Beech_Fork_Waterline_QA__2.docx
DOCX document 12 KB Posted
- Attached to
- Beech Fork Lake Waterline Federal contract opportunity
- Solicitation number
- W91237-18-B-0004
About this file
Questions & Answers #2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.02_Abstract_of_Bids_-_SIGNED.pdf | ||
| Beech_Fork_Waterline_Site_QA_-_Answers_to_Questions_(002).docx | DOCX document | |
| H.01.04_Specifications_REV_01.pdf | ||
| A.07.23_W9123718B00040001.pdf | ||
| A.01.13_Specifications.pdf | ||
| A.07.23_W9123718B0004.pdf | ||
| A.01.13_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Beech Fork Waterline Replacement Additional Questions and Answers
Question: Can directional drilling be used for the whole job?
Answer: The contract should be bid as shown on quantities in the bid sheet.
Variations from contract requirements can be requested as described in section 01 33 00 Section 1.7 of the specs, and will be considered where advantageous to the Government. Also, variations resulting in potential cost savings can be considered as a Value Engineering Change Proposal (VECP), as described in 01 60 00 Section 1.3 of the specs, and FAR Clause 52.248-3 ALT I.