B3.Amendment_3.pdf

PDF 5 MB Posted

Attached to
DISA Mecahnical Federal contract opportunity
Solicitation number
W9126G-16-R-0345
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

About this file

Amendment 3 - Confirm Proposal date of 10 00 A.M. CST 15 AUG 16. Confirm NAICS 236220 / Size Standard 36.5 M. Address bidder inquiries.

View the file

Other files for this federal contract opportunity

Other files attached to DISA Mecahnical, newest first.
File Type Posted
B3.Amendment_6.pdf PDF
B3.Amendment_5.pdf PDF
A1.BACNet_Spec.pdf PDF
A1.2.Additional_Photos.pdf PDF
A1.2.12-02-2006.pdf PDF
Kelly_Annex_Bldg_200_As-builts.pdf PDF
B3.Amendment_4.pdf PDF
A1.2.12-01-1982.pdf PDF
A1.2.As_Built.pdf PDF
A1.2.12-01-1982.pdf PDF
B3.Amendment_2.pdf PDF
B3.Amendment_1.pdf PDF
B3_RFP_Letter.pdf PDF
B3.RFP.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Solicitation for Defense Information Systems Agency (DISA) Building 200 Mechanical Piping and Controls is, is amended as follows:

See SF30 Continuation Sheet(s)

NOTE: Proposal Receipt date is 15 August 2016, 10:00 a.m., Central Time. announced.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

W9126G-16-R-0345

X 9B. DATED (SEE ITEM 11)

15-Jul-2016

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Aug-2016

CODE

US ARMY ENGINEER DISTRICT, FORT WORTH

ATTN: CESWF-CT

819 TAYLOR ST, ROOM 2A19

P.O. BOX 17300

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W9126G-16-R-0345

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. Reference Section 00 21 00 – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFEERS. The following clauses are revised:

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) (AM#3) The small business size standard is $36.5 M. (/AM#3)

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.

This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at

52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.209-11, Representation by Corporations Regarding elinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(viii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(ix) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(x) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xi) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xvi) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xvii) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xviii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.

(D) If the acquisition value is $77,533 or more but is less than $100,000, the provision with its Alternate III applies.

(xix) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xx) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxi) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxii) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPADesignated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (AM#3) $362.73 (/AM#3) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

2. Attachment 2 to Section 00 22 11- LOW PRICED TECHNICALLY ACCPETABLE (LPTA) PROPOSAL PREPARATION is revised. See the attached bearing the noation “W9126G-16-R-0345, Amendment No. 0003”.

3. The following Sections are revised and replaced in their entirety. See the attached bearing the notation “W9126G-16-R-0345, Amendment No. 0003”:

00 11 00 – CLIN SCHEDULE

00 73 46 – WAGE DETERMINATION SCHEDULE

01 10 00 – STATEMENT OF WORK

01 33 16 – DESIGN AFTER AWARD

4. The following attachements are provided, showing current conditions and design requirements. See the attached bearing the noation “W9126G-16-R-0345, Amendment No. 0003”:

B 200 DISA Mechanical 10 Inch Header Redline Complete Sept 2016 B 200 DISA Mechanical Project Site Visit Photos 7-25-2016 Environmental Envelope Psychrometric Chart

M-FP0002-HVAC-FLOOR PLAN-M7-17

San Antonio ASHRAE Design Information SATX - Best Available Piping As-built Information and CRAH Unit - FLOOR

End of Summary of Changes

ATTACHMENT 2 –

PAST PERFORMANCE ASSESSMENT WORKSHEET

(To be completed for each project submitted)

CONSTRUCTION OR PRIME CONTRACTOR PROJECT #_

Offeror:

Project and Location:

Was this project performed by the division or unit of the company submitting the offer for W9126G-16-R- 0345?

Yes

Owner:

Owner’s Point of Contact for Reference: Telephone:

Awarded Construction Cost: Final Construction Cost:

Explain Cost Growth, if any:

Date of Award: Original Completion Date: Revised Completion Date: Percent Complete:

Explain Time Growth, if any:

General Scope of Construction and Offeror’s Role:

Work Your Company Self-Performed: Extent and Type of Work You Subcontracted Out:

Describe extent of relevancy and complexity of the project by checking all applicable boxes below. RELEVANCY:

<AM#3>

The projects are same/similar to the renovation/replacement of chilled water lines in a critical and occupied operating data center.

The projects submitted must be renovation/replacement of chilled water lines valued at over

$500,000 each New construction of simulation center, battle command training center, or similar commercial facility Minimum 100,000 square feet Construction value ranging from $25 million to $100 million SCIF construction</AM#3>

Provide any additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).

Your Performance Evaluation by Owner, if known :

W9126G-16-R-0345, Amendment No. 0003

Estimated Estimated Item No. Description Quantity Unit Unit Price Amount

0001 All Work for the Design and Construction of a Building Automated Controlled Dual Path Chilled Water Supply Loop System 1 JOB $ *** $

0002 All Work for the Design and Construction of the Recycle Water Line within the fence limits 1 JOB $ *** $

<AM#3>

0003 Permit Fees 1 JOB $ *** $

OPTIONS

0004 0003 OPTION NO. 1: All Work for the Design and Construction of Humidification Monitoring and Controls 1 JOB *** $

0005 0004 OPTION NO. 2: All Work for the Connection of the Recycle Water Line outside the fence limits 1 JOB *** $

</AM#3>

TOTAL BASE OFFER

TOTAL (BASE OFFER + ALL OPTIONS)

Defense Information Systems Agency (DISA) Building 200 Mechanical Piping and Controls Port San Antonio, Texas

Solicitation No.W9126G-15-R-1537

CLIN SCHEDULE

BASE OFFER: All work required by the Contract exclusive of work required by the Option Items.

Section 00 11 00 Page 1

APPLICATION OF WAGE DECISION

Contract Number: W9126G-16-R-0345

Project: DISA Building 200-Mechanical

Location: Port San Antonio, San Antonio, Texas County: Bexar, Texas

1. Davis-Bacon Act Wage Decision TX160081, Heavy Construction Projects, is applicable to all utilities more than five feet from buildings, and the construction, alteration or repair of roads, earthworks, paving, fencing, streets, highways, runways, taxiways, alleys, trails, paths, and parking areas for those construction activities as performed in Bexar County, Texas.

2. Davis-Bacon Act Wage Decision TX160280, Building Construction Projects, is applicable to the construction, alteration, painting, or repair of buildings, installations within buildings, appurtenances to buildings, foundations for buildings, excavation and fill for buildings, and utilities within five feet of buildings in Bexar County, Texas.

NOTE:

(1) PAYROLL RECORDS ARE REQUIRED, UNDER THE DAVIS-BACON ACT,

TO BE SUBMITTED TO THE U.S. ARMY CORPS OF ENGINEERS FOR ALL

CONSTRUCTION WORK PERFORMED.

(2) THE WAGE DECISION NUMBER APPLICABLE TO THE WORK

PERFORMED IS TO BE SHOWN ON ALL THE CERTIFIED

PAYROLL RECORDS SUBMITTED.

SECTION 00 73 46

WAGE DETERMINATION

SCHEDULE

General Decision Number: TX160016 01/08/2016 TX16

Superseded General Decision Number: TX20150016 State:

Texas Construction Types: Heavy and Highway

Counties: Atascosa, Bandera, Bastrop, Bell, Bexar, Brazos, Burleson, Caldwell, Comal, Coryell, Guadalupe, Hays, Kendall, Lampasas, McLennan, Medina, Robertson, Travis, Williamson and Wilson Counties in Texas.

HEAVY (excluding tunnels and dams, not to be used for work on

Sewage or Water Treatment Plants or Lift / Pump Stations in Bell, Coryell, McClennon and Williamson Counties) and HIGHWAY Construction Projects

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/08/2016

* SUTX2011-006 08/03/2011

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (Paving and Structures)......................$ 12.56

ELECTRICIAN......................$ 26.35

FORM BUILDER/FORM SETTER

Paving & Curb...............$ 12.94 Structures..................$ 12.87

LABORER

Asphalt Raker...............$ 12.12 Flagger.....................$ 9.45 Laborer, Common.............$ 10.50 Laborer, Utility............$ 12.27 Pipelayer...................$ 12.79 Work Zone Barricade Servicer....................$ 11.85

PAINTER (Structures).............$ 18.34

POWER EQUIPMENT OPERATOR:

Agricultural Tractor........$ 12.69 Asphalt Distributor.........$ 15.55

Asphalt Paving Machine......$ 14.36 Boom Truck..................$ 18.36 Broom or Sweeper............$ Concrete Pavement Finishing Machine...........$

11.04

15.48 Crane, Hydraulic 80 tons or less.....................$ 18.36 Crane, Lattice Boom 80 tons or less................$ 15.87 Crane, Lattice Boom over 80 tons.....................$ 19.38 Crawler Tractor.............$ Directional Drilling Locator.....................$

15.67

11.67 Directional Drilling Operator....................$ 17.24 Excavator 50,000 lbs or Less........................$ 12.88 Excavator over 50,000 lbs...$ Foundation Drill, Truck Mounted.....................$

17.71

16.93 Front End Loader, 3 CY or Less........................$ 13.04 Front End Loader, Over 3 CY.$ 13.21 Loader/Backhoe..............$ 14.12 Mechanic....................$ 17.10 Milling Machine.............$ 14.18 Motor Grader, Fine Grade....$ 18.51 Motor Grader, Rough.........$ 14.63 Pavement Marking Machine....$ 19.17 Reclaimer/Pulverizer........$ 12.88 Roller, Asphalt.............$ 12.78 Roller, Other...............$ 10.50 Scraper.....................$ 12.27 Spreader Box................$ 14.04 Trenching Machine, Heavy....$ 18.48

Servicer.........................$ 14.51

Steel Worker Reinforcing.................$ 14.00 Structural..................$ 19.29

TRAFFIC SIGNAL INSTALLER

Traffic Signal/Light Pole Worker......................$ 16.00

TRUCK DRIVER

Lowboy-Float................$ 15.66 Off Road Hauler.............$ 11.88 Single Axle.................$ 11.79 Single or Tandem Axle Dump Truck.......................$ 11.68 Tandem Axle Tractor w/Semi Trailer.....................$ 12.81

WELDER...........................$ 15.97

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: TX160280 06/17/2016

TX2

80 Superseded General Decision Number: TX20150280 State:

Texas

Construction Type: Building County:

Bexar County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/08/2016 1 01/15/2016 2 03/18/2016 3 04/01/2016 4 05/27/2016 5 06/17/2016

ASBE0087-014 01/01/2016

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Duct, Pipe and Mechanical System Insulation)....$ 21.57 10.02

BOIL0074-003 01/01/2014

Rates Fringes

BOILERMAKER......................$ 23.14 21.55

* ELEC0060-003 06/01/2016

ELECTRICIAN (Communication Technician Only).................$ 21.57 9%+4.65

* ELEC0060-004 06/01/2016

ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 27.50 16%+4.65

ELEV0133-002 01/01/2016

ELEVATOR MECHANIC................$ 37.76 29.985+a

Footnote: A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.

New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Veterans Day.

ENGI0450-002 04/01/2014

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes......................$ 34.85 9.85

IRON0066-013 06/01/2015

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 21.30 5.95

IRON0084-011 06/01/2015

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 23.02 6.35

PLUM0142-009 08/03/2015

Rates Fringes

HVAC MECHANIC (HVAC

Electrical Temperature Control Installation Only).......$ 30.75 11.91 HVAC MECHANIC (HVAC Unit Installation Only)...............$ 30.75 11.91 PIPEFITTER (Including HVAC Pipe Installation)...............$ 30.75 11.91 PLUMBER (Excludes HVAC Pipe Installation)....................$ 30.75 11.91

SFTX0669-002 01/01/2016

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 27.43 22.52

SHEE0067-004 04/01/2014

Rates Fringes

Sheet metal worker Excludes HVAC Duct Installation................$ 25.60 13.54 HVAC Duct Installation Only.$ 25.60 13.54

SUTX2014-006 07/21/2014

Rates Fringes

BRICKLAYER.......................$ 22.15 0.00

CARPENTER (Acoustical Ceiling

Installation Only)...............$ 17.83 0.00

CARPENTER (Form Work Only).......$ 13.63 0.00

CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation................$ 16.86 4.17

CAULKER..........................$ 15.00 0.00

CEMENT MASON/CONCRETE FINISHER...$ 22.27 5.30

DRYWALL FINISHER/TAPER...........$ 13.81 0.00

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 15.18 0.00

ELECTRICIAN (Low Voltage Wiring Only).....................$ 20.39 3.04

IRONWORKER, REINFORCING..........$ 12.27 0.00

LABORER: Common or General......$ 10.75 0.00 LABORER: Mason Tender - Brick...$ 11.88 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 12.00 0.00

LABORER: Pipelayer..............$ 11.00 0.00

LABORER: Roof Tearoff...........$ 11.28 0.00

LABORER: Landscape and Irrigation.......................$ 8.00 0.00

W9126G-16-R-0101

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 15.98 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 14.00 0.00

OPERATOR: Bulldozer.............$ 14.00 0.00

OPERATOR: Drill.................$ 14.50 0.00

OPERATOR: Forklift..............$ 12.50 0.00

OPERATOR: Grader/Blade..........$ 23.00 5.07

OPERATOR: Loader................$ 12.79 0.00

OPERATOR: Mechanic..............$ 18.75 5.12

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 0.00

OPERATOR: Roller................$ 12.00 0.00

PAINTER (Brush, Roller and Spray), Excludes Drywall Finishing/Taping.................$ 13.07 0.00

ROOFER...........................$ 12.00 0.00

TILE FINISHER....................$ 11.32 0.00

TILE SETTER......................$ 14.94 0.00

TRUCK DRIVER: Dump Truck........$ 12.39 1.18

TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57

TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 0.00

TRUCK DRIVER: Water Truck.......$ 12.00 4.11

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations.

Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board).

Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION 01 10 00 Page 1

SECTION 01 10 00

STATEMENT OF WORK

TABLE OF CONTENTS

Amendment No. 003

DIVISION 01 - GENERAL REQUIREMENTS

Paragraphs

1.0 PROJECT OBJECTIVES

2.0 PROJECT SCOPE

3.0 PROJECT WORK ITEM DESCRIPTIONS

4.0 APPLICABLE CRITERIA

5.0 GENERAL TECHNICAL REQUIREMENTS

6.0 PROJECT SPECIFC REQUIREMENTS

ATTACHMENTS

APPENDICES

Appendix A Location Map

Appendix B Existing Floor Plan, Existing Chilled Water Piping Route, and Proposed Chilled Water Piping Route

Appendix C Site Drawings

End of Table of Contents

SECTION 01 10 00 Page 2

SECTION 01 10 00

STATEMENT OF WORK

1.0 PROJECT OBJECTIVES

The Contractor shall provide all plant, labor and materials to complete the design and construction facility sustainment, restoration, and modernization (SRM) work in accordance with the requirements of the drawings, specifications, and attachments provided.

1.1 SECTION ORGANIZATION

This Section is organized under 6 major “paragraphs”.

1) Paragraph 1 is intended to define the project objectives.

2) Paragraph 2 describes the scope of the project(s).

3) Paragraph 3 provides a detailed list of facilities and associated work items, quantities, and brief description of the work item to be included in this contract.

4) Paragraph 4 lists applicable industry and government design criteria generally applicable to the work items in listed in paragraph 3. It is not intended to be all-inclusive. Other industry and government standards may also be used where necessary to produce professional designs, unless they conflict with those listed.

5) Paragraph 5 contains general design criteria specifically applicable to the work items defined in Paragraph 3.

6) Paragraph 6 contains installation and project specific criteria supplementing the other 5 paragraphs.

2.0 PROJECT SCOPE

Base Bid: The Contractor shall replace the existing chilled water piping located in crawl spaces and raised floor pipe trenches with a new 10-inch chilled water loop, provide a redundant 20 gallon per minute water supply to the critical cooling towers.

Bid Option No.1: The Contractor shall replace existing air handling unit #9, design new duct system to provide ventilation to the computer rooms and design and install a humidity control system for the computer rooms.

Base Bid: The Contractor shall design and construct a new 2-inch underground recycled waterline that begins at the existing cooling towers and extends to the existing wrought iron fence adjacent to Clarence Tinker Drive, south corner of the Building 200 site. Refer to drawings for proposed location.

Bid Option No. 2: The Contractor shall design and install an 8-inch connection from the new 2-inch waterline to the existing SAWS non-potable waterline. All work exterior the fence shall be done within the utility easement. Location and connections shall be coordinated with SAWS and Port of San Antonio and per their recycled water standards. Refer to drawings for proposed location.

2.1 WORK ITEM TYPE

The following type of Work Item types are required for this contract:

• Repair Interior Partitions (work item code C1010)

• Construct Recycle Water Distribution (work item code D2090)

• Replace Distribution Systems (work item code D3040)

SECTION 01 10 00 Page 3

2.2 CONTINUED OCCUPANCY

1) All facilities will continue to be occupied and in operation; therefore all systems, utilities, and access to the building must be maintained as part of this SRM work.

2) Schedule all work at such time and in such a manner to minimize interference and inconvenience to public, staff and operations. Refer to Section 01 10 00, paragraphs 5 and 6 for additional requirements.

3) The Contractor must obtain authorization from the COR as approved by the user before starting any work within any existing area of the building. Protect the area immediately surrounding all areas of work from danger of materials being dropped or dislodged.

4) Carry out work in a manner that will not impose avoidable hardship, danger, or inconvenience to the public or staff. Prior to commencement of work, the Contractor and COR shall jointly survey the construction site and surrounding areas, making permanent record of such existing damage as cracks, malfunctioning utility equipment and fixtures, or other similar damage. This record shall serve as a basis for determination of subsequent damage to these structures and adjacent areas due to Contractor's operations. Any damage, of any nature to these structures and adjacent areas not noted in the original survey but subsequently noted shall be reported immediately to the COR.

5) Isolate the Work area from the occupied spaces. Provide dustproof enclosures, air quality monitoring and other systems to prevent cross contamination between occupied and unoccupied spaces. Occupant safety and comfort should be stressed as important requirements.

6) Provide containment and control of computer room conditioned air. Large areas of opened raised flooring allowing underfloor conditioned air to escape into the room proper is not allowed.

7) Provide temporary source of chilled water to all CRAC units within the computer rooms.

Chilled water installation is expected to be done in segments, install new piping behind and removing old piping ahead. Temporary chilled water connection to CRAC units may be accomplished in stages. It is expected that existing chilled water system will be utilized during construction with no need for temporary chillers.

8) CRAC units shall remain operational and running during construction. Per Computer Room, one (1) CRAC unit can be disconnected and reconnected at a time, since each room is in a N + 1 configuration. If additional CRAC units are to be mechanically disconnected or shut off, temporary source of chilled water cooling must be provided.

Additionally, to disconnect and reconnect any of the CRAC units will require an ASI. Site will determine the Level of ASI needed.

9) Disruption of Existing Services. The following conditions apply:

(a) Disruption of utility service is not permitted.

(b) DISA Operational State: Disruption of power to critical IT loads is not permitted. Any work involving power panels fed by site technical power require an Approved Service Interruption (ASI) and MOP approval prior to the performance of the work. The Contractor shall submit the documents thirty (30) calendar days in advance of the work.

(c) The Computer Room Air-Condition (CRAC units) shall remain operational during the installation of the 10-inch chilled water loop. Provide a detailed installation plan to ensure no disruption. After approval of the installation plan by the Government &

SECTION 01 10 00 Page 4 facility staff the Contractor shall not deviate from the installation plan without approval. Request approval not less than (30) days before time of shutdown is desired.

(d) Plan work to minimize shutdown time of any other service or operations. Request approval of a utility or equipment shutdown in writing to the COR not less than (30) calendar days before time shutdown is desired. Provide the COR with an estimate of the duration of shutdown and how it will affect the facility.

(e) Begin work only after COR & facility staff is fully informed and has agreed to the schedule of shut offs with proper documentation.

(f) Do not cut into existing services without first verifying with the COR that service has been correctly identified and shut off.

(g) Operation of existing valves, switches, etc., to affect service shutdown will be completed by the Government, unless arranged otherwise.

(h) Fabricate and install interconnecting portions of these systems prior to shut down for final connections.

(i) Maintain utilities or other service, indicated to be abandoned, in service or provide alternate means of service until new facilities are provided, tested, and put in operation.

(j) Maintain fire protection and fire alarm systems at all times within existing facilities.

(k) Review all existing conditions, drawings and other documents for proper coordination between new and existing construction.

(l) Active utilities whose locations are unknown to the Government are suspected to exist. The Contractor shall be cautious of their existence. If they are encountered, immediately report existence to the COR for direction.

(m) Damages to existing structures, utilities and other items which are caused by Contractor's operations shall be repaired or replaced to their original conditions.

10) Use of site: The following conditions apply:

(a) Limit use and operation at site to "Limits of Construction", indicated and required to perform Work. Portions of site beyond area of required Work shall not be disturbed without written approval of the COR.

(b) Obtain written approval from the COR at least (14) calendar days in advance when scheduling Work outside limits of construction. Provide the COR an estimate of time needed to perform Work outside the limits of construction.

(c) Cutting, capping, and reconnecting utility systems outside the limits of construction shall be performed by Contractor, unless otherwise noted.

(d) Conform to all laws, ordinances, permits and regulations affecting Work on site.

(e) Existing roads, streets, drives, parking lots, entrances and required fire exit ways shall be kept clear and available at all times for their intended use. Do not use these areas for parking, staging or storage without COR's written approval. Coordinate with COR, and provide alternate routes for public and COR access if normal routes are affected.

(f) Do not unreasonably encumber site with equipment, materials or vehicles.

SECTION 01 10 00 Page 5

(g) Return all conditions on or about the site and adjacent property which are not shown to be altered, removed or otherwise changed; to conditions which existed previous to starting performance of this contract.

(h) Construction personnel will not at any time park in any officially marked parking lot;

on Government property without the Government's consent, and will not park on adjacent residential streets.

11) Use of facilities: The following conditions apply:

(a) Limit use and operation within existing facilities to areas indicated for construction Work and as required to perform Work. Other areas within facility shall not be disturbed or disrupted.

(b) Perform Work so as not to interfere or inconvenience public, staff and training operations.

(c) Maintain and keep clear all required fire exit ways throughout facility within and in vicinity of construction areas. Coordinate alternate temporary egress routes with COR and local fire authority.

(d) Do not load structure with weights that will endanger structure.

(e) Smoking is prohibited within government facilities and on site.

(f) Use of toilet facilities, washrooms, and telephones within existing facility or occupied areas is not allowed without the COR's consent.

(g) Cafeteria and dining areas may not be used by construction personnel without the COR's consent.

(h) Coordinate construction operations to assure that operations are carried out with consideration given to conservation of energy, water, and materials.

(i) Maintain existing building in a weather-tight condition throughout the construction period. Repair damage and leaks caused by construction operations. Take all precautions necessary to protect building and its occupants during construction period.

(j) Make every effort to keep noise to a minimum in construction operation. Use of jack hammers will be permitted for use with prior approval only. Obtain COR's consent prior to performing any such work

12) Occupant Safety and Comfort

(a) Protect building occupants from blowing dust and similar materials. Use HEPA filter equipped vacuum equipment simultaneously with all cutting operations inside of the building, i.e. drywall, pipe, etc.

(b) Ensure fumes from work activities outside the building do not enter the building.

(c) Use HEPA rated vacuum cleaners to control dust in computer rooms. Provide the HEPA vacuum cleaners as a part of the installation contract.

(d) Use tack pads at entry ways to prevent dust from being carried out of work areas.

(e) Clean work areas at least once a day and remove installation debris from inside the building daily.

SECTION 01 10 00 Page 6

2.3. SPECIAL SCHEDULE AND PHASING REQUIREMENTS

Refer to specifications.

3.0 PROJECT WORK ITEM DESCRIPTIONS

The facility scope of work is described by an overall narration of the work to be accomplished, and through listed “Work Items”. Work Items are described, quantified and qualified individual project elements. The Work Items are coded and organized per the ASTM Uniformat II Classification for Building Elements (E1557-97); typically to individual element level (Level 3).

Note: Not every aspect of the scope of work is associated with a corresponding Work Item. The lack of a Work Item does not preclude the requirement to deliver on all aspects of the facility scope of work.

3.1 BUILDING 200 - DECC SAN ANTONIO

1) General

(a) The original 1982 design of Building 200 had a building area of approximately 70,000 square feet. A 1991 design expanded the building by approximately 25,000 square feet. Current building area is approximately 95,000 square feet.

(b) The 1982 building design used variable air volume air handling units for office space heating and cooling. The 1991 building design used multizone air handling units for office space heating and cooling. Data center heating and cooling is provided using Computer Room Air Conditioning units with heat rejection to the chilled water system.

(c) The 1982 Building 200 central plant included a 304 ton chiller, a 399 ton chiller, a 910 gpm cooling tower, a 1200 gpm cooling tower and one 1500 MBH boiler. The 1991 Building 200 central plant included two 140 ton chillers, two 420 gpm cooling towers and one 866 MBH boiler. The 1982 central plant appears to perform as the critical systems whereas the 1991 appears to perform as the non-critical system.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .