ELINS_1503050_Grounds_Maintenance_Reg_4_2_May_2016.xlsx

XLSX spreadsheet 150 KB Posted

Attached to
Municipal Services Region 4
Solicitation number
W91238-17-R-0005
Issued by

About this file

ELINS Grounds Maintenance

View the file

Other files

File Type Posted
Amendment_1.pdf PDF
Proposal_Data_Sheet.pdf PDF
ELINS_1503020_Pest_Control_Reg_4_1DEC2015.xlsx XLSX spreadsheet
WD_-_AZ.Maricopa.Pinal.pdf PDF
ELINS_1503010_Janitorial_Reg_4_20_Sept_2016_.xlsx XLSX spreadsheet
WD_-_NM.DonaAna.Grant.TX.ElPaso.pdf PDF
Corporate_Relevant_Experience.pdf PDF
WD_-_NM.Bernalillo.SantaFe.pdf PDF
WD_-_AZ.Cochise.Graham.Pima.pdf PDF
WD_-_NV.Clark.pdf PDF
ELINS_1800000_Environmental_Reg_4_-_11-DEC-2015.xlsx XLSX spreadsheet
W91238-17-R-0005.pdf PDF
Region_4_PWS.pdf PDF
Map_of_63d_RSC_DPW_Operations_Area.FEB_2015.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINS Summary

Grounds Maintenance Services Summary
Service Code: 404
This sheet is filled out automatically as other sheets are completed
CLINTOTAL
0009Base Period Firm Fixed-Price - High Service Level (Green)$0.00
0010Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL--
0010AANV010$0.00
0010ABTX191$0.00
0011Base Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
0012Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL--
0012AANV010$0.00
0012ABTX191$0.00
0013Base Period Indefinite Quantity$0.00
1009First Option Period Firm Fixed-Price - High Service Level (Green)$0.00
1010First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL--
1010AANV010$0.00
1010ABTX191$0.00
1011First Option Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
1012First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL--
1012AANV010$0.00
1012ABTX191$0.00
1013First Option Period Indefinite Quantity$0.00
2009Second Option Period Firm Fixed-Price - High Service Level (Green)$0.00
2010Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL--
2010AANV010$0.00
2010ABTX191$0.00
2011Second Option Period Firm Fixed-Price - Medium Service Level (Amber)$0.00
2012Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL--
2012AANV010$0.00
2012ABTX191$0.00
2013Second Option Period Indefinite Quantity$0.00
$0.00
Note: Either CLIN 0009 or CLIN 0011 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer.

&F

&A &P of &N

Site Summary Sheet

GROUNDS MAINTENANCE (1503050)

This sheet is filled out automatically as other sheets are completed
CLIN / SUBCLINFAC IDELINSTotal Price
0009Base Period Firm Fixed-Price - High Service Level 1 (Green)
0009AAAZ010(Items A001 Through A002)$0.00
0009ABAZ023(Items A003 Through A004)$0.00
0009ACNM004(Items A005 Through A006)$0.00
0009ADNM005(Items A007 Through A008)$0.00
0009AENM008(Items A009 Through A010)$0.00
0009AFNM009(Items A011 Through A012)$0.00
0009AGNM014(Items A013 Through A014)$0.00
0009AHNM017(Items A015 Through A015)$0.00
0009AJNV001(Items A016 Through A016)$0.00
0009AKNV003(Items A017 Through A017)$0.00
0009ALNV008(Itemd A018 Through A018)$0.00
0009AMTX233(Items A019 Through A019)$0.00
$0.00
0010Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL
0010AANV010(Items A001 Through A002)$0.00
0010ABTX191(Items A003 Through A003)$0.00
$0.00
0011Base Period Firm Fixed-Price - Medium Service Level 2 (Amber)
0011AAAZ010(Items A101 Through A102)$0.00
0011ABAZ023(Items A103 Through A104)$0.00
0011ACNM004(Items A105 Through A106)$0.00
0011ADNM005(Items A107 Through A108)$0.00
0011AENM008(Items A109 Through A110)$0.00
0011AFNM009(Items A111 Through A112)$0.00
0011AGNM014(Items A113 Through A114)$0.00
0011AHNM017(Items A115 Through A115)$0.00
0011AJNV001(Items A116 Through A116)$0.00
0011AKNV003(Items A117 Through A117)$0.00
0011ALNV008(Items A118 Through A118)$0.00
0011AMTX233(Items A119 Through A119)$0.00
$0.00
0012Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL
0012AANV010(Items A101 Through A102)$0.00
0012ABTX191(Items A103 Through A103)$0.00
$0.00
0013Base Period Indefinite Quantity
TOTAL IQ LINE ITEMS - A701 THROUGH A737$0.00
1009First Option Period Firm Fixed-Price - High Service Level 1 (Green)
1009AAAZ010(Items B001 Through B002)$0.00
1009ABAZ023(Items B003 Through B004)$0.00
1009ACNM004(Items B005 Through B006)$0.00
1009ADNM005(Items B007 Through B008)$0.00
1009AENM008(Items B009 Through B010)$0.00
1009AFNM009(Items B011 Through B012)$0.00
1009AGNM014(Items B013 Through B014)$0.00
1009AHNM017(Items B015 Through B015)$0.00
1009AJNV001(Items B016 Through B016)$0.00
1009AKNV003(Items B017 Through B017)$0.00
1009ALNV008(Items B018 Through B018)$0.00
1009AMTX233(Items B019 Through B019)$0.00
$0.00
1010First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL
1010AANV010(Items B001 Through B002)$0.00
1010ABTX191(Items B003 Through B003)$0.00
$0.00
1011First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber)
1011AAAZ010(Items B101 Through B102)$0.00
1011ABAZ023(Items B103 Through B104)$0.00
1011ACNM004(Items B105 Through B106)$0.00
1011ADNM005(Items B107 Through B108)$0.00
1011AENM008(Items B109 Through B110)$0.00
1011AFNM009(Items B111 Through B112)$0.00
1011AGNM014(Items B113 Through B114)$0.00
1011AHNM017(Items B115 Through B115)$0.00
1011AJNV001(Items B116 Through B116)$0.00
1011AKNV003(Items B117 Through B117)$0.00
1011ALNV008(Items B118 Through B118)$0.00
1011AMTX233(Items B119 Through B119)$0.00
$0.00
1012First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL
1012AANV010(Items B101 Through B102)$0.00
1012ABTX191(Items B103 Through B103)$0.00
$0.00
1013First Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - B701 THROUGH B737$0.00
2009Second Option Period Firm Fixed-Price - High Service Level 1 (Green)
2009AAAZ010(Items C001 Through C002)$0.00
2009ABAZ023(Items C003 Through C004)$0.00
2009ACNM004(Items C005 Through C006)$0.00
2009ADNM005(Items C007 Through C008)$0.00
2009AENM008(Items C009 Through C010)$0.00
2009AFNM009(Items C011 Through C012)$0.00
2009AGNM014(Items C013 Through C014)$0.00
2009AHNM017(Items C015 Through C015)$0.00
2009AJNV001(Items C016 Through C016)$0.00
2009AKNV003(Items C017 Through C017)$0.00
2009ALNV008(Items C018 Through C018)$0.00
2009AMTX233(Items C019 Through C019)$0.00
$0.00
2010Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL
2010AANV010(Items C001 Through C002)$0.00
2010ABTX191(Items C003 Through C003)$0.00
$0.00
2011Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber)
2011AAAZ010(Items C101 Through C102)$0.00
2011ABAZ023(Items C103 Through C104)$0.00
2011ACNM004(Items C105 Through C106)$0.00
2011ADNM005(Items C107 Through C108)$0.00
2011AENM008(Items C109 Through C110)$0.00
2011AFNM009(Items C111 Through C112)$0.00
2011AGNM014(Items C113 Through C114)$0.00
2011AHNM017(Items C115 Through C115)$0.00
2011AJNV001(Items C116 Through C116)$0.00
2011AKNV003(Items C117 Through C117)$0.00
2011ALNV008(Items C118 Through C118)$0.00
2011AMTX233(Items C119 Through C119)$0.00
$0.00
2012Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL
2012AANV010(Items C101 Through C102)$0.00
2012ABTX191(Items C103 Through C103)$0.00
$0.00
2013Second Option Period Indefinite Quantity
TOTAL IQ LINE ITEMS - C701 THROUGH C737$0.00

&F

&P of &N

ELINS BASE PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A119
CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green)
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
AZ010Barnes Hall USARC/AMSA 96(G)4845
Firm Fixed-Price Work
A001Improved Grounds (Spec Item C, 3.1)7.0Month$ - 0$ - 0
A002Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0009AA (Items A001 Through A002)$0.00
AZ023Herrera Hall USARC4855
Firm Fixed-Price Work
A003Improved Grounds (Spec Item C, 3.1)5.0Month$ - 0$ - 0
A004Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0009AB (Items A003 Through A004)$0.00
NM004Warren Brothers Memorial USARC
Firm Fixed-Price Work
A005Semi-Improved Grounds (Spec Item C, 3.2)9.0Month$ - 0$ - 0
A006Storm Drainage Systems (Spec Item 3.3)9.0Month$ - 0$ - 0
Total CLIN 0009AC (Items A005 Through A006)$0.00
NM005Gallagher Memorial USARC
Firm Fixed-Price Work
A007Semi-Improved Grounds (Spec Item C, 3.2)7.0Month$ - 0$ - 0
A008Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0009AD (Items A007 Through A008)$0.00
NM008SSG James L Phillips USARC35925
Firm Fixed-Price Work
A009Semi-Improved Grounds (Spec Item C, 3.2)10.0Month$ - 0$ - 0
A010Storm Drainage Systems (Spec Item 3.3)10.0Month$ - 0$ - 0
Total CLIN 0009AE (Items A009 Through A010)$0.00
NM009Joseph I Gonzales USARC35935
Firm Fixed-Price Work
A011Semi-Improved Grounds (Spec Item C, 3.2)5.0Month$ - 0$ - 0
A012Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0009AF (Items A011 Through A012)$0.00
NM014Kirtland AFB AFRC35657
Firm Fixed-Price Work
A013Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A014Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0009AG (Items A013 Through A014)$0.00
NM017Proposed Las Cruces GTA35125
Firm Fixed-Price Work
A015Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0Total CLIN 0009AB (Items A004 Through A006)
Total CLIN 0009AH (Items A015)$0.00Total CLIN 0009AC (Items A007 Through A009)
Total CLIN 0009AD (Items A010 Through A012)
NV001Taylor Hall AFRC32775Total CLIN 0009AE (Items A013 Through A015)
Firm Fixed-Price WorkTotal CLIN 0009AF (Items A016 Through A017)
A016Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0Total CLIN 0009AJ (Items A024 Through A026)
Total CLIN 0009AJ (Items A016)$0.00
NV003Nellis AFRC/OMS32778
Firm Fixed-Price WorkTotal CLIN 0009AA(Items A001 Through A003)
A017Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0Total CLIN 0009AD(Items A010 Through A012)
Total CLIN 0009AK (Items A017)$0.00Total CLIN 0009AE(Items A013 Through A015)
Total CLIN 0009AF(Items A016 Through A017)
NV008Sloan USARC32887Total CLIN 0009AG(Items A018 Through A020)
Firm Fixed-Price WorkTotal CLIN 0009AH(Items A021 Through A023)
A018Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0009AL (Items A018)$0.00
TX233Fort Bliss USARC48125
Firm Fixed-Price Work
A019Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0009AM (Items A019)$0.00

TOTAL FFP LINE ITEMS - A001 THROUGH A019 $0.00

CLIN 0011 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)

AZ010Barnes Hall USARC/AMSA 96(G)4845
Firm Fixed-Price Work
A101Improved Grounds (Spec Item C, 3.1)7.0Month$ - 0$ - 0
A102Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0011AA (Items A101 Through A102)$0.00
AZ023Herrera Hall USARC4855
Firm Fixed-Price Work
A103Improved Grounds (Spec Item C, 3.1)5.0Month$ - 0$ - 0
A104Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0011AB (Items A103 Through A104)$0.00
NM004Warren Brothers Memorial USARC
Firm Fixed-Price Work
A105Semi-Improved Grounds (Spec Item C, 3.2)9.0Month$ - 0$ - 0
A106Storm Drainage Systems (Spec Item 3.3)9.0Month$ - 0$ - 0
Total CLIN 0011AC (Items A105 Through A106)$0.00
NM005Gallagher Memorial USARC
Firm Fixed-Price Work
A107Semi-Improved Grounds (Spec Item C, 3.2)7.0Month$ - 0$ - 0
A108Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0011AD (Items A107 Through A108)$0.00
NM008SSG James L Phillips USARC35925
Firm Fixed-Price Work
A109Semi-Improved Grounds (Spec Item C, 3.2)10.0Month$ - 0$ - 0
A110Storm Drainage Systems (Spec Item 3.3)10.0Month$ - 0$ - 0
Total CLIN 0011AE (Items A109 Through A110)$0.00
NM009Joseph I Gonzales USARC35935
Firm Fixed-Price Work
A111Semi-Improved Grounds (Spec Item C, 3.2)5.0Month$ - 0$ - 0
A112Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0011AF (Items A111 Through A112)$0.00
NM014Kirtland AFB AFRC35657
Firm Fixed-Price Work
A113Semi-Improved Grounds (Spec Item C, 3.2)11.0Month$ - 0$ - 0
A114Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0011AG (Items A113 Through A114)$0.00
NM017Proposed Las Cruces GTA35125
Firm Fixed-Price Work
A115Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0011AH (Items A115)$0.00
NV001Taylor Hall AFRC32775
Firm Fixed-Price Work
A116Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0011AJ (Items A116)$0.00
NV003Nellis AFRC/OMS32778
Firm Fixed-Price Work
A117Storm Drainage Systems (Spec Item 3.3)5.0Month$ - 0$ - 0
Total CLIN 0011AK (Items A117)$0.00
NV008Sloan USARC32887
Firm Fixed-Price Work
A118Storm Drainage Systems (Spec Item 3.3)11.0Month$ - 0$ - 0
Total CLIN 0011AL (Items A118)$0.00
TX233Fort Bliss USARC48125
Firm Fixed-Price Work
A119Storm Drainage Systems (Spec Item 3.3)7.0Month$ - 0$ - 0
Total CLIN 0011AM (Items A119)$0.00

TOTAL FFP LINE ITEMS - A101 THROUGH A119 $0.00

&F

&P of &N

ELINS BASE PERIOD FFP (OPTNL)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS A001 - A103
CLIN 0010 - Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
NV010Las Vegas USARC #5, Skypoint32230
Firm Fixed-Price Work
A001Improved Grounds (Spec Item C, 3.1)11.0Month$ - 0$ - 0
A002Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0010AA (Items A001 Through A002)$0.00
TX191Fort Bliss AFRC/ECS48125
Firm Fixed-Price Work
A003Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0010AB (Items A003 Through A003)$0.00

TOTAL FFP LINE ITEMS - A001 THROUGH A003 $0.00

CLIN 0012 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL

NV010Las Vegas USARC #5, Skypoint32230
Firm Fixed-Price Work
A101Improved Grounds (Spec Item C, 3.1)11.0Month$ - 0$ - 0
A102Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0012AA (Items A101 Through A102)$0.00
TX191Fort Bliss AFRC/ECS48125
Firm Fixed-Price Work
A103Storm Drainage Systems (Spec Item C, 3.3)11.0Month$ - 0$ - 0
Total CLIN 0012AB (Items A103 Through A103)$0.00

TOTAL FFP LINE ITEMS - A101 THROUGH A103 $0.00

&F

&P of &N

ELINS BASE PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A737
CLIN 0013 - Base Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
A701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
A702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
A703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
A706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
A707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
A708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
A709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
A710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
A711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A712Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A713Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1
A714Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each10
A715SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A716SpriggingSprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government.
Work shall be completed within 20 calendar days.$ - 0SF50
A717FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.$ - 0SF100
A718Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.$ - 0SF100
A719AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.$ - 0SF100
A720Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0Each5
A721Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.$ - 0L.F.100
A722Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.$ - 0SF50
A723UnderbrushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.$ - 0SF100
A724Field MowingVegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.$ - 0SF5,000
A725Control Undesired VegetationRemove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.$ - 0LF100
A726Debris RemovalRemove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
Work shall be completed within 10 calendar days.$ - 0SF50
Special Event Grass Cutting at the following sites:Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site.
A727CA001$ - 0Each1
A728CA012$ - 0Each1
A729CA014$ - 0Each1
A730CA021$ - 0Each1
A731CA062$ - 0Each1
A732CA070$ - 0Each1
A733CA090$ - 0Each1
A734CA150$ - 0Each1
A735CA187$ - 0Each1
A736CA207$ - 0Each1
A737Plant Native VegetationAll native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape.

Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10

TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A737

&F

&P of &N

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINS FIRST PERIOD FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B119
CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green)
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
AZ010Barnes Hall USARC/AMSA 96(G)4845
Firm Fixed-Price Work
B001Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B002Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AA (Items B001 Through B002)$0.00
AZ023Herrera Hall USARC4855
Firm Fixed-Price Work
B003Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B004Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AB (Items B003 Through B004)$0.00
NM004Warren Brothers Memorial USARC
Firm Fixed-Price Work
B005Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B006Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AC (Items B005 Through B006)$0.00
NM005Gallagher Memorial USARC
Firm Fixed-Price Work
B007Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B008Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AD (Items B007 Through B008)$0.00
NM008SSG James L Phillips USARC35925
Firm Fixed-Price Work
B009Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B010Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AE (Items B009 Through B010)$0.00
NM009Joseph I Gonzales USARC35935
Firm Fixed-Price Work
B011Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B012Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AF (Items B011 Through B012)$0.00
NM014Kirtland AFB AFRC35657
Firm Fixed-Price Work
B013Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B014Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AG (Items B013 Through B014)$0.00
NM017Proposed Las Cruces GTA35125
Firm Fixed-Price Work
B015Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AH (Items B015)$0.00
NV001Taylor Hall AFRC32775
Firm Fixed-Price Work
B016Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AJ (Items B016 Through B016)$0.00
NV003Nellis AFRC/OMS32778
Firm Fixed-Price Work
B017Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AK (Items B017)$0.00
NV008Sloan USARC32887
Firm Fixed-Price Work
B018Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AL (Items B018)$0.00
TX233Fort Bliss USARC48125
Firm Fixed-Price Work
B019Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1009AM (Items B019)$0.00

TOTAL FFP LINE ITEMS - B001 THROUGH B019 $0.00

CLIN 1011 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber)

AZ010Barnes Hall USARC/AMSA 96(G)4845
Firm Fixed-Price Work
B101Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B102Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AA (Items B101 Through B102)$0.00
AZ023Herrera Hall USARC4855
Firm Fixed-Price Work
B103Improved Grounds (Spec Item C, 3.1)12.0Month$ - 0$ - 0
B104Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AB (Items B103 Through B104)$0.00
NM004Warren Brothers Memorial USARC
Firm Fixed-Price Work
B105Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B106Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 0011AC (Items B105 Through B106)$0.00
NM005Gallagher Memorial USARC
Firm Fixed-Price Work
B107Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B108Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AD (Items B107 Through B108)$0.00
NM008SSG James L Phillips USARC35925
Firm Fixed-Price Work
B109Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B110Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AE (Items B109 Through B110)$0.00
NM009Joseph I Gonzales USARC35935
Firm Fixed-Price Work
B111Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B112Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AF (Items B111 Through B112)$0.00
NM014Kirtland AFB AFRC35657
Firm Fixed-Price Work
B113Semi-Improved Grounds (Spec Item C, 3.2)12.0Month$ - 0$ - 0
B114Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AG (Items B113 Through B114)$0.00
NM017Proposed Las Cruces GTA35125
Firm Fixed-Price Work
B115Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AH (Items B115)$0.00
NV001Taylor Hall AFRC32775
Firm Fixed-Price Work
B116Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AJ (Items B116)$0.00
NV003Nellis AFRC/OMS32778
Firm Fixed-Price Work
B117Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AK (Items B117)$0.00
NV008Sloan USARC32887
Firm Fixed-Price Work
B118Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AL (Item B118)$0.00
TX233Fort Bliss USARC48125
Firm Fixed-Price Work
B119Storm Drainage Systems (Spec Item 3.3)12.0Month$ - 0$ - 0
Total CLIN 1011AM (Items B119)$0.00

TOTAL FFP LINE ITEMS - B101 THROUGH B119 $0.00

&F

&P of &N

ELINS FIRST PERIOD FFP (OPTNL)

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS B001 - B104
CLIN 1010 - First Option Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL
FACIDSITE NAMESITE CODE
ELINDESCRIPTIONQTYUNITUNIT PRICETOTAL
NV010Las Vegas USARC #5, Skypoint32230
Firm Fixed-Price Work
B001Improved Grounds (Spec Item C, 3.1)12Month$ - 0$ - 0
B002Storm Drainage Systems (Spec Item C, 3.3)12Month$ - 0$ - 0
Total CLIN 1010AA (Items B001 Through B002)$0.00
TX191Fort Bliss AFRC/ECS48125
Firm Fixed-Price Work
B003Storm Drainage Systems (Spec Item C, 3.3)12Month$ - 0$ - 0
Total CLIN 0010AB (Items B003)$0.00

TOTAL FFP LINE ITEMS - B001 THROUGH B003 $0.00

CLIN 1012 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL

NV010Las Vegas USARC #5, Skypoint32230
Firm Fixed-Price Work
B101Improved Grounds (Spec Item C, 3.1)12Month$ - 0$ - 0
B102Storm Drainage Systems (Spec Item C, 3.3)12Month$ - 0$ - 0
Total CLIN 1012AA (Items B101 Through B102)$0.00
TX191Fort Bliss AFRC/ECS48125
Firm Fixed-Price Work
B103Storm Drainage Systems (Spec Item C, 3.3)12Month$ - 0$ - 0
Total CLIN 1012AB (Items B103)$0.00

TOTAL FFP LINE ITEMS - B101 THROUGH B103 $0.00

&F

&P of &N

ELINS FIRST PERIOD IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B737
CLIN 1013 - First Option Period - Indefinite Quantity Work
UNITUNIT OFMIN. ORDER
ELINSHORT DESCRIPTIONFULL DESCRIPTIONPRICEISSUEQTY
B701Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.$ - 0Each1
B702Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.$ - 0Each1
B703Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B704Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B705Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.$ - 0Each1
B706Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.$ - 0Each1
B707Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.$ - 0Each1
B708Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.$ - 0Each1
B709Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.$ - 0Each1
B710GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.$ - 0SF50
B711Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.$ - 0Each1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .