Industry_Day_Brief_16_Nov_12.pdf
PDF 3 MB Posted
- Attached to
- Industry Day Briefing Slides
- Solicitation number
- W9126G-13-R-0017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry_Day_Ft_Hood_16Nov2012_2nd_SignInSheet.pdf | ||
| Industry_Day_Ft_Hood_16Nov2012_SignInSheet.pdf | ||
| Industry_Day_Notice_Final_1Nov12.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
INDUSTRY DAY BRIEF
16 NOVEMBER 2012
2 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
FORT HOOD, TX
17,175 Acres
Cantonment Areas
- Main Cantonment
- North Fort Hood
- West Fort Hood
27 Miles
218,823 Acres
(5x size of the
District of Columbia)
138,648 Acres
Trainable Acres
63,000 Acres
Live Fire
Impact Area
Western Flight Training Area: 5M+ Acres
3 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
2 large “department stores,”
2 large “grocery stores,” and 121 Exchange Facilities
99 Barracks (over 11,280 rooms)
12 Chapels
72 motor pools--
7.2 miles of combat power
6,730 Family Quarters
9 On-post Schools
838 Teachers (+staff)
24,770 students on/off post
The Fort Hood Community
The World's Premier Installation
Comprehensive Soldier Fitness Training Facility
(CSFTF)
FIRST
IN THE ARMY
LARGEST
IN THE ARMY
9 Gyms
45,400(+) Soldiers
18,514 On-post family members
60,097 Off-post family members
5,332 GS Civilian employees
14,272 Service & contractor employees
250,907 Retirees/Family
Members/Survivors
≈ 395K Total population served
ANNUAL ECONOMIC CONTRIBUTION
$25.35 BILLION
2012 Texas State Comptroller’s Office
4 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
ARMY FACILITY INVESTMENT STRATEGY
1. Maintain Required Facilities
2. Dispose of Excess Facilities
3. Improve Existing Facility Quality (Renovate)
4. Build-out Critical Shortfalls (New)
5 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
DEFINITIONS
MILCON – Military Construction (New)
MCA – Military Construction, Army (New)
SRM – Sustainment, Restoration and Modernization
FRP – Facilities Reduction Program
JOC – Job Order Contract
MATOC– Multiple Award Task Order Contract
6 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
FACILITY REDUCTION PROGRAM
4400 BLOCK- Targeted Area for FY13
Goal:
Eliminate WWII wood facilities by FY17 (Approx. 908K SF)
Begin construction of Warehouse Housing in FY 14.
Policy:
Vacated WWII wood facilities will NOT be reassigned
Utilities will be disconnected immediately upon vacancy
FY 14-17 (Programmed)
• Square Footage: 191,358
• 37 Facilities
FY 13 (Funded)
• Square Footage: 294,136
• 68 Facilities
FY 12 (Awarded)
• Square Footage: 413,166
• 61 Facilities
FY 11 (Complete)
• Square Footage (WWII Wood): 228,527
• 43 Facilities
7 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
FY12 FUNDED RENOVATIONS
1. Q4/3 VOLAR Barracks
$7M, 1 barrack (39053)
2. Q4/3 Vehicle Maintenance Shops
$17.5M / 7 Motor Pools
25020 (27 BSB); 19012 (2-12 CAV);
25060 (3-8 CAV); 38033 (1BSTB);
26005 (3BSTB); 32023 (15 BSB);
38014 (1-8 CAV)
3. Q4/3 Command/Control Facilities
$13.4M / 4 BN HQ, 1 CO HQ
31012 (3 BSTB); 24002 (4BCT HQ);
27008 (215 BSB); 90042 (504th BFSB); 39054 (4SB)
4. Q4/3 Other
$4.3M / Repurpose Clear Creek CDCs (4819/4820) as new
CPAC HQ
$705K / 5005 (Working Dog Kennel)
Total Amount Funded: $43M
All projects under contract and will be completed in FY13.
8 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
R&M PROGRAM - FY13 PRIORITIES
1. Q4/3 VOLAR Barracks –
$80M / 9 barracks, 1 Central Energy Plant
39000/36000 Blocks (13ESC, 1MED, MEDCOM)
2. Q4/3 Vehicle Maintenance Shops –
$18.6M / 7 Motor Pools
38003 (1/1CD); 11007 (41FiB);
26041(3/1CD); 32007/8/9/10 (2/1CD);
35015 (1-5 CAV)
3. Q4/3 Child Development Centers
$5.5M / 2 CDCs
113; 52019
4. Q4/3 Aircraft Maintenance Facilities
$8.7M / 2 Aircraft Hangars
7007 (2-227 AVN BN); 6975 (4-227 AVN BN)
5. Repurpose Existing Buildings to HQ
$7.3M
87017 to BN HQ; 41003 to BN HQ; 91074/77 to Admin
Total Amount Required: $120.1M
9 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
FORT HOOD: FY13-19 R&M PROGRAM
10 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
Planned FY 12 VOLAR Renovations:
• 36000 & 39000 Block
• 9 Barracks
• 1 Central Energy Plant
• 682 Rooms
VOLAR BARRACKS RENOVATIONS
29000
Block
39000
Block
87000
Block
Completed: 15 VOLARS (43%)
Unfunded: 9 VOLARs (26%)
35 VOLARs
2,694 Semi-Private Rooms
“Largest Inventory in the Army”
Completed VOLAR Renovations:
• $132.6M
• 29000, 39000 , 87000 Blocks
• 15 Barracks
• 1194 Rooms
36000
Block
Ongoing VOLAR Renovations:
• $98.4M
• 39000, 87000 Blocks
• 11 Barracks/ 1 Central Energy Plant
• 818 Rooms
• Construction Timeline: Oct 10 - May 13
Ongoing: 11 VOLARS (31%)
BEFORE
AFTER
$85M
As of 2 Nov 12
11 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
GYM RENOVATIONS
Repair Bldg 9301- Burba Gym
Repair Bldg 87010 - Starker Gym
Under Construction Under Design
Repair Bldg 23001 - Abrams Gym
Projected Construction Projected Construction
Projected Construction
Design Projected Construction
12 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
$79 $104 $93
$77 $70 $60 $79
$177
$104
$26 $5
$8 $91 $69
$575
$15 $54
$51
$83$0
$17
$0 $0 $0 $0
$100
$200
$300
$400
$500
$600
$700
$800
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Programmed
Under Design
Under Construction - Stimulus & Supplemental
Under Construction
Completed
Fiscal Year
’s i n
M il li o n s
MCA PROGRAM (FY01-FY18)
As of 1 Oct 12
13 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
MCA PROJECTS UNDER CONSTRUCTION / DESIGN
May be dropped from the program.
FY PN
PA
($000) Project Description Unit
Estimated
Completion Date
2009 71089 $11,200 Child Development Center DFMWR Nov 2012
2009 74650 $14,000 Hood Stadium Replacement DFMWR 2QFY13
2009 74650 $550,000 Medical Center MEDCEN Sep 2015
2010 71515 $8,000 Family Life Center Chaplain Mar 2013
2011 57134 $2,300 Live Fire Exercise Shoothouse “Elam” DPTMS Dec 2012
2011 66532 $3,100 Convoy Live Fire “Pilot Knob” DPTMS Mar2013
2011 71462 $23,900 Battalion Complex 69 th
ADA Apr 2014
2011 72845 $38,100 UAS Hangar 21 st
CAV Apr 2014
2011 71465 $3,700 Company Operations Facility 69 th
ADA Mar 2014
2011 71639 $19,800 Company Operations Facilities 69 th
ADA Mar 2014
2012 77187 $5,400 Access Control Point DES Jan 2014
2012 77187 $7,600 THAAD Battery CoFs HQ 69 th
ADA May 2014
2012 71682 $17,200 THAAD Battery Motor Pools 69 th
ADA May 2014
2012 65374 $38,500 ORTC Barracks, Officer Qtrs, BN HQ DPTMS Nov 2014
Under Const: $742,800
2011 71639 $14,700 Motor Pool Facilities 69 th
ADA FY 2015
2012 69828 $45,000 UAS Hangar 21 st
CAV FY 2014
2012 65374 $6,700 ORTC Dining Facility DPTMS FY 2014
2012 80156 $1,800 SCIF 15
th
MI BN FY 2014
2013 71120 $25,000 Training Support Center DPTMS FY 2015
2013 67020 $4,150 Modified Record Fire Range “Pilot Knob” DPTMS FY 2014
2013 80113 $22,000 UAS CoOps and Motor Pool Facilities 21 st
CAV FY 2015
2015 68826 $46,000 Mission Training Complex III Corps FY 2017
2015 72843 $37,000 BN HQ, Readiness Modules, SSA 69 th
ADA FY 2017
Under Design: $202,350
TOTAL $962,150
14 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
Revised
Unprogrammed
Priority
Project
Number
(PN)
Project Description
Programmed
Amount (PA)
($000)
Proponent
Command
Unit/Agency
(user/tenant)
FY15 68826 Mission Training Complex (FY 15) 51000 FORSCOM III Corps/GAR
FY15 72843
BN HQ, Readiness Modules, SSA (Lost
Scope) 37000 FORSCOM 69th ADA
FY15 71923 Army Reserve Center 17000 USARC USAR
DEFERRED 66677 Battlefield Weather – Large Squadron 5700 FORSCOM Air Force
1 76495 UEPH Barracks 77000 IMCOM 69th ADA
2 71715 Automated Infantry Squad Battle
Course “Owl Creek”
5500 FORSCOM DPTMS
3 62346 ORTC, Phase 2 62000 FORSCOM 1st Army
4 70549 Battlefield Surveillance Brigade 45000 FORSCOM 504 BfSB
5 62789 Central Technical Support Facility 64000 AMC CTSF
6 73264 Clear Creek ACP & Infrastructure 25000 IMCOM GAR
7 70333 Maint Supt C2 Facility 9100 AMC 407TH AFSB
8 66593 Deployment Power Projection 10600 FORSCOM DOL
9 77510 Automated Multipurpose Machine Gun 7400 FORSCOM DPTMS
10 71777 Infantry Platoon Battle Course 7100 FORSCOM DPTMS
11 75157 SSA - 2/1 CAV 6900 FORSCOM 2/1CD
12 71937a BDE HQ 12300 FORSCOM 2/1CD
13 71937b Four Large BN HQ 18400 FORSCOM 2/1CD
14 71937c Extra Large Motor Pool 25100 FORSCOM 2/1CD
15 70490a Seven CoOps 9800 FORSCOM 2/1CD
16 70490b Seven Readiness Modules 25200 FORSCOM 2/1CD
17 76166 BDE HQ, BN HQ, & CoOps HQ (SBCT
Phase 1)
89000 FORSCOM 3 CR
18 76255 CoOps HQ & Barracks (SBCT Phase 2) 87000 FORSCOM 3 CR
19 76257 CoOps HQ & Barracks (SBCT Phase 3) 90000 FORSCOM 3 CR
20 76258 Motor Pool & Barracks (SBCT Phase 4) 79000 FORSCOM 3 CR
CG APPROVED MCA 1-N LIST
Note: CG Priorities in “BOLD”
15 Brian Dosa, brian.l.dosa.civ@mail.mil, 254-287-5500 16 November 2012
• Where do I fit in?
• How can I compete for these projects?
• What is a MATOC? JOC?
Questions
File details come from the government source that posted it. Updated .