B3_IFB_(AM03)_18B0035.pdf

PDF 18 MB Posted

Attached to
ARNORTH Building 56 Renovation
Solicitation number
W9126G18B0035
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
B3_IFB_(AM04)_18B0035.pdf PDF
B3_IFB_(AM02)_18B0035.pdf PDF
B56_Site_Visit_Sign_In_Sheet.pdf PDF
B3_IFB_(AM_01)_18B0035.pdf PDF
B3_IFB_B56_18B0035.pdf PDF
B3_IFB_(Drawings)_B56_18B0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Renovation Building 56, Fort Sam Houston, San Antonio, Texas is amended as follows.

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 11 September 2018 at 2:00 PM Central Time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G18B0035

X 9B. DATED (SEE ITEM 11)

23-Aug-2018

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended,X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

Sept 7, 2018

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G18B0035

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO THE SPECIFICATIONS

1. LIMITED HAZARDOUS MATERIALS: Limited Hazardous Materials (Asbestos, Lead, PCB, & Mercury) Survey documents has been added to the solicitation, bearing the notation W9126G18B0035-0003.

2. Replacement Sections - Replace the following sections with the accompanying new sections of the same number and title, bearing the notation W9126G18B0035-0003.

TABLE OF CONTENTS

SUBMITTAL REGISTER

3. Added Sections - The following section has been added to the solicitation, bearing the notation W9126G18B0035-0003.

09 69 19 STRINGERLESS ACCESS FLOORING

CHANGES TO THE DRAWINGS

4. Replacement Drawings.- Replace the drawings listed below with the attached new drawings(s) of the same number, bearing the notation W9126G18B0035-0003.

G-003 GENERAL NOTES

A-101 ARCHITECTURAL NEW WORK FLOOR PLAN

A-102 ARCHITECTURAL REFLECTED CEILING PLAN

A-301 ARCHITECTURAL BUILDING SECTIONS

A-404 ARCHITECTURAL FENCE ELEVATIONS & DETAILS

A-501 ARCHITECTURAL ENLARGED RESTROOM PLAN

A-601 ARCHITECTURAL DOOR SCHEDULE

AD101 ARCHITECTURAL DEMOLITION PLAN

CS101 CIVIL SITE PLAN

IN601 INTERIOR DESIGN ROOM FINISH SCHEDULE & LEGEND

P-101 PLUMBING FLOOR PLAN

S-001 STRUCTURAL GENERAL NOTES

End of Summary of Changes

Bldg 56 Renovation FSH18ANB56

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00.01 SOLICITATION, OFFER AND AWARD, SF-1442

00 11 00.02 CONTRACT LINE ITEM SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 22 11 LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL

PREPARATION

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATION SCHEDULE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 13.01 44 SPECIAL PROJECT PROCEDURES FOR JOINT BASE SAN

ANTONIO/FORT SAM HOUSTON

01 35 13.02 44 ISSUANCE OF ACCESS TO NON-COMMON ACCESS CARD CONTRACTORS,

VENDORS, AND NON-DOD CIVILIANS

01 35 13.03 44 TECHNICAL SUPPLEMENT TO THE DESIGN GUIDE FOR JOINT BASE

SAN ANTONIO/FORT SAM HOUSTON

01 35 13.10 00 SPECIAL PROJECT PROCEDURES - SURVEYING

01 35 13.20 00 SPECIAL PROJECT PROCEDURES - CAD

01 35 13.30 00 SPECIAL PROJECT PROCEDURES - GIS

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 58 00 PROJECT IDENTIFICATION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 01 20.70 UNIT MASONRY CLEANING AND RESTORATION

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

PROJECT TABLE OF CONTENTS Page 1

W9126G18B0035-0003

06 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 14 00 WOOD DOORS

08 41 13 INTERIOR ALUMINUM DOORS AND FRAMES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 68 00 CARPETING

09 69 19 STRINGERLESS ACCESS FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION

12 59 00 SYSTEMS FURNITURE

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

PROJECT TABLE OF CONTENTS Page 2

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERS

33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 45 PAGES

Renovate Building 56; Fort Sam Houston, TX

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.14.4Receipts

02 82 16.00 20 SD-03 Product Data

3.1.4 GLocal Exhaust Equipment

3.1.5 GVacuums

3.1.1.1 GRespirators

3.1.4 GPressure Differential Automatic

Recording Instrument

1.2.2 GAmended Water

3.1.7 GGlovebags

1.3.8 GMaterial Safety Data Sheets

(Msds) for all materials

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

For Local Exhaust System

3.3.3.2 GAsbestos Disposal Quantity

Report

3.2.6.3 GClearance Sampling

SD-07 Certificates

1.3.9 GAsbestos Hazard Abatement Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 45 PAGES

02 82 16.00 20 1.3.10 GTesting Laboratory

1.5.1 GPrivate Qualified Person

Documentation

1.5.4 GContractor's License

1.5.2 GCompetent Person

1.5.3 GWorker's License

1.3.11 GLandfill Approval

1.3.3 GEmployee Training

1.3.12 GMedical Certification

1.3.11 GWaste Shipment Records

1.3.6 GRespiratory Protection Program

1.3.11 GDelivery Tickets

3.1.5 GVacuums

3.1.2.3 GWater Filtration Equipment

3.1.5 GVentilation Systems

3.1 GEquipment Used To Contain

Airborne Asbestos Fibers

1.3.4Notifications

SD-11 Closeout Submittals

1.3.4 GNotifications

1.3.6.1 GRespirator Program Records

1.3.4 GPermits and Licenses

1.5.7 GProtective Clothing

Decontamination Quality Control

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 45 PAGES

02 82 16.00 20 1.5.8 GProtective Clothing

Decontamination Facility

Notification

02 82 33.13 20 SD-03 Product Data

1.6.4 GVacuum Filters

1.6.1 GRespirators

SD-06 Test Reports

1.5.2.3 GSampling Results

1.5.2.3 GOccupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.1 GQualifications of CP

1.5.1.3 GTesting Laboratory

3.1.1.1 GOccupant Notification

1.5.1.2 GTraining Certification

1.5.1.4 GThird Party Consultant

Qualifications

1.5.3 Glead-based paint/paint with lead

removal/control plan

1.6.3 GRental equipment notification

1.5.2.6 GRespiratory Protection Program

1.5.2.7 GHazard Communication Program

3.5.2 GEPA or State approved

hazardous waste treatment, storage, or disposal facility

1.5.2.8 GLead Waste Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 45 PAGES

02 82 33.13 20 1.6.4 GVacuum filters

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

1.5.2.4 GMedical Examinations

1.5.1.2 GTraining Certification

3.5.2.1 GTurn-In Documents or Weight

Tickets

02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3.2DD Form 1348-1

03 30 53 SD-02 Shop Drawings

1.4 GInstallation Drawings

SD-03 Product Data

2.2.3.1Air-Entraining Admixture

2.2.3.2Accelerating Admixture

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 45 PAGES

03 30 53 2.2.3.3Water-Reducing or Retarding

Admixture

2.2.11Curing Materials

2.2.6Expansion Joint Filler Strips, Premolded

2.2.7Joint Sealants - Field Molded

Sealants

2.4.1Waterstops

3.2Conveying and Placing Concrete

2.2.8Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete

2.4.2Curing Compound

2.2.5Mechanical Reinforcing Bar

Connectors

SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.3.3.2Measurement of Floor Tolerances

3.8.3 GCompressive Strength Testing

3.8.3 GSlump

3.8.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

2.2.2Aggregates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 45 PAGES

03 30 53 2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

2.4.2Curing Compound

04 01 20.70 SD-01 Preconstruction Submittals

1.5.1 GQuality Control Plan

1.5.1 GProject Training Program

1.5.2 GQualifications

SD-02 Shop Drawings

1.5.4Photographic Documentation

3.5.1 GStructural Upgrades

SD-03 Product Data

1.5.2Qualifications

1.5.5 GCleaning and Restoration

Methods

2.1 GCleaning Materials

2.1.4Biocides

2.2.2.1 GReplacement Mortar

2.4 GMortar Mix

3.4.7.2 GWater Repellents Infiltration

3.4.7.3 GStone Consolidants

SD-04 Samples

1.5.6 GMock-ups

SD-05 Design Data

3.5.1 GStructural Upgrades

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 45 PAGES

04 01 20.70 3.5.2Existing Sealants for Asbestos and PCBs

SD-07 Certificates

2.2Repair Materials

06 10 00 SD-02 Shop Drawings

2.6.4 GTrussed Rafters

2.6.5 GTrussed Joists

1.9.1 GFabricated Structural Members

1.9.2 GModifications of Structural

Members

2.3.2 GNailing Strips

SD-03 Product Data

2.5Underlayment

2.2.1Plastic Lumber

1.8Fire-retardant Treatment

1.4.3Structural-use and OSB Panels

2.6.7Adhesives

SD-05 Design Data

1.9.2 GModifications of Structural

Members

SD-06 Test Reports

1.4.4Preservative-treated

SD-07 Certificates

1.10.1Certificates of Grade

1.10.2 GCertified Sustainably Harvested

Wood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 45 PAGES

06 10 00 1.7Preservative Treatment

1.10.3Indoor Air Quality

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.2 GBlock or Board Insulation

2.3 GVapor Retarder

2.4 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

2.6 GAccessories

SD-07 Certificates

2.2 GBlock or Board Insulation

2.3 GVapor Retarder

2.5 GProtection Board or Coating

1.7 GSpecial Warranties

1.7 GSpecial Warranties

SD-08 Manufacturer’s Instructions

2.2Block or Board Insulation

2.6.1Adhesive

SD-11 Closeout Submittals

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 45 PAGES

07 22 00 2.2 GInsulation

SD-06 Test Reports

1.7.1 GFlame Spread Rating

SD-07 Certificates

1.8 GVolatile Organic Compounds

(VOC) Content

1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials

SD-08 Manufacturer’s Instructions

2.2 GInsulation

SD-11 Closeout Submittals

1.8 SVolatile Organic Compounds

(VOC) Content

07 27 19.01 SD-01 Preconstruction Submittals

1.7.1 GQualifications of Manufacturer

1.7.2 GQualifications of Installer

SD-02 Shop Drawings

1.4 GSelf-adhering Air Barrier

SD-03 Product Data

1.4 GSelf-adhering Air Barrier

2.3 GPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4 GSelf-adhering Air Barrier

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 45 PAGES

07 27 19.01 1.6 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

1.4.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections and Testing

SD-07 Certificates

1.4 GSelf-adhering Air Barrier

1.7.1 GQualifications of Manufacturer

1.7.2 GQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 GSelf-adhering Air Barrier

2.3 GPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

2.2.1 GGravel Stops and Fasciae

3.1.11 GBase Flashing

3.1.12 GCounterflashing

2.2.12 GReglets

3.1.15 GDrip Edges

3.1.16 GEave Flashing

SD-04 Samples

1.4.2 GFinish Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 45 PAGES

07 60 00 SD-07 Certificates

2.1 GCertificates of Compliance

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

SD-11 Closeout Submittals

2.1 SRecycled Content

07 92 00 SD-03 Product Data

2.2 GSealants

2.3 GPrimers

2.4 GBond Breakers

2.5 GBackstops

3.1 GField Adhesion

08 14 00 SD-02 Shop Drawings

2.2 GDoors

SD-03 Product Data

2.2 GDoors

2.3Accessories

2.4.7Water-resistant Sealer

1.4Warranty

2.2.2 GSound Transmission Class

Rating

2.2.3 GFire Resistance Rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 45 PAGES

08 14 00 SD-04 Samples

2.2Doors

2.4.6.3 GDoor Finish Colors

SD-06 Test Reports

2.5Cycle-Slam

2.5Hinge Loading Resistance

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GList of Product Installations

SD-02 Shop Drawings

3.3 GInstallation Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.1 GFinish

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SD-11 Closeout Submittals

3.5Manufacturer's Product Warranty

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.8 GKeying System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 45 PAGES

08 71 00 2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.6.1Insulating Glass

1.3Glazing Accessories

SD-04 Samples

1.6.1Insulating Glass

2.4.2Glazing Compound

2.4.5Tape

2.4.3.1Sealant

SD-07 Certificates

1.6.1Insulating Glass

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

09 29 00 SD-03 Product Data

2.2.6Cementitious Backer Units

2.2.4Glass Mat Water-Resistant

Gypsum Tile Backing Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 45 PAGES

09 29 00 2.2.3Water-Resistant Gypsum Backing

Board

2.2.5Glass Mat Covered or Reinforced

Gypsum Sheathing

2.2.5.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.2.12Accessories

2.2.1Gypsum Board

SD-07 Certificates

2.2 GAsbestos Free Materials

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1.2 GAccessories

2.1 GTransition Strips

2.6 GTransition Strips

SD-07 Certificates

1.3.1Indoor Air Quality

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 45 PAGES

09 30 10 SD-10 Operation and Maintenance

Data

3.2 GInstallation

09 51 00 SD-02 Shop Drawings

1.2Approved Detail Drawings

SD-03 Product Data

1.4Certification

SD-04 Samples

2.1Acoustical Units

2.1.1Acoustic Ceiling Tiles

SD-06 Test Reports

1.2.1Ceiling Attenuation Class and

Test

SD-07 Certificates

2.1Acoustical Units

2.1.1Acoustic Ceiling Tiles

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.2 GCarpet

2.4 GCarpet Cushion

2.6 GMoldings

SD-04 Samples

2.2 GCarpet

2.6 GMoldings

2.4 GCarpet Cushion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 45 PAGES

09 68 00 SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

1.3.1Indoor Air Quality

1.6Warranty

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Carpeting

2.2.1 SRecycled Content for Carpeting

2.2.1 SIndoor Air Quality for Carpet

2.5 SIndoor Air Quality for Aerosol

Adhesives and Sealants

2.5 SIndoor Air Quality for Non-Aerosol

Adhesives

2.5 SIndoor Air Quality for Concrete

Primer

1.6Warranty

09 69 19 SD-02 Shop Drawings

2.2.2 GDetailed Installation Drawings

SD-03 Product Data

2.1 GAccess Flooring System

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

***AMD-01

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 45 PAGES

09 69 19 2.2Floor Panels

2.3Panel Support System

GAccessories

2.4 GFascia

2.6 GCut Outs

SD-05 Design Data

2.1.6Seismic Calculations

SD-06 Test Reports

2.5Factory Tests

2.1.1Concentrated Load

2.1.1Uniform Live Load

2.1.1Rolling Load

2.1.1Rolling Load

2.1.1Impact Load

2.1.3Pedestal Axial Load

2.1.4Bonding Strength of Pedestal

Adhesive

3.2Field Tests

SD-07 Certificates

2.1Compliance with ICC-ES AC300

2.1Compliance with ICC IBC

2.1Certificate of Compliance

1.4.1Qualification of Manufacturer

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 45 PAGES

09 69 19 3.5 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2.7Lifting Device

1.6 GWarranty

09 90 00 SD-02 Shop Drawings

3.12Piping identification

3.12stencil

SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets

3.3.5Sealant

SD-04 Samples

1.9 GColor

1.4.2 GTextured Wall Coating System

1.4.3 GSample Textured Wall Coating

System Mock-Up

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions

3.4.1Application instructions

3.8.2Mixing

1.7.2Manufacturer's Safety Data

Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

***/AMD-01

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 45 PAGES

09 90 00 SD-10 Operation and Maintenance

Data

2.1 GCoatings:

10 14 00.20 SD-02 Shop Drawings

1.5.2 GDetail Drawings

SD-03 Product Data

3.1 GInstallation

1.7 GWarranty

SD-04 Samples

1.5.1 GInterior Signage

1.4 GSoftware

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings

3.2 GInstallation Drawings

SD-03 Product Data

2.1Cleaning and Maintenance

Instructions

2.7Colors And Finishes

2.2.1Anchoring Devices and Fasteners

2.2.3Hardware and Fittings

2.2.2Brackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 45 PAGES

10 21 13 2.2.4Door Hardware

2.5Pilaster Shoes

SD-04 Samples

2.7 GColors and Finishes

2.2.3Hardware and Fittings

2.2.1Anchoring Devices and Fasteners

SD-07 Certificates

1.6Warranty

SD-11 Closeout Submittals

2.3.1 SToilet Enclosures

2.3.2 SUrinal Screens

2.5 SPilaster Shoes

10 26 00 SD-02 Shop Drawings

2.2 GCorner Guards

2.3 GDoor Protectors

SD-03 Product Data

2.2 GCorner Guards

2.3 GDoor Protectors

SD-04 Samples

2.5 GFinish

SD-06 Test Reports

2.2Corner Guards

2.3Door Protectors

SD-07 Certificates

2.2Corner Guards

2.3Door Protectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 45 PAGES

10 26 00 1.3.1Indoor Air Quality

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 GFinishes

2.2Accessory Items

SD-07 Certificates

2.2Accessory Items

10 44 16 SD-02 Shop Drawings

1.2.1 GAccessories

Part 2 GCabinets

1.2.1 GWall Brackets

SD-03 Product Data

1.2.1 GAccessories

Part 2 GCabinets

1.2.1 GWall Brackets

3.2.1 GReplacement Parts List

SD-04 Samples

1.2.1 GCabinet

1.2.1 GWall Brackets

1.2.1 GAccessories

12 48 13 SD-02 Shop Drawings

3.2 GInstallation Drawings

3.2 GDetail Drawings

3.2 GCustom Graphics Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 45 PAGES

12 48 13 SD-03 Product Data

2.1.1 GEntrance Floor Mats and Frames

SD-04 Samples

2.1.1 GEntrance Floor Mats and Frames

2.1.1 GCustom Graphics

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Instructions

SD-10 Operation and Maintenance

Data

3.2Protection, Maintenance, and

Repair Information

12 50 00.13 10 SD-01 Preconstruction Submittals

1.7.3 GStorage Location

SD-02 Shop Drawings

3.3.1 GInstallation Drawings

3.3.1 GGrommet, Power and

Communication Units, and Wire

Management Locations

SD-03 Product Data

2.3 GProduct Data

2.3 GProduct Style Options

SD-04 Samples

2.3.5 GFabric and Finishes

SD-07 Certificates

1.6 GAuthorized Dealer

1.6 GCertified Furniture Installers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 45 PAGES

12 50 00.13 10 1.6 GLicensed Electrician

1.6 GCertified Telecommunications

Installer

2.3 GManufacturer's Certification

1.8 GWarranty

SD-10 Operation and Maintenance

Data

3.5 GFurniture, Data Package 1

SD-11 Closeout Submittals

2.1.1 SEnergy Efficient Equipment

2.1.2 SReduced VOC's for Furniture

12 59 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

1.6 GWarranty

2.2.1Workstations

2.11Power and Communications

2.11.8Communications

SD-04 Samples

2.2.1 GWorkstations

2.2.3 GMock-up

2.2.2Samples

SD-06 Test Reports

2.2.4.1 GSelected Components

1.4.2 GFire Safety

1.4.3 GElectrical System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 45 PAGES

12 59 00 SD-07 Certificates

2.2.1Workstations

1.3.1Indoor Air Quality

SD-10 Operation and Maintenance

Data

2.3.1 GAssembly Manuals

3.2 GMaintenance Manuals

3.2 GCleaning

1.4.3 GElectrical System

3.1 GInstallation

SD-11 Closeout Submittals

2.1.1 SEnergy Efficient Equipment

2.1.2 SReduced VOC's for Furniture

SIndoor Air Quality for Office

Furniture Systems and Seating

22 00 00 SD-02 Shop Drawings

3.8.1 GPlumbing System

SD-03 Product Data

2.5Fixtures

2.5.3Flush Valve Water Closets

2.5.4Flush Valve Urinals

2.5.6Wall Hung Lavatories

2.5.7Kitchen Sinks

2.5.9 GDrinking-Water Coolers

2.9 GWater Heaters

3.8.1.1 GBackflow Prevention Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 45 PAGES

22 00 00 1.5.1Welding

3.8.1Plumbing System

SD-06 Test Reports

3.8Tests, Flushing and Disinfection

3.8.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.2.1Bolts

SD-10 Operation and Maintenance

Data

3.8.1 GPlumbing System

SD-11 Closeout Submittals

2.1.1 SWater-Efficient Products

2.1.2 SEnergy-Efficient Water Heaters

23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data

2.10.1.1Metallic Flexible Duct

2.10.1.2Insulated Nonmetallic Flexible

Duct Runouts

2.10.1.2Duct Connectors

2.10.2 GDuct Access Doors

2.10.3Fire Dampers

2.10.4 GManual Balancing Dampers

2.10.9.1Diffusers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 45 PAGES

23 00 00 2.10.9.2Registers and Grilles

2.10.10Louvers

2.10.11Air Vents, Penthouses, and

Goosenecks

2.11.1.1Centrifugal Fans

2.11.1.2In-Line Centrifugal Fans

2.11.1.3Ceiling Exhaust Fans

2.12 GAir Handling Units

2.13.1.1 GVariable Volume, Single Duct

Terminal Units

1.4.6Test Procedures

1.2.1.2 GDiagrams

SD-06 Test Reports

3.13 GPerformance Tests

3.11 GDamper Acceptance Test

SD-07 Certificates

1.4.7Certification

1.4.3Ozone Depleting Substances

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Installation

Instructions

3.15.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 45 PAGES

23 00 00 3.15.1 GOperation and Maintenance

Manuals

2.10.3 GFire Dampers

2.10.4 GManual Balancing Dampers

2.11.1.1 GCentrifugal Fans

2.11.1.2 GIn-Line Centrifugal Fans

2.11.1.3 GCeiling Exhaust Fans

2.12 GAir Handling Units

2.13.1.1 GVariable Volume, Single Duct

Terminal Units

SD-11 Closeout Submittals

2.1.1 SEnergy Efficient Equipment

2.1.2 SReduce Volatile Organic

Compounds (VOC)

3.1 SIndoor Air Quality During

Construction

2.1.3 SOzone Depleting Substances for

Refrigerants

23 05 93 SD-01 Preconstruction Submittals

1.3.2 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2 GTAB Team Assistants

1.2 GTAB Team Engineer

1.5.3.2 GTAB Specialist

1.2 GTAB Team Field Leader

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 45 PAGES

23 05 93 1.3.2 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

1.5.2 GTAB Procedures

1.5.2 GCalibration

1.3.2 GSystems Readiness Check

1.5.4 GTAB Execution

1.5.4.3 GTAB Verification

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.7.1.1 GTAB Design Review Report

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.7.1 GDALT and TAB Submittal and

Work Schedule

1.7.1.3 GTAB Pre-Field Engineering

Report

1.5.3.1 GTAB Firm

1.3.2 GDesign Review Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 45 PAGES

23 05 93 1.7.1.2 GPre-field DALT Preliminary

Notification

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.4Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

SD-03 Product Data

2.4 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.3.1.2 GThermal Insulation

3.1.1 GDisplay Samples

SD-08 Manufacturer’s Instructions

2.4 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-11 Closeout Submittals

2.1.1 SReduce Volatile Organic

Compounds (VOC)

2.1.2 SRecycled Content

23 11 25 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 45 PAGES

23 11 25 1.5.3 GGas Piping System

2.2 GGas Piping System

3.3 GGas Piping System

SD-03 Product Data

1.6.1 GPipe and Fittings

1.5.3 GGas Equipment Connectors

1.5.3 GGas Piping System

2.2 GGas Piping System

3.3 GGas Piping System

2.1 GPipe Coating Materials

2.5 GPressure Regulators

2.2.11 GTransition Fittings

2.3 GValves

2.2.7 GWarning and Identification Tape

SD-06 Test Reports

3.18 GTesting

3.18.1 GPressure Tests

3.18.2 GTest with Gas

SD-07 Certificates

1.5.1 GWelders Procedures and

Qualifications

1.5.1 GAssigned Number, Letter, or

Symbol

SD-08 Manufacturer’s Instructions

1.5.2 GPE Pipe and Fittings

2.1 GPipe Coating Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 45 PAGES

23 11 25 SD-10 Operation and Maintenance

Data

1.3.1 GGas Facility System and

Equipment Operation

1.3.2 GGas Facility System Maintenance

1.3.3 GGas Facility Equipment

Maintenance

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

1.5.2Spare Parts

3.5Refrigerant Piping Tests

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-07 Certificates

2.1Service Organization

SD-10 Operation and Maintenance

Data

1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 82 02.00 10 SD-02 Shop Drawings

1.4Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 45 PAGES

23 82 02.00 10 SD-03 Product Data

2.1Materials and Equipment

1.6Spare Parts

3.4Posted Instructions

3.1Verification of Dimensions

2.9.1.1Coil Corrosion Protection

3.6System Performance Tests

3.4 GDemonstrations

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates

2.1Materials and Equipment

2.1.1Service Organization

SD-10 Operation and Maintenance

Data

3.4 GOperation and Maintenance

Manuals

26 05 48.00 10 SD-02 Shop Drawings

3.1Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

3.1 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 45 PAGES

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure

26 20 00 SD-02 Shop Drawings

2.11 GPanelboards

2.14 GTransformers

SD-03 Product Data

2.10 GReceptacles

2.11.3 GCircuit breakers

2.8 GSwitches

2.14 GTransformers

2.22 GMetering

2.18.3 GGrounding Busbar

2.23 GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.5 GGrounding system test

3.5.3 GTransformer tests

3.5.4 GGround-fault receptacle test

SD-07 Certificates

2.9 GFuses

SD-09 Manufacturer’s Field

Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 45 PAGES

26 20 00 2.25.1Transformer factory tests

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

2.22 GMetering

26 41 00 SD-02 Shop Drawings

1.4.1.1 GOverall lightning protection

system

1.4.1.2 GEach major component

SD-06 Test Reports

1.4.3 GLightning Protection and

Grounding System Test Plan

3.5.1 GLightning Protection and

Grounding System Test

SD-07 Certificates

1.2.3 GLightning Protection System

Installers Documentation

1.4.2 GComponent UL Listed and

Labeled

1.4.4 GLightning protection system

inspection certificate

3.1.1 GRoof manufacturer's warranty

26 51 00 SD-02 Shop Drawings

1.5.1 GLuminaire Drawings

1.5.2 GOccupancy/Vacancy Sensor

Coverage Layout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 45 PAGES

26 51 00 SD-03 Product Data

2.2 GLuminaires

2.4 GLight Sources

2.3 GDrivers, Ballasts and Generators

1.6.1 GLED Luminaire Warranty

1.5.4 GLuminaire Design Data

2.5.3.2 GVacancy Sensors

2.5.2 GDimming Controllers (Dimmers)

2.5.4 GTimeswitch

2.8 GPower Hook Luminaire Hangers

2.6.1 GExit Signs

2.5.3.1 GOccupancy Sensors

SD-06 Test Reports

1.5.5 GLED Luminaire - IES LM-79 Test

Report

1.5.6 GLED Light Source - IES LM-80

Test Report

1.5.7 GLED Light Source - IES TM-21

Test Report

1.5.8 GOccupancy/Vacancy Sensor

Verification Tests

1.5.11.3 GEnergy Efficiency

SD-07 Certificates

1.6.1.1 GLuminaire Useful Life Certificate

1.5.3 GLED Driver and Dimming Switch

Compatibility Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 45 PAGES

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications…