B3.Amendment_6.pdf

PDF 3 MB Posted

Attached to
DISA Mecahnical
Solicitation number
W9126G-16-R-0345
Issued by

View the file

Other files

File Type Posted
B3.Amendment_5.pdf PDF
A1.BACNet_Spec.pdf PDF
A1.2.Additional_Photos.pdf PDF
A1.2.12-01-1982.pdf PDF
A1.2.As_Built.pdf PDF
A1.2.12-01-1982.pdf PDF
A1.2.12-02-2006.pdf PDF
Kelly_Annex_Bldg_200_As-builts.pdf PDF
B3.Amendment_4.pdf PDF
B3.Amendment_3.pdf PDF
B3.Amendment_2.pdf PDF
B3.Amendment_1.pdf PDF
B3_RFP_Letter.pdf PDF
B3.RFP.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Defense Information Systems Agency (DISA) Building 200 Mechanical Piping and Controls is, is amended as follows:

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is changed to 25 August 2016, 10:00 a.m., Central Time, as previously announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-16-R-0345

X 9B. DATED (SEE ITEM 11)

15-Jul-2016

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2016

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9126G-16-R-0345

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The Proposal Reciept date is changed to 25 August 2016, 10:00 am Central Time. The bidder inquiry period will reopen for comments until 16 August 2016, 5:00 p.m..

2. The following attachments are changed by amendment, see the attached bearing the notation “W9126G-16-R-0345, Amendment No. 0006”:

00 11 00 – CLIN SCHEDULE

01 10 00 – STATEMENT OF WORK

3. B200 Existing Direct Digital Control Systems As-Built Drawings are provided with this amendment. See the attached.

End of Summary of Changes

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

0001 All Work for the Design and Construction of a Building Automated Controlled Dual Path Chilled Water Supply Loop System 1 JOB $ *** $

0002 All Work for the Design and Construction of the Recycle Water Line within the fence limits 1 JOB $ *** $

<AM#3>

0003 Permit Fees 1 JOB $ *** $

<AM#6>

0004 Provide controls compatible with eixsting BACnet and Modbus per the DISA Standards. 1 JOB $ *** $

OPTIONS

0004 0003

OPTION NO. 1: All Work for the Design and Construction of Humidification Monitoring and Controls 1 JOB *** $

0005 0004

OPTION NO. 2: All Work for the Connection of the Recycle Water Line outside the fence limits 1 JOB *** $

</AM#3>

0007 OPTION NO. 3: Replace the existing DDC network with Delta Control systems to meet the requirements of DISA's specifications. 1 JOB *** $

<AM#6>

TOTAL BASE OFFER

TOTAL (BASE OFFER + ALL OPTIONS)

Defense Information Systems Agency (DISA) Building 200 Mechanical Piping and Controls Port San Antonio, Texas

Solicitation No.W9126G-15-R-1537

CLIN SCHEDULE

BASE OFFER: All work required by the Contract exclusive of work required by the Option Items.

Section 00 11 00 Page 1

W9126G-16-R-0345, Amendment No. 0006

SECTION 01 10 00 Page 1

SECTION 01 10 00

STATEMENT OF WORK

TABLE OF CONTENTS

Amendment No. 003 Amendment No. 006

DIVISION 01 - GENERAL REQUIREMENTS

Paragraphs

1.0 PROJECT OBJECTIVES

2.0 PROJECT SCOPE

3.0 PROJECT WORK ITEM DESCRIPTIONS

4.0 APPLICABLE CRITERIA

5.0 GENERAL TECHNICAL REQUIREMENTS

6.0 PROJECT SPECIFC REQUIREMENTS

ATTACHMENTS

APPENDICES

Appendix A Location Map

Appendix B Existing Floor Plan, Existing Chilled Water Piping Route, and Proposed Chilled Water Piping Route

Appendix C Site Drawings

End of Table of Contents

SECTION 01 10 00 Page 2

SECTION 01 10 00

STATEMENT OF WORK

1.0 PROJECT OBJECTIVES

The Contractor shall provide all plant, labor and materials to complete the design and construction facility sustainment, restoration, and modernization (SRM) work in accordance with the requirements of the drawings, specifications, and attachments provided.

1.1 SECTION ORGANIZATION

This Section is organized under 6 major “paragraphs”.

1) Paragraph 1 is intended to define the project objectives.

2) Paragraph 2 describes the scope of the project(s).

3) Paragraph 3 provides a detailed list of facilities and associated work items, quantities, and brief description of the work item to be included in this contract.

4) Paragraph 4 lists applicable industry and government design criteria generally applicable to the work items in listed in paragraph 3. It is not intended to be all-inclusive. Other industry and government standards may also be used where necessary to produce professional designs, unless they conflict with those listed.

5) Paragraph 5 contains general design criteria specifically applicable to the work items defined in Paragraph 3.

6) Paragraph 6 contains installation and project specific criteria supplementing the other 5 paragraphs.

2.0 PROJECT SCOPE

Base Bid: The Contractor shall replace the existing chilled water piping located in crawl spaces and raised floor pipe trenches with a new 10-inch chilled water loop, provide a redundant 20 gallon per minute water supply to the critical cooling towers.

Bid Option No.1: The Contractor shall replace existing air handling unit #9, design new duct system to provide ventilation to the computer rooms and design and install a humidity control system for the computer rooms.

Base Bid: The Contractor shall design and construct a new 2-inch underground recycled waterline that begins at the existing cooling towers and extends to the existing wrought iron fence adjacent to Clarence Tinker Drive, south corner of the Building 200 site. Refer to drawings for proposed location.

Bid Option No. 2: The Contractor shall design and install an 8-inch connection from the new 2-inch waterline to the existing SAWS non-potable waterline. All work exterior the fence shall be done within the utility easement. Location and connections shall be coordinated with SAWS and Port of San Antonio and per their recycled water standards. Refer to drawings for proposed location.

2.1 WORK ITEM TYPE

The following type of Work Item types are required for this contract:

• Repair Interior Partitions (work item code C1010)

• Construct Recycle Water Distribution (work item code D2090)

• Replace Distribution Systems (work item code D3040)

SECTION 01 10 00 Page 3

2.2 CONTINUED OCCUPANCY

1) All facilities will continue to be occupied and in operation; therefore all systems, utilities, and access to the building must be maintained as part of this SRM work.

2) Schedule all work at such time and in such a manner to minimize interference and inconvenience to public, staff and operations. Refer to Section 01 10 00, paragraphs 5 and 6 for additional requirements.

3) The Contractor must obtain authorization from the COR as approved by the user before starting any work within any existing area of the building. Protect the area immediately surrounding all areas of work from danger of materials being dropped or dislodged.

4) Carry out work in a manner that will not impose avoidable hardship, danger, or inconvenience to the public or staff. Prior to commencement of work, the Contractor and COR shall jointly survey the construction site and surrounding areas, making permanent record of such existing damage as cracks, malfunctioning utility equipment and fixtures, or other similar damage. This record shall serve as a basis for determination of subsequent damage to these structures and adjacent areas due to Contractor's operations. Any damage, of any nature to these structures and adjacent areas not noted in the original survey but subsequently noted shall be reported immediately to the COR.

5) Isolate the Work area from the occupied spaces. Provide dustproof enclosures, air quality monitoring and other systems to prevent cross contamination between occupied and unoccupied spaces. Occupant safety and comfort should be stressed as important requirements.

6) Provide containment and control of computer room conditioned air. Large areas of opened raised flooring allowing underfloor conditioned air to escape into the room proper is not allowed.

7) Provide temporary source of chilled water to all CRAC units within the computer rooms.

Chilled water installation is expected to be done in segments, install new piping behind and removing old piping ahead. Temporary chilled water connection to CRAC units may be accomplished in stages. It is expected that existing chilled water system will be utilized during construction with no need for temporary chillers.

8) CRAC units shall remain operational and running during construction. Per Computer Room, one (1) CRAC unit can be disconnected and reconnected at a time, since each room is in a N + 1 configuration. If additional CRAC units are to be mechanically disconnected or shut off, temporary source of chilled water cooling must be provided.

Additionally, to disconnect and reconnect any of the CRAC units will require an ASI. Site will determine the Level of ASI needed.

9) Disruption of Existing Services. The following conditions apply:

(a) Disruption of utility service is not permitted.

(b) DISA Operational State: Disruption of power to critical IT loads is not permitted. Any work involving power panels fed by site technical power require an Approved Service Interruption (ASI) and MOP approval prior to the performance of the work. The Contractor shall submit the documents thirty (30) calendar days in advance of the work.

(c) The Computer Room Air-Condition (CRAC units) shall remain operational during the installation of the 10-inch chilled water loop. Provide a detailed installation plan to ensure no disruption. After approval of the installation plan by the Government &

SECTION 01 10 00 Page 4 facility staff the Contractor shall not deviate from the installation plan without approval. Request approval not less than (30) days before time of shutdown is desired.

(d) Plan work to minimize shutdown time of any other service or operations. Request approval of a utility or equipment shutdown in writing to the COR not less than (30) calendar days before time shutdown is desired. Provide the COR with an estimate of the duration of shutdown and how it will affect the facility.

(e) Begin work only after COR & facility staff is fully informed and has agreed to the schedule of shut offs with proper documentation.

(f) Do not cut into existing services without first verifying with the COR that service has been correctly identified and shut off.

(g) Operation of existing valves, switches, etc., to affect service shutdown will be completed by the Government, unless arranged otherwise.

(h) Fabricate and install interconnecting portions of these systems prior to shut down for final connections.

(i) Maintain utilities or other service, indicated to be abandoned, in service or provide alternate means of service until new facilities are provided, tested, and put in operation.

(j) Maintain fire protection and fire alarm systems at all times within existing facilities.

(k) Review all existing conditions, drawings and other documents for proper coordination between new and existing construction.

(l) Active utilities whose locations are unknown to the Government are suspected to exist. The Contractor shall be cautious of their existence. If they are encountered, immediately report existence to the COR for direction.

(m) Damages to existing structures, utilities and other items which are caused by Contractor's operations shall be repaired or replaced to their original conditions.

10) Use of site: The following conditions apply:

(a) Limit use and operation at site to "Limits of Construction", indicated and required to perform Work. Portions of site beyond area of required Work shall not be disturbed without written approval of the COR.

(b) Obtain written approval from the COR at least (14) calendar days in advance when scheduling Work outside limits of construction. Provide the COR an estimate of time needed to perform Work outside the limits of construction.

(c) Cutting, capping, and reconnecting utility systems outside the limits of construction shall be performed by Contractor, unless otherwise noted.

(d) Conform to all laws, ordinances, permits and regulations affecting Work on site.

(e) Existing roads, streets, drives, parking lots, entrances and required fire exit ways shall be kept clear and available at all times for their intended use. Do not use these areas for parking, staging or storage without COR's written approval. Coordinate with COR, and provide alternate routes for public and COR access if normal routes are affected.

(f) Do not unreasonably encumber site with equipment, materials or vehicles.

SECTION 01 10 00 Page 5

(g) Return all conditions on or about the site and adjacent property which are not shown to be altered, removed or otherwise changed; to conditions which existed previous to starting performance of this contract.

(h) Construction personnel will not at any time park in any officially marked parking lot;

on Government property without the Government's consent, and will not park on adjacent residential streets.

11) Use of facilities: The following conditions apply:

(a) Limit use and operation within existing facilities to areas indicated for construction Work and as required to perform Work. Other areas within facility shall not be disturbed or disrupted.

(b) Perform Work so as not to interfere or inconvenience public, staff and training operations.

(c) Maintain and keep clear all required fire exit ways throughout facility within and in vicinity of construction areas. Coordinate alternate temporary egress routes with COR and local fire authority.

(d) Do not load structure with weights that will endanger structure.

(e) Smoking is prohibited within government facilities and on site.

(f) Use of toilet facilities, washrooms, and telephones within existing facility or occupied areas is not allowed without the COR's consent.

(g) Cafeteria and dining areas may not be used by construction personnel without the COR's consent.

(h) Coordinate construction operations to assure that operations are carried out with consideration given to conservation of energy, water, and materials.

(i) Maintain existing building in a weather-tight condition throughout the construction period. Repair damage and leaks caused by construction operations. Take all precautions necessary to protect building and its occupants during construction period.

(j) Make every effort to keep noise to a minimum in construction operation. Use of jack hammers will be permitted for use with prior approval only. Obtain COR's consent prior to performing any such work

12) Occupant Safety and Comfort

(a) Protect building occupants from blowing dust and similar materials. Use HEPA filter equipped vacuum equipment simultaneously with all cutting operations inside of the building, i.e. drywall, pipe, etc.

(b) Ensure fumes from work activities outside the building do not enter the building.

(c) Use HEPA rated vacuum cleaners to control dust in computer rooms. Provide the HEPA vacuum cleaners as a part of the installation contract.

(d) Use tack pads at entry ways to prevent dust from being carried out of work areas.

(e) Clean work areas at least once a day and remove installation debris from inside the building daily.

SECTION 01 10 00 Page 6

2.3. SPECIAL SCHEDULE AND PHASING REQUIREMENTS

Refer to specifications.

3.0 PROJECT WORK ITEM DESCRIPTIONS

The facility scope of work is described by an overall narration of the work to be accomplished, and through listed “Work Items”. Work Items are described, quantified and qualified individual project elements. The Work Items are coded and organized per the ASTM Uniformat II Classification for Building Elements (E1557-97); typically to individual element level (Level 3).

Note: Not every aspect of the scope of work is associated with a corresponding Work Item. The lack of a Work Item does not preclude the requirement to deliver on all aspects of the facility scope of work.

3.1 BUILDING 200 - DECC SAN ANTONIO

1) General

(a) The original 1982 design of Building 200 had a building area of approximately 70,000 square feet. A 1991 design expanded the building by approximately 25,000 square feet. Current building area is approximately 95,000 square feet.

(b) The 1982 building design used variable air volume air handling units for office space heating and cooling. The 1991 building design used multizone air handling units for office space heating and cooling. Data center heating and cooling is provided using Computer Room Air Conditioning units with heat rejection to the chilled water system.

(c) The 1982 Building 200 central plant included a 304 ton chiller, a 399 ton chiller, a 910 gpm cooling tower, a 1200 gpm cooling tower and one 1500 MBH boiler. The 1991 Building 200 central plant included two 140 ton chillers, two 420 gpm cooling towers and one 866 MBH boiler. The 1982 central plant appears to perform as the critical systems whereas the 1991 appears to perform as the non-critical system.

(d) A project in 2009 modified the central plant. Currently there are two (2) 700 ton, 1680 gpm chillers with two (2) associated 700 ton, 2100 gpm cooling towers that supply chilled water to the majority of the building. There is one (1) 150 ton air-cooled chiller that supports the administration areas of the building.

(e) The floor of the building is pier and beam with a significant crawl space under the concrete floors. The floor below the computer rooms is depressed allowing a raised floor for the computer rooms. Additional utility trenches were provided below the computer rooms of the 1982 design to allow routing of hydronic piping above the crawl space.

(f) Several significant changes to hydronic pipe configurations have been made in mechanical rooms and in crawl spaces that are not included on currently available as-built drawings. Several additional hydronic piping and HVAC ductwork changes are currently planned or in progress. Many locations in the building crawl spaces are cluttered with un-documented electrical and piping systems.

2) The work identified for this project includes replacing existing chilled water piping in crawl spaces and raised floor pipe trenches with a new 10-inch chilled loop, provide dedicated outdoor air handling with humidity control for computer rooms and provide a redundant 20 gallon per minute water supply to the critical cooling towers.

SECTION 01 10 00 Page 7

3) The Contractor shall provide and maintain a step-by-step Method of Procedure for all aspects of the project as specified in other sections of this RFP.

(a) Computer Room #3 (CR3) has a separate tenant, special security and coordination considerations for this tenant.

4) Commissioning:

(a) The Contractor shall provide a Commissioning Plan, a Quality Assurance Plan and a Security Plan.

(b) Commissioning shall include all equipment installed under this contract including lighting, water recirculation, temperature controls, etc.

(c) The designer shall include a commissioning plan in accordance with ASHRAE 202- 2013 as part of their final design submittal. Provide all required training to use/maintain any new equipment installed under this Statement of Work for the air handling unit, chilled water system and cooling tower makeup water system.

(d) Operation & Maintenance Manuals: The design shall require three sets of hard and soft copies of operation and maintenance (O&M) manuals be provided to DISA. Two sets are to be distributed to the site; one to the DISA facilities engineering staff. The operation and maintenance manuals must include the following:

i. Installation and operation manuals for all items of equipment

ii. Factory test reports & Commissioning documents

iii. Record drawings

iv. Make, model number, serial number, and any unique identifiers for each item of equipment

v. For large equipment / packages / integrated systems, provide a spare parts list based on equipment manufacturers’ recommendations

vi. Maintenance procedures and schedules for all systems based on manufacturers’ O&M manuals, recommendations and NFPA requirements

vii. Sequence of operations

viii. Building automation drawings and sequence of operations

ix. Warranty letter / Warranty contact information

x. Applicable engineering studies generated as a result of engineering best practices

5) All welding is to be performed and inspected in accordance with AWS Welding Handbook, Codes and Specifications. Permits and approval from the Site Facility Manager must be provided to solder in the computer rooms and welding outside of the computer rooms.

6) Provide a detailed demolition and installation sequencing accompanied by any necessary special method of procedures. Demolition and installation must be sequenced around maintaining 24/7, 365 operation of the data center and the cooling of the IT loads.

7) Provide controls compatible with BACnet and Modbus per the DISA Standards. <AM#6> Currently the "DISA MINIMUM TECHNICAL SPECIFICATIONS FOR BACnet DIRECT DIGITAL CONTROL SYSTEMS (DDC) FOR HVAC" refers to Delta Controls. The DDC

SECTION 01 10 00 Page 8 network for Building 200 is Johnson Controls not Delta Controls as stated in the specification. The Contractor shall expand the existing DDC network as required to integrate all components with DISA’s Enterprise Building Automation System (Iconics Genesis 64). The Contractor shall coordinate with DISA’s Enterprise Building Automation System provider (SPEC LLC) to integrate the two systems.</AM#6>

8) <AM#6>Bid Option: Replace the existing DDC network (Johnson Control) with Delta Control systems to meet the requirements of DISA's specifications. The Contractor shall coordinate with DISA’s Enterprise Building Automation System provider (SPEC LLC) to integrate the two systems. Refer to appendices for as builts of existing control system.</AM#6>

9) Provide labeling per the DISA Identification, Labeling, and Marking Specification.

10) There is a separate project to upgrade the fire detection and suppression systems. This project will require coordination with the Contractor performing this work.

3.2. INTERIOR PARTITIONS (C1010)

Item Quantity Item Description

C1010 100 SF Repair C1010 Partitions, Concrete - Interior Wall

Design and installation shall also address sealing of all computer room wall/floor penetrations air tight to repair new penetration that occur from construction activities, existing penetrations will be repaired as part of the fire suppression project. Areas include Computer Rooms CR1, CR2A, CR2B, and CR3. <AM#3>Perform air leakage test of computer rooms to verify seals. Air leakage of computer rooms shall not exceed 0.04 cfm per square when pressurized to 0.3 in.

w.g. Pressure test boundaries shall be clearly identified on design drawings.</AM#3>

3.3. RECYCLE WATER DISTRIBUTION (D2090)

<AM#3>

Item Quantity Item Description

D2090 905 605 LF Base Bid - Add D2090 Recycle Water Distribution, PVC – 2-inch

D2090 1550 LF Bid Option No. 2 - Add D2090 Recycle Water Distribution, PVC – 8-inch

</AM#3>

The Contractor shall provide a second makeup water supply, using recycled water, to the cooling tower serving the critical chillers. Makeup water supply tie-in into cooling tower shall include water meter monitored by BAS, check valve and isolation valve.

1) Base Bid

The Contractor shall design and construct a new 2-inch underground recycled waterline that begins at the existing cooling towers and extends to the existing wrought iron fence adjacent to Clarence Tinker Drive, south corner of the Building 200 site. Refer to drawings for proposed location.

2) Bid Option No. 2

SECTION 01 10 00 Page 9

The Contractor shall design and install an 8-inch connection from the new 2-inch waterline to the existing SAWS non-potable waterline. All work exterior the fence shall be done within the utility easement. Location and connections shall be coordinated with SAWS and Port of San Antonio and per their recycled water standards. Refer to drawings for proposed location.

SECTION 01 10 00 Page 10

3.4. DISTRIBUTION SYSTEMS (D3040)

1) Base Bid

Item Quantity Item Description

D3040.1 800 LF Replace D3040 Distribution Systems, Black Steel - > 6 IN DIA - Piping (HVAC)

(a) The proposed 10-inch chilled water loop is to serve critical Computer Room Air- Condition, CRAC units. The CRAC units shall remain operational during the installation of the 10-inch loop. The Contractor shall install half the 10-inch loop in the building crawl spaces then link into the raised floor trenches, demolish existing piping and tie the existing CRAC units into the 10-inch loop pipe as work progresses.

(b) Installation of the new chilled water piping shall be done without interruption of flow of chilled water to existing HVAC equipment to such a degree that would impact operational mission. Specify hot taps and Petersen Plugs where required for isolation during construction of existing chilled water system. Coordinate Implementation with site personnel and DISA engineering.

(c) Much of the raised floor is supported by pedestals that rest on the floor of the raised floor pipe trenches. These pedestals conflict with routing of the piping in the pipe trenches. The Contractor shall bridge the pipe trenches above the piping and have the bridges support the floor pedestals.

(d) The resultant of this project will provide DISA with fully functional dual path header loop chilled water system for the DECC San Antonio computer rooms to include design-package for full demolition and installation (Complete with project timelines, Specifications, Design Calculations, Drawings, O&M Manuals, and Training).

Demolition shall include removal of existing chilled water supply and return piping except CRAC connecting branches in computer rooms: 1, 2A and 2B back to supply chillers in mechanical room 1. Design and installation shall include a 10-inch HVAC chilled water loop in computer room 1, an appropriately sized loop beneath computer room 2B and connection to an existing 6-inch supply loop beneath Computer Room 3 meeting current applicable codes, standards and regulations (See attached “Existing Piping Plan” and “Suggested Piping Plan” drawings).

(e) Chilled Water Piping:

i. Table:

Pipe Service Table

Service Serv. Code Min Size Max Size Pipe Material Pipe Joint Method

Chilled Water Supply

CWS 3/4” 2-1/2” Carbon Steel Schedule 40 Copper Type L

Threaded, Welded*

Soldered**

SECTION 01 10 00 Page 11

Chilled Water Return

CWR 3/4” 2-1/2” Carbon Steel Schedule 40 Copper Type L

Threaded, Welded*

Soldered**

Chilled Water Supply

CWS 3” 10” Carbon Steel Schedule 40

Victaulic or Similar*

Chilled Water Return

CWR 3” 10” Carbon Steel Schedule 40

Victaulic or Similar*

Condensate Drain

C 3/4” 3” Carbon Steel Schedule 40 Copper Type L

Threaded

Soldered**

Pro Press

*If desiring welded joints and connections, acceptance and approval is required.

Welding is prohibited in the computer room. The Contractor shall obtain all necessary building or base welding/burn permits.

**Brazing and soldering acceptance and approval is required. The Contractor shall obtain all necessary building or base welding/burn permits.

i. Calculate pipe size and friction loss based on a max velocity of 10 feet per second.

ii. Dielectric unions shall be used when mating dissimilar metals.

(f) Piping insulation;

i. The insulation for all piping associated with humidifiers shall be flexible elastomeric with thicknesses in compliance with ASHRAE 90.1-2010.

ii. Indoors: Provide closed-cell elastomeric foam. Seal face shall be taped after the adhesive has been applied and has cured. Elastomeric foam shall be provided in lengths no less than three (3) feet unless the piping is less than three

(3) feet or unless the end of the pipe requires a shorter piece. A protective PVC jacketing shall be required on all piping and fittings. Provide color scheme per the DISA Identification, Labeling, and Marking Specification.

iii. Outdoors: Provide closed-cell elastomeric foam. Seal face shall be taped after the adhesive has been applied and has cured. Elastomeric foam shall be provided in lengths no less than three (3) feet unless the piping is less than three

(3) feet or unless the end of the pipe requires a shorter piece. A protective aluminum jacketing shall be required on all piping and fittings.

(g) Utilities servicing areas other than the CR3 shall not transit the room unless approved by the COR.

(h) Areas include Computer Rooms CR1, CR2A, CR2B, and CR3. Provide hydrostatic testing of piping systems.

(i) Hydrostatic testing:

i. Each piping system shall be hydrostatically tested at a pressure not less than 1297 kPa (gage) 188 psig for a period of time sufficient to inspect every joint in the system and in no cases less than 2 hours per UFGS 23 64 26 3.5.2.

SECTION 01 10 00 Page 12

ii. Retrofits: Test envelope must be backed by new valves to protect the existing system.

(j) The Contractor shall provide a complete hydronic analysis of the new chilled water system design for DECC San Antonio to include future CRAC configuration in computer rooms CR1, CR2A, CR2B and CR3. Design capacity shall at a minimum, support maximum chiller output flow. The Contractor shall replace or refurbish existing chilled water pumping systems differential pressure transmitter.

(k) The Contractor shall provide isolation valves in the 10-inch piping loop and in the branch piping leading to the CRAC units. These isolation valves are to allow isolation of parts of the chilled water loop while chilled water can be provided from the opposite direction. The Contractor shall also provide isolation valves at the top and bottom of each floor penetration leading to crawl space.

(l) Replace all existing isolation valves on CRAC connections. All valves on the main chilled water lines and multi-CRAC connected branches, cross-connects and loops shall have actuators. Actuators shall be connected to the site BAS and allow the site maintenance staff to open or close the valves remotely through the workstation.

(m) In addition valving shall be determined as follows: Add a minimum of one (1) valve with an actuator on each end of a loop. Add one (1) valve with actuator on either side of multi-CRAC branches. If a section of pipe between multi-CRAC branches requires no more than one (1) joint for system assembly, only one (1) valve with an actuator is required between the branches and will be located at that joint. Additional valves with actuators shall be installed as necessary to assure uninterrupted site operations during maintenance and repair efforts (See Future CRAC Configuration drawing).

Valves for connection of individual CRAC units shall be manual only.

(n) Provide two (2) 2-1/2-inch manual valves with blind flanges for each 6 inch Cross Connect in CR1, 4 inch loop in CR2B, and 6 inch Tie in for CR2A located by the Site Facilities Manager.

(o) Automated Isolation Valve Actuators:

i. Specify with proof of status and end switch indication.

ii. Provide a floor plan screen in BAS with piping, valve locations and tags so that an operator can open and close each valve separately.

(p) Provide an overall mechanical piping drawing view capturing all piping and valves.

(q) The design/build Contractor shall capture as-built conditions related to the 10-inch loop piping including all electrical, structural and piping potential conflicts. Shop drawing quality drawings are to be provided. All piping and components in scope of this project shall be modeled in 3-dimensions.

<AM#3>

(r) Provide 4 supply and 4 return valves in CR1 and 2 supply and 2 return valves in

CR2A and CR2B for future connections.</AM#3>

2) Bid Option No. 1

Item Quantity Item Description

SECTION 01 10 00 Page 13

D3040.2 1 EA Replace D3040 Distribution Systems, D3040110 - Air Handling Unit, Central Station - D30401101020 - 5000 CFM

(a) General;

i. Replace the existing air handling unit #9 (AHU 9) and design new duct system to provide ventilation to the computer rooms and design and install a humidity control system for the computer rooms.

ii. AHU 9 that originally serviced the warehouse and building areas on the south side and was reconfigured to supply fresh air to the computer rooms.

iii. The Contractor shall install ductwork, exhaust fans and controls as required to achieve required fresh air supplies for Computer Rooms 1, 2A, 2B and 3.

iv. New air handling unit serving computer rooms shall be variable air volume controlled with terminal units and dampers controlling air flow to each computer room.

v. Contractor shall provide a complete psychometric analysis of the design days for San Antonio.

vi. Design days shall be as defined by the facility and DISA. Contractor shall provide a complete humidification and dehumidification analysis. <AM#3>In accordance with ASHRAE 9.9 the facility is considered Class I.</AM#3>

vii. Utilities servicing areas other than the CR3 shall not transit the room unless approved by the COR. All openings that penetrate the perimeter walls of CR3 and exceed 96 square inches shall be protected with permanently affixed bars or grills. Air handling units and ducts require baffles if conversation can be overhead in adjacent areas.

(b) Demolition;

i. Demolition will only be in relation to relocating the ductwork for AHU 9 to AHU 10 and demolition of AHU 9.

ii. Demolition shall include complete removal of existing Air Handler #9 (originally identified as AHU-1 on 1991 design drawings) in Mechanical Room 2 and associated piping back as required to install new air handler.

(c) Air handling unit;

i. Air handling unit to be sized to provide dedicated fresh air supply in Computer Rooms 1, 2A, 2B and 3.

ii. Design and installation shall include HVAC and plumbing systems to meet current applicable codes, standards and regulations.

(d) Humidity control;

i. Humidity control to include trunk duct mounted or air handling unit mounted humidifier.

ii. Humidifier canister shall be integral to humidifier or mounted on wall near humidifier.

iii. Humidifier and humidifier canisters shall be easily accessible for maintenance and inspection.

SECTION 01 10 00 Page 14

iv. System design shall be such that the humidifiers maximum set point will correspond to a dew point temperature within the computer rooms of one (1) degree below the CRAC chilled water supply temperature within the rooms.

v. Humidifiers shall be designed/selected with a 20 year lifecycle.

vi. Piping insulation;

(1) The insulation for all piping associated with humidifiers shall be flexible elastomeric with thicknesses in compliance with ASHRAE 90.1-2010.

(2) The seal face shall be taped after the adhesive has been applied and has cured.

(3) Elastomeric shall be provided in lengths no less than 3’ unless the piping is less than 3’ or unless the end of the pipe requires a shorter piece.

vii. Ultrasonic humidifiers shall be used in DISA datacenter facilities.

viii. Water Treatment;

(1) Use and provide, as part of this contract, a reverse osmosis and deionizing water treatment system to completely purify the water supply to the humidifiers

(2) Do not use chemically treated water.

(3) Use stainless steel or plastic piping to supply water to the humidifiers.

(4) Copper pipe water distribution for deionized water is prohibited.

(5) Location of water treatment system to be coordinated with the site.

(6) Water treatment system to be installed next to a floor drain, if a floor drain is not available, one shall be added.

(e) Ductwork;

i. Ductwork originally connected to AHU 9 servicing areas other than Computer Rooms 1, 2A, 2B and 3 shall be connected to AHU 10 per approved 100% design.

ii. Ducts penetrations for walls of rooms CR2A, 2B and 3 must meet SCIF Perimeter Penetration Criteria as defined in ICD 705 including man bars and sound attenuation/baffles. <AM#3>Piping and duct may pass though CR2A and 2B but not CR3. CR3 requires dielectrics and grounding.</AM#3>

iii. Analysis and recommendations shall be done for any ductwork supplying fresh air in the computer rooms.

iv. All ductwork that is not reused shall be removed.

v. All fittings, hangers, etc. associated with the removed ductwork shall also be removed.

(f) Electrical;

i. Designer shall field verify that all relevant electrical boxes and provide calculations showing electrical equipment has the capability to handle any additional load associated with the replacement of existing equipment or installation of new equipment.

SECTION 01 10 00 Page 15

ii. All electrical wiring, conduit, etc required to properly operate the new equipment shall be part of this contract.

iii. Verify and connect any humidity control equipment to the building essential electrical distribution.

iv. Contractor shall use TEFC premium efficiency motors for motors larger than 5

HP.

(g) Building Automation System

i. Designer and controls contractor shall familiarize themselves with existing control system and provide compatible new systems.

ii. Any exhaust fans required to exhaust the relief air shall be variable speed direct drive to control/balance air flow. Below are the minimum points that are required for the exhaust fans:

(1) Enable/Disable

(2) Status

(3) Airflow, CFM

iii. Below are the minimum points that are required for this project for the humidifier:

(1) Enable/Disable

(2) Status

(3) Humidity Level, dew point temperature

(4) Differential Pressure Filter Sensor

iv. Provide sensors in each computer room to adjust the CFM from minimum to maximum value, this adjustment would allow each room to have more humidity control via supply more CFM with higher moisture content into the space.

v. Below are the minimum points that are required for this project for humidity control:

(1) High/Low humidity readings mapped from sensors located in the return and supply air for all CRAC units.

(2) Actuated Dampers on the supply/relief/return duct, mapped to shut off the supply and return of outside air when humidity levels are high.

(3) Enable/disable the exhaust fans in coordination with the relative humidity

vi. Below are the minimum points that are required for this project to control the humidifier water treatment system:

(1) Enable/Disable

(2) Status

(3) Flow, GPM

(4) Sensor to Alert when the Cartridges need changing

(h) Specifications;

i. Contractor shall use and edit SpecsIntact for the specifications.

SECTION 01 10 00 Page 16

ii. Contractor shall use and edit the DISA control specifications, attached.

iii. The Contractor shall not edit the specifications unless it is to add or remove equipment.

iv. Material, equipment, et cetera, types shall not be modified.

4.0 APPLICABLE CRITERIA

Unless a specific document version or date is indicated, use criteria from the most current references, including any applicable addenda, unless otherwise stated in the contract, as of the date of the Contractor’s latest accepted proposal or date of issue of the contract solicitation, whichever is later. In the event of conflict between References and/or Applicable Military Criteria, apply the most stringent requirement, unless otherwise specifically noted in the contract.

4.1. INDUSTRY CRITERIA

Applicable design and construction criteria references are listed in Table 1 below. This list is not intended to include all criteria that may apply or to restrict design and construction to only those references listed. See also Paragraph 3 for additional facility-specific applicable criteria.

Table 1: Industry Criteria

Air Conditioning and Refrigeration Institute (ARI)

ANSI/ARI 430-99 Central Station Air Handling Units

Air Movement and Control Association (AMCA)

AMCA 210 Laboratory Methods of Testing Fans for Rating

American Association of State Highway and Transportation Officials (AASHTO)

Roadside Design Guide [guardrails, roadside safety devices]

Standard Specifications for Transportation Materials and Methods of Sampling and Testing [Road Construction Materials]

Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals

Guide for Design of Pavement Structures, Volumes 1 and 2 [pavement design guide]

A Policy of Geometric Design of Highways and Streets

American Bearing Manufacturers Association (AFBMA)

AFBMA Std. 9 Load Ratings and Fatigue Life for Ball Bearings

AFBMA Std. 11 Load Ratings and Fatigue Life for Roller Bearings

SECTION 01 10 00 Page 17

American Concrete Institute

ACI 302.2R Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials

ACI 318 Building Code Requirements for Structural Concrete

ACI SP-66 ACI Detailing Manual

ACI 530 Building Code Requirements for Masonry Structures

ADA Standards for Accessible Design

See US Access Board ADA and ABA Accessibility Guidelines for Buildings and Facilities, Chapters 3-10.

American Institute of Steel Construction (AISC)

Manual of Steel Construction – 13 Edition (or latest version)

American Iron and Steel Institute

AISI S100 North American Specification for the Design of Cold- Formed Steel Structural Members

American National Standards Institute 11 (ANSI)

ANSI/IEEE C2 National Electrical Safety Code

American Society of Civil Engineers (ASCE)

ASCE 7 Minimum Design Loads for Buildings and Other Structures

ASCE 37-02 Design Loads on Structures During Construction

ASCE/SEI 31-03 Seismic Evaluation of Existing Buildings [Existing Building Alteration/Renovation]

ASCE/SEI 41-06 Seismic Rehabilitation of Existing Buildings [Existing Building Alteration/Renovation]

American Society of Heating Refrigerating and Air Conditioning Engineers

(ASHRAE)

ASHRAE 90.1 ANSI/ASHRAE/IESNA 90.1, Energy Standard for Buildings Except Low-Rise Residential Buildings

ASHRAE Guideline 0 The Commissioning Process

SECTION 01 10 00 Page 18

ASHRAE Guideline 1.1 The HVAC Commissioning Process

ASHRAE Handbooks Fundamentals, HVAC Applications, Systems and Equipment, Refrigeration (Applicable, except as otherwise specified)

ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality

ASHRAE Standard 55 Thermal Environmental Conditions for Human Occupancy (Design portion is applicable, except where precluded by other project requirements.)

ASHRAE Standard 189.1

Standard for the Design of High-Performance Green Buildings (ANSI Approved; USGBC and IES Co-sponsored), - (APPLICABLE TO THE EXTENT

SPECIFICALLY CALLED OUT IN THE CONTRACT)

ASHRAE Standard 202 Commissioning Process for Buildings and Systems

ASHRAE TC 9.9 Mission Critical Facilities, Data Centers, Technology Spaces And Electronic Equipment

American Society of Mechanical Engineers International (ASME)

ASME B 31 (Series) Piping Codes

American Welding Society

Welding Handbook

Welding Codes and Specifications (as applicable to application, see International Building Code for example)

Architectural Woodwork Institute (AWI)

Latest Version AWI Quality Standards

Associated Air Balance Council (AABC)

AABC MN-1 National Standards for Testing and Balancing Heating, Ventilating, and Air Conditioning Systems

AABC Associated Air Balance Council Testing and Balance Procedures

ASTM International

ASTM E 779 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization

SECTION 01 10 00 Page 19

ASTM E1827-96 Standard Test Methods for Determining Airtightness of Buildings Using an Orifice Blower Door

Builders Hardware Manufacturers Association (BHMA)

ANSI/BHMA The Various BHMA American National Standards

Code of Federal Regulations (CFR)

10 CFR 430 Energy Conservation Program for Consumer Products

Consumer Electronics Association

CEA 709.1B Control Network Protocol Specification

CEA 709.3 Free-Topology Twisted-Pair Channel Specification

CEA 852 Tunneling Component Network Protocols Over Internet Protocol Channels

Defense Information Systems Agency

DISA CSI 360-95-3 DIV 23 Instrumentation and Controls for HVAC

DISA CSI 360-95-3 DIV 25 Integration Automation

DISA Electrical Safety Program

DISA EDS Minimum Technical Specifications for BACnet Direct Digital Control Systems for HVAC

Electronic Industries Association (EIA)

ANSI/EIA/TIA 568 Structured Cabling Series

ANSI/EIA/TIA 569 Commercial Building Standard for Telecommunications Pathways and Spaces (includes ADDENDA)

ANSI/TIA/EIA-606 Administrative Standard for the Telecommunications Infrastructure of Commercial Buildings

J-STD EIA/TIA 607 Commercial Building Grounding and Bonding Requirements for Telecommunications

Federal Highway Administration (FHWA)

Manual on Uniform Traffic Control Devices for Streets and Highways [signage and pavement markings for streets and highways]

SECTION 01 10 00 Page 20

FHWA-NHI-01-021 Hydraulic Engineering Circular No. 22, Second Edition, URBAN DRAINAGE DESIGN MANUAL

Greenguard Environmental Institute (GEI)

GEIGreenguard Standards for Low Emitting Products

Illuminating Engineering Society of North America (IESNA)

IESNA RP-1 Office Lighting

IESNA RP-8 Roadway Lighting

IESNA Lighting Handbook Reference and Application

Institute of Electrical and Electronics Engineers Inc. (IEEE)

Standard for Use of the International System of Units (SI):

the Modern Metric System

Standard 1100 Recommended Practice for Powering and Grounding Sensitive Electronic Equipment

International Code Council (ICC)

IBC

International Building Code

Note: All references in the International Building Code to the International

Electrical Code shall be considered to be references to

NFPA 70.

All references in the International Building Code to the International Fuel Gas Code shall be considered to be references to NFPA 54 and NFPA 58.

All references in the International Building Code to the International Fire Code and Chapter 9 shall be considered to be references to Unified Facilities Criteria (UFC) 3-600- 01.

IMC

International Mechanical Code –

Note: For all references to “HEATING AND COOLING LOAD CALCULATIONS”, follow ASHRAE 90.1

SECTION 01 10 00 Page 21

Note: For all references to “VENTILATION”, follow

ASHRAE 62.1

IPC International Plumbing Code

IEC

Energy Conservation Code (IEC) –Applicable only to the extent specifically referenced herein. Refer to Paragraph 5, ENERGY CONSERVATION requirements.

LonMark International (LonMark)

LonMark Interoperability Guidelines

(available at www.lonmark.org), including: Application Layer Guidelines, Layer 1-6 Guidelines, and External Interface File (XIF) Reference Guide

LonMark Resource Files (available at www.lonmark.org), including Standard Network Variable Type (SNVT) definitions

Master Painters Institute (MPI)

MPI Approved Products List www.specifypaint.com/APL/paintinfo_APL/ProductIdxByMP Inum.asp

National Association of Architectural Metal Manufacturers (NAAMM)

NAAMM HMMA HMM(1999;

R2000) Hollow Metal Manual

National Association of Corrosion Engineers International (NACE)

NACE RP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems

NACE RP0185 Extruded, Polyolefin Resin Coating Systems with Adhesives for Underground or Submerged Pipe

NACE RP0285 Corrosion Control of Underground Storage Tank Systems by Cathodic Protection

NACE RP0286 Electrical Isolation of Cathodically Protected Pipelines

National Environmental Balancing Bureau (NEBB)

Procedural Standards Procedural Standards for Testing Adjusting Balancing of Environmental Systems

National Fire Protection Association (NFPA)

SECTION 01 10 00 Page 22

NFPA 70 National Electrical Code

NFPA 70E Standard for Electrical Safety in the Workplace

NFPA 90a Installation of Air Conditioning and Ventilating Systems

NFPA 101 Life Safety Code

NFPA 780 Standard for the Installation of Lightning Protection Systems

Occupational Safety and Health Administration (OSHA)

Title 29, Part 1926 OSHA Construction Industry Standards, Title 29, Code of Federal Regulations, Part 1926, Safety and Health Regulations for Construction

Precast Concrete Institute

PCI Design Handbook Precast and Prestressed Concrete

San Antonio Water Supply (SAWS)

SAWS Design Resources Specification for Water and Sanitary Sewer Construction

Sheet Metal and Air Conditioning Contractor’s National Association (SMACNA)

SMACNA HVAC Duct Construction Standards

HVAC Duct Construction Standards - Metal and Flexible

SMACNA Architectural Manual Architectural Sheet Metal Manual

SMACNA HVAC TAB HVAC Systems - Testing, Adjusting and Balancing

State/Local Regulations

State Department of Transportation Standard Specifications for Highway and

Bridge Construction

Sedimentation and Erosion…