Pre-Proposal_Conference_PPT_Presentation_30_Nov_2016.pdf
PDF 2 MB Posted
- Attached to
- Replace Air National Guard C-130 Squadron Operations Facility Federal contract opportunity
- Solicitation number
- W91242-17-R-0001
About this file
Pre-Proposal Conference Slideshow
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers2.pdf | ||
| W91242-17-R-0001-0005.pdf | ||
| Questions_and_Answers1.pdf | ||
| Q&A_Attachment_Question__03.pdf | ||
| W91242-17-R-0001-0004.pdf | ||
| Q&A_Attachment_Question__65.pdf | ||
| Site_Visit_Sign-in_Sheet.pdf | ||
| W91242-17-R-0001-0003.pdf | ||
| Base_Map_-_Squad_Ops.pdf | ||
| As-Built_Addition_Drawings_-_1990.pdf | ||
| W91242-17-R-0001-0002.pdf | ||
| As-Built_Structural_Drawings_-_1976.pdf | ||
| Exhibits_A_-_C_v1.docx | DOCX document | |
| W91242-17-R-0001-0001.pdf | ||
| Visitor_Request_Worksheet.pdf | ||
| Bid_Schedule.pdf | ||
| W91242-17-R-0001.pdf | ||
| Brand_Name_Justification_and_Approval_-_REDACTED.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE
30 November 2016
W91242-17-R-0001
REPLACE C-130 SQUADRON
OPERATIONS FACILITY
PROJECT NO. FJRP89066
Tentative Contract Award Date:
23 March 2017
Construction Location 145th Airlift Wing
Charlotte, North Carolina (NC)
Replace C-130 Squadron Operations Facility
Project Magnitude:$5M - $10M Demolition of existing, construction of new 24,600 SF Facility Brand Name Item Options 1 – Helmet Lockers 2 – Millwork in Rooms 135, 136, 137, 223, and 225 3 – Asphalt Surface Course 4 – Landscaping & Masonry Paver Hardscape Area 5 – New Vehicular Anti-Ram Barrier, New Paving Extension, Reroute
Water Line, Ornamental Fence & Knee Wall 6 – Main Briefing Room Fixed Seating, Demountable Partitions, 10
Year Lighting Warranty
One (1) Firm-fixed price contract will be awarded
Base + Options 1-6 420 Days after NTP
Contract Line Item Number (CLIN) Structure:
Base = CLIN 0001
Options = CLIN 0002 - 0007
Project is being solicited as a 100% small business set-aside
The Contract will be awarded using Tradeoff Source Selection Procedures resulting in the BestValue to the Government
Evaluation Factors – Technical, Past/Present Performance,and Price
Website - https://www.fbo.gov
Solicitation & Amendments
Exhibits
Questions & Answers (Q&A) Document
Check Regularly & Refresh Web Page
Specifications, Spec Supplement, & Plans/Drawings (Secure package; must be registered & have password on FBO) https://www.fbo.gov/
The Government intends to award without discussions and there may not be a chance for discussions, corrections, or revised proposals.
Offerors are strongly cautioned to carefully read the requirements of the solicitation and comply accordingly.
Section 00110 of the RFP Details the Required Information and Format of the Proposal
Proposal
2VOLUMES
Volume 1 – Price Proposal & Pro forma docs (1 original, 2 hard copies)
Volume 2 (1 original, 5 hard copies, 1 CD/DVD)
Part 1:Technical Proposal
Part 2:Past/Present Performance Info
Bid Bond! Page 16/17 of 80
Offeror portion of SF 1442 – Block 14 - 20c
Section 00010 – Bid Schedule - All items
Section 00600 – Representations & Certifications
• Complete Reps & Certs on the web at https://www.sam.gov/portal/public/SAM/
• Complete & return Reps & Certs in Section 00600
Section 00110 – Introductory Page
• Refer to paragraph 2.5.1.2 for details
Executed JointVenture Agreement (if applicable) https://www.sam.gov/portal/public/SAM/
BID SCHEDULE
CLIN Description Amount
Substructure Shell
Interiors Conveying Plumbing
HVAC
Fire Protection
Electrical Communications
Electronic Safety and Security Equipment & Furnishings
Support Facility (includes Pavements, Utilities, and Demolition and Abatement
Base Total $ 0.00
Option CLIN Description Amount 0002 Helmet Lockers 0003 Millwork in Rooms 135,136,137,223 and 225 0004 Asphalt Surface Course 0005 Landscaping & Masonry Paver Hardscape Area 0006 New Vehicular Anti-Ram Barrier, New Paving Extension, Reroute Water Line, Ornamental Fence & Knee Wall 0007 Main Briefing Room Fixed Seating Demountable Partitions, 10 year Lighting Warranty Option Total $ 0.00
Separate contract costs (temporary facilities) $0.00
Total $0.00
Part I -Technical Comprised of 5 sub factors:
Experience & Capability Safety Activities Construction Schedule & Commissioning Approach/Timeline Quality Control Experience with Building to USGBC LEED® Standards
Technical Ratings:
Utilizes CombinedTechnical/Risk Rating
Method Descriptions
COLOR RATING ADJECTIVAL RATING
Blue Outstanding
Purple Good
Green Acceptable
Yellow Marginal
Red Unacceptable
Exhibit A- Performance Relevancy Questionnaire PART 1 and PART 2
Exhibit B-Subcontractor Information and Consent Form (if applicable)
Exhibit C- Reference Questionnaire Package Exhibit C1 and Exhibit C2
Exhibit A - Part 1- Performance Relevancy Questionnaire Use Exhibit Format!
Complete no more than three (3) forms for Relevant Contracts
Quality > Quantity
Completed or Substantially Completed (70%) in the last five (5) years Send Questionnaires for the Exhibit A Projects to your references Do this Early! – Must be received by the Contracting office by the solicitation close date
Exhibit A - Part 2 – Provide the following one (1) time:
Describe compliance with FAR 52.219-8,Utilization of Small Businesses (2A)
2B – 2E 2E has a limit of four (4) pages
Exhibit C – Reference Questionnaire Package Linked to Exhibit A – Part 1
If you do not have relevant past/present performance and are using the experience of key personnel, predecessor companies or subcontractors, ensure you clearly state this in the proposal .
In order to consider the work of subs and teaming partners not currently employed by proposing contractor, the subcontractor must complete Exhibit B - Information and Consent form
Reference questionnaires are also due by this time and date.
Send Reference Questionnaires out
EARLY!
Return to KO via E-mail at:
Zachary.d.leddy.mil@mail.mil bryant.k.alexander.mil@mail.mil
Evaluation Factors for Award is detailed in RFP section 00120
Carefully review section 00120 when preparing proposal
Comply with section 00100 and 00110 requirements
Failure to furnish a complete proposal may result in elimination from consideration
Technical is somewhat more important than Past/Present Performance and when combined these non-cost factors are approximately equal to the Price Factor.
1. Technical will be evaluated first, Past/Present performance second and Price last.
2. If an offeror receives “red” or “yellow” technical rating, they will be eliminated unless discussions and proposal revisions are deemed necessary by KO
3. Past/Present Performance – Relevancy and Confidence Assessment
4. Price – Not rated. Reviewed to ensure it is reasonable, realistic, and affordable
5. Trade-off analysis is conducted to arrive at Best Value decision
Best value is defined as an award based on the greatest overall benefit in response to the requirement. Award is based on price and other non-cost related factors.
Award in this process does not necessarily mean the lowest price wins
• Award is contemplated to be made without discussions. Do not anticipate a chance to make corrections or changes
• Your first proposal will probably be your ONLY proposal!
• Read the solicitation requirements carefully!!
• Consider using Section 00120 to“rate”yourself before submitting the proposal - Is it complete??
When using a subcontractor to obtain/enhance relevancy provide Subcontractor Information and Consent Form (Exhibit B) or it will not be considered
All amendments will be posted on the FBO web site
After closing,no information will be available until award
Award will be posted to the web
Results will be announced around end of March 2017
FAR 52.219-14 Limitations on Subcontracting Apply- Small Business must perform 15% of cost of contract, not including the cost of materials with its own employees
Page 2 of SF 1442, acknowledge all amendments.
• Questions and RFIs are due NLT Tuesday, December 13th 2016 at 10:00 a.m. EST
• Answers to questions should be posted not later than Friday December 16th 2016 at 10:00 a.m. EST
• Questions received after December 13th 2016 at 10:00 a.m. EST may be held and addressed after RFP closing with those offerors determined to be in the competitive range if discussions are deemed necessary
• Do not call technical personnel or A&E as this will delay getting an answer
• All questions and answers will be posted on https://www.fbo.gov/
• If there are necessary addendums,they will be issued by an amendment and posted
• Check web site regularly and don’t forget to refresh web page https://www.fob.gov/
Submit a complete proposal in accordance with instructions – use formats provided.
Prime Contractors are responsible for coordination among the divisions with subcontractors
• https://www.fbo.gov
• https://www.acquisition.gov/
• www.sam.gov/
• http://www.wdol.gov/dba.aspx https://www.fbo.gov/ https://www.acquisition.gov/ http://www.sam.gov/ http://www.wdol.gov/dba.aspx
• Proposal Due 2:00 PM EST on Tuesday, December 20, 2016
• Proposal MUST be signed by Officer of your Company
• No Facsimile
• Send CD/DVDs & Paper Submissions to:
ATTN: SSgt Zachary Leddy Contracting Office 4930 Minuteman Way Charlotte, NC 28208
• Drive to parking lot near the site, then walk approximately 1/8th of a mile to the site
• Do not cross red line
• No pictures toward the aircraft
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 9 |
| Slide Number 10 |
| Section 00110 of the RFP Details the Required Information and Format of the Proposal |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 34 |
| Slide Number 36 |
File details come from the government source that posted it. Updated .