Questions_and_Answers.pdf

PDF 186 KB Posted

Attached to
Repair Engine Shop Floor Federal contract opportunity
Solicitation number
W9124V-19-R-5004
Issued by
Department of the Army Montana Army National Guard

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Repair Engine Shop Floor, newest first.
File Type Posted
SCA_Wage_Determination.pdf PDF
SOW_Repair_Engine_Shop_Floor.pdf PDF
Combined_Drawings.pdf PDF
Combined_Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for JKSE 192404, Repair Engine Shop Floor

Schedule - Must be completed by 15 November 2019, or can’t start until February 2020.

- Include schedule in proposal

Do cracks and joints need to be filled to create an even surface?

- Yes

What is the amount of grit that should be used?

- Around 46 grit

What color?

- White

Does the rubber base need to be removed and replaced?

- Yes, remove and install new 4” base cave. Currently, there is 230LF of 4 inch rubber base cove, brown in color, with 8 preformed outside corners.

Wage Determination?

- Wage Determination No.: 2015-5391, Revision No.: 8, Date Of Last Revision: 07/26/2019

File details come from the government source that posted it.