W91247-16-R-0012_Amendment_0001 _08Aug16.pdf

PDF 88 KB Posted

Attached to
SATMO Taiwan NASC UH-60M Pilot Training
Solicitation number
W91247-16-R-0012
Issued by

About this file

W91247-16-R-0012 Amendment 0001 is issued to answer industry questions and update the PWS.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise Section C, Performance Work Statement, and add Section J responses to questions received from industry as show n in the summary of changes.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 25

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91247-16-R-0012

X 9B. DATED (SEE ITEM 11)

26-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2016

CODE

MICC CENTER - FORT BRAGG

MICC - FORT BRAGG

2175 REILLY ROAD STOP A

FORT BRAGG NC 28310-5000

W91247 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91247-16-R-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Taiwan NASC CONUS Flight Training

USASATMO

Part 1

General Information

1.0. General. This is a non-personal services contract to provide training to the Taiwan National Airborne Service Corps (NASC) to achieve the training objectives specified by the NASC for CONUS UH-60M Training Program.

1.1. Description of Services. The Contractor shall provide all necessary labor, materials, facilities, aircraft maintenance, and travel to accomplish the requirements of this Performance Work Statement (PWS) for the U.S. Army Security Assistance Training Management Office (USASATMO) managed 2nd Year of their NASC Continental U.S. (CONUS) UH-60M Training Program.

1.1.1. Key Required Elements of Performance. The Contractor shall be required to meet the following requirements:

1.1.1.1. Aviation Facilities and Services. The Contractor shall provide NASC students access to all aviation facilities and services required to conduct the NASC training. These include classrooms, flight planning areas, weather forecast facilities/services, hangars, parking ramps, runways, flight training areas, flight simulators, air traffic control communications, fueling services, crash rescue, etc.

1.1.1.2. Pilot Training. The Contractor shall provide UH-60M qualification courses for NASC pilots. No NASC maintainers shall be trained under this contract.

1.1.1.3. Course Training Materials. The Contractor shall provide all training materials required to conduct the NASC training including student handouts and classroom presentations.

1.1.1.4. Flight Training Simulator. The Contractor shall provide a UH-60M or S-70i Flight Simulator Training Device capable of supporting the NASC training program. NASC requires the UH-60M or S-70i Flight Simulator Training Device be equivalent to an FAA Level C or D

Full Flight Simulator; a UH-60M or S-70i Flight Training Device does not meet this requirement. No less than 60% of flight training must be accomplished in the simulator.

1.1.1.5. Flight Training. The Contractor shall provide Flight Instructors and other personnel required to support flight training using three (3) UH-60M aircraft by NASC provided as Government Furnished Equipment (GFE).

1.1.1.6. Aircraft Maintenance. The Contractor shall perform scheduled and unscheduled maintenance on three (3) UH-60M aircraft provided by NASC. The Contractor shall provide the maintenance personnel, tools, test sets, and consumables required to support this maintenance, as detailed in this PWS.

1.1.1.7. Meet NASC Training Timelines. The Contractor must be capable of starting NASC UH- 60M training on 01 OCT 16.

1.2. Background. NASC operates under the Taiwan Ministry of Interior to perform aerial search and rescue, disaster relief, emergency medical service, reconnaissance and patrol, firefighting, monitoring, and transportation missions in Taiwan over both land and sea. NASC has purchased fifteen (15) UH-60M helicopters, through Foreign Military Sales. This training will enable NASC to train pilots in the UH-60M to support the fielding of their new aircraft. The S-70i helicopter is the civilian version of the UH-60M.

1.2.1 NASC Students. NASC personnel are, in general, highly experienced in rotary wing aviation. All NASC Pilots have been previously qualified as helicopter pilots and will generally have greater than 3,000 flight hours of experience. All NASC flight students will have at least International Civil Aviation Organization (ICAO) Level 4 (or equivalent) English-language capability.

1.3. Mission Execution: The Contractor shall provide academic, hands-on, simulated flight and flight training at their CONUS training facility to meet NASC training requirements. Training shall consist of a series of formal pilot courses of instruction conducted by the Contractor. Pilot training shall be conducted using a Contractor-provided UH-60M Simulator (or S-70i Flight Simulator) and NASC-provided UH-60M aircraft. The Contractor shall provide daily routine scheduled maintenance and occasional unscheduled UH-60M maintenance as required to support the training program.

1.3.1. Objectives. The U.S. Government (USG) and Contractor’s objective is to train NASC aviation personnel to proficiency in UH-60M flight procedures to allow NASC to safely and effectively operate their aircraft in Taiwan. Training must be completed to aviation Federal Aviation Administration (FAA) standards and on schedule to meet NASC’s requirements.

1.4. Scope of Work. Services/courses to be performed are as follows:

1.4.1. UH-60M Pilot Training. All NASC pilots shall complete the following five (5) pilot training courses. All Pilot training shall be primarily conducted in English; the Contractor may utilize Mandarin Translators to facilitate more effective classroom, simulator, and flight training.

1.4.1.1. UH-60M Initial Course - Planned as a four (4) week course to train pilots in the tasks and skills necessary for basic UH-60M flight. Course includes academics and simulator training.

1.4.1.2. UH-60M Transition Course - Planned as a two (2) week course to train pilots in the tasks and skills necessary for basic UH-60M flight. Course includes academics and aircraft flight training.

1.4.1.3. UH-60M Instrument Course - Planned as a one (1) week course to provide pilots greater training in the tasks and skills necessary for UH-60M flight under instrument meteorological conditions. Course includes academics and simulator training.

1.4.1.4. UH-60M Emergency Procedures Course - Planned as a one (1) week course to provide pilots greater training in UH-60M simulated emergency tasks and procedures. Course includes academics and simulator training.

1.4.1.5. UH-60M Advanced Maneuvers Course - Planned as a one (1) week course to provide pilots training in UH-60M mission tasks and procedures relevant to the NASC mission. These tasks may include confined area landing, low level flight, search and rescue (SAR), rescue hoist, offshore SAR procedures, etc. The course includes academics and aircraft flight training. This course includes academics and aircraft flight training.

1.4.2. UH-60M Advanced Pilot Qualification Training. NASC-selected pilots shall complete the following two (2) courses in addition to the basic pilot training.

1.4.2.1. UH-60M Instructor Pilot Course - Planned as a two (2) week course to train pilots to perform duties as a UH-60M Instructor Pilot. Course includes academics, simulator and aircraft flight training.

1.4.2.2. UH-60M Maintenance Check Pilot Course - Planned as a three (3) week course to train pilots to perform duties as an UH-60M Maintenance Check Pilot. Course includes academics, simulator and aircraft flight training.

1.4.3. No Maintainer training shall be conducted under this contract.

1.4.4. Student Support Services. Student support services shall include billeting, meals, local transportation, air transportation, and administrative support for NASC students attending training. Travel reimbursements shall not exceed the Joint Federal Travel Regulation (JFTR).

The Contractor shall provide students with billeting at a local hotel. The billeting shall be based on single-occupancy at a hotel rated three-stars or higher on the TripAdvisor website. The Contractor shall provide internet or WI-FI service in the hotel and training location.

Transportation shall consist of a vehicle with driver to transport students between their billeting and the Contractor’s training facility on training days. Transportation shall also include reasonable accommodation for shopping and meals for two hours after completion of daily training. Administrative support shall include maintaining student training records. Meals shall consist of daily breakfast, lunch, and dinner for seven days per week.

1.4.5. Interpretation/Translation Services. The Contractor shall provide no less than two (2) English-to-Mandarin Interpreters to support the training of the NASC students. Interpreters may be employed to facilitate classroom, simulator, and flight training. Interpreters may also assist NASC personnel with the translation of written documents. Interpreters are not required to be US citizens but must be authorized to work in the U.S.

1.4.6. NASC Provided UH-60M Aircraft. Due to Air Worthiness Release (AWR) certification requirements in Army Regulation (AR) 70-62, civilian S-70i aircraft cannot be used for the contracted flight training. NASC will provide three (3) NASC UH-60M aircraft to the Contractor to be used to conduct flight training in support of the NASC training program.

1.4.6.1. Maintenance, Tools, Test Equipment, and Repair Parts. The Contractor shall provide maintenance support for all scheduled maintenance as listed on the DA form 2408-18 and other U.S. Army maintenance publications throughout the duration of NASC training. Upon completion of training, the contractor will review the DA Form 2408 to ensure no inspections will be due upon the aircraft's arrival in Taiwan (or release to USG) except for the 10hour/14 day and the 40 hour inspections. All batteries should be serviced /replaced so as not to be required to be replaced for a minimum of 90 days after arrival in Taiwan (or release to USG).

1.4.6.1.1. Scheduled Maintenance. Scheduled maintenance consists of the periodic, recurring inspections, services, repairs, and component replacement that are detailed in U.S. Army UH- 60M maintenance publications. These maintenance requirements become due based on a normal aircraft event (pre-flight, post-flight), aircraft flight hours (40 hours, 120 hours, etc.), or a published time schedule (daily, 14 day, etc.). These scheduled maintenance requirements can be accurately forecasted by the Contractor based on the planned number of flights, flight hours, and duration of training. The Contractor shall provide all common tools, special tools, test sets, common bench stock, repair parts, and consumables required for scheduled maintenance.

1.4.6.1.2. Unscheduled Maintenance. Unscheduled maintenance consists of unforecasted inspections, services, repairs, and component replacements that are required due to an unscheduled event such as a component failure or aircraft incident (i.e., hard landing, engine over speed, etc.). Corrective unscheduled maintenance procedures shall be conducted as detailed in U.S. Army UH-60M maintenance publications. The Contractor shall provide maintenance support for any unscheduled maintenance that may arise while the NASC UH-60M are under the control of the Contractor on a cost reimbursable basis. The costs for labor, common bench stock, consumables, and shipping required for unscheduled maintenance shall be reimbursed by the Government. Repair parts for unscheduled maintenance shall be provided by either the Original Equipment Manufacturer (OEM) for parts under warranty or by the Government for NASC unique items not under OEM warranty. The Contractor shall provide Unscheduled Maintenance Labor Categories with anticipated Labor Rates with their proposal. The COR may approve unscheduled maintenance up to $3,000; the KO must approve all unscheduled maintenance over $3,000.

1.4.6.1.3. Repair parts for unscheduled maintenance shall be provided by either the OEM for parts under warranty, NASC spares supply stock, controlled exchange, or procured from US

Army stocks and billed against the appropriate CLIN with preapproval by the COR/KO. Any parts, materials, etc. (excluding labor) not provided for unscheduled maintenance shall be requested IAW PWS 1.6.13 and billed against the appropriate CLIN.

1.4.6.1.4. Repair Parts Request Process. When an unscheduled maintenance event occurs, the Contractor will first identify the faulty component to the USG, through the COR, to determine the appropriate source of supply for the required repair part; sources of supply may include new procurement by USG, delivered NASC stores in Taiwan, the OEM for parts under warranty, and procurement by the Contractor, when appropriate. The COR will coordinate with the Security Assistance Management Directorate (SAMD) to determine if the required part is available from NASC/Taiwan Army stocks or from US Army stocks. When the repair part is not readily available from NASC/Taiwan Army stocks, the COR will coordinate to procure the repair stock through the US Army supply system; NASC will be informed of the required procurement and the procurement will be paid for from TW-B-YZC case funds. For items under OEM warranty, the USG will coordinate with the OEM to determine the expected timeline for repairing or replacing the warrantied item.

1.4.6.1.5. Controlled Exchange may be authorized to transfer critical parts from one aircraft to another. Controlled exchange is used when delays in receiving repairs parts by other means would have a detrimental impact on the training schedule or other contract requirements. Items removed from an aircraft for controlled exchange shall immediately be ordered for replacement through the appropriate repair parts request method. All controlled exchange parts will be tracked by the Contractor in the aircraft logbooks of both the losing and gaining aircraft. All requests for controlled exchange must be approved by the COR.

1.4.7. Maintenance Standards. The Contractor shall perform all scheduled and unscheduled UH- 60M maintenance IAW the US Army UH-60M Integrated Electronic Technical Manual (IETM), the Taiwan Unique UH-60M IETM (for Taiwan unique items only) and the NASC or Taiwan Army Operational Air Worthiness Release (AWR).

1.4.8. Simulators and Training Devices. While only UH-60M aircraft shall be used to conduct flight training, simulated flight training shall be conducted in a UH-60M or S-70i Full Flight Simulator meeting FAA Level C or D criteria. Other Aviation Training Devices may be used to train cockpit procedures, aircraft systems, or similar non-flight training. To reduce training costs, the Contractor shall utilize a combination of training with actual UH-60M aircraft and an appropriate flight simulator. The flight simulator should be used for no less than 60% of pilot training flight hours.

1.5. Period of Performance (PoP): The PoP shall be twelve (12) months from 01 Oct 2016 to and including 30 Sep 2017.

1.5.1. Course Schedules. Figure 1 provides a general representation of the planned training schedule. A more detailed training schedule is provided in Technical Exhibit C, for planning purposes. Training schedules will be finalized by the Contractor and COR after contract award but no later than 14 days prior to the start of training.

1.5.1.1. Pilot Training. 16 NASC Pilots shall be trained. These 16 pilots are divided into four

(4) training groups of four pilots each. The following information is provided to support planning:

1.5.1.1.1 Group 1 (AQC/IP/MP). Four (4) NASC Pilots will complete the Aircraft Initial Course, UH-60M Aircraft Transition Course, UH-60M Instrument Procedures Course, UH-60M Emergency Procedures Course, and the UH-60M Advanced Maneuvers Course. Additionally, this group will complete the UH-60M Instructor Pilot Course and UH-60M Maintenance Check Pilot Course. Planned Group 1 arrival and departure dates are 6 OCT 16 through 19 FEB 17.

1.5.1.1.2 Group 2 (AQC Only). Four (4) NASC Pilots will complete the Aircraft Initial Course, UH-60M Aircraft Transition Course, UH-60M Instrument Procedures Course, UH-60M Emergency Procedures Course, and the UH-60M Advanced Maneuvers Course. Planned Group 2 arrival and departure dates are 30 DEC 16 through 28 MAR 17. NASC requires that the Group 2 students depart Taiwan prior to the end of CY 2016. The Contractor shall provide student support services from their arrival through their departure including times scheduled for independent self-study.

1.5.1.1.3 Group 3 (AQC Only). Four (4) NASC Pilots will complete the Aircraft Initial Course, UH-60M Aircraft Transition Course, UH-60M Instrument Procedures Course, UH-60M Emergency Procedures Course, and the UH-60M Advanced Maneuvers Course. Planned Group 3 arrival and departure dates are 16 MAR 17 through 23 MAY 17.

1.5.1.1.4 Group 4 (AQC/IP/MP). Four (4) NASC Pilots will complete the Aircraft Initial Course, UH-60M Aircraft Transition Course, UH-60M Instrument Procedures Course, UH-60M Emergency Procedures Course, and the UH-60M Advanced Maneuvers Course. Additionally, this group will complete the UH-60M Instructor Pilot Course and UH-60M Maintenance Check Pilot Course. Planned Group 1 arrival and departure dates are 14 MAY 17 through 15 SEP 17.

Figure 1 Pilot Training

GRP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP

1.6. General Information.

1.6.1. Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements).

1.6.1.1 Quality Control Program: The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the government recipient of services. This relationship shall be achieved through an effective Prevention Based

Quality Control Program dedicated to ensuring the best possible products and services to end users.

1.6.1.1.1 The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection;

discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies;

procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints.

1.6.1.1.2. Upon request from the COR, the Contractor shall provide, all reports generated as a result of the Contractor’s quality control efforts. This shall include any summary information used to track quality control, including any charts/graphs.

1.6.1.1.3. The Contractor’s QCP shall be incorporated into and become part of this contract after the plan has been accepted by the KO. Proposed changes made after KO acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision. The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract. The Contractor shall provide their final written Quality Control Plan (QCP) no later than (NLT) 14 days after contract award, and within five (5) days of any proposed changes to the COR and KO.

1.6.1.2. Contractor Discrepancy Report (CDR). When the Contractor's performance is unsatisfactory, a CDR will be issued by the KO. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.6.2. Quality Assurance: The COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). When an observation indicates defective performance, the COR will require the Contractor or designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance.

1.6.3. Recognized Holidays. Normal performance is not required on the non-training/Holidays identified below however the Contractor shall continue to provide Student Support Services on these holidays on an as needed basis.

Non-training days/ Holidays for this contract are:

Labor Day Thanksgiving Day Friday, November 25 Christmas/New Year’s Break (Monday, December 26 through Friday, December 30) Friday, March 24 Memorial Day Independence Day

The following Federal Holidays will be normal duty/training days:

Birthday of Martin Luther King, Jr.

Washington’s Birthday Columbus Day Veterans Day

1.6.4. Hours of Operation: Contractors will normally work 40 hours per week, Monday through Friday, when training courses are being conducted. Daily schedules shall be determined by the course syllabus and training schedule. The Contractor must at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential. Overtime shall be requested at least 48 hours in advance and can only be approved by the KO, if required.

1.6.5. Place of Performance: Performance shall take place at the Contractor’s training facilities and local flight training areas.

1.6.6. Security Requirements: No security clearance is required.

1.6.6.1. Physical Security: The contractor shall be responsible for safeguarding any USG property provided for contractor use.

1.6.7. Special Qualifications:

1.6.7.1. Contractor Interpreters shall be bilingual in English and Mandarin Chinese and capable of performing effective oral interpretation and written translation in an academic environment.

1.6.8. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO, COR, and other USG personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the contractor of how the USG views the contractor's performance and the contractor shall apprise the USG of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the USG.

1.6.9. Contracting Officer Representative. The COR shall be appointed in a separate letter.

The COR monitors all technical aspects of the contract and assists in contract administration.

The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including USG drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of USG and Taiwan furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract nor bind the Government.

1.6.10. Key Personnel Requirements: Key personnel are critical to achieving mission objectives. The contractor shall assign experienced key personnel, qualified in the conduct of similar operations that have adequate education, background, and experience to perform tasks required in this PWS. The following are considered key personnel by the Government:

1.6.10.1. Program Manager (PM) serves as the primary point of contract between the Company and the KO/COR. The PM ensures Contractor compliance with PWS requirements.

1.6.10.2. Site Lead serves as the primary point of contract (POC) between at the Contractor’s training facility. The Site Lead ensures training and maintenance is conducted in compliance with PWS requirements.

1.6.10.3. Flight Instructors train NASC Pilots on the skills required to safely and effectively perform pilot duties in the UH-60M under a variety of conditions. Additionally, teach UH-60M Instructor Pilot and Maintenance Check Pilot skills to NASC personnel.

1.6.10.4. Interpreters participate in training sessions to enhance communication with NASC personnel and increase their understanding of subject material. Interpreters may also prepare written translations of instructional and educational materials, correspondence and forms from English to Mandarin Chinese and from Mandarin Chinese to English.

1.6.11. Identification of Contractor Employees: All contractor personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are USG officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.12. Other Direct Costs (ODC): ODCs include, common bench stock, consumables, and shipping shall be reimbursed by the Government for unscheduled maintenance. Shipping and installation costs for this equipment shall be funded as ODC. The Contractor shall submit requests for ODCs and separate the cost by common bench stock, consumables and shipping to the COR via email at least two (2) work days prior to need date to coordinate pre-approval by the

KO prior to expenditure of funds. Invoice submitted through Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) must clearly identify the specifics of the costs (e.g., who, what, where, when) to the appropriate CLIN.

1.7. Medical Requirements: Contractor personnel shall have required FAA medical certifications. NASC students will provide their own travelers/visitors insurance to cover emergency medical care (accident or sickness), emergency evacuation, or repatriation of remains.

1.8. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

Part 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government.

Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.6. INTERNATIONAL CIVIL AVIATION ORGANIZATION (ICAO) LEVEL 4

ENGLISH. This is the language required to deal effectively with all the non-standard, abnormal or emergency situations which pilots and controllers encounter and for which standardized phraseology is insufficient. English language capabilities will meet the standards listed in Figure 2.

Figure 2. ICAO English Language Standards

Level Vocabulary Structure

Relevant grammatical structures and sentence

Pronunciation

Assumes a dialect and/or accent intelligible to

Fluency Comprehension Interactions patterns are determined by language function appropriate to the task.

the aeronautical community.

Operational 4 Vocabulary range and accuracy are usually sufficient to communicat e effectively on common, concrete, and work related topics. Can often paraphrase successfully when lacking vocabulary in unusual or unexpected circumstanc es.

Basic grammatical structures and sentence patterns are used creatively and are usually well controlled.

Errors may occur, particularly in unusual or unexpected circumstanc es, but rarely interfere with meaning.

Pronunciation, stress, rhythm, and intonation are influenced by the first language or reginal variation but only sometimes interfere with ease of understanding.

Produces stretches of language at an appropriate temp. There may be occasional loss of fluency on transition from rehearsed or formulaic speech to spontaneous interaction, but this does not prevent effective communicat ion. Can make limited use of discourse markers or connectors.

Fillers are not distracting.

Comprehension is mostly accurate on common, concrete and work related topics when the accent or variety used is sufficiently intelligible for an international community of users. When the speaker is confronted with a linguistic or situational complication or an unexpected turn of events, comprehension may be slower or required clarification strategies.

Responses are usually immediate, appropriate, and informative.

Initiates and maintains exchanges even when dealing with an unexpected turn of events. Deal adequately with apparent misunderstandin gs by checking, confirming, or clarifying.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13. WORK WEEK. The work week is defined as Monday through Friday, unless specified otherwise.

2.1.14. FLIGHT TRAINING. Flight training is defined as any instruction that is conducted where the student is occupying a pilot, copilot, or crew chief/observer station in an aircraft or simulated aircraft and receive training/demonstration or practice flight crew duties. The simulator requirement applies to the UH-60M Pilot Initial Course, Instrument Procedures Course, Emergency Procedures Course, Instructor Pilot (Ground school and simulator) Familiarization Course, and Maintenance Test (Ground School and simulator) Pilot Familiarization Course. Courses that include flight training but are excluded from the simulator requirement are the UH-60M Mission Equipment Familiarization Course and UH-60M Pilot Transition Course, UH-60M Instructor Pilot Familiarization (flight) Course, and the UH-60M Maintenance Test Pilot Familiarization (flight) Course.

2.2. ACRONYMS.

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AFCS Automated Flight Control System AIT American Institute in Taiwan AQC Aircraft Qualification Course AR Army Regulation AWR Air Worthiness Release CCE Contracting Center of Excellence CFR Code of Federal Regulations CFS Contract Field Services CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAA Federal Aviation Agency FAR Federal Acquisition Regulation FMS Foreign Military Sales GFR Government Flight Representative HIPAA Health Insurance Portability and Accountability Act of 1996

ICAO International Civil Aviation Organization IVHMS Integrated Vehicle Health Management System JFTR Joint Federal Travel Regulation KO Contracting Officer NASC National Airborne Service Corps OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OEM Original Equipment Manufacturer POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program S-70i Civilian Blackhawk helicopter TA Taiwan Army TAFT Technical Assistance Field Team TE Technical Exhibit TECRO Taipei Economic and Cultural Offices TW Taiwan UH-60M Military Blackhawk helicopter USAACE United States Army Aviation Center of Excellence (Fort Rucker/Eustis) USASATMO U.S. Army Security Assistance Training Management Organization USG United States Government

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3.1. Government Furnished Items Property: None

3.2. Government Furnished Items Equipment:

3.2.1 Student Flight Equipment. NASC will provide students flight helmets and protective equipment.

3.2.2. UH-60M Aircraft. NASC will provide UH-60M aircraft to the Contractor to support flight training. NASC will provide three (3) NASC UH-60M aircraft to the Contractor to be used to conduct flight training in support of the NASC training program. These aircraft are post- DD250 and are wholly owned by Taiwan. These aircraft shall be released (in flyable condition) back to USG custody no later than 1 SEP 17 so that the USG can prepare them to be shipped to Taiwan.

3.2.3. UH-60M Special Mission Equipment. NASC will provide any UH-60M special mission equipment (rescue hoist, etc.) required for actual aircraft flight training. Shipping and installation costs for this equipment will be funded as ODC.

3.2.4. UH-60M Repair Parts. UH-60M repair parts to support unscheduled maintenance, not covered under OEM warranty or procured from US Army stocks, shall be provided from NASC spares supply stocks, obtained through controlled exchange, or be purchased using Unscheduled Maintenance CLIN.

3.3. Government Furnished Items Services: None.

NOTE 1. Government Furnished Equipment / Property / Information: The Government Furnished Equipment identified in this contract is being provided by the Government of Taiwan.

The aircraft provided to the Contractor are post-delivery UH-60M aircraft wholly owned, titled, and registered by Taiwan Army or NASC.

NOTE 2. Indemnification. This contract is being procured through Foreign Military Sales Case TW-B-YZC. The Standard Terms and Conditions in the TW-B-YZC Letter of Offer and Agreement indemnifies the USG, USG Contractors, and USG Subcontractors from certain risks.

Section 3 states:

3.4 Indemnification and Assumption of Risks

3.4.1 The Purchaser recognizes that the USG will procure and furnish the items described in this LOA on a non-profit basis for the benefit of the Purchaser. The Purchaser therefore undertakes to indemnify and hold the USG, its agents, officers, and employees harmless from any and all loss or liability (whether in tort or in contract) which might arise in connection with this LOA because of:

3.4.1.1 Injury to or death of personnel of Purchaser or third parties, or

3.4.1.2 Damage to or destruction of (a) property of DOD furnished to Purchaser or suppliers specifically to implement this LOA, (b) property of Purchaser (including the items ordered by Purchaser pursuant to this LOA, before or after passage of title to Purchaser), or (3) property of third parties, or

3.4.1.3 Infringement or other violations of intellectual property or technical data rights.

3.4.2 Subject to express, special contractual warranties obtained for the Purchaser, the Purchaser agrees to relieve the contractors and subcontractors of the USG from liability for, and will assume the risk of, loss or damage to:

3.4.2.1 Purchaser's property (including items procured pursuant to this LOA, before or after passage of title to Purchaser), and

3.4.2.2 Property of DOD furnished to suppliers to implement this LOA, to the same extent that the USG would assume for its property if it were procuring for itself the items being procured.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.0. Contractor Furnished Items and Services: Except for those items specifically stated to be government furnished in Part 3, the contractor shall furnish everything else required to accomplish training and required to perform this PWS; including:

4.1. Instructors and Interpreters.

4.2. Classrooms, hangars, and other training areas.

4.3. UH-60M flight simulator equivalent to a UH-60M or S-70i FAA Level C or D Full Flight Simulator and any other training devices required for the PWS courses along with maintenance support for aircraft, simulators, and devices as required to support PWS courses.

4.4. Tools, sets, kits, and test equipment used on hands-on demonstration, practice of student tasks, routine scheduled maintenance, and unscheduled maintenance.

4.5. Petroleum, oils, and lubricants, common bench stock, and other consumables required for operating, servicing and maintaining training aircraft.

4.5. Classroom presentation and automation devices required to support training.

4.6. Training materials such as lesson plans, student handouts, presentations, etc. as required for the PWS courses.

4.7. Student Support Services including:

4.7.1. Deleted

4.7.2. Ground Transportation from the airport to the hotel and from the hotel to the airport. The Contractor shall provide suitable ground transportation for students and their baggage when students are first arriving at the airport and for their final departure. Contractor shall plan on three checked bags per student when arranging transportation.

4.7.3. Hotel Billeting for all students. The Contractor shall provide students with billeting at a local hotel. The billeting shall be based on single-occupancy, all rooms shall be accessible by elevator (if more than one floor), opens into lobby or hotel hallway, and be non-smoking. The Contractor shall provide internet or WI-FI service in the hotel and training location.

4.7.4. Meals. The Contractor shall provide meals for each student consisting of daily breakfast, lunch, and dinner meals for seven (7) days per week.

4.7.5. Daily Ground Transportation. Student transportation shall consist of a vehicle with driver to transport students between their hotel and the Contractor’s training facility on training days.

Transportation shall also include accommodation for local shopping and meals for two (2) hours after completion of daily training.

4.7.6. Student Record Keeping. The Contractor shall maintain records of all student’s training and provide copies of these records to the COR upon completion of training.

4.8. None of the above listed items transfer to NASC. All items remain property of the Contractor.

4.9. The contractor shall transmit a quarterly assessment of training to the COR. A format for the report may be provided to contractor upon task order award unless the Contractor elects to use their own format.

4.10. The contractor shall maintain detailed notes during the conduct of this training effort. At the conclusion of this effort the contractor shall provide an After Action Report (AAR) / Lessons Learned report to the COR. A format for the report may be provided to contractor upon award unless the Contractor elects to use their own format.

4.11. Invoicing. The contractor shall submit invoices through Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT). All contractor invoices and receiving reports are required to be submitted electronically in accordance with DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Contractors shall submit invoices through iRAPT via WAWF e-Business Suite at https://wawf.eb.mil/.

PART 5

SPECIFIC TASKS

5.0. Specific Tasks

5.1. CONUS UH-60M Training.

5.1.1. The Contractor shall conduct the UH-60M courses listed in the PWS to train NASC Pilots to a level of proficiency that allow them to safely and effective fly and maintain the NASC UH- 60M aircraft in Taiwan.

5.1.2. The Contractor shall conduct UH-60M courses IAW a schedule mutually agreed upon by the Contractor and USASATMO. This schedule will be based on the planning schedule provided in the PWS.

5.1.3. The Contractor shall provide adequate Instructors to conduct the required courses.

Instructors shall have appropriate experience, training, and qualification for the subject to be taught, as detailed in AR 95-20. Maximum student-to-instructor ratios are 2-to-1 for flight training and 8-to-1 for all other training.

5.1.4. The Contractor shall provide adequate English-to-Mandarin Interpreters to support the courses of instruction as stated in Paragraph 1.4.5.

5.1.5. The Contractor shall provide Certificates of Completion for all courses a Student satisfactorily completes. Certificates of Attendance will be provided to Students that complete a course but fail to meet course requirements. Certificates shall be provided to the students immediately upon the end of the training course. Copies shall be provided to the COR in the next monthly report.

5.2. Student Support Services:

5.2.1. The Contractor shall provide adequate Student support services as stated in Paragraph 1.4.4.

5.2.2. The Contractor shall provide the COR and USASATMO monthly reports of Students’ status and progress by the 10th day of each month throughout the period of performance and upon COR request.

5.3. Aircraft Maintenance. The Contractor shall provide maintenance support for all scheduled maintenance as listed on the DA form 2408-18 and any other maintenance required by the maintenance publications upon completion of maintenance. The Contractor shall provide maintenance support for any unscheduled maintenance that may arise while the NASC UH-60M are under the control of the Contractor. The contractor will review the DA form 2408 to ensure no inspections will be due upon the aircraft's arrival in Taiwan except for the 10hour/14 day and the 40 hour inspection. All batteries should not be required to be replaced for a minimum of 90 days after arrival in country.

PART 6

APPLICABLE PUBLICATIONS

6.0. Applicable Publications: The Contractor shall provide all applicable technical publications.

6.1. The Contractor shall abide by all applicable regulations, publications, manuals, and local policies and procedures. These include:

AR 95-1 Flight Regulations (as Service guidance) AR 95-20 Contractor Flight and Ground Operations DA Pam 738–751 Functional User’s Manual for the Army Maintenance Management

System-Aviation DA Form 2408 Series Aircraft Forms and Records US Army UH-60M Integrated Electronic Technical Manual (IETM) Taiwan Unique UH-60M Integrated Electronic Technical Manual (IETM) (for Taiwan unique items only) NASC Operational UH-60M Air Worthiness Release (AWR) Taiwan Army Operational UH-60M Air Worthiness Release (AWR) Other US Army UH-60M-related Technical Manuals

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

Technical Exhibit A - Performance Requirements Summary (PRS)

Technical Exhibit B – List of Deliverables

Technical Exhibit C – Proposed Training Schedule for Planning

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

QUESTIONS AND ANSWERS

Question Number

PWS Reference Submitted Question Government Answer

1 Background: PWS 4.7.2 identifies that the Contractor is responsible for student

Considering “PBI” (presumably Palm Beach International airport?) is

The Government has no intent to direct the use of any subcontractor. The reference

Question Number

PWS Reference Submitted Question Government Answer transportation to/from “PBI” (presumably the Palm Beach International airport, Florida).

It appears the Government is telegraphing their intent that the work be conducted in the Palm Beach, Florida area.

Furthermore, FlightSafety’s West Palm Beach Learning Center is the only known commercially-available FAA Level C/D S-70i simulator to meet the requirements.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .