Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_of_Bids.pdf | ||
| W91237-16-B-0003-0003.pdf | ||
| Questions_and_Answers_2of2.pdf | ||
| W91237-16-B-0003-0002.pdf | ||
| W91237-16-B-0003-0001.pdf | ||
| Pre-Bid_Roster.xlsx | XLSX spreadsheet | |
| Questions_and_Answers_Final.pdf | ||
| Specs_rev01.pdf | ||
| W91237-16-B-0003-0001.pdf | ||
| Plans.pdf | ||
| W91237-16-B-0003.pdf | ||
| Synopsis.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications for
LIFTING AND PLACING UPPER MAIN
CHAMBER MITER GATE LEAVES
AT MELDAHL LOCKS AND DAM,
FELICITY, OHIO
Certified Final Documents - RTA
DEPARTMENT OF THE ARMY
HUNTINGTON DISTRICT, CORPS OF ENGINEERS
HUNTINGTON, WEST VIRGINIA
IFB No. W91237-16-B-0003 November 2016
This page was intentionally left blank for duplex printing.
CAM09 IFB No. W91237-16-B-0003
ITEM NO. DESCRIPTION QUANTITY UNIT
UNIT
PRICE AMOUNT
1 Reimbursement of Actual Cost of Performance and Payment Bonds for Bids in Excess of $150,000 1 Job Sum (not to exceed)
2 Mobilization and Demobilization 1 Job Sum
3 Install Miter Gates 1 Job Sum
4 Standby Time 1 Day
5 Environmental Protection 1 Job Sum $
Total (Items 1 thru 5) $
SCHEDULE
IFB NO. W91237-16-B-0003 CAM09
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 CONTRACT CONSIDERATIONS
01 22 00.00 20 APPLICATION FOR PAYMENT
01 28 00.00 10 CONTRACT MODIFICATIONS
01 31 19.00 40 PROJECT CONFERENCES
01 32 01.00 10 PROJECT SCHEDULE
01 32 16.00 20 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 40 CONTRACTOR QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 60 00.00 40 MATERIAL AND EQUIPMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
IFB No. W91237-16-B-0003 CAM09
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 80 00
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.2 SUBMITTALS
1.3 LIQUIDATED DAMAGES--CONSTRUCTION
1.4 Notice to Proceed
1.5 DOCUMENT SECURITY
1.5.1 For Official Use Only (FOUO)
1.6 SECURITY REQUIREMENTS
1.6.1 Foreign Nationals
1.7 AT/OPSEC REQUIREMENTS
1.7.1 AT Level I Traininge
1.7.2 Access and General Protection/Security Policy and Procedures
1.7.2.1 For Contractors Who do not Require CAC, but Require Access to a DOD Facility or Installation
1.7.3 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)
1.7.4 Pre-Screening Candidates Using E-Verify Program
1.8 RECORDKEEPING AND REPORTING
1.9 CONTRACT DRAWINGS AND SPECIFICATIONS
1.10 SUBMISSION OF CONTRACT DOCUMENTATION
1.11 WAGE RATES
1.12 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
1.13 OBSTRUCTION OF NAVIGABLE WATERWAYS
1.14 FLOATING PLANT AND TOWBOAT
1.15 FLOOD OUTAGE
1.16 REQUIRED INSURANCE
1.16.1 Insurance Certification
1.17 PERFORMANCE EVALUATION OF CONTRACTOR
1.18 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)
1.19 AVAILABILITY AND USE OF UTILITY SERVICES
1.19.1 Government Furnished Utility Services
1.20 PROGRESS SCHEDULE
1.20.1 Schedule Preparation
1.21 PAYMENT
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
DOCUMENT 00 80 00 Page 1
SECTION 00 80 00
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
Comply with the Contract Clause 52.211-10.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Employees; G|SM Investigation Package for Contractor and Subcontractor Employees;
G|SM
1.3 LIQUIDATED DAMAGES--CONSTRUCTION
Upon the Contractor's date for being on-site and ready to make the lifts as reflected on the approved schedule, the contractor has 21 calender days to complete the work and demobilize from the site. Liquidated damages in the amount specified in FAR Clause 52.211-12 may be assessed by the Government for each calender day of delay until the work is completed or accepted.
These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.4 Notice to Proceed
At the successful conclusion of the Preconstruction Meeting the Government expects to issue notice-to-proceed to the Contractor. The Contractor will be required to complete all requirements as outlined in the preconstruction meeting prior to receiving Government clearence for mobilization. A clearance to mobilize is expected to be issued 14 April 2017 and the contractor shall complete all remaining required tasks no later than 160 days after the Government has provided the authorization to mobilize.
1.5 DOCUMENT SECURITY
Contractors working for and on USACE projects shall provide the appropriate physical security for all related items as detailed/prescribed in AR 380-5, dated 29 September 2000.
1.5.1 For Official Use Only (FOUO)
For Official Use Only (FOUO): The unauthorized disclosure of the information contained in the attached documents is forbidden to protect the Government's interest in compliance with program effectiveness under AR 380-5 and as follows:
DOCUMENT 00 80 00 Page 2
a. During working hours, reasonable steps shall be taken to minimize risk of access by unauthorized personnel. After working hours, FOUO information can be stored in unlocked containers, desks or cabinets if U.S. Government or U.S. Government-contract building security is provided. If U.S. Government-contract building security is not provided, FOUO information must be stored in locked desks, file cabinets, bookcases, or similar locked containers.
b. FOUO documents and material can be transmitted via first class mail, parcel post, or, for bulk shipments, fourth class mail. Electronic transmission of FOUO information by voice, data, facsimile or similar means, shall be by approved secure communications systems whenever possible. (AR 380-5 (dated 29 September 2000))
c. Record copies of FOUO documents shall be disposed of in accordance with AR 25-400-2. Non-record FOUO documents shall be destroyed by shredding or tearing into pieces and discarding the pieces in regular trash containers.
1.6 SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on this contract must be vetted by completing a Security Information Sheet. The Security Information Sheet can be emailed or sent to Matthew D. Green or Sandra L.
Hardwick, phone (304) 399-5612.
The Contracting Officer Representative (COR) or the Contracting Specialist shall provide a list of names of those individuals who have been cleared to work on this contract to the Contractor.
Following submission of the Security Information Sheet, the Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, Security Management Office will make recommendations to the COR and/or the Contracting Specialist. The Security Management Office cannot give approval due to unfavorable report(s). The Security Management Office shall coordinate with Office of Counsel and will jointly determine and make recommendations to the Contracting Officer. The Contracting Officer will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the Contracting Officer will advise Contractor of the decision.
1.6.1 Foreign Nationals
The Contractor shall provide the package listed above, as well as, additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters Staff to accomplish. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, "Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives" dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers' contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with
DOCUMENT 00 80 00 Page 3 documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S.
passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time delays, Contractor is encouraged to work closely with the Security Management Office. The Government will return, for correction, incomplete forms, illegible forms, etc., which will delay the contractor/subcontractor from commencing work.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government will add any changes to security requirements by modification to the contract. The Contractor shall contact the Security Management Office by phone, letter, or e-mail at the following numbers/addresses:
US Army Corps of Engineers
ATTN: CELRH-SM
502 Eighth Street Huntington, WV 25701
Sandra L. Hardwick, phone (304) 399-5612;
e-mail sandra.l.hardwick@usace.army.mil or
Matthew D. Green, phone (304) 399-5294;
e-mail matthew.d.green@usace.army.mil
1.7 AT/OPSEC REQUIREMENTS
Contractors are required to comply with the following:
1.7.1 AT Level I Traininge
All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within thirty (30) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Contracting Officer's Representative (COR) or to the Contracting Officer (if a COR is not assigned), within five (5) calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
1.7.2 Access and General Protection/Security Policy and Procedures
All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/ facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all
DOCUMENT 00 80 00 Page 4 information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.7.2.1 For Contractors Who do not Require CAC, but Require Access to a DOD Facility or Installation
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.7.3 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within thirty
(30) calendar days of contract award and within thirty (30) calendar days of new employees commencing performance with the results reported to the Contracting Officer's Representative no later than five (5) calendar days after the completion of the training.
1.7.4 Pre-Screening Candidates Using E-Verify Program
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government-issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible candidates must be provided to the Contracting Officer's Representative no later than three (3) business days after the initial contract award.
1.8 RECORDKEEPING AND REPORTING
The Contractor shall maintain a roster of all background investigation requests. The roster shall be maintained and available for inspection by the Contracting Officer upon request. A copy will also be provided to the Contracting Officer on a monthly basis. At a minimum, the roster shall include the following information:
Full Name of Employee Employer
DOCUMENT 00 80 00 Page 5
Date Phase I Background Check Requested Date of Phase I Approval/Disapproval Date Phase II Background Investigation Requested Date of Phase II Approval/Disapproval Date Foreign National/Recent U.S. Citizen Check Requested Date Foreign National/Recent U.S. Citizen Check Approval/Disapproval
Other information may also be included on the roster. However, the Contractor is responsible for protecting all sensitive personal information such as social security numbers, birth dates, etc.
1.9 CONTRACT DRAWINGS AND SPECIFICATIONS
Comply with Contract Clause 252.236-7001. Contractor shall field verify all dimensions on drawings prior to commencing design and layout of the work.
1.10 SUBMISSION OF CONTRACT DOCUMENTATION
Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:
Submittals, including ENG 4025 transmittal form
Meeting Minutes
Construction Photographs
Correspondence
Requests for Information
Payroll Documents
Statement and Acknowledgement Forms (SF 1413)
Request for Additional Classification (SF 1444)
Progress Payment Requests and Supporting Documentation
Contract Modification Documentation, including SF 30, Contractor's Offer, Cost/Pricing Audit Report, and Certificate of Current Cost or Pricing Data
Contractor Quality Control Reports (with attachments)
Accident Reports
Schedules and Schedule Updates
Closeout Documentation, including Release of Claims
Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer's Representative (COR).
Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR)
DOCUMENT 00 80 00 Page 6 routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic documents fewer than 10MB to an email address as directed by the COR. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:
https://safe.amrdec.army.mil/safe/
The Government reserves the right to request hard copy submission of any item, if deemed necessary. The Contractor shall be prepared to provide up to eight (8) additional paper hard copies of any contract document at the discretion of the COR, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format because law or other regulations require signed originals be kept in accordance with FAR
4.805 -- STORAGE, HANDLING, AND DISPOSAL OF CONTRACT FILES:
Advance Payment Bond
Bid Bond including Annual Bid Bond
Performance Bond including Annual Performance Bond
Payment Bond
Patent Infringement Bond
Any performance security instruments
Certificate of Insurance
Novation/Change of Name Agreement
Assignment of Claims
Any document containing a raised seal. Examples include:
o Notarized documents o Architecture Drawings
Paper Payroll Documents
Physical signatures on contracts and modifications o SF 1442 o SF 30
1.11 WAGE RATES
Wage rates shall be in accordance with Contract Clause 52.222-6
CONSTRUCTION WAGE RATE REQUIREMENTS.
1.12 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
(a) The Contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls
DOCUMENT 00 80 00 Page 7 electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR clause 52.222-8, PAYROLLS AND BASIC RECORDS and FAR clause 52.222-13, COMPLIANCE WITH CONSTRUCTION
WAGE RATE REQUIREMENTS AND RELATED REGULATIONS.
(b) If the Contractor elects to use an electronic Davis-Bacon Act payroll processing system, then the Contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the Contractor to comply with Davis-Bacon and Related Act Regulations. When the Contractor uses an electronic Davis-Bacon Act payroll system, the electronic payroll service shall be used by the Contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required three (3) years after contract completion. If the Contractor chooses to use an electronic Davis-Bacon Act payroll system, then the Contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and Related Act Regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract admin office to the electronic payroll processing system used by the Contractor.
(c) The Contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria:
commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rms.usace.army.mil/Home/SiteMap) for export in an Excel spreadsheet to be imported into the Contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce Contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis-Bacon Act payrolls submitted to the Government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic D-B payroll processing system shall be provided to the Government during contract closeout.
(d) All Contractor-incurred costs related to the Contractor's provision and use of an electronic payroll processing service shall be included in the Contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid or reimbursed item under this contract.
1.13 OBSTRUCTION OF NAVIGABLE WATERWAYS
a. The Contractor shall--
DOCUMENT 00 80 00 Page 8
(1) Promptly recover and remove any material, plant, machinery, or appliance which the contractor loses, dumps, throws overboard, sinks, or misplaces, and which, in the opinion of the Contracting Officer, may be dangerous to or obstruct navigation;
(2) Give immediate notice, with description and locations of any such obstructions, to the Contracting Officer; and
(3) When required by the Contracting Officer, mark or buoy such obstructions until the same are removed.
b. The Contracting Officer may--
(1) Remove the obstructions by contract or otherwise should the Contractor refuse, neglect, or delay compliance with paragraph (a); and
(2) Deduct the cost of removal from any monies due or to become due to the Contractor, or
(3) Recover the cost of removal under the Contractor's bond.
c. The Contractor's liability for the removal of a vessel wrecked or sunk without fault or negligence is limited to that provided in Sections 15, 19, and 20 of the River and Harbor Act of March 3, 1899 (33 U.S.C. 410 et.seq.).
1.14 FLOATING PLANT AND TOWBOAT
a. The Contractor shall notify the Contracting Officer, in writing, at least thirty (30) days in advance of the date he proposes to use a floating plant above or below the immediate vicinity of the Locks and Dam (within the confines of the designated lockage arrival points). The Contracting Officer will advise the Lockmaster so that action is coordinated with traffic in a timely manner. Priority lockage can be authorized at the request of the Contractor.
b. Stationing of floating plant above the immediate vicinity of the Locks and Dam will be prohibited whenever river flows are sufficient to require a total Dam gate opening exceeding 50 feet. Stationing of floating plant below the immediate vicinity of the Locks and Dam will be prohibited whenever river flows are sufficient to require a total Dam gate opening exceeding 25 feet. Projected increased river flow which may require total Dam opening to exceed the referenced 50 or 25 feet, of total Dam gate opening and/or possible accidents, will require the Contractor to immediately remove the floating plant. Therefore, the Contractor shall furnish the Contracting Officer a list of all the Contractor's key personnel, along with telephone numbers where they may be contacted day or night, so that on a short notice the floating plant may be removed from the vicinity of the Dam.
c. If the Contracting Officer or Lockmaster at Meldahl Locks and Dam is unable to contact the Contractor or his key employees, or if after contact the floating plant is not removed within four hours following notice, the Government will take the necessary action required to have the floating plant removed from the immediate vicinity of the Dam. All costs and any damages resulting from the removal shall be at the expense of the Contractor.
d. The floating plant cannot be left unattended while stationed in the
DOCUMENT 00 80 00 Page 9 immediate vicinity of the Locks and Dam, unless written permission is obtained from the Contracting Officer for each and every occurrence.
e. Mooring facilities are available for use within the Main Lock Chamber during the execution of the lifting operations. While the Contractor is in "Stand-By" mode, all equipment shall be moored at commercial mooring facilities at the expense of the Contractor. Plant shall not be moored in lock chambers or on lock walls where it will affect navigation. This area shall be vacated before the upper pool elevation reaches 486.50 or at the direction of the Lockmaster.
f. The Contractor shall also provide a towboat with adequate horsepower and twin screws to handle the floating plant being utilized, or shall obtain a contract with a reputable towing or marine service company to provide towboat services on an as-needed basis. The towboat shall be available within four hours of notice of need to abandon the work position, as directed by the Contracting Officer, on a 24-hour-a-day, seven-day-a-week basis, anytime the Contractor's floating plant is on station at the Locks and Dam. Note: The towboat does not have to be on station but shall be available on notice to reach the project site as specified above. The Government will furnish three (3) copies of 33 CFR 207.300, "Regulations Prescribed by the Secretary of the Army for Ohio River, Mississippi River above Cairo, Ill., and their Tributaries, Use, Administration and Navigation", to the Contractor for purpose of construction.
g. During use of a floating plant, the Government will, to maximum extent practicable, operate the Dam in such manner that tainter gate No. 1 will be closed while the Contractor is working in the immediate area.
1.15 FLOOD OUTAGE
During the course of the contract, high river flow conditions will develop in varying degrees. The Contracting Officer or the Lockmaster will inform the Contractor as to when he will be required to remove his floating plant from the work area to meet the requirements above. At above 50 feet of total Dam opening, the Lockmaster will make an evaluation of pending river conditions and will inform the Contracting Officer as to whether the Contractor shall be required to remove his floating plant.
a. Total gate openings of 50 feet and 25 feet referred to in the specifications equate to 175,000 cfs and 88,700 cfs, respectively. It is imperative that the Contractor maintain close communication with the Lockmaster throughout this contract and to ascertain expected river conditions for the remainder of the work day and the short term future.
b. The stage duration curves, Contract Drawings S-701 through S-708, represent the results of a statistical analysis of historical stage data for the upper and lower gages, on a monthly basis. For any given stage, these curves can be used to determine the percentage of time for which that particular stage could be expected to be equaled or exceeded on a monthly basis or for any given month. The historical stage hydrographs shown on Contract Drawings S-709 and S710, illustrate the variation in the upper and lower pools for the period of record 1 October 2002 to 30 September 2015. For the upper pool hydrographs the gage datum is 473.0 feet. For the lower pool hydrographs the gage datum is 443.0 feet.
DOCUMENT 00 80 00 Page 10
1.16 REQUIRED INSURANCE
In reference to Contract Clause INSURANCE--WORK ON A GOVERNMENT INSTALLATION, FAR 52.228-5, the Contractor shall procure and maintain, during the entire period of his performance under this contract, the following minimum insurance:
a. Workmen's Compensation. Workmen's Compensation and Occupational Disease Coverage, as legally required by the State wherein the work is being performed.
b. Comprehensive Automobile Liability Insurance. Bodily injury coverage with minimum limits of $200,000 per person and $500,000 per occurrence, and $100,000 per occurrence for property damage shall be required.
c. Comprehensive General Liability Insurance. Bodily injury coverage with minimum limit of $500,000 per occurrence shall be required.
Property damage coverage with a minimum limit of $100,000 per occurrence shall be required. In addition, the Contractor shall have liability insurance in the minimum amount of $10,258,000 that cover damages to the Government furnished property, which will be provided to the Contractor. Paragraph IDENTIFICATION OF GOVERNMENT FURNISHED PROPERTY of Section 01 60 00.00 40 MATERIAL AND EQUIPMENT provides the details and values of the Government furnished property.
e. Marine Liability Insurance. The Contractor shall procure and maintain Protection and Indemnity, including Jones Act and Collision and Towers liability insurance in the minimum amount of $1,000,000 per occurrence.
1.16.1 Insurance Certification
Before commencing work under this contract, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained. The policies evidencing the required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe or (2) until thirty (30) days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
1.17 PERFORMANCE EVALUATION OF CONTRACTOR
It is the Corps' standard operating procedure that the Contracting Officer evaluate the Contractor's performance and prepare a performance report using the web-based application CPARS (Contractor Performance Assessment Reporting System) for construction contracts per the threshold established by FAR 42.1502 (e) (currently $700,000). After an evaluation (interim or final) is written by the Corps, the Contractor has a 60-day period to access, review and comment on the evaluation. Accessing and using CPARS requires having specific software, called PKI certification, installed on the user's computer. The certification, a Department of Defense requirement, was implemented to provide security in electronic transactions. The certification software could cost approximately $100-$125 per certificate, per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web
DOCUMENT 00 80 00 Page 11 site: http://www.cpars.gov. The Contractor is encouraged to participate in the performance evaluation process, access to CPARS and PKI certification is the sole responsibility of the Contractor.
1.18 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, BASIS FOR SETTLEMENT OF PROPOSALS, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition, owned or controlled, and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE, REGION II. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, RENTAL COSTS. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the Simplified Acquisition Threshold (SAT), the Contracting Officer shall request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
1.19 AVAILABILITY AND USE OF UTILITY SERVICES
1.19.1 Government Furnished Utility Services
The Government will not provide any utilities under this contract.
1.20 PROGRESS SCHEDULE
1.20.1 Schedule Preparation
Prepare schedules in accordance with Section 01 32 01.00 10 PROJECT
SCHEDULE.
DOCUMENT 00 80 00 Page 12
1.21 PAYMENT
No separate payment will be made for the work covered under this section and all costs in connection therewith shall be included in the applicable contract price to which the work pertains.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
DOCUMENT 00 80 00 Page 13
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00
CONTRACT CONSIDERATIONS
PART 1 GENERAL
1.1 SUBMITTALS
1.2 DESCRIPTION OF WORK
1.2.1 General Project Features
1.2.2 Schedule
1.2.3 Limited Working Area and Times
1.2.4 Work Covered by Contract Documents
1.2.5 Work by Other Prime Contractors
1.3 CONTRACT CONSIDERATIONS
1.3.1 Contractor Use of Site
1.3.1.1 General
1.3.1.2 Site Layout Organization Plan
1.3.2 Identification of Government Furnished Property
1.3.3 Payments
1.3.3.1 Applications for Payment
1.3.3.2 Measurement and Payment
1.3.4 Contract Modifications (Change Orders)
1.3.5 Safety
1.3.6 Materials, Equipment and Workmanship
1.3.7 Permits, Licenses, Fees and Taxes
1.3.8 Shop Drawings, Product Data, and Samples
1.3.9 Network Analysis Schedules
1.3.10 Project Conferences
1.3.11 Reference Standards
1.3.12 Quality Control
1.3.13 Submittals
1.4 PAYMENT
1.4.1 Install Miter Gates
1.4.2 Standby Time
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
SECTION 01 00 00 Page 1
SECTION 01 00 00
CONTRACT CONSIDERATIONS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Site Layout Organization Plan; G|CM
1.2 DESCRIPTION OF WORK
1.2.1 General Project Features
a. The general description of the work of this contract consists of furnishing all materials, equipment, labor, layouts of work features, and supervision needed to accomplish work related to lifting two (2) leaves of a new miter gate, moving them and installing them in the main chamber upper miter gate recesses at Meldahl Locks and Dam located at approximately mile marker 436 on the Ohio River. There is one (1) right leaf and one (1) left leaf. Each leaf is approximately 66-foot tall by 62-foot wide by 7-foot deep and weighs approximately 245 tons. Both new miter gate leaves are currently stored in a horizontal position (lying flat). The right leaf is on the esplanade/grass approximately 400-foot downstream of the upper auxiliary chamber miter gate and no closer than 55-foot from the face of the lock wall. The left leaf is on a Government barge moored off in the harbor area behind the upper guide wall. Each of the new leaves have both a set of two (2) lifting lugs on the top (G-1) for lifting the leaves vertically and a set of four (4) lifting lugs on the downstream (open) side for lifting the leaves horizontally. These lugs were designed and installed by the fabrication contractor. If the Contractor wishes to utilize these lugs as is, the drawings are included in the reference drawings of the contract drawings and computations are included at the end of Section 01 00 00 CONTRACT CONSIDERATIONS, titled "Meldahl Locks and Dam Leaf Gate Lift & Barge Stability for the Contractor's use in verifying the adequacy of the lugs.
b. Each of the miter gate leaves will need to be rotated from the horizontal (flat) position to a vertical position with girder G-1 on top.
The Contractor shall develop a plan for handling the turning the leaves.
The Government has four (4) turning shoes, two of which can be mounted to the bottom horizontal girder at the intermediate diaphragms of each gate leaf to assist with rotating the leaves. If the Contractor wishes to utilize these turning shoes they shall notify the Government thirty (30) days in advance of when they will be needed. A Drawing of the turning shoes is included in the reference drawings of the contract drawings. The Contractor shall be responsible for installing on and removing the turning shoes from the miter gate leaves.
SECTION 01 00 00 Page 2
c. The miter gate leaves shall be placed in their respective recesses "in the dry". To accomplish this the Government will: (1) set the downstream emergency gate to hold back the upper pool; (2) place a stack of maintenance bulkhead units downstream of the miter gate recesses; (3) pump out the water between the emergency gate and maintenance bulkheads and (4) maintain the pumped out condition as long as river levels permit or the work is complete. This will create a dewatered area at the location where the miter gate leaves will be set on the pintles. The water elevation upstream of the dewatered area will be at upper pool and the water elevation downstream of the dewatered area will be at lower pool. The Contractor will need to lift the miter gate leaves either over the emergency gate on the upstream end or over the maintenance bulkhead units on the downstream end. While placing the gate leaves on the pintles, there will be no submerging of the gate leaves.
d. Once a miter gate leaf has been set on the pintle ball in the chamber, the Contractor shall hold the leaf in place to permit the Government to install the top miter gate anchorage. It may be necessary for the Contractor to make small adjustments to the location/alignment of the top of the gate leaf to assists in the installation of the miter gate top anchorage. After the miter gate top anchorage has been installed, the Contractor shall remove the lifting rigging from the leaf.
1.2.2 Schedule
The Government expects to have the preparation work to the lock chamber completed by 17 July 2017. To provide ample time for scheduling the availability of the Contractor, the miter gate leaves can be lifted and installed on the pintle balls, in the dewatered portion of the lock chamber, anytime between 17 July 2017 and 31 August 2017. The Contractor shall plan on being available for a period of twenty-one (21) days from the actual date they indicated they will be on-site and be ready to make the lifts. The Government estimates that the Contractor will need to make a minimum of three (3) lifts and as many as six (6) lifts to get both miter gate leaves to their final position on the pintle balls. However, the Contractor is responsible for developing the installation plans for the gate leaves and will establish the actual number of lifts to be performed.
The Contractor shall schedule one day for each lift with the remainder of the scheduled 21 days in "stand-by" mode. "Stand-by" mode shall be defined as when the Contractor has all material, equipment and personnel available to proceed with a lift during the scheduled twenty-one (21) day period but is delayed by the Government. The Contractor shall submit a detailed breakdown of costs associated with the daily standby costs. After the miter gate leaves have been installed on the pintle balls and the Government has accepted the work as completed, the Contractor shall depart from the project within 24 hours.
1.2.3 Limited Working Area and Times
The Meldahl Locks and Dam project is an active navigation lock on the Ohio River operated 24/7. The locks consists of two (2) lock chambers commonly referred to as the "main" chamber and "auxiliary" chamber. The main chamber is 110-foot wide by 1200-foot long and the auxiliary chamber is 110-foot wide by 600-foot long. During the time of performance of this contract, the main chamber will be inactive and the auxiliary chamber will be the only chamber available to pass navigation traffic. During the course of this work it will be necessary for the Contractor be in the auxiliary chamber thus shutting the project down to navigation traffic. To reduce the impact to the navigation industry, the Contractor's access in
SECTION 01 00 00 Page 3 the auxiliary chamber shall be limited to one 10-hour long period during daylight hours each day. Outside of this 10-hour period the Contractor will need to remove their equipment and materials from the auxiliary lock chamber and its approaches to permit navigation traffic to utilize the auxiliary chamber.
1.2.4 Work Covered by Contract Documents
Perform all the work shown on the drawings and identified in Division 01 and Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS.
1.2.5 Work by Other Prime Contractors
Comply with the Contract Clause 52.236-8 OTHER CONTRACTS.
1.3 CONTRACT CONSIDERATIONS
1.3.1 Contractor Use of Site
1.3.1.1 General
Comply with the Contract Clauses 52.236-7 PERMITS AND RESPONSIBILITIES, 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, 52.236-10 OPERATIONS AND STORAGE AREAS and
52.236-12 CLEANING UP.
1.3.1.2 Site Layout Organization Plan
Within ten (10) calendar days after the date of Notice of Award, submit a Site Layout Organization Plan showing the Contractor's proposed layout of facilities on the site. The Contracting Officer will review the plan and issue its comments within fifteen (15) calendar days of receipt of the same. Acceptance of the final plan by the Contracting Officer is a prerequisite to the Contractor's use of the site. Upon completion of the work, vacate from the site all plant and temporary facilities and complete post-construction as specified in Section 01 57 20.00 10 ENVIRONMENTAL
PROTECTION.
1.3.2 Identification of Government Furnished Property
Comply with the requirements of Section 01 60 00.00 40 MATERIAL AND
EQUIPMENT.
1.3.3 Payments
1.3.3.1 Applications for Payment
Payments will be made in accordance with the Contract Clauses and with the applicable provisions of Section 01 22 00.00 20 APPLICATION FOR PAYMENT.
1.3.3.2 Measurement and Payment
Measurement and payment shall be determined in accordance with Contract Clauses 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS, and 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS and with the payment paragraphs of each of the technical specifications sections.
SECTION 01 00 00 Page 4
1.3.4 Contract Modifications (Change Orders)
Modifications shall be determined in accordance with the provisions of Section 01 28 00.00 10 CONTRACT MODIFICATIONS, Contract Clauses 52.243-4 CHANGES and 252.236-7000 MODIFICATION PROPOSALS--PRICE BREAKDOWN of Section
00700 CONTRACT CLAUSES.
1.3.5 Safety
Safety shall be the responsibility of the Contractor. Comply with the provisions of the Contract Clauses 52.236-13 ACCIDENT PREVENTION and with Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS of the specifications.
1.3.6 Materials, Equipment and Workmanship
Comply with the Contract Clause 52.236-5 MATERIAL AND WORKMANSHIP and with Section 01 60 00.00 40 MATERIAL AND EQUIPMENT of the specifications.
1.3.7 Permits, Licenses, Fees and Taxes
The Contractor shall ascertain the extent of, and pay for all necessary permits, licenses, fees, and taxes in accordance with the provisions of the Contract Clauses 52.236-7 PERMITS AND RESPONSIBILITIES and 52.229-3 FEDERAL, STATE, AND LOCAL TAXES of Section 00700 CONTRACT CLAUSES.
1.3.8 Shop Drawings, Product Data, and Samples
Comply with the Contract Clause 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION and with Section 01 32 16.00 20 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES of the specifications.
1.3.9 Network Analysis Schedules
Comply with Section 01 32 01.00 10 PROJECT SCHEDULE.
1.3.10 Project Conferences
Comply with the provisions of Section 01 31 19.00 40 PROJECT CONFERENCES of the specifications.
1.3.11 Reference Standards
Comply with the individual technical specifications sections and with Section 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS.
1.3.12 Quality Control
Comply with Contract Clauses 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR and 52.236-5 MATERIAL AND WORKMANSHIP and with Section 01 45 00.00 40
CONTRACTOR QUALITY CONTROL.
1.3.13 Submittals
Comply with the requirements of Section 01 33 00 SUBMITTAL PROCEDURES.
1.4 PAYMENT
Except as specified below, no separate payment will be made for the work covered under this section and all costs in connection therewith shall be
SECTION 01 00 00 Page 5 included in the applicable contract price to which the work pertains.
1.4.1 Install Miter Gates
Payment for all costs in connection with lifting and installing the miter gates will be made at the contract lump sum price for "Install Miter Gates". The payment shall constitute full compensation for furnishing all plant, labor, materials, tools, and equipment and performing all operations necessary for lifting, transporting, and placing the new miter gate leaves in their final positions as specified.
1.4.2 Standby Time
Payment for all costs in connection with standby time during the planned twenty-one (21) day window for execution of the lifts will be made at the contract price per day for "Standby Time". The payment shall constitute full compensation for furnishing all plant, labor, materials, tools and equipment and performing all operations necessary for standby time as specified. Contractor will only be compensated for actual standby time utilized.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
SECTION 01 00 00 Page 6
MELDAHL LOCKS AND DAM
LEAF GATE LIFT & BARGE STABILITY
PREPARED FOR:
Hillsdale Fabricators
PO Box 142637 St. Louis, MO 63114
PREPARED BY:
Ruby+Associates, Inc.
30445 Northwestern Hwy.
Suite 310
Farmington Hills, MI 48334
(248) 865-8855
September 2, 2010 Ruby 10-002-04
Brian Koontz, EIT Staff Engineer II
Thaddaeus Greiner, PE, SE Assistant Project Engineer
Bruce Burt, PE, SECB Associate
David I. Ruby, PE, SE Chairman, Founding Principal
Sketch Description/Location Calculations TOC-1 Calculation & Sketch Table of Contents --
M1 to M3 Main Lift Beam & Calculations M1-1 to -10 T1 to T3 Tailing Beam & Calculations T1-1 to -10 FT1 Fabrication Table Splice & Calculations FT1-1 to -4 R1 to R2 Rigging & Calculations R1-1 to -4 -- Miter Gate 3D Model & Analysis D-1 to D-8 -- Spreader Beam & Barge Floor Calculations B1-1 to -12 -- Shipping Frame Calculations SF-1 to -15 -- Barge Stability Calculations BS-1 to -11 -- Barge Calculation Reference Information A-1 to -4
Drawing Sheet Title EP-1 Fabrication Table Arrangement EP-2 Gate Assembly Sequence EP-3 Lift Crane Load Arrangement Loading Barge EP-4 Shipping Frame Arrangement EP-5 Lift Crane Load Arrangement Tip-Up EP-6 Lift Crane Load Arrangement Laydown EP-7 Rigging Diagram EP-8 Rigging Details
PROJECT
TITLE
Hillsdale Fabricators
Meldahl Locks & Dam
Table of Contents
BY:
DATE:
CHKD:
SHEET:
PAGE:
TAG
09/02/10
10-002-04RA
TOC-1
PROJECT NO:
Table Of Contents
© 2009 Ruby + Associates, Inc.
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 20
APPLICATION FOR PAYMENT
PART 1 GENERAL
1.1 SCOPE
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 FORMAT
3.2 PREPARATION OF APPLICATIONS
3.3 SUBMITTAL PROCEDURES
3.4 SUBSTANTIATING DATA
3.5 ESTIMATED EARNINGS
3.6 PAYMENT
SECTION 01 22 00.00 20 Page 1
SECTION 01 22 00.00 20
APPLICATION FOR PAYMENT
PART 1 GENERAL
1.1 SCOPE
Procedures for preparation and submittal of Application for Payment.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 FORMAT
Use format approved by the Contracting Officer. For each item, provide a column for listing: Item Number; Description of work; Scheduled Value, Previous Applications; Work in Place under this Application; Authorized Changes; Total Completed to Date of Application; Percentage of Completion;
Balance to Finish; and Retainage. Other entries required by the Contract Clause 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS shall be included.
3.2 PREPARATION OF APPLICATIONS
a. Present required information on electronic media printout.
b. Execute certification by signature of authorized officer.
c. Use data from Bid Schedule. Provide dollar value in each column for each line item for portion of work performed.
d. List each authorized Change Order as an extension on continuation sheet, listing Changes number and dollar amount as for an original item of work.
3.3 SUBMITTAL PROCEDURES
a. Submit three (3) copies of each Application for Payment.
b. Submit an updated construction schedule with each Application for Payment.
c. Payment Period: Submit at monthly intervals, as stipulated in the Contract Clause 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS.
d. Submit under transmittal form specified in Section 01 33 00
SUBMITTAL PROCEDURES.
3.4 SUBSTANTIATING DATA
a. Submit substantiating information, and…
This is the start of the file's text. The full file is on GovTribe.