Amendment_No._2.pdf

PDF 16 KB Posted

Attached to
Tree Trimming
Solicitation number
W91248-17-Q-0050
Issued by

View the file

Other files

File Type Posted
W91248-17-Q-0050_Amendment_No.pdf PDF
Amendment_1.pdf PDF
Att_001_Wage_Determination_1AUG17.pdf PDF
W91248-17-Q-0050.pdf PDF
Att_002__Pricing_Schedule_for_Tree_Maintenance.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Type: Modification to a Previous Synopsis/Solicitation

Solicitation Number: W91248-17-Q-0050

Original Posted Date: 11 September 2017

Current Response Date: 25 September 2017, 6:00 P.M. CST

Classification Code: S208 Landscaping/Grounds Keeping Services

Set Aside: 100% Set-Aside Woman Owned Small Business Concern

Contracting Office Address:

Mission and Installation Contracting Command - Fort Campbell, ATTN: CCMI-CBR-CM, Bldg 6923, 38th Street & Desert Storm, Fort Campbell, KY 42223-5355

NOTE: It is important to read the entire solicitation and all modifications prior to completing and submitting the offer package for this requirement.

Modification 02 : This is a modification to subject solicitation posted on FedBizOpps on 11September 2017.

The following questions are being answered. This modification has been issued to answer questions pertaining to the current solicitation.

PLEASE READ THE ENTIRE SOLICITATION AND ATTACHMENTS BEFORE

SUBMITTING QUESTIONS. Submit Questions to: shirley.a.banks4.civ@mail.mil.

Question #1: Re: Para 1.6.4.1. The Solicitation states that the Quality Control (QC) Plan is to be submitted with the offeror’s packet (part of the technical evaluation); it also states that the contractor shall submit a QCP within 30 days after the contract commencement. Which is correct?

Answer #1: Both. An “intermediate” QC Plan shall be provided as part of the offeror’s packet for technical evaluation. Additionally, a “final” QC Plan shall be submitted within 30-days after commencement of the contract in accordance with the Statement of Work.

The QCP shall be submitted with the offerors packet as follows:

Volume 1 – Technical Factors.

Sub-Factor 2 –Quality Control Plan. The offeror shall submit an “Intermediate” Quality Control Plan.

mailto:shirley.a.banks4.civ@mail.mil

File details come from the government source that posted it. Updated .