A.01.13 Welcome Center RTA Spec Section 01 45 05.50 Revised.pdf
PDF 65 KB Posted
- Attached to
- DLA Renovate Welcome Center Bldg. Federal contract opportunity
- Solicitation number
- W9123622B2009
About this file
This document provides the specifications for quality control on a federal construction contract to renovate a welcome center building. The specifications outline requirements for the contractor's quality control plan, personnel, inspections, testing, recordkeeping and reporting. Key details include:
-
The contractor must designate a quality control system manager and provide qualified personnel to ensure safety and contract compliance. Inspections and testing are required for all construction operations and materials to verify conformance with contract requirements.
-
The quality control plan must include procedures for preparatory, initial and follow-up inspections for each definable feature of work. Inspections are required for materials, workmanship, safety compliance and testing. Deficiencies must be documented and corrected.
-
Daily reports from quality control personnel are required detailing work performed, inspection results, safety issues and corrective actions. Test reports and results must be provided. The contractor is responsible for certifying compliance of all work, except as documented.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IFB Abstract of Offerors Welcome Center.pdf | ||
| Welcome Center Amend 0005.pdf | ||
| W9123622B2009 Amendment 0004.pdf | ||
| 22B2009 Amendment 0003.pdf | ||
| W9123622B2009 Amendment 0002.pdf | ||
| Welcome Center Site Visit SignIn Sheet (2).pdf | ||
| 22B2009 Amend 1.pdf | ||
| A.01.13 Welcome Center RTA Spec Section 09 90 00 Revised.pdf | ||
| A.01.13 Welcome Center RTA Submittal Drawings.pdf | ||
| A.01.13 Welcome Center RTA Specifications.pdf | ||
| H.01.04 North Gate RTA Specs VOL 1.pdf | ||
| H.01.04 North Gate RTA Specs VOL 2.pdf | ||
| H.01.01 North Gate RTA Drawings.pdf | ||
| W9123622B2009.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Building 210 Welcome Center, DSCR, VA W9123617D0003
PN 2016.01628 W9123619F0095
SECTION 01 45 04.00 50
CONTRACTOR QUALITY CONTROL
12/18
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a 11 G 11 designation;
submittals not having a 11 G 11 designation are for information only. The following shall be submitted in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Quality Control Plan; G
1.2 PAYMENT
Separate payment will not be made for providing and maintaining an effective Quality Control program, and all costs associated therewith shall be included in the applicable unit prices or lump-sum prices contained in the Bidding Schedule.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract Clause titled "Inspection of Construction." The quality control system shall consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. The system shall cover all construction operations, both onsite and offsite, and shall be keyed to the proposed construction sequence. The site project superintendent will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract. The site project superintendent in this context shall be the highest level manager responsible for the overall construction activities at the site, including quality and production. The site project superintendent shall maintain a physical presence at the site at all times, except as otherwise acceptable to the Contracting Officer, and shall be responsible for all construction and construction related activities at the site. The site project Superintendent may not also serve as CQC System Manager. The site project Superintenent may not also serve as SSHO.
3.2 QUALITY CONTROL PLAN
The Contractor shall furnish for review by the Government, not later than 10 days after receipt of notice to proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause titled "Inspection of Construction". The plan shall identify personnel, SECTION 01 45 04.00 50 Page 1 procedures, control, instructions, tests, records, and forms to be used.
The Government will consider an interim plan for the first 60 days of operation. Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the features of work included in an accepted interim plan will not be permitted to begin tmtil acceptance of a CQC Plan or another interim plan containing the additional features of work to be started.
3.2.1 Content of the CQC Plan
The CQC Plan shall include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:
a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff shall implement the three phase control system for all aspects of the work specified. The staff shall include a CQC System Manager .
b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.
c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the contract. The CQC System Manager shall issue letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities.
Copies of these letters shall also be furnished to the Government.
d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures shall be in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Documentation shall be managed by Section 01 45 02.00 50 QUALITY CONTROL SYSTEM
(QCS).
e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer shall be used.)
f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.
g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. These procedures shall establish verification that identified deficiencies have been corrected.
h. Reporting procedures, including proposed reporting formats.
i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different
SECTION 01 45 04.00 50 Page 2 trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.
3.2.2 Acceptance of Plan
Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.
3.2.3 Notification of Changes
After acceptance of the CQC Plan, the Contractor shall notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
3.3 COORDINATION MEETING
After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the CQC Plan, the Contractor shall meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. The CQC Plan shall be submitted for review a minimum of 10 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting shall be prepared by the Government and signed by both the Contractor and the Contracting Officer. The minutes shall become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure safety and contract compliance. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization.
The Contractor's CQC staff shall maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance.
The CQC staff shall be subject to acceptance by the Contracting Officer.
The Contractor shall provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Complete records of all letters, material submittals, shop drawing submittals, schedules and all other project documentation shall be promptly furnished to the CQC organization by the Contractor. The
SECTION 01 45 04.00 50 Page 3
CQC organization shall be responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.
3.4.2 CQC System Manager
The Contractor shall identify as CQC System Manager an individual within the onsite work organization who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager shall have at least five (5) years' experience as a project quality control officer on projects involving multiple trades and sub-contractors to include a project having a minimum gross area of 15,000 square feet or a minimum total value of $ 5,000,000.
This CQC System Manager shall be on the site at all times during construction and shall be employed by the prime Contractor. An alternate for the CQC System Manager shall be identified in the plan to serve in the event of the System Manager's absence. The requirements for the alternate shall be the same as for the designated CQC System Manager. The CQC System Manager may not also serve as project Superintendent. The CQC System Manager may not also serve as Site Safety and Health Officer (SSHO).
3.4.3 CQC Personnel
In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: TAB, electrical, mechanical, architectural. A separate individual does not need to be assigned to each displine/tade area listed in the preceding sentence; however, the individuals performing the CQC function for the listed areas must be qualified for the areas in accordance with the experience matrix below.
Separate individuals are not required to perform the adminstrative and submitals role but they must have suffcient time to perform their duties specified below. These individuals must be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility;
have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. A single person may cover more than one area provided that they are qualified to perform QC activities in each designated and that workload allows.
Experience Matrix
Area Qualifications
b. Testing, Adjusting and Balancing Specialist must be a member (TAB} Personnel of AABC or an experienced technician of the firm certified by the NEBB.
c. Mechanical 5 yrs of experience
SECTION 01 45 04.00 50 Page 4 supervising mechanical features of work in the field with a construction company.
d. Electrical 5 yrs of experience supervising mechanical features of work in the field with a construction company.
e. Architectural 2 yrs related experience .
3.4.4 Additional Requirement
In addition to the above experience, the CQC System Manager shall have completed the course entitled "Construction Quality Management For Contractors. Specific times and locations for this training are available from the Contracting Officer.
3.4.5 Organizational Changes
The Contractor shall maintain the CQC staff at full strength at all times.
When it is necessary to make changes to the CQC staff, the Contractor shall revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance.
3.5 SUBMITTALS AND DELIVERABLES
Submittals, if needed, shall be made as specified in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization shall be responsible for certifying that all submittals and deliverables are in compliance with the contract requirements. When Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC is included in the contract, the submittals required by those sections shall be coordinated with Section 01 33 00 SUBMITTAL PROCEDURES to ensure adequate time is allowed for each type of submittal required.
3.6 CONTROL
Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control shall be conducted by the CQC System Manager for each definable feature of the construction work as follows:
3.6.1 Preparatory Phase
This phase shall be performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase shall include:
a. A review of each paragraph of applicable specifications, reference codes, and standards. A copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field shall be made available by the Contractor at the preparatory inspection. These copies shall be maintained in the
SECTION 01 45 04.00 50 Page 5 field and available for use by Government personnel until final acceptance of the work.
b. A review of the contract drawings.
c. A check to assure that all materials and/or equipment have been tested, submitted, and approved.
d. Review of provisions that have been made to provide required control inspection and testing.
e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.
f. A physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.
g. A review of the appropriate activity hazard analysis to assure safety requirements are met.
h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.
i. A check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.
j. Discussion of the initial control phase.
k. The Government shall be notified at least 48 hours in advance of beginning the preparatory control phase. This phase shall include a meeting conducted by the CQC System Manager, and attended by the Superintendent and other CQC personnel (as applicable), and the foreman responsible for the definable feature of work to be started .
The results of the preparatory phase actions shall be documented by separate minutes prepared by the CQC System Manager and attached to the daily CQC report. The Contractor shall instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.
3.6.2 Initial Phase
This phase shall be accomplished at the beginning of a definable feature of work. The following shall be accomplished:
a. A check of work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.
b. Verify adequacy of controls to ensure full contract compliance.
Verify required control inspection and testing.
c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required samplepanels as appropriate.
d. Resolve all differences.
e. Check safety to include compliance with and upgrading of the safety
SECTION 01 45 04.00 50 Page 6 plan and activity hazard analysis. Review the activity analysis with each worker.
f. The Government shall be notified at least 24 hours in advance of beginning the initial phase. Separate minutes of this phase shall be prepared by the CQC System Manager and attached to the daily CQC report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.
g. The initial phase should be repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.
3.6.3 Follow-up Phase
Daily checks shall be performed to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. The checks shall be made a matter of record in the CQC documentation. Final follow-up checks shall be conducted and all deficiencies corrected prior to the start of additional features of work which may be affected by the deficient work. The Contractor shall not build upon nor conceal non-conforming work.
3.6.4 Additional Preparatory and Initial Phases
Additional preparatory and initial phases shall be conducted on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.
3.7 TESTS
3.7.1 Testing Procedure
The Contractor shall perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements. Upon request, the Contractor shall furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. The Contractor shall procure the services of a Corps of Engineers approved testing laboratory or establish an approved testing laboratory at the project site. The Contractor shall perform the following activities and record and provide the following data:
a. Verify that testing procedures comply with contract requirements.
b. Verify that facilities and testing equipment are available and comply with testing standards.
c. Check test instrument calibration data against certified standards.
d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.
e. Results of all tests taken, both passing and failing tests, shall
SECTION 01 45 04.00 50 Page 7 be recorded on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test shall be given. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the test number and date taken. An information copy of tests performed by an offsite or commercial test facility shall be provided directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this contract.
3.7.2 Testing Laboratories
3.7.2.1 Capability Check
The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician 1 s testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel shall meet criteria detailed in ASTM D 3740 and ASTM E 329.
3.7.2.2 Capability Recheck
If the selected laboratory fails the capability check, the Contractor will be assessed a charge of $1,000.00 to reimburse the Government for each succeeding recheck of the laboratory or the checking of a subsequently selected laboratory. Such costs will be deducted from the contract amount due the Contractor.
3.7.3 Onsite Laboratory
The Government reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests, and to check the Contractoro s testing procedures, techniques, and test results at no additional cost to the Government.
3.7.4 Furnishing or Transportation of Samples for Testing
Costs incidental to the transportation of samples or materials shall be borne by the Contractor. Samples of materials for test verification and acceptance testing by the Government shall be delivered to the Contracting Officer.
Coordination for each specific test, exact delivery location, and dates will be made through the Area Office.
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
Near the end of the work, or any increment of the work established by a time stated in the SPECIAL CONTRACT REQUIREMENTS Clause, "Commencement, Prosecution, and Completion of Work", or by the specifications, the CQC Manager shall conduct an inspection of the work. A punch list of items which do not conform to the approved drawings and specifications shall be prepared and included in the CQC documentation, as required by paragraph DOCUMENTATION. The list of deficiencies shall include the estimated date by which the deficiencies will be corrected. The CQC System Manager or
SECTION 01 45 04.00 50 Page 8 staff shall make a second inspection to ascertain that all deficiencies have been corrected. Once this is accomplished, the Contractor shall notify the Government that the facility is ready for the Government Pre-Final inspection.
3.8.2 Pre-Final Inspection
The Government will perform the pre-final inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. The Contractor's CQC System Manager shall ensure that all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled. Any items noted on the Pre-Final inspection shall be corrected in a timely manner. These inspections and any deficiency corrections required by this paragraph shall be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.
3.8.3 Final Acceptance Inspection
The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the Contracting Officer's Representative shall be in attendance at the final acceptance inspection. Additional Government personnel including, but not limited to, those from Base/Post Civil Facility Engineer user groups, and major commands may also be in attendance. The final acceptance inspection will be formally scheduled by the Contracting Officer based upon results of the Pre-Final inspection. Notice shall be given to the Contracting Officer at least 14 days prior to the final acceptance inspection and shall include the Contractor's assurance that all specific items previously identified to the Contractor as being uaacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government o s additional inspection cost in accordance with the contract clause titled "Inspection of Construction".
3.9 DOCUMENTATION
The Contractor shall maintain current records providing factual evidence that required quality control activities and/or tests have been performed. These records shall include the work of subcontractors and suppliers and shall be on an acceptable form that includes, as a minimum, the following information:
a. Contractor/subcontractor and their area of responsibility.
b. Operating plant/equipment with hours worked, idle, or down for repair.
c. Work performed each day, giving location, description, and by whom.
When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.
d. Test and/or control activities performed with results and references to specifications/drawings requirements. The control phase shall be
SECTION 01 45 04.00 50 Page 9 identified (Preparatory, Initial, Follow-up). List of deficiencies noted, along with corrective action.
e. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.
f. Submittals and deliverables reviewed, with contract reference, by whom, and action taken.
g. Offsite surveillance activities, including actions taken.
h. Job safety evaluations stating what was checked, results, and instructions or corrective actions.
i. Instructions given/received and conflicts in plans and/or specifications.
j. Contractor 1 s verification statement.
These records shall indicate a description of trades working on the project; the number of personnel working; weather conditions encountered;
and any delays encountered. These records shall cover both conforming and deficient features and shall include a statement that equipment and materials incorporated in the work and workmanship comply with the contract. The original and one copy of these records in report form shall be furnished to the Government daily within 24 hours after the date covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, one report shall be prepared and submitted for every 7 days of no work and on the last day of a no work period. All calendar days shall be accounted for throughout the life of the contract. The first report following a day of no work shall be for that day only. Reports shall be signed and dated by the CQC System Manager. The report from the CQC System Manager shall include copies of test reports and copies of reports prepared by all subordinate quality control personnel.
3.10 SAMPLE FORMS
Sample forms enclosed at the end of this section.
3.11 NOTIFICATION OF NONCOMPLIANCE
The Contracting Officer will notify the Contractor of any detected noncompliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.
SECTION 01451 ATTACHMENT NO. 1
GUIDE FOR LISTING DEFINABLE FEATURES OF CONSTRUCTION WORK
SECTION 01 45 04.00 50 Page 10
***** Contractor shall modify this guide to accommodate the project. *****
DIVISION 1 - GENERAL REQUIREMENTS
(a) Special Project procedures to include coordination of work, Project meetings, Submittals and Quality Control
(b) Administrative Requirements
(c) Environmental Protection
(d) Historic Preservation
(e) Job Conditions
DIVISION 2 - SITE WORK
(a) Demolition
(b) Removal and Disposal of Asbestos Materials
(c) Excavation, Trenching and Backfilling for Utilities Systems to include sewer gravity drainage and water lines
(d) Clearing and Grubbing, Backfilling for Buildings
(e) Grading
(f) Fence, Chain-Link
(g) Concrete for sidewalks and Curbs
(h) Drilled Pile Foundation
(i) Bituminous Paving
(j) Underground Sprinkler Systems
DIVISION 3 - CONCRETE
(a) Concrete Materials, Concrete Procedures, Concrete Formwork, Forms, Form Ties and Accessories, Concrete Reinforcement, Concrete Accessories to Include Cast-in-Place Concrete, Specially Placed Concrete, Concrete Finishing, Concrete Curing and Grouting
(b) Concrete Restoration and Cleaning
(c) Precast Concrete
(d) Electrical and Mechanical Inserts
(e) Testing
(f) Approval of Samples
DIVISION 4 - MASONRY
(a) Masonry Procedures, Mortar, Mortar Accessories, Unit Masonry, Cavity Wall Construction to Include Bringing Inner and Outer Wythes Up Simultaneously, Reinforcement, Wall Ties, Flashing, Masonry Restoration and Cleaning
(b) Acceptance of Sample Panel for Cavity Wall Construction
(c) Composite Wall Construction
(d) Acceptance of Sample Panel for Composite Wall Construction
(e) CMU Partition Wall Construction to Include Prepared Openings for Ducts, Fire Dampers, Door Frames, Lintels and Bond Beams
(f) Acceptance of CMU Partition Wall Sample Panel
(g) Insulation and Waterproofing
(h) Testing
SECTION 01 45 04.00 50 Page 11
ATTACHMENT NO. 1 (continued)
DIVISION 5 - METALS
(a) Structural Steel Framing To Include Metal Materials and Methods, Metal Fastening, Metal Joints, Welding, Expansion Control and Miscellaneous Metals
(b) Steel Roof Decking (c) High Strength Bolts
DIVISION 6 - WOODS AND PLASTICS
(a) Rough Carpentry To Include Framing, Prefabricated Structural Wood, Fasteners and Supports, Roof Sheeting, Siding and Sub-Flooring, Insulation and Flashing
(b) Finish Carpentry To Include Wood Treatment, Finish Flooring, Cabinets and Closets
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
(a) Dampproofing and Waterproofing
(b) Fireproofing
(c) Insulation, Flashing and Sheet Metal, Roof Accessories, Sealants, Shingles, Roof Tiles and Membrane Roofing (Built-Up and EPDM)
DIVISION 8 - DOORS AND WINDOWS
(a) Metal Doors and Frames, Wood and Plastic Doors, Special Doors, Door Opening Assemblies, Metal Windows, Wood and Plastic Windows, Special Windows, Glazing and Miscellaneous Hardware, Caulking
DIVISION 9 - FINISHES
(a) Ceramic Tile
(b) Gypsum Wallboard To Include Special Framing, Shaft Wall Framing System, Ceiling and Wall Opening
(c) Acoustical Treatment to include Metal Suspension System for Acoustical Tile and Lay-In-Panel Ceiling
(d) Wall Covering
(e) Carpeting
(f) Resilient Flooring
(g) Painting
(h) Furring (Metal)
(i) Plastering
DIVISION 10 - SPECIALTIES
(a) Metal Toilet Partitions
(b) Raised Floor System
(c) Movable Partitions
(d) Wardrobe
(e) Fire Extinguisher Cabinets
(f) Toilet Accessories
SECTION 01 45 04.00 50 Page 12
ATTACHMENT NO. 1 (continued)
DIVISION 11 - EQUIPMENT
(a) Fueling System for Motor Vehicles
(b) Adjustable Loading Ramps
(c) Incinerator, Packaged Controlled Air
(d) Incinerator, Medical Waste, General Purpose, Field Erected
(e) Food Service Equipment
(f) Government Furnished Equipment
DIVISION 12 - FURNISHINGS
(a) Theater Chairs
(b) Blinds
(c) Drapes
(d) Lockers
(e) Training Equipment
(f) Furniture and Accessories
(g) Rugs and Mats
(h) Fabrics
DIVISION 13 - SPECIAL CONSTRUCTION
(a) RF Shielding
(b) Sky Lights
(c) Swimming Pool
(d) Energy Monitoring and Control System (EMCS)
(e) Pre-Engineered Structures
(f) Liquid and Gas Storage Tanks
(g) Vaults
DIVISION 14 - CONVEYING SYSTEMS
(a) Shaft Construction To Include Guides and Guide Rails
(b) Car Assembly
(c) Machine Room Layout
(d) Entrances
(e) Operating and Signal Devices
(f) Fire/Emergency Power Operations
(g) Lighting, Power and Wiring
(h) Elevator Power Unit
(i) Acceptance Testing To Include Communications, Safety, Weights, Emergency and Fire Operations, Dispatch System
DIVISION 15 - MECHANICAL
(a) Insulation to Include:
(1) Pipes
(2) Ducts
(3) Equipment
(4) High Density Inserts, Insulation Protective Shields, Clips or U Bolt Supports for Multiple Pipe Hanger Supports
(5) Perimeter Insulation
SECTION 01 45 04.00 50 Page 13
ATTACHMENT NO. 1 (continued)
(b) Plumbing Systems
(1) Waste/Vent Piping To Include: Underground Soil Piping, Above Ground Soil Piping
(2) Interior Piping Rough-In To Include: Galvanized Black Iron and Copper Including Drains, Fittings, Valves and Piping Supports
(3) Plumbing Fixtures To Include Flush Valves, Faucets and Accessories
(4) Cleaning, Balancing and Operational Testing
(c) Heating systems
(1) Equipment and System Accessories
(2) Hot Water/Steam Piping Supports
(3) Fuel Oil/Gas Piping and Supports
(4) System Testing and Balancing
(d) Air Distribution Systems
(1) Equipment and Accessories
(2) Duct Work To Include Galvanized, Aluminum, Flexible and Fiberglass, Supports, Dampers, Louvers, Diffusers, Duct Line Supports and Fire-Dampers
(e) Refrigeration Systems
(1) Equipment and Accessories
(2) Chilled Water/Condenser Water Piping and Supports
(3) Refrigerant Piping and Supports
(4) System Testing
(f) Automatic Temperature Control Systems
(1) Equipment and Materials
(2) Installation of Materials and Equipment
(3) System Testing
(g) Underground Heat Distribution Systems
(1) Manholes
(2) Piping and Supports
(3) Cathodic Protection
(h) Sprinkler Systems
(1) Equipment
(2) Piping and Supports
(3) Accessories
(i) Water Treatment Systems
(j) Welding - Piping Systems
DIVISION 16 - ELECTRICAL
(a) Exterior Electrical Distribution, Aerial
(1) Pole Setting
(2) Placement of Crossarms, Pins, Insulators, Pole Line Hardware and Conductors
(3) Placement of Fuse Cutouts, Surge Arresters, Reclosers, Potheads, Pole Mounted Transformers to Include Grounding Conductors, Testing and Cable Terminations
(b) Exterior Electrical Distribution, Underground
(1) Duct Line Excavation, Placement of Ducts and Misc. Materials
(2) Placement of In Ground Junction or Pull Boxes and Manholes
(3) Placement of Duct Bank Concrete Encasement
(4) Transformer Pad Placement
(5) Mounting of Pad Mounted Transformers
(6) Cable Placement to Include Splicing, Fire-Proofing and Cable Terminations
SECTION 01 45 04.00 50 Page 14
ATTACHMENT NO. 1 (continued)
(7) Grounding Conductors and Testing
(c) Electrical Distribution, Interior
(1) Wiring Methods to Include Conduit Rough-in, Raceway Boxes, Outlet Boxes, Panelboard Cabinets, Placement of Conductors and Conduit Placement Below the Slab for Slab-On-Grade Construction
(2) Wiring Devices, Panelboards, Switch-Boards and Lighting Fixtures
(3) Motors and Transformers
(4) Testing
(d) Fire Detection and Alarm System
(1) Wiring Methods to Include Conduit, Ground Rods, Detectors, Control Panels, Power Supply, Door Holders, Audible Fire Alarm and Annunciator Panel
(2) Testing
-- End of Attachment No. 1 --
SECTION 01 45 04.00 50 Page 15
SECTION 01451 ATTACHMENT NO. 2
PREPARATORY PHASE CHECKLIST
CONTRACTOR'S NAME (Address }
Contract No.:________________________Date Preparatory Held:________________
Title:_____________________________ Spec Section:___________________
_______________________________________ Drawing No(s):_______________________________
Definable Feature of Work:_____________________________________________________
A. PERSONNEL PRESENT:
Name Position Company
1.________________________________ __________________________________
2.________________________________ __________________________________
3.________________________________ __________________________________
4.________________________________ __________________________________
5.________________________________ __________________________________
6.________________________________ __________________________________
7.________________________________ __________________________________
8.________________________________ __________________________________
(List additional personnel on reverse side}
B. DRAWINGS AND SPECS:
I. Has each spec paragraph, contract drawing, and shop drawing been studied? YES _____________ NO _______________
II. Do all parties have up-to-date drawings and specifications?
YES _____________ NO _______________
SECTION 01 45 04.00 50 Page 16
ATTACHMENT NO. 2 (continued)
C. SHOP DRAWINGS INVOLVED:
Transmittal/Item Code Contractor or Gov't Approval
1._________________________ ___________________________
2._________________________ ___________________________
3._________________________ ___________________________
4._________________________ ___________________________
D. MATERIALS:
I. Are all materials on hand? YES _________ NO _________
II. Have all materials been checked for contract compliance against approved shop drawings? YES _________ NO _________
III. Items not on hand or not in accordance with transmittals (if not on hand, check during initial phase) :
1.___________________________________
2.___________________________________
3.___________________________________
4.___________________________________
E. TESTS required in accordance with contract requirements:
Test/Paragraph Frequency
1.__________________________________ _______________________________
2.__________________________________ _______________________________
3.__________________________________ _______________________________
4.__________________________________ _______________________________
5.__________________________________
SECTION 01 45 04.00 50 Page 17
ATTACHMENT N0.2 (continued)
6._________________________________ _______________________________
F. ACCIDENT PREVENTION: Has Hazard Analysis been completed?
YES _________ NO _________
If yes, attach a copy, if no, explain:
G. EQUIPMENT Requiring Operational Check:
1.___________________________________________________________________________
2.___________________________________________________________________________
3.___________________________________________________________________________
4.___________________________________________________________________________
H. WORKMANSHIP: Have procedures for accomplishing work been reviewed with appropriate people? YES _________ NO _________
I. PREVIOUS WORK: Has all preliminary work been accomplished in accordance with contract requirements and is this feature of work ready to start? YES _________ NO _________
Explain any problems:_____________________________________________________
J. HI-LIGHTING SPECIFIC ITEMS: Hi-light specific items noted during the Preparatory Phase inspection. ie, (Med. Voltage cable shall be hi-pot tested).
K. OTHER COMMENTS:
Quality Control Representative Signature
SECTION 01 45 04.00 50 Page 18
SECTION 01451 ATTACHMENT NO. 3
INITIAL PHASE CHECKLIST
CONTRACTOR'S NAME (Address }
Contract No.:___________________________ Date Initial Held:
Title: _______________________________Spec Section: __________________________________
Drawing No(s).:_________________________________________
Definable Feature of Work:
A. PERSONNEL PRESENT:
Name Position Company
1.____________________________________________________________________
2.____________________________________________________________________
3.____________________________________________________________________
4.____________________________________________________________________
5.____________________________________________________________________
6.____________________________________________________________________
B. MATERIALS being used are in strict accordance with the contract plans and specifications? YES _________ NO _________
If not, explain:____________________________________________________________
SECTION 01 45 04.00 50 Page 19
ATTACHMENT NO. 3 (continued)
C. WORKMANSHIP:
I. Procedures and/or work methods witnessed are in strict compliance with the requirement of the contract specificatio ns? YES _________ NO _________ If not, explain:_______________________________________________
II. Workmanship is acceptable? YES _________ NO _________
State area where improvement is needed:__________________________________
D. SAFETY violations and corrective action taken:______________________
E. COMMENTS:___________________________________________________________
Quality Control Representative Signature
SECTION 01 45 04.00 50 Page 20
SECTION 01451 ATTACHMENT NO. 4
DAILY CONSTRUCTION QUALITY CONTROL REPORT
(Sample of Typical Contractor Daily Quality Control Report)
CONTRACTORS NAME (Address)
Date _________ Report No. _______ Contract No. DAC( ) 65- -c- - Project Name and Location of work: _________________________
Weather: (Clear) (P.Cloudy) (Cloudy) (Rain: _____ inches) (Temp. min. max.) Other Weather Conditions ___________________________
1. Contractor (C) or Sub-contractor (S), and Area of Responsibility:
a.( b.( c.( d.( e.(
2. Equipment Data. (Indicate items of construction equipment, other than hand tools, at the job site and whether or not used):
3. Work Performed Today (Indicate identity of Contractor and Sub-contractors, location, and description of work:
4. Results of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken):
a. Preparatory Phase:____________________________________________________________________
b. Initial Phase:____________________________________________________________________
c. Follow-up Phase:_____________________________________________________
SECTION 01 45 04.00 50 Page 21
DAILY CONSTRUCTION QUALITY CONTROL REPORT (Continued)
5. Tests performed as required by plans and specifications and the results:_________________________________________________________________
6. Verbal instructions received (List instructions given by Government personnel on construction deficiencies, retesting required, etc. Include the name of Government person, time and place instructions given, and action taken to comply:_________________________________________________________
7. Job Safety (Include deficiencies and corrective action taken:
8. Equipment Data (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used):___________________________________________________________________
9. Material and equipment items that arrived at the job site. Indicate compliance or non-compliance of these items with approved shop drawings, the contract plans and specificatio ns, and the storage of the item is required prior to the time of installation, indicate how this storage was provided and whether or not it is adequate:_______________________________________________________________
10. Remarks (Cover any conflicts in the plans and specifications, instructions, or delays):________________________________________________________________
SECTION 01 45 04.00 50 Page 22
CONTRACTOR'S VERIFICATION: THE ABOVE REPORT IS COMPLETE AND ALL DATA
LISTED IS CORRECT. ALL MATERIALS PROVIDED, EQUIPMENT USED, AND WORKMANSHIP
FOR THIS REPORTING PERIOD ARE IN COMPLIANCE WITH THE CONTRACT PLANS AND
SPECIFICATIONS EXCEPT AS NOTED ABOVE.
SIGNED
_____________________________________________CONTRACTOR'S QC SYSTEM MANAGER
SECTION 01 45 04.00 50 Page 23
SECTION 01451 ATTACHMENT NO. 4
DAILY CONSTRUCTION QUALITY CONTROL REPORT (RMS QC)
CONTRACTORS QUALITY CONTROL REPORT (QCR) MILITARY REPORT NUMBER 1
DATE 29 Feb 00 - Tuesday
DAILY LOG OF CONSTRUCTION -
PROJECT Sample Project ND RMS, Langley AFB, Virginia CONTRACT NUMBER
DACA65-99-C-XXXX
CONTRACTOR WEATHER No Weather Reported QC NARRATIVES( S) Activities in Progress: Include comments here. Did anything develop that may lead to a Change Order/Claim? No Safety Inspection / Safety Meeting: Include meetings here. Safety:
Inspections made, Deficiencies noted) : Include safety inspections and safety deficiencies here. Safety: Correction Action taken: Corrective Action Verbal Instructions given by Government: Include instructions here. Were there any Delays in Work Progress today? None.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice) No preparatory or initial inspections were held today.
ACTIVITY START/FINISH No activities were started or finished today. QC REQUIREMENTS No QC requirements were completed today.
CONTRACTORS QUALITY CONTROL REPORT (QCR) MILITARY REPORT NUMBER 1
DATE 29 Feb 00 - Tuesday
DAILY LOG OF CONSTRUCTION -
PROJECT Sample Project ND RMS, Langley AFB, Virginia CONTRACT NUMBER
DACA65-99-C-XXXX
QA/QC COMMENTS (Describe QC comments issued, report QA and QC comments corrected) No QC comments were issued today.
CONTRACTORS ON SITE (Report contractor's first and/or last date on site) No contractors were reported on site today.
LABOR HOURS No labor hours were reported today. EQUIPMENT HOURS No equipment hours were reported today.
EQUIPMENT CHECKS No equipment inspections were conducted today.
SAFETY CORRECTIONS (Report corrective actions for safety violations) No outstanding safety violations.
CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment and material used and work performed during this reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
QC REPRESENTATIVE'S SIGNATURE DATE SUPERINTENDENT'S
INITIALS DATE
SECTION 01 45 04.00 50 Page 24
SECTION 0141A ATTACHMENT N0.5
TEST REPORT
CONTRACTOR'S NAME (Address)
STRUCTURE OR BUILDING _______________________________________________
CONTRACT NO._________________________________________________________
DESCRIPTION OF ITEM, SYSTEM OR PART OF SYSTEM TESTED:________________
DESCRIPTION OF TEST:_________________________________________________
NAME AND TITLE OF PERSON IN CHARGE OF PERFORMING TESTS FOR CONTRACTOR:
NAME _______________________________________________
TITLE _______________________________________________
SIGNATURE ___________________________________________
I HEREBY CERTIFY THAT THE ABOVE DESCRIBED ITEM, SYSTEM OR PART OF SYSTEM HAS
BEEN TESTED AS INDICATED ABOVE AND FOUND TO BE ENTIRELY SATISFACTORY AS
REQUIRED IN THE CONTRACT SPECIFICATIONS.
SIGNATURE OF CONTRACTOR QUALITY CONTROL INSPECTOR
DATE _______________________________________________
REMARKS: _____________________________________________________________
SECTION 01 45 04.00 50 Page 25
SECTION 01451 ATTACHMENT NO. 6
DEFICIENCY TRACKING LOG
Construction Deficiency:_______________________________________________
Contract No.___________________________________________________________
Safety Deficiency:_____________________________________________________
Project Title: ________________________________________________________
Date Reported: ________________________________________
Reported By:___________________________________________
Deficient Work:
Description of Corrective Action Taken:
Date Corrected: _____________________________________
Verified By: ________________________________________
-- End of Section --
SECTION 01 45 04.00 50 Page 26