Amendment_No._2.pdf
PDF 16 KB Posted
- Attached to
- Tree Trimming
- Solicitation number
- W91248-17-Q-0050
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91248-17-Q-0050_Amendment_No.pdf | ||
| Amendment_1.pdf | ||
| Att_001_Wage_Determination_1AUG17.pdf | ||
| W91248-17-Q-0050.pdf | ||
| Att_002__Pricing_Schedule_for_Tree_Maintenance.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Type: Modification to a Previous Synopsis/Solicitation
Solicitation Number: W91248-17-Q-0050
Original Posted Date: 11 September 2017
Current Response Date: 25 September 2017, 6:00 P.M. CST
Classification Code: S208 Landscaping/Grounds Keeping Services
Set Aside: 100% Set-Aside Woman Owned Small Business Concern
Contracting Office Address:
Mission and Installation Contracting Command - Fort Campbell, ATTN: CCMI-CBR-CM, Bldg 6923, 38th Street & Desert Storm, Fort Campbell, KY 42223-5355
NOTE: It is important to read the entire solicitation and all modifications prior to completing and submitting the offer package for this requirement.
Modification 02 : This is a modification to subject solicitation posted on FedBizOpps on 11September 2017.
The following questions are being answered. This modification has been issued to answer questions pertaining to the current solicitation.
PLEASE READ THE ENTIRE SOLICITATION AND ATTACHMENTS BEFORE
SUBMITTING QUESTIONS. Submit Questions to: shirley.a.banks4.civ@mail.mil.
Question #1: Re: Para 1.6.4.1. The Solicitation states that the Quality Control (QC) Plan is to be submitted with the offeror’s packet (part of the technical evaluation); it also states that the contractor shall submit a QCP within 30 days after the contract commencement. Which is correct?
Answer #1: Both. An “intermediate” QC Plan shall be provided as part of the offeror’s packet for technical evaluation. Additionally, a “final” QC Plan shall be submitted within 30-days after commencement of the contract in accordance with the Statement of Work.
The QCP shall be submitted with the offerors packet as follows:
Volume 1 – Technical Factors.
Sub-Factor 2 –Quality Control Plan. The offeror shall submit an “Intermediate” Quality Control Plan.
mailto:shirley.a.banks4.civ@mail.mil
File details come from the government source that posted it. Updated .