W9124M-16-B-0015-0003_(Amendment).pdf

PDF 23 KB Posted

Attached to
Renovate VOLAR Barracks Federal contract opportunity
Solicitation number
W9124M-16-B-0015
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Stewart

About this file

W9124M-16-B-0015-0001 Solicitation Amendment

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010865181 RCF-32-9J

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Provide Government responses to industry questions follow ing the second site visit.

2. Clarify the description of line item 0004, Contract Manpow er Reporting.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124M-16-B-0015

X 9B. DATED (SEE ITEM 11)

16-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Sep-2016

CODE

MISSION & INSTALLATION CONTRACTING CMND

MICC-FORT STEWART

976 WILLIAM H WILSON AVE SUITE 100

FORT STEWART GA 31314-3425

W9124M 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9124M-16-B-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

QUESTIONS AND ANSWERS 2

1. Reference: Design Drawing Sheet S-1, Hollowcore Plank Penetration Notes.

Question: During the follow-up site visit within the units, the Hollowcore Planks were not visible. Within the solicitation documents it does not appear any information is provided regarding the currently installed direction of the hollowcore plank layout. How the planks are installed currently (the direction of the plank layout) will impact the direction of the prestressing strands. The length of the hollowcore planks and the design capacities will additionally affect the number and size of the strands.

Per the drawing note: The General Contractor is required “not to decrease the structural capacity of the section of the hollowcore planks and to have an engineer design and sign and seal any additional structural capacity or supports”.

Since this is a potentially large risk for any bidding contractor we would like to request the Government provide the hollowcore plank layout in an effort to ascertain if this engineering will be required?

Additionally all bidding contractors will need to know the current designed capacity. Can this be provided?

Answer: Direction of the hollowcore plank layout was visible within the Typical Living Unit. Direction of plank is indicated by “Typical Section thru Chase Opening” on Drawing AD-2 and A-7.

Existing hollowcore plank shop drawings are not available. Contractor will be required to perform site investigation after award to determine number and size of strands. Contractor shall include structural design analysis per Drawing S-1. The Contractor should price the site investigation and structural design analysis accordingly in their bid.

Construction Documents for the original structure indicating design loads will be available to successful bidding Contractor.

2. Reference: Description of Work, Paragraph 4.4.3.1 Asbestos Containing Materials (ACM)

Question: This Solicitation requires the contractor to perform asbestos abatement. No asbestos report was provided with the Solicitation. Can the Asbestos Report for the building be provided?

Answer: TPG, Paragraph 4.4.3.1 addresses actions to be taken if Asbestos Containing Materials (ACM) were to be encountered.

We do not expect to encounter ACM as building has been completely renovated. See Question 11, from first set of questions.

(End of Questions and Answers 2)

SECTION B - SUPPLIES OR SERVICES AND PRICES

W9124M-16-B-0015

CLIN 0004

The CLIN description has changed from Contract Manpower Reporting to Contractor Manpower Reporting.

The CLIN extended description has changed from:

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:

https://www.cmra.army.mil.

To:

In accorcandce with Section H of this contract, the Contractor shall report ALL contractor labor data (including subcontractor labor data) required for performance of services provided under this contract for the Department of the Army via a secure data collection site. The data must be accurate, complete, and entered at the following web address: https://www.cmra.army.mil/.NOTE: This line item is only used for pricing the Contract Manpower Reporting Requirement. If the Contractor Manpower Reporting is not separately priced, insert "NSP" in the Unit Price space..

(End of Summary of Changes)

File details come from the government source that posted it. Updated .