W91237-16-B-0003-0001.pdf

PDF 93 KB Posted

Attached to
Miter Gate Installation Federal contract opportunity
Solicitation number
W91237-16-B-0003
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

About this file

Previous document labeled as W91237-16-B-0003-0001 was not the correct document. The attached document (W91237-16-B-0003-0001) replaces it in its entirety.

View the file

Other files for this federal contract opportunity

Other files attached to Miter Gate Installation, newest first.
File Type Posted
Abstract_of_Bids.pdf PDF
W91237-16-B-0003-0003.pdf PDF
Questions_and_Answers_2of2.pdf PDF
W91237-16-B-0003-0002.pdf PDF
Questions_and_Answers_Final.pdf PDF
Pre-Bid_Roster.xlsx XLSX spreadsheet
W91237-16-B-0003-0001.pdf PDF
Specs_rev01.pdf PDF
Specs.pdf PDF
Plans.pdf PDF
W91237-16-B-0003.pdf PDF
Synopsis.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Miter Gate Installation for Medahl Locks and Dam, Felicity, OH

Solicitation is hereby amended to include the follow ing changes:

Attached Davis Bacon Wage Rate Determination revision OH160002 12/09/2016 replaces previous Wage Deteminations in their entirety.

Specification Section 01 00 00 (Contract Considerations) Paragraph 1.2.2. is changed as show n on the follow ing continuation page.

Updated specification provided as a seperate attachment.

Response date is extended to 1:00 PM Eastern Time on 3 January 2017. Note change in room location for the bid opening.

1. CONTRACT ID CODE PAGE OF PAGES

1 44

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91237-16-B-0003

X 9B. DATED (SEE ITEM 11)

19-Nov-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Dec-2016

CODE

USACE, CONTRACTING BRANCH

ALLISON PACK, 502 8TH STREET

HUNTINGTON WV 25701

W91237 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91237-16-B-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SPECIFCATION CHANGE

Section 01 00 00 (Contract Considerations), paragraph 1.2.2 (Schedule) as reads:

The Government expects to have the preparation work to the lock chamber completed by 17 July 2017. To provide ample time for scheduling the availability of the Contractor, the miter gate leaves can be lifted and installed on the pintle balls, in the dewatered portion of the lock chamber, anytime between 17 July 2017 and 31 August 2017. The Contractor shall plan on being available for a period of twenty-one (21) days from the actual date they indicated they will be on-site and be ready to make the lifts. The Government estimates that the Contractor will need to make a minimum of three (3) lifts and as many as six (6) lifts to get both miter gate leaves to their final position on the pintle balls. However, the Contractor is responsible for developing the installation plans for the gate leaves and will establish the actual number of lifts to be performed. The Contractor shall schedule one day for each lift with the remainder of the scheduled 21 days in "stand-by" mode. "Stand-by" mode shall be defined as when the Contractor has all material, equipment and personnel available to proceed with a lift during the scheduled twenty-one (21) day period but is delayed by the Government. The Contractor shall submit a detailed breakdown of costs associated with the daily standby costs. After the miter gate leaves have been installed on the pintle balls and the Government has accepted the work as completed, the Contractor shall depart from the project within 24 hours.

Is deleted in its entirety and replaced with the following:

The Government expects to have the preparation work to the lock chamber completed by 17 July 2017. To provide ample time for scheduling the availability of the Contractor, the miter gate leaves can be lifted and installed on the pintle balls, in the dewatered portion of the lock chamber, anytime between 17 July 2017 and 31August 2017. The Contractor shall plan on being available for a period of up to twenty-one (21) calendar days from the actual date they indicated they will be on-site and be ready to make the lifts. This 21 day period includes up to 15 days that the Government may place the Contractor in standby mode. "Stand-by" mode shall be defined as when the Contractor has all material, equipment and personnel available to proceed with a lift during the scheduled twenty-one (21) day period but is delayed by the Government. As specified in Paragraph 1.4.2 (STANDBY TIME), the Contractor will only be compensated for actual standby time caused by the Government. The Government estimates that the Contractor will need to make a minimum of three (3) lifts and as many as six (6) lifts to get both miter gate leaves to their final position on the pintle balls. However, the Contractor is responsible for developing the installation plans for the gate leaves and will establish the actual number of lifts to be performed. After the miter gate leaves have been installed on the pintle balls and the Government has accepted the work as completed, the Contractor shall depart from the project within 24 hours.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 19-Dec-2016 10:00 AM to 03-Jan-2017 01:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO BIDDERS

BID OPENING.

The bid opening will be held at US Army Corps of Engineers, 502 8th Street, 1st Floor East/West Conference Room, Huntington, WV 25701 on 03 January 2017 at 01:00 PM local time. Upon arrival, Contractors must check in with the Security Desk and have them contact Allison Pack at ext. 5046 to submit bid.

QUESTIONS

Technical questions must be received in the Huntington District Office no later than 5 December 2016, 1:00 pm. EST. Questions will not be accepted after this date. Questions are to be emailed to Allison.Pack@usace.army.mil

PRICE BASIS.

Bidders are advised that only bids submitted on a firm-fixed price basis will be considered, and that bids submitted on any other than firm-fixed price basis will be rejected.

Bid price alterations, i.e., crossed-out or white-out changes on the bid will not be accepted unless the change (s) is/are initialed by the person authorized to sign bid package.

BID QUANTITIES.

Bids for less than specified quantities of each item in Section 00100 of the Schedule will not be considered. Failure to submit a unit price for each item where required in the Schedule will be considered as a material deviation from the requirements of the solicitation, and the bid will be rejected. (FAR 14.201-5)

ARITHMETIC DISCREPANCIES.

(a) For the purpose of initial evaluation of bids the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by the bidders:

(1) Obviously misplaced decimal points will be corrected;

(2) In case of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump sum and extended price will be corrected; and

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidders intends their bid to be evaluated on the basis of unit prices, extensions, and totals arrived at by resolution of arithmetic discrepancies as provided above and bid will be so reflected on the abstract of bids.

Help us in BUILDING STRONG. Visit our Interactive Customer Evaluation (ICE) Website at:

https://ice.disa.mil/index.cfm?fa=card&sp=127368&s=856&dep=*DoD&sc=14

CHANGES IN SPECIFICATIONS AND DRAWINGS.

The right is reserved, as in the interest of the Government may require, to revise or amend the specifications prior to the date set for receipt of bids. Such revisions and amendments, if any, will be announced by amendment or amendments to this solicitation. Copies of such amendments, as may be issued, will be furnished to all prospective offerors through the applicable method of advertisement (e.g.

FedBizOpps, FTP secure site, etc.). If the revisions and amendments are of a nature which require material changes in quantities or prices offered, or both, the date set for receipt of bids may be postponed by such number of days as in the opinion of the Contracting Officer will enable the offerors to revise their bids. In such cases, the amendment will include an announcement of the new date for receipt of bids.

DETERMINATION OF RESPONSIBILITY REQUIREMENTS.

1. To ensure award is made to a responsible bidder, a determination of responsibility will be conducted. The apparent low bidder will be contacted by the Contracting Officer and will be required to provide the requested responsibility information within 4 calendar days. As part of this responsibility determination, the Contracting Officer will utilize the guidance contained in FAR 9.104-1 which states to be determined responsible, a prospective contractor must:

a. Have adequate financial resources to perform the contract or the ability to obtain them.

b. Be able to comply with the required or proposed delivery or performance schedule. Demonstrate the understanding and capability to bid, prepare for, and perform task orders associated with the contract under a “plant rental” scenario. These requirements are defined in the contract specifications.

c. Have a satisfactory performance record of construction projects, similar in scope and magnitude of that stated in the contract requirements.

d. Have a satisfactory record of integrity and business ethics.

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them.

f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them. This includes an adequate fleet of dredging equipment, capable of deployment in accordance with the contract requirements. This equipment must be in sound serviceable condition, and meet the requirements of EM 385-1-1 (November 2014).

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

WAGE RATES -REVISED

General Decision Number: OH160002 12/09/2016 OH2

Superseded General Decision Number: OH20150002

State: Ohio

Construction Types: Heavy and Highway

Counties: Ohio Statewide.

Heavy and Highway Construction Projects

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 02/05/2016 3 02/19/2016 4 03/04/2016 5 03/18/2016 6 04/01/2016 7 04/08/2016 8 04/22/2016 9 05/06/2016 10 05/13/2016 11 05/27/2016 12 06/17/2016 13 06/24/2016 14 07/01/2016 15 07/08/2016 16 07/15/2016 17 07/22/2016 18 08/12/2016 19 08/19/2016 20 08/26/2016 21 09/02/2016 22 09/23/2016

23 10/14/2016 24 11/25/2016 25 12/02/2016 26 12/09/2016

BRKY0007-003 06/01/2011

LAWRENCE

Rates Fringes

Bricklayer, Stonemason...........$ 28.29 16.80

BROH0001-001 07/01/2015

DEFIANCE, FULTON (Excluding Fulton, Amboy & Swan Creek Townships), HENRY (Excluding Monroe, Bartlow, Liberty, Washington, Richfield, Marion, Damascus & Townships & that part of Harrison Township outside corporate limits of city of Napoleon), PAULDING, PUTNAM and WILLIAMS COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 30.10 14.01

BROH0001-004 06/01/2015

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.48 12.62

BROH0003-002 07/01/2015

FULTON (Townships of Amboy, Swan Creek & Fulton), HENRY (Townships of Washington, Damascus, Richfield, Bartlow, Liberty, Harrison, Monroe, & Marion), LUCAS and WOOD (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids) COUNTIES

Bricklayer, Stonemason...........$ 28.85 17.91

BROH0005-003 05/01/2015

CUYAHOGA, LORAIN & MEDINA (Hinckley, Granger, Brunswick, Liverpool, Montville, York, Homer, Harrisville, Chatham, Litchfield & Spencer Townships and the city of Medina)

BRICKLAYER

BRICKLAYERS; CAULKERS;

CLEANERS; POINTERS; &

STONEMASONS.................$ 33.81 13.86

SANDBLASTERS................$ 34.06 13.86

SEWER BRICKLAYERS & STACK

BUILDERS....................$ 34.31 13.86

SWING SCAFFOLDS.............$ 34.56 13.86

BROH0006-005 06/01/2015

CARROLL, COLUMBIANA (Knox, Butler, West & Hanover Townships), STARK & TUSCARAWAS

Bricklayer, Stonemason...........$ 29.48 12.62

BROH0007-005 06/01/2015

PORTAGE & SUMMIT

Rates Fringes

BRICKLAYER.......................$ 30.24 15.21

BROH0007-010 06/01/2015

PORTAGE & SUMMIT

Rates Fringes

MASON - STONE....................$ 29.48 12.62

BROH0008-001 06/01/2015

COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton, & Unity Townships and the city of New Waterford), MAHONING & TRUMBULL

BRICKLAYER.......................$ 27.15 18.19

BROH0009-002 06/01/2015

BELMONT & MONROE COUNTIES and the Townships of Warren & Mt.

Pleasant and the Village of Dillonvale in JEFFERSON COUNTY

Refractory.......................$ 29.48 12.62

BROH0010-002 06/01/2015

COLUMBIANA (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships) & JEFFERSON (Brush Creek & Saline Townships)

BROH0014-002 06/01/2015

HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale)

BROH0016-002 05/01/2015

ASHTABULA, GEAUGA, and LAKE COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 32.03 14.9

BROH0018-002 06/01/2015

BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN COUNTIES:

BROH0022-004 06/01/2015

CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN,

MIAMI, MONTGOMERY, PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) and SHELBY COUNTIES

BROH0032-001 06/01/2015

GALLIA & MEIGS

Rates Fringes

Bricklayer, Stonemason...........$ 29.48 12.62

BROH0035-002 06/01/2015

ALLEN, AUGLAIZE, MERCER and VAN WERT COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 29.48 12.62

BROH0039-002 06/01/2015

ADAMS & SCIOTO

Rates Fringes

Bricklayer, Stonemason...........$ 30.00 18.60

BROH0040-003 06/01/2015

ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND,

WAYNE and WYANDOT (Except Crawford, Ridge, Richland & Tymochtee Townships) COUNTIES

Bricklayer, Stonemason...........$ 29.09 17.18

FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

"Hot" work: $2.50 above journeyman rate.

BROH0044-002 06/01/2015

Rates Fringes

Bricklayer, Stonemason

COSHOCTON, FAIRFIELD,

GUERNSEY, HOCKING, KNOX,

KICKING, MORGAN,

MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships) & PERRY

COUNTIES:...................$ 29.48 12.62

BROH0045-002 06/01/2015

FAYETTE, JACKSON, PIKE, ROSS and VINTON COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 30.11 13.75

BROH0046-002 06/01/2015

ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) and WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships) COUNTIES & the Islands of Lake Erie north of Sandusky

Bricklayer, Stonemason...........$ 29.60 16.88

FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

"Hot" work: $2.50 above journeyman rate.

BROH0052-001 06/01/2015

ATHENS COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 29.48 12.62

BROH0052-003 06/01/2015

NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) and WASHINGTON COUNTIES

Bricklayer, Stonemason...........$ 28.10 15.80

BROH0055-003 06/01/2015

DELAWARE, FRANKLIN, MADISON, PICKAWAY and UNION COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 28.12 15.74

CARP0003-004 05/01/2014

MAHONING & TRUMBULL

Rates Fringes

CARPENTER........................$ 25.61 15.10

CARP0069-003 05/01/2014

CARROLL, STARK, TUSCARAWAS & WAYNE

Rates Fringes

CARPENTER........................$ 25.50 13.67

CARP0069-006 05/01/2014

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

CARPENTER........................$ 23.66 13.05

CARP0171-002 05/01/2014

BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE

Rates Fringes

CARPENTER........................$ 26.02 15.49

CARP0200-002 05/01/2016

ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA,

GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING,

MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY,

PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON and WASHINGTON

COUNTIES

CARPENTER........................$ 28.70 15.39

Diver............................$ 39.41 10.40

PILEDRIVERMAN....................$ 28.70 15.39

CARP0248-005 07/01/2008

LUCAS & WOOD

Rates Fringes

CARPENTER........................$ 27.27 14.58

CARP0248-008 07/01/2008

Rates Fringes

CARPENTER

DEFIANCE, FULTON, HANCOCK,

HENRY, PAULDING & WILLIAMS

COUNTIES....................$ 23.71 13.28

CARP0254-002 05/01/2014

ASHTABULA, CUYAHOGA, GEAUGA & LAKE

Rates Fringes

CARPENTER........................$ 31.61 14.46

CARP0372-002 07/01/2008

ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT

Rates Fringes

CARPENTER........................$ 23.18 13.28

CARP0639-003 05/01/2014

MEDINA, PORTAGE & SUMMIT

Rates Fringes

CARPENTER........................$ 29.59 14.64

CARP0735-002 05/01/2014

ASHLAND, ERIE, HURON, LORAIN & RICHLAND

Rates Fringes

CARPENTER........................$ 24.80 13.29

CARP1311-001 05/01/2014

BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE,

GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY &

WARREN

Carpenter & Piledrivermen........$ 27.39 14.33 Diver............................$ 40.58 9.69

CARP1393-002 07/01/2008

CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA,

PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD

Piledrivermen & Diver's Tender...$ 27.30 16.05

DIVERS - $250.00 per day

CARP1393-003 07/01/2008

ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT

Rates Fringes

Piledrivermen & Diver's Tender...$ 25.15 15.92

DIVERS - $250.00 per day

CARP1871-006 06/01/2013

BELMONT, HARRISON, & MONROE

Rates Fringes

Diver, Wet.......................$ 47.07 13.92 Piledrivermen; Diver, Dry........$ 31.38 13.92

CARP1871-008 06/01/2013

ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE,

LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT

Diver, Wet.......................$ 44.22 15.49 Piledrivermen; Diver, Dry........$ 29.48 15.49

CARP1871-014 06/01/2013

CARROLL, STARK, TUSCARAWAS & WAYNE

Rates Fringes

Diver, Wet.......................$ 37.40 13.81 Piledrivermen; Diver, Dry........$ 24.93 13.81

CARP1871-015 06/01/2013

COSHOCTON, HOLMES, KNOX & MORROW

Diver, Wet.......................$ 36.53 12.96 Piledrivermen; Diver, Dry........$ 24.35 12.96

CARP1871-017 06/01/2013

MAHONING & TRUMBULL

Rates Fringes

Diver, Wet.......................$ 39.44 14.16 Piledrivermen; Diver, Dry........$ 26.29 14.16

CARP2235-012 01/01/2014

COLUMBIANA & JEFFERSON

Rates Fringes

PILEDRIVERMAN....................$ 31.74 16.41

CARP2239-001 07/01/2008

CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT

Rates Fringes

CARPENTER........................$ 23.71 13.28

ELEC0008-002 05/23/2016

DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING,

PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD

CABLE SPLICER....................$ 38.98 18.96

ELECTRICIAN......................$ 37.36 4.5%+18.63

ELEC0032-003 06/01/2014

ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT &

WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships)

ELECTRICIAN......................$ 28.32 15.18

ELEC0032-004 06/01/1998

ALLEN, HARDIN, VAN WERT & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships)

Line Construction Equipment Operator..........$ 20.27 4.12+a Groundman Truck Driver......$ 14.43 3.63+a Lineman.....................$ 22.52 4.31+a

FOOTNOTE: a. Half day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day

ELEC0038-002 04/25/2016

CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)

ELECTRICIAN

Excluding Sound & Communications Work.........$ 37.13 20.38

FOOTNOTES;

a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; & Christmas Day

b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service

ELEC0038-008 04/25/2016

CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)

Sound & Communication Technician Communications Technician...$ 26.05 10.90+a+b Installer Technician........$ 24.80 10.86+a+b

FOOTNOTES;

a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; & Christmas Day

b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service

ELEC0064-003 11/28/2016

COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships), & TRUMBULL (Hubbard & Liberty Townships)

ELECTRICIAN......................$ 32.27 14.39

ELEC0071-001 12/28/2015

ASHLAND, CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE,

FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING,

JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MARION, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), UNION, VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships), and WASHINGTON COUNTIES

Equipment Operators.........$ 32.24 12.34 Groundmen...................$ 23.28 10.37 Linemen & Cable Splicers....$ 35.82 13.13

ELEC0071-004 12/28/2015

AUGLAIZE, CLINTON, DARKE, GREENE, LOGAN, MERCER, MIAMI,

MONTGOMERY, PREBLE, and SHELBY COUNTIES

Equipment Operator..........$ 32.24 12.34 Groundman...................$ 23.28 10.37 Lineman & Cable Splicers....$ 35.82 13.13

ELEC0071-005 12/29/2015

ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN

Rates Fringes

LINE CONSTRUCTION: Equipment Operator DOT/Traffic Signal & Highway Lighting Projects...$ 31.30 13.07 Municipal Power/Transit Projects....................$ 37.34 14.58 LINE CONSTRUCTION: Groundman DOT/Traffic Signal & Highway Lighting Projects...$ 24.34 11.33 Municipal Power/Transit Projects....................$ 29.05 12.51

LINE CONSTRUCTION:

Linemen/Cable Splicer DOT/Traffic Signal & Highway Lighting Projects...$ 34.78 13.94 Municipal Power/Transit Projects....................$ 41.49 15.61

ELEC0071-008 12/28/2015

COLUMBIANA, MAHONING, and TRUMBULL COUNTIES

Equipment Operator..........$ 32.24 12.34 Groundman...................$ 23.28 10.37 Lineman & Cable Splicers....$ 35.82 13.13

ELEC0071-010 12/28/2015

BELMONT, CARROLL, HARRISON, HOLMES, JEFFERSON, MEDINA, PORTAGE,

STARK, SUMMIT, and WAYNE COUNTIES

Equipment Operator..........$ 32.24 12.34 Groundman...................$ 23.28 10.37 Lineman & Cable Splicers....$ 35.82 13.13

ELEC0071-013 12/28/2015

BROWN, BUTLER, CLERMONT, HAMILTON, and WARREN COUNTIES

Rates Fringes

Line Construction Equipment Operator..........$ 32.24 12.34 Groundman...................$ 23.28 10.37 Lineman & Cable Splicers....$ 35.82 13.13

ELEC0071-014 12/28/2015

ADAMS, ATHENS, GALLIA, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), LAWRENCE, MEIGS, PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships)

Equipment Operator..........$ 32.24 12.34 Groundman...................$ 23.28 10.37 Lineman & Cable Splicers....$ 35.82 13.13

ELEC0082-002 11/30/2015

CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN

(Wayne, Clear Creek & Franklin Townships)

ELECTRICIAN......................$ 28.60 17.60

ELEC0082-006 11/30/2015

CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN

(Wayne, Clear Creek & Franklin Townships)

Sound & Communication Technician Cable Puller................$ 10.24 4.91 Installer/Technician........$ 22.75 10.56

ELEC0129-003 02/29/2016

LORAIN (Except Columbia Township) & MEDINA (Litchfield & Liverpool Townships)

ELECTRICIAN......................$ 32.35 16.24

ELEC0129-004 02/29/2016

ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships)

ELECTRICIAN......................$ 32.35 16.24

ELEC0141-003 09/05/2016

BELMONT COUNTY

Rates Fringes

CABLE SPLICER....................$ 32.45 24.22

ELECTRICIAN......................$ 29.20 23.63

ELEC0212-003 06/06/2016

BROWN, CLERMONT & HAMILTON

Rates Fringes

Sound & Communication Technician.......................$ 27.47 17.78

ELEC0212-005 06/06/2016

BROWN, CLERMONT, and HAMILTON COUNTIES

Rates Fringes

ELECTRICIAN......................$ 27.47 17.78

ELEC0245-003 08/29/2016

DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA,

PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, and WOOD COUNTIES

Cable Splicer...............$ 43.34 25.2%+5.25+a Groundman/Truck Driver......$ 16.49 25.2%+5.25+a Heli-arc Welding............$ 37.99 25.2%+5.25+a Lineman.....................$ 37.69 25.2%+5.25+a Operator - Class 1..........$ 30.15 25.2%+5.25+a Operator - Class 2..........$ 26.38 25.2%+5.25+a Traffic Signal & Lighting Technician..................$ 33.92 25.2%+5.25+a

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

ELEC0245-004 08/29/2016

ERIE COUNTY

Rates Fringes

Line Construction Cable Splicer...............$ 43.34 25.2%+5.25+a Groundman/Truck Driver......$ 16.49 25.2%+5.25+a Lineman.....................$ 37.69 25.2%+5.25+a Operator - Class 1..........$ 30.15 25.2%+5.25+a Operator - Class 2..........$ 26.38 25.2%+5.25+a

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

ELEC0246-006 10/29/2012

Rates Fringes

ELECTRICIAN......................$ 33.00 26.16

ELEC0306-005 05/30/2016

MEDINA (Brunswick, Chatham, Granger, Guilford, Harrisville, Hinckley, Homer, Lafayette, Medina, Montville, Sharon, Spencer, Wadsworth, Westfield & York Townships), PORTAGE (Atwater, Aurora, Brimfield, Deerfield, Franklin, Mantua, Randolph, Ravenna, Rootstown, Shalersville, Streetsboro & Suffield Townships), SUMMIT & WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton, & Wayne Townships)

CABLE SPLICER....................$ 36.87 16.56

ELECTRICIAN......................$ 33.79 5%+16.41

ELEC0317-002 06/01/2016

GALLIA & LAWRENCE

CABLE SPLICER....................$ 32.68 18.13

ELECTRICIAN......................$ 33.31 22.98

ELEC0540-005 12/28/2015

CARROLL (Northern half, including Fox, Harrison, Rose & Washington Townhships), COLUMBIANA (Knox Township), HOLMES, MAHONING (Smith Township), STARK, TUSCARAWAS (North of Auburn, Clay, Rush & York Townships), and WAYNE (South of Baughman, Chester, Green & Wayne Townships) COUNTIES

ELECTRICIAN......................$ 30.04 21.78

ELEC0573-003 06/01/2015

ASHTABULA (Colebrook, Wayne, Williamsfield, Orwell & Windsor Townships), GEAUGA (Auburn, Middlefield, Parkman & Troy Townships), MAHONING (Milton Township), PORTAGE (Charlestown, Edinburg, Freedom, Hiram, Nelson, Palmyra, Paris & Windham Townships), and TRUMBULL (Except Liberty & Hubbard Townships)

ELECTRICIAN......................$ 30.57 16.85

ELEC0575-001 05/30/2016

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY (Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)

ELECTRICIAN......................$ 31.85 14.02

ELEC0648-001 09/05/2016

BUTLER and WARREN COUNTIES (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships)

CABLE SPLICER....................$ 30.50 17.23

ELECTRICIAN......................$ 30.00 17.20

ELEC0673-004 05/30/2016

ASHTABULA (Excluding Orwell, Colebrook, Williamsfield, Wayne & Windsor Townships), GEAUGA (Burton, Chardon, Claridon, Hambden, Huntsburg, Montville, Munson, Newbury & Thompson Townships) and

LAKE COUNTIES

CABLE SPLICER....................$ 33.29 17.11

ELECTRICIAN......................$ 33.24 3%+17.78

ELEC0683-002 05/30/2016

CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON,

PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships), and

UNION COUNTIES

CABLE SPLICER....................$ 31.45 15.85

ELECTRICIAN......................$ 31.85 17.38

ELEC0688-003 05/30/2016

ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley & Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown & Jefferson Townships), MARION, MORROW, RICHLAND and WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)

ELECTRICIAN......................$ 28.16 16.34

ELEC0972-002 06/01/2015

ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships), and WASHINGTON

COUNITES

CABLE SPLICER....................$ 32.74 22.38

ELECTRICIAN......................$ 32.49 22.38

ELEC1105-001 12/28/2015

COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College Townships), LICKING, MUSKINGUM, PERRY, and TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry & Bucks Townships) COUNTIES

ELECTRICIAN......................$ 30.20 15.08

ENGI0018-003 06/01/2016

ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA,

PORTAGE, and SUMMIT COUNTIES

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 35.33 14.41

GROUP 2.....................$ 35.23 14.41

GROUP 3.....................$ 34.19 14.41

GROUP 4.....................$ 32.97 14.41

GROUP 5.....................$ 27.68 14.41

GROUP 6.....................$ 35.58 14.41

GROUP 7.....................$ 35.58 14.41

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;

Crane (All Types, Including Boom Truck, Cherry Picker);

Crane-Compact, Track or Rubber over 4,000 lbs. capacity;

Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System);

Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge); Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper; Piledriving Machine (All Types);

Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work;

Rough Terrain Fork Lift with Winch/Hoist; Side-Boom;

Slip-Form Paver; Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; Wheel Excavator; and Asphalt Plant Engineer (Cleveland District Only).

GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Horizontal Directional Drill (Over 50,000 ft lbs thrust); Hydro Milling Machine; Kolman-type Loader (production type-Dirt);

Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications);

Material Transfer Equipment (Shuttle Buggy) Asphalt;

Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types;

Trench Machine (24" wide & under); Vermeer type Concrete Saw; and Maintenance Operators (Portage and Summit Counties Only).

GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer (Portage and Summit Counties Only); Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types);

Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs.

Pressure) Pump Operator installing & operating Well Points;

Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); Welding Machines; and Railroad Tie Inserter/Remover; Articulating/straight bed end dumps if assigned (minus $4.00 per hour.

GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine;

Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;

Farm-type Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types);

Forklift; Form Trencher; Hydro Hammer expect masonary;

Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver;

Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader;

Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.

GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonry Fork Lift;

Inboard-Outboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes - Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.

GROUP 6 - Master Mechanic & Boom from 150 to 180.

GROUP 7 - Boom from 180 and over.

ENGI0018-004 06/01/2016

ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN,

BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON,

COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD,

FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON,

HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES,

HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN,

LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE,

MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING,

PERRY, PICKAWAY, PIKE, PREBLE, PUTNAM, RICHLAND, ROSS,

SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN

WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, and

YANDOT COUNTIES

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 33.84 14.41

GROUP 2.....................$ 33.72 14.41

GROUP 3.....................$ 32.68 14.41

GROUP 4.....................$ 31.50 14.41

GROUP 5.....................$ 26.04 14.41

GROUP 6.....................$ 34.09 14.41

GROUP 7.....................$ 34.09 14.41

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;

Crane (All Types, Including Boom Truck, Cherry Picker);

Crane-Compact, Track or Rubber over 4,000 lbs. capacity;

Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge);

Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper;

Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver;

Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; and Wheel Excavator.

GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Hydro Milling Machine; Horizontal Directional Drill (over 50,000 ft. lbs.

thrust);Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24" wide & under); and Vermeer type Concrete Saw.

GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Railroad Tie Inserter/Remover; Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); and Welding Machines; Artiaculating/straight bed end dumps if assigned (minus $4.00 per hour.

GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine;

Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;

Farm-type Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift; Form Trencher; Hydro Hammer expect masonary; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader;

Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.

GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonary Forklift;

Inboard-Outboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes - Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.

GROUP 6 - Master Mechanic & Boom from 150 to 180.

GROUP 7 - Boom from 180 and over.

ENGI0066-023 06/01/2014

COLUMBIANA, MAHONING & TRUMBULL COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 1 - A & B.............$ 37.55 17.51

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 2 - A & B.............$ 37.22 17.51

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 3 - A & B.............$ 33.49 17.51

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 4 - A & B.............$ 29.54 17.51

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 5 - A & B.............$ 26.15 17.51

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 1 - C & D.............$ 34.42 17.51

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 2 - C & D.............$ 34.12 17.51

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 3 - C & D.............$ 30.70 17.51

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 4 - C & D.............$ 27.08 17.51

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 5 - C & D.............$ 23.97 17.51

ALL OTHER WORK

GROUP 1.....................$ 31.29 17.51

ALL OTHER WORK

GROUP 2.....................$ 31.02 17.51

ALL OTHER WORK

GROUP 3.....................$ 27.91 17.51

ALL OTHER WORK

GROUP 4.....................$ 24.62 17.51

ALL OTHER WORK

GROUP 5.....................$ 21.79 17.51

GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached

GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;

Boring Machine Attached to Tractor; Bullclam; Bulldozer;

C.M.I. Road Builder & Similar Type; Cable Placer & Layer;

Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;

Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;

Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;

Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;

Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile;

Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail;

Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;

Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;

Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine;

Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);

Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in

Slip Form or Lift Slab Construction); Pump Crete Machine;

Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing;

Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;

Tractor-Double Boom; Tractor with Attachments; Truck-Boom;

Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)

GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer;

Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork lift & Lulls; Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine; Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden);

Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist

GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor;

Curb Builder, self-propelled; Drill Wagon; Generator Set;

Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven;

Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller;

Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter;

Tractor; Trencher Form; Water Blaster; Steam Jenny;

Syphon; Vibrator-Gasoline; & Welding Machine

GROUP 5 - Brakeperson; Fireperson; & Oiler

IRON0017-002 05/01/2016

ASHTABULA (North of Route 6, starting at the Geauga County Line, proceeding east to State Route 45), CUYAHOGA, ERIE (Eastern 2/3), GEAUGA, HURON (East of a line drawn from the north border through Monroeville & Willard), LAKE, LORAIN, MEDINA (North of Old Rte. #224), PORTAGE (West of a line from Middlefield to Shalersville to Deerfield), and SUMMIT (North of Old Rte. #224, including city limits of Barberton) COUNTIES

IRONWORKER

Ornamental, Reinforcing, & Structural..................$ 33.33 20.55

IRON0017-010 05/01/2016

ASHTABULA (Eastern part from Lake Erie on the north to route #322 on the south to include Conneaut, Kingsville, Sheffield, Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont, Richmond, Andover & Williamsfield Townships)

Structural, including metal building erection & Reinforcing.................$ 33.33 20.55

IRON0044-002 06/01/2016

CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line)

Fence Erector...............$ 25.15 20.20 Ornamental; Structural......$ 26.47 20.20

IRON0055-003 07/01/2015

CRAWFORD (Area Between lines drawn from where Hwy #598 & #30 meet through N. Liberty to the northern border & from said Hwy junction point due west to the border), DEFIANCE (S. of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), ERIE (Western 1/3), FULTON, HANCOCK, HARDIN (North of a line drawn from Maysville to a point 4 miles south of the northern line on the eastern line), HENRY, HURON (West of a line drawn from the northern border through Monroeville & Willard), LUCAS, OTTAWA, PUTNAM (East of a line drawn from the northern border down through Miller City to where #696 meets the southern border), SANDUSKY, SENECA, WILLIAMS (East of a line drawn from Pioneer through Stryker to the southern border), WOOD & WYANDOT (North of Rte.

#30)

Fence Erector...............$ 20.00 20.13 Flat Road Mesh..............$ 20.75 18.00 Tunnels & Caissons Under Pressure....................$ 28.50 18.00 All Other Work..............$ 29.12 21.47

IRON0147-002 06/01/2015

ALLEN (Northern half), DEFIANCE (Northern part, excluding south of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), MERCER

(Northern half), PAULDING, PUTNAM (Western part, excluding east of a line drawn from the northern border down through Miller City to where #696 meets the southern border), VAN WERT, and WILLIAMS (Western part, excluding east of a line drawn from Pioneer through Stryker to the southern border) COUNTIES

IRONWORKER.......................$ 25.39 20.64

IRON0172-002…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .