) successful experience that is demonstrated to be directly on point with the Feature of Work/Operation described or (2) very similar successful experience is demonstrated, variations from the applicable Feature of Work/Operation are described, and the technical and operational considerations are well thought out and described so as to reasonably assure safety (including dam safety), quality, and schedule requirements will be met.
Standard of Acceptabilty:
Name:
Position:
Signature:
The following statement shall be signed by a principal of your firm:
"I certify that the answers which are provided in in response to this Prequalification of Sources
Relevant Experience and Technical Approach to Work: Offerors are required to prepare a narrative (a maximum of 5 pages for each type of work, this includes front and back with a font no smaller than 10) describing their firm’s or a subcontracted firm’s successful experience with the following work as well as their technical approach to the work. Include the project name and contract number and provide the contracting agency’s contact information for each example of past experience. Also demonstrate the project met the criteria below and that the outcome was successful.:
Types of Work:
a) Dewatering a surcharged foundation to a depth of approximately 20 feet below the existing ground surface with a well-point system. Operating and maintaining the system to keep the ground water surface at or below three feet of the excavated subgrade.
b) Auguring or boring small and/or large diameter (4-inch to 48-inch) cased holes through clay, sand and shale materials to depths up to approximately 50 feet. The foundation materials have the potential to be saturated and to have sufficient pore pressure to create a heave and/or blow out situation.
Standard of Acceptability:
The standard is met when the offeror demonstrates it’s or an identified subcontractor’s technical ability and experience to reliably and safely complete the tasks.
Subcontractors identified in this section should be those who will be involved in any future contracts. The offerer may provide information for a primary and alternate subcontractor. The offeror may utilize completed projects with similar requirements to demonstrate technical capabilities.
| Contract: |
| Name of Project: |
| Project Location: |
| Contract Award Bid Schedule: |
| Contract Price: |
| Brief Project Descr: |
| Contracting Agency Reference Information: |
| Performance Rating if any Assigned by the Project Owner: |
| Company Name: |
| Company Point of Contact: |
| POC Email: |
| Company Address: |
| DUNS Number: |
| 8(a): Off |
| Small Business: Off |
| SDVOSB: Off |
| Woman Owned Small Business: Off |
| HUBZone: Off |
| Large Business: Off |
| Aggregate Bonding: [ -] |
| Single Bonding: [ -] |
| Construction Experience: [ -] |
File details come from the government source that posted it.