Questions_and_Answers.pdf
PDF 186 KB Posted
- Attached to
- Repair Engine Shop Floor Federal contract opportunity
- Solicitation number
- W9124V-19-R-5004
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SCA_Wage_Determination.pdf | ||
| SOW_Repair_Engine_Shop_Floor.pdf | ||
| Combined_Drawings.pdf | ||
| Combined_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for JKSE 192404, Repair Engine Shop Floor
Schedule - Must be completed by 15 November 2019, or can’t start until February 2020.
- Include schedule in proposal
Do cracks and joints need to be filled to create an even surface?
- Yes
What is the amount of grit that should be used?
- Around 46 grit
What color?
- White
Does the rubber base need to be removed and replaced?
- Yes, remove and install new 4” base cave. Currently, there is 230LF of 4 inch rubber base cove, brown in color, with 8 preformed outside corners.
Wage Determination?
- Wage Determination No.: 2015-5391, Revision No.: 8, Date Of Last Revision: 07/26/2019