Combined_Drawings.pdf
PDF 782 KB Posted
- Attached to
- Repair Engine Shop Floor Federal contract opportunity
- Solicitation number
- W9124V-19-R-5004
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.pdf | ||
| SCA_Wage_Determination.pdf | ||
| SOW_Repair_Engine_Shop_Floor.pdf | ||
| Combined_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scale
Project number
Date
Drawn by
Checked by
M O
N
TA
N A
AI
R
N
AT
IO
N
AL
G
U
AR
D
A
IR
PO
R T
AV
E
B G
R
EA
T
FA
LL
S
M T, MONTANA AIR
NATIONAL GUARD
120 AW CES
Sheet
MONTANA AIR NATIONAL GUARD
GREAT FALLS, MONTANA
GENERAL NOTES:
1. GENERAL CONTRACTOR SHALL VERIFY
DIMENSIONS AND CONDITIONS OF THE EXISTING
BUILDING.
2. THE TERM "CONTRACTOR" REFERS TO THE
GENERAL CONTRACTOR UNLESS OTHERWISE
NOTED.
3. ALL FINAL RESPONSIBILITY FOR ON-SITE
COORDINATION IS WITH THE GENERAL
CONTRACTOR
4. ALL SHOP DRAWING DIMENSIONS TO BE CHECKED
AND VERIFIED IN THE FIELD BY THE CONTRACTOR
WHO WILL BE RESPONSIBLE FOR SAME.
5. GENERAL CONTRACTOR IS RESPONSIBLE FOR
PATCHING OF ALL HOLES OR DAMAGE TO
ENCOUNTERED IN WORK DONE BY HIMSELF OR
ANY OTHER TRADE OR CONTRACTOR
6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR THE COMPLETE REPAIR AND REFINISHING OF
ALL WORK TO MATCH EXISTING CONDITIONS AS A
RESULT OF NECESSARY CUTTING, PATCHING, OR
DEMOLITION BY ALL TRADES WHILE PERFORMING
WORK.
7. GENERAL CONTRACTOR TO PROVIDE ALL
REQUIRED BLOCKING, ANCHORAGE FOR
ACCESSORIES, MILL WORK, TRIM, GRAB BARS,
MECHANICAL AND ELECTRICAL ITEMS.
8. CONSTRUCTION LIMIT LINE IS APPROXIMATE,
ACCESS TO OTHER AREAS AS REQUIRED BY
WORK IS ACCEPTABLE BY APPROVAL OF OWNERS
REPRESENTATIVE.
9. ALL WORK TO BE PERFORMED IN ACCORDANCE
WITH LOCAL BUILDING CODES.
10. WHERE CONDITIONS OF FINISH ARISE THAT NO
DETAIL OR NOTE COVERS MATCH DETAIL TO
EXISTING SITUATION OF SIMILAR CONDITION.
11. ANY DAMAGE TO EXISTING BY THE CONTRACTOR
OR PEOPLE UNDER DIRECT SUPERVISION OF
SHALL BE REPLACED OR REPAIRED AT NO
EXPENSE TO OWNER.
12. CONTRACTOR WILL SEED ANY AREAS OF SOIL
DISTURBED DURING CONSTRUCTION
13. CONTRACTOR SHALL USE CHAIRS FOR ALL REBAR
IN CONCRETE FLAT WORK
1/
/2
2:
:5
PM
TITLE PAGE
PROJECT: JKSE 192404
JANUARY 15, 2019
Author Checker
PR
O
JE
C
T:
J
KS
E
R
EP
AI
R
E N
G
IN
E
SH
O P
FL
O
O R
T-100
REPAIR ENGINE SHOP FLOOR
PROJECT: JKSE 192404
JANUARY 15, 2019
No. Description Date 1 Revision 1 Date 1
Sheet List
Sheet Name
Sheet Number Count
FLOOR
PLAN
A101 1
TITLE
PAGE
T-100 1
WORK LOCATION
5 5
6 6
7 7
8 8
5535 SF
ENGINE SHOP
AREA TO RECIEVE EPOXY FLOOR COATING
69' - 4"
0"
324 SF
WASH BAY
WORK NOTES
1. FLOOR DRAINS, PROTECT FROM DAMAGE.
2. ELECTRICAL CONDUIT COLUMNS, PROTECT FROM DAMAGE.
3. OIL WATER SEPORATOR LID, CLEAN AND REPAINT.
4. HOTSY EQUIPMENT, PROTECT FROM DAMAGE.
5. PROTECT ADJACENT AREAS FROM DUST AND FUME
EXPOSURE.
6. CONTRACTOR SHALL PROVIDE 100 SQ FT SAMPLE AREA FOR
SLIP RESISTANCE VERIFICATION PRIOR TO FINISH
APPLICATION ON REMAINING AREA. SAMPLE AREA TO BE
LOCATED IN WASH BAY.
GENERAL NOTES
1. WORK SHALL BEGIN OCTOBER 7, 2019
2. CONTRACTOR SHALL NOTIFY USER 15 WORKING DAYS PRIOR
TO COMENCMENT OF WORK
Scale
Project number
Date
Drawn by
Checked by
M O
N
TA
N A
AI
R
N
AT
IO
N
AL
G
U
AR
D
A
IR
PO
R T
AV
E
B G
R
EA
T
FA
LL
S
M T, MONTANA AIR
NATIONAL GUARD
120 AW CES
Sheet
1/8" = 1'-0"
1/
/2
2:
:4
PM
FLOOR PLAN
PROJECT: JKSE 192404
JANUARY 15, 2019
Author
CAPT JEWETT
PR
O
JE
C
T:
J
KS
E
R
EP
AI
R
E N
G
IN
E
SH
O P
FL
O
O R
A101
No. Description Date
1/8" = 1'-0"1 ENGINE SHOP FLOOR REPAIR
| REPAIR ENGINE SHOP FLOOR - Sheet - T-100 - TITLE PAGE |
| Sheets |
| A101 - FLOOR PLAN |
| T-100 - TITLE PAGE |
| REPAIR ENGINE SHOP FLOOR - Sheet - A101 - FLOOR PLAN |
| Sheets |
| A101 - FLOOR PLAN |
| T-100 - TITLE PAGE |
File details come from the government source that posted it.