B3_IFB_(AM03)_18B0035.pdf
PDF 18 MB Posted
- Attached to
- ARNORTH Building 56 Renovation
- Solicitation number
- W9126G18B0035
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B3_IFB_(AM04)_18B0035.pdf | ||
| B3_IFB_(AM02)_18B0035.pdf | ||
| B56_Site_Visit_Sign_In_Sheet.pdf | ||
| B3_IFB_(AM_01)_18B0035.pdf | ||
| B3_IFB_B56_18B0035.pdf | ||
| B3_IFB_(Drawings)_B56_18B0035.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for Renovation Building 56, Fort Sam Houston, San Antonio, Texas is amended as follows.
See SF30 Continuation Sheet(s)
NOTE: Proposal Receipt date is 11 September 2018 at 2:00 PM Central Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G18B0035
X 9B. DATED (SEE ITEM 11)
23-Aug-2018
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended,X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
Sept 7, 2018
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9126G18B0035
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO THE SPECIFICATIONS
1. LIMITED HAZARDOUS MATERIALS: Limited Hazardous Materials (Asbestos, Lead, PCB, & Mercury) Survey documents has been added to the solicitation, bearing the notation W9126G18B0035-0003.
2. Replacement Sections - Replace the following sections with the accompanying new sections of the same number and title, bearing the notation W9126G18B0035-0003.
TABLE OF CONTENTS
SUBMITTAL REGISTER
3. Added Sections - The following section has been added to the solicitation, bearing the notation W9126G18B0035-0003.
09 69 19 STRINGERLESS ACCESS FLOORING
CHANGES TO THE DRAWINGS
4. Replacement Drawings.- Replace the drawings listed below with the attached new drawings(s) of the same number, bearing the notation W9126G18B0035-0003.
G-003 GENERAL NOTES
A-101 ARCHITECTURAL NEW WORK FLOOR PLAN
A-102 ARCHITECTURAL REFLECTED CEILING PLAN
A-301 ARCHITECTURAL BUILDING SECTIONS
A-404 ARCHITECTURAL FENCE ELEVATIONS & DETAILS
A-501 ARCHITECTURAL ENLARGED RESTROOM PLAN
A-601 ARCHITECTURAL DOOR SCHEDULE
AD101 ARCHITECTURAL DEMOLITION PLAN
CS101 CIVIL SITE PLAN
IN601 INTERIOR DESIGN ROOM FINISH SCHEDULE & LEGEND
P-101 PLUMBING FLOOR PLAN
S-001 STRUCTURAL GENERAL NOTES
End of Summary of Changes
Bldg 56 Renovation FSH18ANB56
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00.01 SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.02 CONTRACT LINE ITEM SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
00 22 11 LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL
PREPARATION
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 44 CONSTRUCTION SCHEDULE
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 13.01 44 SPECIAL PROJECT PROCEDURES FOR JOINT BASE SAN
ANTONIO/FORT SAM HOUSTON
01 35 13.02 44 ISSUANCE OF ACCESS TO NON-COMMON ACCESS CARD CONTRACTORS,
VENDORS, AND NON-DOD CIVILIANS
01 35 13.03 44 TECHNICAL SUPPLEMENT TO THE DESIGN GUIDE FOR JOINT BASE
SAN ANTONIO/FORT SAM HOUSTON
01 35 13.10 00 SPECIAL PROJECT PROCEDURES - SURVEYING
01 35 13.20 00 SPECIAL PROJECT PROCEDURES - CAD
01 35 13.30 00 SPECIAL PROJECT PROCEDURES - GIS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 01 20.70 UNIT MASONRY CLEANING AND RESTORATION
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 1
W9126G18B0035-0003
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 14 00 WOOD DOORS
08 41 13 INTERIOR ALUMINUM DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 68 00 CARPETING
09 69 19 STRINGERLESS ACCESS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
12 59 00 SYSTEMS FURNITURE
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 2
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 45 PAGES
Renovate Building 56; Fort Sam Houston, TX
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.14.4Receipts
02 82 16.00 20 SD-03 Product Data
3.1.4 GLocal Exhaust Equipment
3.1.5 GVacuums
3.1.1.1 GRespirators
3.1.4 GPressure Differential Automatic
Recording Instrument
1.2.2 GAmended Water
3.1.7 GGlovebags
1.3.8 GMaterial Safety Data Sheets
(Msds) for all materials
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
For Local Exhaust System
3.3.3.2 GAsbestos Disposal Quantity
Report
3.2.6.3 GClearance Sampling
SD-07 Certificates
1.3.9 GAsbestos Hazard Abatement Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 45 PAGES
02 82 16.00 20 1.3.10 GTesting Laboratory
1.5.1 GPrivate Qualified Person
Documentation
1.5.4 GContractor's License
1.5.2 GCompetent Person
1.5.3 GWorker's License
1.3.11 GLandfill Approval
1.3.3 GEmployee Training
1.3.12 GMedical Certification
1.3.11 GWaste Shipment Records
1.3.6 GRespiratory Protection Program
1.3.11 GDelivery Tickets
3.1.5 GVacuums
3.1.2.3 GWater Filtration Equipment
3.1.5 GVentilation Systems
3.1 GEquipment Used To Contain
Airborne Asbestos Fibers
1.3.4Notifications
SD-11 Closeout Submittals
1.3.4 GNotifications
1.3.6.1 GRespirator Program Records
1.3.4 GPermits and Licenses
1.5.7 GProtective Clothing
Decontamination Quality Control
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 45 PAGES
02 82 16.00 20 1.5.8 GProtective Clothing
Decontamination Facility
Notification
02 82 33.13 20 SD-03 Product Data
1.6.4 GVacuum Filters
1.6.1 GRespirators
SD-06 Test Reports
1.5.2.3 GSampling Results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.1 GQualifications of CP
1.5.1.3 GTesting Laboratory
3.1.1.1 GOccupant Notification
1.5.1.2 GTraining Certification
1.5.1.4 GThird Party Consultant
Qualifications
1.5.3 Glead-based paint/paint with lead
removal/control plan
1.6.3 GRental equipment notification
1.5.2.6 GRespiratory Protection Program
1.5.2.7 GHazard Communication Program
3.5.2 GEPA or State approved
hazardous waste treatment, storage, or disposal facility
1.5.2.8 GLead Waste Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 45 PAGES
02 82 33.13 20 1.6.4 GVacuum filters
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
1.5.2.4 GMedical Examinations
1.5.1.2 GTraining Certification
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.5.3.2DD Form 1348-1
03 30 53 SD-02 Shop Drawings
1.4 GInstallation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Accelerating Admixture
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 45 PAGES
03 30 53 2.2.3.3Water-Reducing or Retarding
Admixture
2.2.11Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
2.2.7Joint Sealants - Field Molded
Sealants
2.4.1Waterstops
3.2Conveying and Placing Concrete
2.2.8Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.4.2Curing Compound
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.3.3.2Measurement of Floor Tolerances
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.2Aggregates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 45 PAGES
03 30 53 2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
2.4.2Curing Compound
04 01 20.70 SD-01 Preconstruction Submittals
1.5.1 GQuality Control Plan
1.5.1 GProject Training Program
1.5.2 GQualifications
SD-02 Shop Drawings
1.5.4Photographic Documentation
3.5.1 GStructural Upgrades
SD-03 Product Data
1.5.2Qualifications
1.5.5 GCleaning and Restoration
Methods
2.1 GCleaning Materials
2.1.4Biocides
2.2.2.1 GReplacement Mortar
2.4 GMortar Mix
3.4.7.2 GWater Repellents Infiltration
3.4.7.3 GStone Consolidants
SD-04 Samples
1.5.6 GMock-ups
SD-05 Design Data
3.5.1 GStructural Upgrades
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 45 PAGES
04 01 20.70 3.5.2Existing Sealants for Asbestos and PCBs
SD-07 Certificates
2.2Repair Materials
06 10 00 SD-02 Shop Drawings
2.6.4 GTrussed Rafters
2.6.5 GTrussed Joists
1.9.1 GFabricated Structural Members
1.9.2 GModifications of Structural
Members
2.3.2 GNailing Strips
SD-03 Product Data
2.5Underlayment
2.2.1Plastic Lumber
1.8Fire-retardant Treatment
1.4.3Structural-use and OSB Panels
2.6.7Adhesives
SD-05 Design Data
1.9.2 GModifications of Structural
Members
SD-06 Test Reports
1.4.4Preservative-treated
SD-07 Certificates
1.10.1Certificates of Grade
1.10.2 GCertified Sustainably Harvested
Wood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 45 PAGES
06 10 00 1.7Preservative Treatment
1.10.3Indoor Air Quality
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GBlock or Board Insulation
2.3 GVapor Retarder
2.4 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
2.6 GAccessories
SD-07 Certificates
2.2 GBlock or Board Insulation
2.3 GVapor Retarder
2.5 GProtection Board or Coating
1.7 GSpecial Warranties
1.7 GSpecial Warranties
SD-08 Manufacturer’s Instructions
2.2Block or Board Insulation
2.6.1Adhesive
SD-11 Closeout Submittals
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 45 PAGES
07 22 00 2.2 GInsulation
SD-06 Test Reports
1.7.1 GFlame Spread Rating
SD-07 Certificates
1.8 GVolatile Organic Compounds
(VOC) Content
1.6 GInstaller Qualifications
1.6 GCertificates Of Compliance For
Felt Materials
SD-08 Manufacturer’s Instructions
2.2 GInsulation
SD-11 Closeout Submittals
1.8 SVolatile Organic Compounds
(VOC) Content
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.3 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4 GSelf-adhering Air Barrier
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 45 PAGES
07 27 19.01 1.6 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections and Testing
SD-07 Certificates
1.4 GSelf-adhering Air Barrier
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.3 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
2.2.1 GGravel Stops and Fasciae
3.1.11 GBase Flashing
3.1.12 GCounterflashing
2.2.12 GReglets
3.1.15 GDrip Edges
3.1.16 GEave Flashing
SD-04 Samples
1.4.2 GFinish Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 45 PAGES
07 60 00 SD-07 Certificates
2.1 GCertificates of Compliance
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
SD-11 Closeout Submittals
2.1 SRecycled Content
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
2.4 GBond Breakers
2.5 GBackstops
3.1 GField Adhesion
08 14 00 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.3Accessories
2.4.7Water-resistant Sealer
1.4Warranty
2.2.2 GSound Transmission Class
Rating
2.2.3 GFire Resistance Rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 45 PAGES
08 14 00 SD-04 Samples
2.2Doors
2.4.6.3 GDoor Finish Colors
SD-06 Test Reports
2.5Cycle-Slam
2.5Hinge Loading Resistance
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
3.3 GInstallation Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.1 GFinish
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.5Manufacturer's Product Warranty
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.8 GKeying System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 45 PAGES
08 71 00 2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.6.1Insulating Glass
1.3Glazing Accessories
SD-04 Samples
1.6.1Insulating Glass
2.4.2Glazing Compound
2.4.5Tape
2.4.3.1Sealant
SD-07 Certificates
1.6.1Insulating Glass
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
09 29 00 SD-03 Product Data
2.2.6Cementitious Backer Units
2.2.4Glass Mat Water-Resistant
Gypsum Tile Backing Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 45 PAGES
09 29 00 2.2.3Water-Resistant Gypsum Backing
Board
2.2.5Glass Mat Covered or Reinforced
Gypsum Sheathing
2.2.5.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant
2.2.12Accessories
2.2.1Gypsum Board
SD-07 Certificates
2.2 GAsbestos Free Materials
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GPorcelain Tile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1.2 GAccessories
2.1 GTransition Strips
2.6 GTransition Strips
SD-07 Certificates
1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 45 PAGES
09 30 10 SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
1.2Approved Detail Drawings
SD-03 Product Data
1.4Certification
SD-04 Samples
2.1Acoustical Units
2.1.1Acoustic Ceiling Tiles
SD-06 Test Reports
1.2.1Ceiling Attenuation Class and
Test
SD-07 Certificates
2.1Acoustical Units
2.1.1Acoustic Ceiling Tiles
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.2 GCarpet
2.4 GCarpet Cushion
2.6 GMoldings
SD-04 Samples
2.2 GCarpet
2.6 GMoldings
2.4 GCarpet Cushion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 45 PAGES
09 68 00 SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
1.3.1Indoor Air Quality
1.6Warranty
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Carpeting
2.2.1 SRecycled Content for Carpeting
2.2.1 SIndoor Air Quality for Carpet
2.5 SIndoor Air Quality for Aerosol
Adhesives and Sealants
2.5 SIndoor Air Quality for Non-Aerosol
Adhesives
2.5 SIndoor Air Quality for Concrete
Primer
1.6Warranty
09 69 19 SD-02 Shop Drawings
2.2.2 GDetailed Installation Drawings
SD-03 Product Data
2.1 GAccess Flooring System
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
***AMD-01
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 45 PAGES
09 69 19 2.2Floor Panels
2.3Panel Support System
GAccessories
2.4 GFascia
2.6 GCut Outs
SD-05 Design Data
2.1.6Seismic Calculations
SD-06 Test Reports
2.5Factory Tests
2.1.1Concentrated Load
2.1.1Uniform Live Load
2.1.1Rolling Load
2.1.1Rolling Load
2.1.1Impact Load
2.1.3Pedestal Axial Load
2.1.4Bonding Strength of Pedestal
Adhesive
3.2Field Tests
SD-07 Certificates
2.1Compliance with ICC-ES AC300
2.1Compliance with ICC IBC
2.1Certificate of Compliance
1.4.1Qualification of Manufacturer
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 45 PAGES
09 69 19 3.5 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.2.7Lifting Device
1.6 GWarranty
09 90 00 SD-02 Shop Drawings
3.12Piping identification
3.12stencil
SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets
3.3.5Sealant
SD-04 Samples
1.9 GColor
1.4.2 GTextured Wall Coating System
1.4.3 GSample Textured Wall Coating
System Mock-Up
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions
3.4.1Application instructions
3.8.2Mixing
1.7.2Manufacturer's Safety Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
***/AMD-01
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 45 PAGES
09 90 00 SD-10 Operation and Maintenance
Data
2.1 GCoatings:
10 14 00.20 SD-02 Shop Drawings
1.5.2 GDetail Drawings
SD-03 Product Data
3.1 GInstallation
1.7 GWarranty
SD-04 Samples
1.5.1 GInterior Signage
1.4 GSoftware
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.2 GInstallation Drawings
SD-03 Product Data
2.1Cleaning and Maintenance
Instructions
2.7Colors And Finishes
2.2.1Anchoring Devices and Fasteners
2.2.3Hardware and Fittings
2.2.2Brackets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 45 PAGES
10 21 13 2.2.4Door Hardware
2.5Pilaster Shoes
SD-04 Samples
2.7 GColors and Finishes
2.2.3Hardware and Fittings
2.2.1Anchoring Devices and Fasteners
SD-07 Certificates
1.6Warranty
SD-11 Closeout Submittals
2.3.1 SToilet Enclosures
2.3.2 SUrinal Screens
2.5 SPilaster Shoes
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
2.3 GDoor Protectors
SD-03 Product Data
2.2 GCorner Guards
2.3 GDoor Protectors
SD-04 Samples
2.5 GFinish
SD-06 Test Reports
2.2Corner Guards
2.3Door Protectors
SD-07 Certificates
2.2Corner Guards
2.3Door Protectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 45 PAGES
10 26 00 1.3.1Indoor Air Quality
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
10 44 16 SD-02 Shop Drawings
1.2.1 GAccessories
Part 2 GCabinets
1.2.1 GWall Brackets
SD-03 Product Data
1.2.1 GAccessories
Part 2 GCabinets
1.2.1 GWall Brackets
3.2.1 GReplacement Parts List
SD-04 Samples
1.2.1 GCabinet
1.2.1 GWall Brackets
1.2.1 GAccessories
12 48 13 SD-02 Shop Drawings
3.2 GInstallation Drawings
3.2 GDetail Drawings
3.2 GCustom Graphics Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 45 PAGES
12 48 13 SD-03 Product Data
2.1.1 GEntrance Floor Mats and Frames
SD-04 Samples
2.1.1 GEntrance Floor Mats and Frames
2.1.1 GCustom Graphics
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Instructions
SD-10 Operation and Maintenance
Data
3.2Protection, Maintenance, and
Repair Information
12 50 00.13 10 SD-01 Preconstruction Submittals
1.7.3 GStorage Location
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
3.3.1 GGrommet, Power and
Communication Units, and Wire
Management Locations
SD-03 Product Data
2.3 GProduct Data
2.3 GProduct Style Options
SD-04 Samples
2.3.5 GFabric and Finishes
SD-07 Certificates
1.6 GAuthorized Dealer
1.6 GCertified Furniture Installers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 45 PAGES
12 50 00.13 10 1.6 GLicensed Electrician
1.6 GCertified Telecommunications
Installer
2.3 GManufacturer's Certification
1.8 GWarranty
SD-10 Operation and Maintenance
Data
3.5 GFurniture, Data Package 1
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduced VOC's for Furniture
12 59 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
1.6 GWarranty
2.2.1Workstations
2.11Power and Communications
2.11.8Communications
SD-04 Samples
2.2.1 GWorkstations
2.2.3 GMock-up
2.2.2Samples
SD-06 Test Reports
2.2.4.1 GSelected Components
1.4.2 GFire Safety
1.4.3 GElectrical System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 45 PAGES
12 59 00 SD-07 Certificates
2.2.1Workstations
1.3.1Indoor Air Quality
SD-10 Operation and Maintenance
Data
2.3.1 GAssembly Manuals
3.2 GMaintenance Manuals
3.2 GCleaning
1.4.3 GElectrical System
3.1 GInstallation
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduced VOC's for Furniture
SIndoor Air Quality for Office
Furniture Systems and Seating
22 00 00 SD-02 Shop Drawings
3.8.1 GPlumbing System
SD-03 Product Data
2.5Fixtures
2.5.3Flush Valve Water Closets
2.5.4Flush Valve Urinals
2.5.6Wall Hung Lavatories
2.5.7Kitchen Sinks
2.5.9 GDrinking-Water Coolers
2.9 GWater Heaters
3.8.1.1 GBackflow Prevention Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 45 PAGES
22 00 00 1.5.1Welding
3.8.1Plumbing System
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
3.8.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.2.1Bolts
SD-10 Operation and Maintenance
Data
3.8.1 GPlumbing System
SD-11 Closeout Submittals
2.1.1 SWater-Efficient Products
2.1.2 SEnergy-Efficient Water Heaters
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.10.1.1Metallic Flexible Duct
2.10.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.10.1.2Duct Connectors
2.10.2 GDuct Access Doors
2.10.3Fire Dampers
2.10.4 GManual Balancing Dampers
2.10.9.1Diffusers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 45 PAGES
23 00 00 2.10.9.2Registers and Grilles
2.10.10Louvers
2.10.11Air Vents, Penthouses, and
Goosenecks
2.11.1.1Centrifugal Fans
2.11.1.2In-Line Centrifugal Fans
2.11.1.3Ceiling Exhaust Fans
2.12 GAir Handling Units
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
1.4.6Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.13 GPerformance Tests
3.11 GDamper Acceptance Test
SD-07 Certificates
1.4.7Certification
1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation
Instructions
3.15.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 45 PAGES
23 00 00 3.15.1 GOperation and Maintenance
Manuals
2.10.3 GFire Dampers
2.10.4 GManual Balancing Dampers
2.11.1.1 GCentrifugal Fans
2.11.1.2 GIn-Line Centrifugal Fans
2.11.1.3 GCeiling Exhaust Fans
2.12 GAir Handling Units
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduce Volatile Organic
Compounds (VOC)
3.1 SIndoor Air Quality During
Construction
2.1.3 SOzone Depleting Substances for
Refrigerants
23 05 93 SD-01 Preconstruction Submittals
1.3.2 GRecords of Existing Conditions
1.5.3.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.3.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 45 PAGES
23 05 93 1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.3.2 GSystems Readiness Check
1.5.4 GTAB Execution
1.5.4.3 GTAB Verification
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.7.1.1 GTAB Design Review Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.7.1 GDALT and TAB Submittal and
Work Schedule
1.7.1.3 GTAB Pre-Field Engineering
Report
1.5.3.1 GTAB Firm
1.3.2 GDesign Review Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 45 PAGES
23 05 93 1.7.1.2 GPre-field DALT Preliminary
Notification
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.4Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SD-03 Product Data
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-04 Samples
2.3.1.2 GThermal Insulation
3.1.1 GDisplay Samples
SD-08 Manufacturer’s Instructions
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-11 Closeout Submittals
2.1.1 SReduce Volatile Organic
Compounds (VOC)
2.1.2 SRecycled Content
23 11 25 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 45 PAGES
23 11 25 1.5.3 GGas Piping System
2.2 GGas Piping System
3.3 GGas Piping System
SD-03 Product Data
1.6.1 GPipe and Fittings
1.5.3 GGas Equipment Connectors
1.5.3 GGas Piping System
2.2 GGas Piping System
3.3 GGas Piping System
2.1 GPipe Coating Materials
2.5 GPressure Regulators
2.2.11 GTransition Fittings
2.3 GValves
2.2.7 GWarning and Identification Tape
SD-06 Test Reports
3.18 GTesting
3.18.1 GPressure Tests
3.18.2 GTest with Gas
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
1.5.1 GAssigned Number, Letter, or
Symbol
SD-08 Manufacturer’s Instructions
1.5.2 GPE Pipe and Fittings
2.1 GPipe Coating Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 45 PAGES
23 11 25 SD-10 Operation and Maintenance
Data
1.3.1 GGas Facility System and
Equipment Operation
1.3.2 GGas Facility System Maintenance
1.3.3 GGas Facility Equipment
Maintenance
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 82 02.00 10 SD-02 Shop Drawings
1.4Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 45 PAGES
23 82 02.00 10 SD-03 Product Data
2.1Materials and Equipment
1.6Spare Parts
3.4Posted Instructions
3.1Verification of Dimensions
2.9.1.1Coil Corrosion Protection
3.6System Performance Tests
3.4 GDemonstrations
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-07 Certificates
2.1Materials and Equipment
2.1.1Service Organization
SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
26 05 48.00 10 SD-02 Shop Drawings
3.1Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.1 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 45 PAGES
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 20 00 SD-02 Shop Drawings
2.11 GPanelboards
2.14 GTransformers
SD-03 Product Data
2.10 GReceptacles
2.11.3 GCircuit breakers
2.8 GSwitches
2.14 GTransformers
2.22 GMetering
2.18.3 GGrounding Busbar
2.23 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
3.5.3 GTransformer tests
3.5.4 GGround-fault receptacle test
SD-07 Certificates
2.9 GFuses
SD-09 Manufacturer’s Field
Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 45 PAGES
26 20 00 2.25.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
2.22 GMetering
26 41 00 SD-02 Shop Drawings
1.4.1.1 GOverall lightning protection
system
1.4.1.2 GEach major component
SD-06 Test Reports
1.4.3 GLightning Protection and
Grounding System Test Plan
3.5.1 GLightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3 GLightning Protection System
Installers Documentation
1.4.2 GComponent UL Listed and
Labeled
1.4.4 GLightning protection system
inspection certificate
3.1.1 GRoof manufacturer's warranty
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
1.5.2 GOccupancy/Vacancy Sensor
Coverage Layout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 45 PAGES
26 51 00 SD-03 Product Data
2.2 GLuminaires
2.4 GLight Sources
2.3 GDrivers, Ballasts and Generators
1.6.1 GLED Luminaire Warranty
1.5.4 GLuminaire Design Data
2.5.3.2 GVacancy Sensors
2.5.2 GDimming Controllers (Dimmers)
2.5.4 GTimeswitch
2.8 GPower Hook Luminaire Hangers
2.6.1 GExit Signs
2.5.3.1 GOccupancy Sensors
SD-06 Test Reports
1.5.5 GLED Luminaire - IES LM-79 Test
Report
1.5.6 GLED Light Source - IES LM-80
Test Report
1.5.7 GLED Light Source - IES TM-21
Test Report
1.5.8 GOccupancy/Vacancy Sensor
Verification Tests
1.5.11.3 GEnergy Efficiency
SD-07 Certificates
1.6.1.1 GLuminaire Useful Life Certificate
1.5.3 GLED Driver and Dimming Switch
Compatibility Certificate
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 45 PAGES
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications…
This is the start of the file's text. The full file is on GovTribe.