B3_Amend-0001_W9126G-16-B-0009.pdf

PDF 4 MB Posted

Attached to
CCSC, TEXAS, INNER BASIN TO VIOLA TURNING BASIN
Solicitation number
W9126G-16-B-0009
Issued by

About this file

PROJECT Corpus Christi Ship Channel Texas Inner Basin To Viola Turning Basin And Laquinta Channel In Nueces County Texas - Pipeline Dredging (Deep Channel) - Unrestricted Procurement - AMENDMENT 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT: Corpus Christi Ship Channel, Texas, Inner Basin To Viola Turning Basin, And Laquinta Channel, In Nueces County, Texas-Pipeline Dredging (Deep Channel) - Unrestricted Procurement - SEE THE ATTACHED PAGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-16-B-0009

X 9B. DATED (SEE ITEM 11)

12-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

2000 FORT POINT ROAD

GALVESTON TX 77550-1229

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M3ODXMAN

Text Box

M3ODXMAN

Text Box 03-Jun-2016

W9126G-16-B-0009

A0001-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The specifications for Solicitation No. W9126G-16-B-0009, Corpus Christi Ship Channel, Texas, Inner Basin to Viola Turning Basin, and La Quinta Channel, in Nueces County, Texas, Pipeline Dredging, are hereby amended as follows:

a) Specifications.

(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.

(2) SECTION 35 20 23.16 45, PIPELINE DREDGING – The enclosed SECTION 35 20 23.16 45, entitled PIPELINE DREDGING, supersedes that issued with this Solicitation.

b) Drawings.

(1) DRAWINGS NO. 6-8, 11, 12, 24, 25, 34-37, 40-45 - The enclosed Drawings No. 6-8, 11, 12, 24, 25, 34-37, 40-45, supersedes that issued with this Solicitation.

2. This amendment shall be attached to and become a part of the solicitation.

3 Encls:

1. SECTION 00 11 00.00 45, BID SCHEDULE

2. SECTION 35 20 23.16 45, PIPELINE DREDGING

3. DRAWINGS NO. 6-8, 11, 12, 24, 25, 34-37, 40-45

SWG FILE NO.:NUECES 803-350 SOLICITATION NO.:W9126G-16-B-0009

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 11 00.00 45

BID SCHEDULE

PART 1 GENERAL

1.1 BID SCHEDULE

1.1.1 Schedule No. 1

1.1.2 Option No. 1

1.1.3 Option No. 2

1.1.4 Option No. 3

1.1.5 Option No. 4

1.1.6 Option No. 5

1.1.7 Option No. 6

1.1.8 Option No.7

1.1.9 Option No. 8

1.1.10 Option No. 9

1.1.11 Option No. 10

1.1.12 Option No.11

1.1.13 Option No. 12

1.1.14 Option No. 13

1.2 MODIFICATIONS (CESWG)

1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)

-- End of Section Table of Contents --

DOCUMENT 00 11 00.00 45 Page 1

(TO ACCOMPANY AMENDMENT NO. 0001 TO SOLICITATION NO. W9126G-16-B-0009)

SECTION 00 11 00.00 45

BID SCHEDULE

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 BID SCHEDULE

BID SCHEDULE

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.1 Schedule No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

SCHEDULE NO. 1

0001 Mobilization and Demobilization

1 JOB SUM $___________

0002 Pipeline Management 1 JOB SUM $___________

0003 Dredging CCSC/La Quinta Channel

2,300,000 C.Y. $_________ $___________

TOTAL SCHEDULE NO. 1 $___________

DOCUMENT 00 11 00.00 45 Page 2

BID SCHEDULE (CONT'D)

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.2 Option No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 1

0004 Dredging

CCSC 290,000 C.Y. $_________ $___________

TOTAL OPTION NO. 1 $___________

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________

NOTE: The Government may exercise Option No. 1 by written notice to the Contractor prior to completion of all authorized work. Award of Option No.

1 is contingent upon the availability of funds. Additional time of 30 calendar days will be added to this Contract for completion of Option No. 1.

DOCUMENT 00 11 00.00 45 Page 3

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.3 Option No. 2

Item No. Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 2

0005 Dredging CCSC/La Quinta Junction 981,000 C.Y. $_________ $___________

TOTAL OPTION NO. 2 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 AND 2 $___________

NOTE: The Government may exercise Option No. 2 by written notice to the Contractor prior to completion of all authorized work. Award of Option No.

2 is contingent upon availability of funds. Additional time of 70 calendar days will be added to this Contract for completion of Option No. 2.

DOCUMENT 00 11 00.00 45 Page 4

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.4 Option No. 3

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 3

0006 Dredging Rincon Channel

262,000 C.Y. $_________ $___________

TOTAL OPTION NO. 3 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, AND 3 $___________

NOTE: The Government may exercise Option No. 3 by written notice to the Contractor prior to completion of all authorized work. Award of Option No.

3 is contingent upon availability of funds. Additional time of 30 calendar days will be added to this Contract for completion of Option No. 3.

DOCUMENT 00 11 00.00 45 Page 5

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.5 Option No. 4

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 4

0007 Dredging POCCA Cargo Dock No. 9 1 JOB SUM $___________

TOTAL OPTION NO. 4 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3 AND 4 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 6

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.6 Option No. 5

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO.5

0008 Dredging POCCA Oil Dock No. 1 1 JOB SUM $___________

TOTAL OPTION NO. 5 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4 AND 5 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 7

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.7 Option No. 6

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 6

0009 Dredging POCCA Oil Dock No. 2 1 JOB SUM $___________

TOTAL OPTION NO. 6 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5

AND 6 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 8

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.8 Option No.7

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 7

0010 Dredging POCCA Cargo Dock No. 8 1 JOB SUM $___________

TOTAL OPTION NO. 7 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5,

6 AND 7 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 9

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.9 Option No. 8

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 8

0011 Dredging POCCA Oil Dock No. 4 1 JOB SUM $___________

TOTAL OPTION NO. 8 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5,

6, 7 AND 8 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 10

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.10 Option No. 9

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 9

0012 Dredging POCCA Oil Dock No. 7 1 JOB SUM $___________

TOTAL OPTION NO. 10 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5,

6, 7, 8, AND 9 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 11

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.11 Option No. 10

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 10

0013 Dredging POCCA Oil Dock No. 11 1 JOB SUM $___________

TOTAL OPTION NO. 10 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5,

6, 7, 8, 9 AND 10 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 12

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.12 Option No.11

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 11

0014 Dredging POCCA Bulk Material Dock No. 2

1 JOB SUM $___________

TOTAL OPTION NO.11 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5,

6, 7, 8, 9, 10 AND 11 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 13

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.13 Option No. 12

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 12

0015 Dredging POCCA Oil Dock No. 8 1 JOB SUM $___________

TOTAL OPTION NO.12 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5,

6, 7, 8, 9, 10, 11 AND 12 $___________

NOTE: The Government may exercise Options No. 4 through No. 12 by written notice to the Contractor, singly or in combination, at any time prior to completion of all authorized work. Award of Options No. 4 through No. 12 is contingent upon availability of funds. Additional time of 25 calendar days will be added to this Contract for completion of Options No. 4 through No. 12 whether options are awarded singly or in combination.

DOCUMENT 00 11 00.00 45 Page 14

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.14 Option No. 13

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 13

0016 Precast Concrete Box Drainage Features

1 JOB SUM $___________

0017 Articulated Concrete Block Mats(ACBM)

18,900 S.F. $___________ $___________

0018 Earthwork for Ditch Relocation 1,300 L.F. $___________ $___________

0019 Suntide Outfall Rehabilitation 1 JOB SUM $___________

TOTAL OPTION NO.13 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5,

6, 7, 8, 9, 10, 11, 12 and 13 $___________

NOTE: The Government may exercise Option No. 13 by written notice to the Contractor prior to completion of all authorized work. Award of Option No.

13 is contingent upon availability of funds. Additional time of 50 calendar days will be added to this Contract for completion of Option No.

13.

DOCUMENT 00 11 00.00 45 Page 15

(TO BE ATTACHED TO STANDARD FORM 1442)

1.2 MODIFICATIONS (CESWG)

If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment of each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

-- End of Document --

DOCUMENT 00 11 00.00 45 Page 16

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 20 23.16 45

PIPELINE DREDGING

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 WORK COVERED BY CONTRACT PRICE

1.3.1 Existing Conditions

1.4 REFERENCES

1.5 SUBMITTALS

1.6 CHARACTER OF MATERIAL

1.6.1 Debris Within the Dredging Limits

1.7 EASEMENTS

1.8 UTILITIES ACROSS THE LIMITS OF DREDGING

1.8.1 Known Pipeline/Utility Crossings

1.9 ORDER OF WORK

1.9.1 Dredging Options

1.10 OBSTRUCTION OF CHANNEL

1.11 TEMPORARY REMOVAL OF AIDS TO NAVIGATION

1.12 NOTIFICATION PRIOR TO COMMENCEMENT OF DREDGING OPERATIONS

1.13 SIGNAL LIGHTS

1.14 PLANT

1.14.1 General Requirements

1.14.2 Capacity

1.14.3 Inspectors (Government Agents) Transportation

PART 2 PRODUCTS

2.1 BRIDGE-TO-BRIDGE RADIOTELEPHONE EQUIPMENT

PART 3 EXECUTION

3.1 ESTIMATED QUANTITY OF MATERIAL

3.1.1 Quantity Summary

3.1.2 Required Dredging Prism

3.1.3 Allowable Overdepth

3.1.4 Side And End Slopes

3.1.5 Excessive Dredging

3.2 AREAS TO BE DREDGED

3.3 CONDUCT OF DREDGING WORK

3.3.1 Pre-Operations Safety Coordination Meeting

3.3.2 Protection of Existing Waterways

3.3.3 Adjacent Property and Structures

3.4 PLACEMENT OF EXCAVATED MATERIAL

3.4.1 General

3.4.1.1 Misplaced Material

3.4.1.2 Placement Operations Inspection

3.4.1.3 Placement Area Drainage

3.4.1.4 Maintenance of Existing Levees and Drop-outlet Structures

3.4.2 Spillway Operations

SECTION 35 20 23.16 45 Page 1

3.4.3 Placement Area

3.4.3.1 Partially Emergent Unconfined Placement Area No. 7 and No. 8

3.4.3.1.1 Environmental Considerations for Placement Area No. 7 and No. 8

3.4.3.2 Confined Placement Area No. 10

3.4.3.3 Open Water Placement Area Nos. 15A and 15B

3.4.3.4 Open Water Placement Area Nos. 17A and 17B

3.4.3.5 Placement Area No. 2 (IH-PA-2)

3.4.3.6 Confined Placement Area No. 8 (IH-PA 8)

3.4.3.7 Causeway Island

3.4.3.8 (AM#1)Confined Placement Area No. 3, Cell B (IH-PA 3B)

3.4.3.9 (AM#1)Coordination with Non-Federal Activities

3.5 PRESERVATION OF PUBLIC AND PRIVATE PROPERTY

3.5.1 Damages

3.5.2 Accountability and Restoration

3.6 ALTERNATE PLACEMENT AREA(S) PROPOSED BY CONTRACTOR WITH BID AFTER

AWARD OF CONTRACT

3.6.1 Data Submittal

3.7 METHOD OF PLACEMENT

3.7.1 Pipeline Route

3.8 DISPOSAL IN PLACEMENT AREA

3.8.1 Utilities within the Placement Area

3.8.2 Unauthorized Placement of Material

3.8.3 Debris Disposal

3.9 DREDGE PIPELINES

3.9.1 Submerged Pipeline

3.9.2 Submerged Pipeline Lighting Requirements

3.9.3 Floating Pipeline

3.9.4 Pipeline Leaks

3.9.5 Pipeline Inventory Management

3.10 WORK IN THE VICINITY OF OTHER GOVERNMENT CONTRACTORS

3.11 DREDGING AND DREDGE RELATED MARINE WORK (CESWG)

3.12 AUTOMATIC IDENTIFICATION SYSTEM

3.13 DREDGE PLANT INSTRUMENTATION

ATTACHMENTS:

Appendix 1 - QUANTITY SUMMARY TABLE

-- End of Section Table of Contents --

SECTION 35 20 23.16 45 Page 2

SECTION 35 20 23.16 45

PIPELINE DREDGING

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUMMARY

The work in this Section consists of furnishing plant, labor, materials, and equipment and performing the operations necessary for the removal of materials to the required dimensions shown, satisfactory disposal thereof, and other operations incidental thereto.

1.2 MEASUREMENT AND PAYMENT

Measurement and payment for pipeline dredging will be paid for in accordance with provisions of the SECTION 01 22 00.10 MEASUREMENT AND

PAYMENT.

1.3 WORK COVERED BY CONTRACT PRICE

Base bids on the quantity of dredging indicated. If the total quantity of dredging varies from that specified as the basis for bidding, the Contract price will be adjusted in accordance with SECTION 01 10 00.01 45 NON-REGULATED SPECIAL CONTRACT REQUIREMENTS, Paragraph: VARIATION IN ESTIMATED QUANTITIES - DREDGING. The dredging conditions specified and indicated describe conditions which are known. However, the Contractor is responsible for other conditions encountered which are not unusual when compared to the conditions recognized in the dredging business as usual in dredging activities such as those required under this Contract. The Contract price for dredging will include the cost of removal and placement of the material as specified in the Paragraphs: CHARACTER OF MATERIAL and PLACEMENT OF EXCAVATED MATERIAL. The Contract price for dredging shall include the costs for maintenance of levees and ditches necessary to confine the material within the areas shown.

1.3.1 Existing Conditions

The drawings already prepared as specified in the CONTRACT CLAUSES Paragraph entitled CONTRACT DRAWINGS AND SPECIFICATIONS represent conditions existing as of the date of their preparation using average existing conditions. However, to reflect anticipated shoaling occurring between the dates of preparation of the drawings and the dates of the "before-dredging" sections, the estimated dredging quantities stated in the Bid Schedule have been adjusted accordingly. The depths and elevations shown will be verified and corrected by fathometer soundings taken by the Government before dredging. The Government will normally use a frequency of 200 kHz to conduct hydrographic surveys. If the surveys indicate the presence of fluff in the channel, a frequency of 40 kHz will be used.

Determination of quantities removed and the deductions made from them to determine quantities by in-place measurement to be paid for in the area specified, after having once been made will not be reopened, except on evidence of collusion, fraud, or obvious error.

SECTION 35 20 23.16 45 Page 3

1.4 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-5027 (1987) Confined Disposal of Dredged Material

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with the SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Notification Prior To Commencement of Dredging Operations; G

Indicate commencement of dredging operations, and location of dredge(s).

Temporary Removal of Aids To Navigation; G

SD-02 Shop Drawings

Submerged Pipeline; G

Indicate pipeline location and installation details as outlined in the Subparagraph: Submerged Dredge Pipeline.

Pipeline Route; G

A detailed pipeline diagram for each Placement Area detailing the pipeline route and anchor locations shall be submitted prior to commencing work on this project.

1.6 CHARACTER OF MATERIAL

The material to be removed is shoals which have accumulated over a period of time. This contract represents a transition from the use of the Mean Low Tide (MLT) datum to the Mean Lower Low Water (MLLW) datum. As a result, the Government anticipates that virgin material may be encountered in the allowable overdepth and/or side slope dredging. Bidders are expected to examine the worksite and the records of previous dredging, which are available upon request from the Corpus Christi Resident Office and after investigation decide for themselves the character of materials.

1.6.1 Debris Within the Dredging Limits

Debris including but not limited to, metal bands, pallets, pieces of broken cable, rope, stumps, and broken piles may be encountered. Debris removed

SECTION 35 20 23.16 45 Page 4 from the dredged area shall be removed from the water. Disposal shall be the responsibility of the Contractor and disposal shall be outside the limits of Government property. If the actual conditions differ from those stated or shown, an adjustment in Contract price or time of completion, or both, will be made in accordance with the CONTRACT CLAUSE entitled

DIFFERING SITE CONDITIONS.

1.7 EASEMENTS

Permits authorizing the laying of shore pipe, and for placement of dredge material in the Placement Area(s), are on file and available for examination upon request form the Corpus Christi Resident Office of the U.S. Army Corps of Engineers, 1920 N. Chaparral, Corpus Christi, Texas 78401. The instruments authorizing the laying of shore pipelines may contain certain restrictions relative to specific route, location, and general use of the land. These instruments form a part of these specifications and the Contractor shall strictly comply with the terms thereof.

1.8 UTILITIES ACROSS THE LIMITS OF DREDGING

It is the Contractor's responsibility to investigate the location of utility crossings. The Contractor shall take precautions against damages which can result from dredging operations in the vicinity of the utility crossings. If damage occurs as a result of dredging operations, the Contractor will be required to suspend dredging until the damage is repaired and approved. Costs of these repairs and downtime of the dredge and attendant plant shall be at the Contractor's expense.

1.8.1 Known Pipeline/Utility Crossings

There are pipelines and or utilities which are within the work limits. The following pipeline/utilities cross the area(s) to be dredged:

Approximate Station

Permit No. Description Owner

Corpus Christi Ship Channel

70+99.19 8135 One 8-inch Conduit Central Power & Light

71+02.19 7757 One 20-inch pipeline Nueces County Water District

308+27.14_ 9339 One 6-inch pipeline Channel Industries Gas Co.

380+99.12 1885 and

One 12-inch Pipeline One 6-inch Pipeline Two 4-inch Pipelines

Mako Company, Oxyx Company

399+13.12 7045 One 12-inch Pipeline Unite Gas Co.

SECTION 35 20 23.16 45 Page 5

Approximate Station

Permit No. Description Owner

1125+48 14114/(01)/9Two 36-inch Pipe Conduits Two 12-inch Pipelines(FM) Two 12-inch Pipelines (Water) Two 10-inch Pipelines (Gas) One 1-inch Pipe(Fire Alarm)

City of Corpus Christi

1129+48 14114/29 One 12-inch Cable Conduit

Southwestern Bell Telephone Co.

1105+00 HWY 87 Bridge +138 Feet MLT Vertical Clearance

TXDOT

1207+70 Two 16-inch Pipelines One 8-inch Pipeline One 8-inch Pipeline

Hiliburten Cement Company Permian Corporation sun Pipeline Company

1208+41.16 One 8-inch Pipeline Champlin Petroleum Company City Utilities

1213+95.15 One Overhead Power Line at 172.0 feet

Central Power and Light Company

1221+62.30 One Submarine Cable at -70.0 Feet MLT

Central Power and Light Company

1225+18.18 Five 8-inch Submarine Cables at -65+0 Feet MLT

Central Power and Light Company

1236.29.32 One 6-inch Gas

Pipeline

Crosstex CCNG Transmission LTD

1263+05 Thirty Various Size Pipelines

100- foot Wide Multiple Pipeline Companies

1346+04 One 16-inch Pipeline Two 12-inch Pipelines

Coastal States Crude Gathering Co.

1435+56.34 One 10-inch Pipeline Coronado Transmission Co.

1511+48.14 Overhead Power Line 1-66kva Lower Wire Vertical Elev.

+164.5 MLT

Central Power and Light Co.

1512+48.13 One 30-inch Pipeline Texas Eastern Transmission

SECTION 35 20 23.16 45 Page 6

Approximate Station

Permit No. Description Owner

1531+27.94 One 16-inch Pipeline Three 8-inch

Exxon Corp.

1533+82.15 Two 8-inch Pipelines One 12-inch Pipeline

Exxon Corp.

La Quinta Channel

310+34 One 10-inch Pipeline South Cross

321+19 One 7-inch Pipeline Royal Production

339+00 One 3.5-inch Pipeline Cross Tex

346+34 One 16-inch Pipeline One 4-inch Pipeline

Cross Tex

SABCO

EVERY EFFORT HAS BEEN MADE TO GIVE ALL PERTINENT DETAILS ON THE LOCATION OF

PIPELINES/UTILITIES. THE DATA FURNISHED ON THE PLANS ARE BELIEVED TO BE

SUBSTANTIALLY CORRECT. HOWEVER, THE EXACT LOCATIONS MAY VARY FROM THAT

SHOWN: THEREFORE THE CONTRACTOR SHALL COOPERATE WITH THE RESPECTIVE OWNERS

TO ESTABLISH THE ACTUAL POSITION OF THE PIPELINES/UTILITIES. THE U.S. ARMY

CORPS OF ENGINEERS PERMITS OF THE RESPECTIVE PIPELINES AND PREVIOUS SURVEYS

ARE AVAILABLE UPON REQUEST FROM THE CORPUS CHRISTI RESIDENT OFFICE.

THE FOLLOWING IS FURNISHED FOR INFORMATION ON VERIFYING PIPELINE OWNERSHIPS:

Lonestar Notification Center 1-713-223-4567 or 1-800-669-8344

Texas 811 (Dig-Tess) 1-800-344-8377

1.9 ORDER OF WORK

The Contractor shall begin and complete Schedule No. 1 in the order it desires. Work in Option No. 2, if awarded may not commence until the completion of all work related to Sections Nos. 1-5 of Schedule No. 1. All other Options, if awarded, may be completed in the order the Contractor desires.

For POCCA Dock Option Nos. 4 through 12, the Contractor will notify the Contracting Officer and the Port to coordinate dredging activities in conjunction with the dredging in the Federal Channel. While dredging along the Federal Channel, the Contractor will notify the Contracting Officer before the dredge gets to within 1,000 feet of exercised POCCA Dock Options Nos. 4 through 12 and complete dredging of any such exercised options prior to passing the associated docks by more than 1000 feet. The Contractor may be directed by the Contracting Officer to proceed with the Option before, after, or in conjunction with the adjacent Federal Channel, depending on the coordination efforts with the Port.

Additional cost, including but not limited to Mobilization and Demobilization, pipelines, moving off the Federal Channel to Options, and returning to the Federal Channel will be included in the line item cost for POCCA Dock Option Nos.4 through 12. The Government reserves the right to

SECTION 35 20 23.16 45 Page 7 change the order of work at any time.

1.9.1 Dredging Options

The Government will award Dredging Options as specified.

1.10 OBSTRUCTION OF CHANNEL

The Government will not undertake to keep the Channel free from vessels or other obstructions, except to the extent of applicable regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work using a method that will obstruct navigation as little as possible, and if the Contractor's plant does obstruct the Channel and makes passage of vessels difficult or endangers them, the plant shall be promptly moved on the approach of a vessel as far as may be necessary to afford a practicable passage. Upon completion of the work, the Contractor shall promptly remove its plant, including ranges, buoys, piles, and other marks placed under this Contract.

1.11 TEMPORARY REMOVAL OF AIDS TO NAVIGATION

The temporary removal or changes in locations of channel markers may be required to facilitate dredging operations. The Contractor shall notify the Contracting Officer at least 21 days prior to the date that the removal or change in location of channel markers will be required so the U.S. Coast Guard can perform the work and so navigation interests may be informed sufficiently in advance of the proposed removal or change in location.

The Contractor shall not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with aids to navigation.

Indicate temporary removal or changes in locations of channel markers required to facilitate dredging operations.

1.12 NOTIFICATION PRIOR TO COMMENCEMENT OF DREDGING OPERATIONS

Notify the Resident Engineer, Corpus Christi Resident Office, in writing, at least 10 days prior to commencement of dredging operations, the location or locations at which a dredge or dredges will be placed on the work. This information is required in addition to the progress charts and schedule provided for in the CONTRACT CLAUSE entitled SCHEDULE FOR CONSTRUCTION

CONTRACTS.

1.13 SIGNAL LIGHTS

The Contractor shall display signal lights and conduct its operations in accordance with the General Regulations of the Department of the Army and of the U.S. Coast Guard governing the:

i) lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations;

ii) lights to be displayed on dredge pipe lines;

iii) day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel; and

iv) passing by other vessels of floating plant working in navigable channels;

SECTION 35 20 23.16 45 Page 8 as set forth in Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International - Inland (COMDTINST M16672.2) or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (Inland) as applicable. The USCG Navigation Rules can be located at http://www.navcen.uscg.gov/?pageName=navRuleChanges.

1.14 PLANT

1.14.1 General Requirements

Keep the necessary dredge equipment and attendant plant on the job to meet the requirements of the work. The dredge equipment and attendant plant shall be in satisfactory operating condition and capable of safely and efficiently performing the work as set forth in specifications and shall be subject to inspection by the Contracting Officer's representative at all times.

1.14.2 Capacity

No reduction in the capacity of the dredge equipment and attendant plant employed to execute the work shall be made except by written direction of the Contracting Officer. The measure of the "Capacity of the Dredge and Attendant Plant" shall be its actual performance on the work to which these specifications apply.

1.14.3 Inspectors (Government Agents) Transportation

Furnish throughout the Contract period, for the exclusive use of the Government: a motorboat, minimum 18 feet in length, with enclosed cabin, a minimum of a 50 horsepower motor and equipped with safety equipment as required by EM 385-1-1. Furnish fuel, oil, and maintenance for the motorboat throughout the Contract period. Assume full responsibility for the storage and security of the motorboat when not in use by the Government employees. There shall be no separate payment for these items and the cost shall be distributed throughout the existing bid items. Equipment which fails to perform because of insufficient power or other mechanical deficiencies shall be replaced and inexperienced operators unable to operate the equipment shall be replaced within 12 hours after the Contractor is directed to do. No smoking shall be allowed inside the cabin and operator's space while occupied by Government personnel. No Smoking signs shall be posted.

PART 2 PRODUCTS

2.1 BRIDGE-TO-BRIDGE RADIOTELEPHONE EQUIPMENT

Dredge and self-propelled attendant floating plant shall be radiotelephone equipped to comply with the provisions of the Vessel Bridge-to-Bridge Radiotelephone Act (Public Law 92-63). This will require, as a minimum, the radiotelephone equipment capable of transmitting and receiving on

156.65 MHz (Channel 13). Multi-channel equipment will also require 156.8 MHz (Channel 16). Dredge tugs and tenders will be considered towing vessels within the meaning of the Act.

SECTION 35 20 23.16 45 Page 9

PART 3 EXECUTION

3.1 ESTIMATED QUANTITY OF MATERIAL

Within the limits of available funds, the Contractor will be required to excavate the entire quantity of material necessary to complete the work specified whether the quantities involved are greater or less than those estimated. The work is to be done in accordance with this Contract and at the Contract price or prices, subject to the provisions of the SECTION 01 10 00.01 45 NON-REGULATED SPECIAL CONTRACT REQUIREMENTS, Paragraph entitled VARIATIONS IN ESTIMATED QUANTITIES - DREDGING.

3.1.1 Quantity Summary

The quantities listed in Appendix 1 - QUANTITY SUMMARY TABLE include the volumes present at the time of the surveys indicated on the Contract drawings, plus anticipated shoaling before dredging begins. For the purpose of acceptance, the pipeline dredging work in the Bid Item(s) of the Bidding Schedule are divided into Sections.

3.1.2 Required Dredging Prism

The total estimated amount of material to be removed from within the specified limits, including side and end slopes and including anticipated shoaling occurring prior to the dates of the "before-dredging" surveys but excluding overdepths, in cubic yards is listed in Appendix 1 - QUANTITY

SUMMARY TABLE.

3.1.3 Allowable Overdepth

To cover unavoidable inaccuracies of the dredging process, material actually removed from the designated areas to be dredged, will be measured and paid for at full Contract price. The maximum amount of allowable overdepth dredging is estimated, including anticipated shoaling occurring prior to the dates of the "before-dredging" surveys in cubic yards is listed in Appendix 1 - QUANTITY SUMMARY TABLE.

3.1.4 Side And End Slopes

Dredging of the side and end slopes shall follow, as closely as practicable, the lines indicated or specified. Material actually removed from within the limits as approved, to provide for final side and end slopes as specified, but not in excess of the amounts originally above the limiting side and end slopes will be estimated and paid for, whether dredged in original position or by dredging the space below the pay slope plane at the bottom of the slope for upslope material capable of falling into the cut. In computing the limiting amount of side and end slope dredging, net dimensions, without allowance for overdepth, will be used.

3.1.5 Excessive Dredging

Material taken from beyond the limits specified will be deducted from the total amount dredged as excessive overdepth dredging or excessive side or end slope dredging, for which payment will not be made. Nothing herein shall be construed to prevent payment for the removal of shoals performed in accordance with the applicable provisions of the SECTION 01 10 00.01 45 NON-REGULATED SPECIAL CONTRACT REQUIREMENTS, Paragraph FINAL EXAMINATION AND ACCEPTANCE or Paragraph SHOALING.

SECTION 35 20 23.16 45 Page 10

3.2 AREAS TO BE DREDGED

Based on information currently available to the Government, areas known to require dredging are shown.

3.3 CONDUCT OF DREDGING WORK

3.3.1 Pre-Operations Safety Coordination Meeting

Prior to arrival on location and commencing dredge operations, the Contractor shall attend a pre-dredging safety coordination meeting between the dredge operators, pilots, towing industry representatives, VTS, and the affected port.

3.3.2 Protection of Existing Waterways

Conduct dredging operations using a method that will ensure that material or other debris are not pushed outside of the dredging limits or otherwise deposited in existing side channels, basins, docking areas, or other areas being used by vessels. The Contractor will be required to change its method of operations as may be required to comply with the above requirements. If bottom material or other debris is pushed into areas noted above, as a result of the Contractor's operations, the same shall be promptly removed by and at the expense of the Contractor to the satisfaction of the Contracting Officer.

3.3.3 Adjacent Property and Structures

Dredging adjacent to a structure will not be permitted closer than that shown. Damage to private or public property or structures resulting from the disposal or dredging operations shall be repaired promptly by and at the Contractor's expense. Damage to structures as a result of Contractor's negligence will result in suspension of dredging and require prompt repair at the Contractor's expense as a prerequisite to the resumption of dredging. Details for dredging adjacent to structures are shown.

3.4 PLACEMENT OF EXCAVATED MATERIAL

3.4.1 General

Material excavated shall be transported to and deposited in the Placement Area designated. Inspect the Placement Area to ensure that using the Area for placement operations will not place it in violation of the applicable Federal, State, or local statutes concerning fish and wildlife. Particular statutes which the Contractor shall consider include, but are not limited to, the Federal Migratory Bird Treaty Act and the Endangered Species Act of 1973.

3.4.1.1 Misplaced Material

Material shall not be deposited or allowed to flow into project channels or into a bayou, stream tributary to the Channel, or into an existing drainage outlet ditch, canal, water intake or outlet facility, nor shall materials be allowed to flow onto improved areas including highways and roads in or adjacent to the Placement Area. If a stream, bayou drainage outlet, ditch, canal, water intake or outlet facility becomes shoaled as a result of the pipeline dredging or placement operations, promptly remove these shoals and the material shall be placed in the Placement Area. Dragging or washing operations to remove the shoals will not be permitted.

SECTION 35 20 23.16 45 Page 11

3.4.1.2 Placement Operations Inspection

Adequately inspect placement operations in the Placement Area(s) daily to reduce the possibility of accidental breaching of levees and spillway with resulting spillage of dredged materials outside the Area. If levee failures occur while materials are being pumped into the Placement Area, dredging operations shall be stopped immediately, and the deposit of material in the Area shall not be resumed until the confining structures have been restored to an approved condition. Holes dug on the banks for deadmen or anchorage shall be filled. Confined areas shall be maintained in an operational condition until completion and acceptance of the work under this Contract. The SECTION 01 10 00.01 45 NON-REGULATED SPECIAL CONTRACT REQUIREMENTS, Paragraph DAMAGE TO WORK is only applicable to damage of levees and other non-dredging items.

3.4.1.3 Placement Area Drainage

Deposited materials shall not impound water or impede natural drainage.

The Contractor shall, if necessary, excavate and maintain ditches to drain the low areas in the dredged material and Placement Area to the weirs. The ditches shall be of adequate number and size to eliminate ponding of water within the limits of the Placement Area.

3.4.1.4 Maintenance of Existing Levees and Drop-outlet Structures

The available information regarding the heights and dimensions of levees and dimensions and elevations of the drop-outlet structures are contained in these Contract documents; however, it is the responsibility of the Contractor to verify the current condition of the levees prior to commencement of dredging and to notify the Contracting Officer of slumped or failed areas where there appears to be a potential for failure or overtopping during ponding. The Contractor will have the responsibility of continually monitoring the levees condition and to maintain the levees in a condition and elevation equal to or better than the condition of the levees at the date of this Contract award. The Contractor shall also construct temporary access from the existing roadway to each drop-outlet structure in each Placement Area.

3.4.2 Spillway Operations

Once placement operations are completed in a confined area for which the Placement Area is being used, the boards on the spillway of that Placement Area shall be removed at a proper rate to allow drainage of the Area. In confined areas, levee and spillway work required shall be completed and accepted prior to placement operations in that Area. Spillways shall be operated in general accordance with guidelines contained in the Engineering Manual EM 1110-2-5027 entitled "Confined Disposal of Dredged Material", to maintain uniformity of weir elevation around the drop-out structure, as is practicable, during discharge of effluent. Boards shall be uniform in width and of proper length so insertion and removal is not difficult.

Cracked, warped or boards of improper length shall be replaced. Seepage between boards during ponding shall be eliminated using plastic sheeting or other effective methods. Upon completion of discharge within a particular Area, the Contractor shall remove the boards as soon as practicable to accomplish drainage of the Area.

SECTION 35 20 23.16 45 Page 12

3.4.3 Placement Area

3.4.3.1 Partially Emergent Unconfined Placement Area No. 7 and No. 8

The Placement Area shall be prominently marked by the Contractor with conspicuous buoys or stakes at each corner. The Dredge Pipeline shall generally follow the route shown. The Contractor shall limit the pipeline corridor(s) to the minimum number and width needed to accomplish access for pipeline movement and dredged material placement. Initial discharge shall begin at the approximate location shown. The dredged material shall be deposited over and beyond the crests of the highest existing mounds. A spreader at the end of the discharge pipe shall be used at this Placement Area to reduce scour and to distribute the material evenly. The Contractor shall perform operations using a method that will prevent the material from flowing back into the Channel or into an environmentally sensitive area on the back side, bounded approximately by Corpus Christi Ship Channel Station 340+00 and Station 360+00. No material or runoff from dredging will be allowed to enter the sensitive area. Toe levees shall be constructed as necessary to direct effluent and natural runoff toward the open back bay and away from the sensitive area. Material shall be deposited within the limiting lines of discharge shown. Material deposited beyond the limiting lines of discharge shall be removed by the Contractor at no additional cost to the Government. Operations, including moving machinery and related equipment on this Placement Area shall be performed using a method that will prevent damage to existing vegetation on the front side of the existing mounds and surrounding slopes. No work is allowed on this Placement Area during the period of March 1, 2016 through August 31, 2016.

3.4.3.1.1 Environmental Considerations for Placement Area No. 7 and No. 8

This emergent Placement Area is known as Brown Pelican Island. This Island is a significant colonial water-bird nesting site that is managed by the National Audubon Society as a bird sanctuary. This Island is a major nesting site for the Federally listed endangered brown pelican. Dredged material is used beneficially to nourish the island that is highly susceptible to land and vegetation erosion. Dredged material is deposited over the crests of existing mounds onto the surrounding slopes to enhance bird nesting. Placement operations are limited to before and after the period of March 1st, 2016, through August 31st, 2016, to avoid interruptions in nesting activity. This operation is for dredging shoaled reaches of the Corpus Christi Ship Channel while nourishing and enhancing bird habitat. It is possible that bird nesting activity may occur outside the dates specified above. Placement operations and movement of equipment are prohibited within 1,000 feet of any active nesting site, eggs or chicks.

3.4.3.2 Confined Placement Area No. 10

The weir boards shall be furnished and installed at Placement Area No.

10. The dredge pipeline routes to the Placement Areas are shown. The Contractor shall furnish and install sufficient spillway boards at each drop-outlet structure needed to raise the weir elevations to within 3 feet of top-of-levee elevations. Lumber shall be southern yellow pine rough No. 2, dense, minimum allowable bending stress of 1,400 psi. Treated lumber shall be furnished and installed by the Contractor on the sides of the structure from the top of the concrete slab or headwall to two feet below the top of the structure. The contractor shall field verify the length and width of the treated lumber for the drop outlet structure.

Lumber shall be 8-inches nominal width. Lumber shall be straight, even sawed, sound, and entirely free from defects which can impair its

SECTION 35 20 23.16 45 Page 13 durability or its usefulness for the purpose intended. Lumber shall bear the official Grade mark of the association under whose rules it is purchased or, in lieu thereof, each shipment shall be accompanied by a certificate of inspection issued by the inspection association. Lumber shall have a Chromated Copper Arsenate (CCA) preservative treatment and shall be accompanied by a certificated from a recognized treatment company certifying the amount of treatment. During Placement operations, the Contractor shall take the precautions necessary to prevent erosion of the levee. No dredge slurry shall be drained or allowed to drain over or to reach the levee. When placing material into the Placement Area, the Contractor will assure that a minimum 3 feet of freeboard continually exists above the ponded water level throughout the entire levee perimeter.

Material shall be deposited over existing mounds without overtopping or breaching the adjacent levees. Drainage shall be provided and no ponds will be allowed to form between the discharge mounds and the levee. The spillway shall be monitored daily to assure proper water quality. Contractor will inspect placement operations at the Placement Areas. Dredging operations into the Placement Areas shall cease and placement operations shall not be resumed until the containing structure has been restored to an approved condition. Damage or scouring of the levees due to the Contractor's operations, shall be repaired to the original condition at no additional cost to the Government.

3.4.3.3 Open Water Placement Area Nos. 15A and 15B

Placement Area Nos. 15A and 15B shall be prominently marked by the Contractor with conspicuous buoys at each corner. For material originating in the La Quinta Channel, the initial placement operation shall begin 5,400 from the centerline of the Corpus Christi Ship Channel. The Placement operation shall extend from the initial discharge point toward and perpendicular to the Corpus Christi Ship Channel for approximate length of 2,000 feet to the front limit of the lines of discharge. No material shall be placed outside of these limiting lines of discharge, which define the Placement Area. As the material accumulates and becomes emergent at the point of discharge, the discharge pipe shall be moved away from the Channel along the line of discharge to another point of discharge. When possible, the discharge end of the pipe shall be held at or near the bottom during placement operations to confine the material within the designated Area.

A spreader shall be used at the submerged end of the discharge pipe to distribute the material evenly and reduce scouring.