20230705 Abstract - Duluth MD signed.pdf
PDF 267 KB Posted
- Attached to
- FY23 Duluth Superior Harbor Maintenance Dredging
- Solicitation number
- W911XK23B0007
About this file
This abstract of offers summarizes six bids received in response to Solicitation Number W911XK23B0007, issued by the Department of the Army Corps of Engineers Engineering District Detroit, for the FY23 Duluth Superior Harbor Maintenance Dredging project. The project requires maintenance dredging between upstream and downstream limits in Duluth Harbor to place dredged material at the Erie Pier confined disposal facility. Bids include lump sum pricing for mobilization and demobilization, unit prices for initial and overdredge quantities in six dredge areas, and option prices for additional dredging in Area 6B. Bid prices range from $1,803,900 to $3,297,900. The government estimate is $3,297,900. JF Brennan Roen provided the lowest bid at $1,803,900.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
6-29 1 2
DATE SIGNED
7A. ITEM
NO
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT PRICE
F. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
0001 MOBILIZATION & DEMOBILIZATION 1 job $453,477.00 $453,477.00 $280,000.00 $280,000.00 $243,175.00 $243,175.00
0002 Required Dredging - Dredge Area 3 $0.00 $0.00 $0.00
0002AA FIRST 6,600 CY 6600 CY $28.79 $190,014.00 $17.00 $112,200.00 $20.00 $132,000.00
0002AB OVER 6,600 CY 11100 CY $20.29 $225,219.00 $16.25 $180,375.00 $17.50 $194,250.00
0003 Required Dredging - Dredge Area 6A $0.00 $0.00 $0.00
0003AA FIRST 1,300 CY 1300 CY $25.85 $33,605.00 $17.00 $22,100.00 $30.00 $39,000.00
0003AB OVER 1,300 CY 2000 CY $18.49 $36,980.00 $16.25 $32,500.00 $17.50 $35,000.00
0004 Required Dredging - Dredge Area 10 $0.00 $0.00 $0.00
0004AA FIRST 2,900 CY 2900 CY $28.42 $82,418.00 $17.00 $49,300.00 $23.25 $67,425.00
0004AB OVER 2,900 CY 4900 CY $20.00 $98,000.00 $16.25 $79,625.00 $17.50 $85,750.00
0005 Required Dredging - Dredge Area 14 $0.00 $0.00 $0.00
0005AA FIRST 5,700 CY 5700 CY $35.71 $203,547.00 $17.00 $96,900.00 $22.00 $125,400.00
0005AB OVER 5,700 CY 10200 CY $24.88 $253,776.00 $16.25 $165,750.00 $19.00 $193,800.00
0006 Required Dredging - Dredge Area 19 $0.00 $0.00 $0.00
0006AA FIRST 1,900 CY 1900 CY $26.00 $49,400.00 $17.00 $32,300.00 $26.00 $49,400.00
0006AB OVER 1,900 CY 3600 CY $17.92 $64,512.00 $16.25 $58,500.00 $17.00 $61,200.00
0007 Option 1 Dredging - Dredge Area 6B 5000 CY $19.00 $95,000.00 $9.00 $45,000.00 $16.50 $82,500.00
0008 Option 2 Dredging - Dredge Area 6B 10000 CY $18.40 $184,000.00 $9.00 $90,000.00 $16.50 $165,000.00
0009 Option 3 Dredging - Dredge Area 6B 20000 CY $18.20 $364,000.00 $9.00 $180,000.00 $16.50 $330,000.00
$2,333,948.00 $1,424,550.00 $1,803,900.00 Total Price
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT (Including Profit)
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
1 Amendment N/A N/A
A. OFFEROR:
JF Brennan Roen x B. REASONABLE CONTRACT (Without Profit)
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
KO confirmed KO confirmed
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Duluth MD (Check A, B, or C and complete D, E, and F) NO. 1 NO. 2
A. HIRED LABOR
A. OFFEROR:
ABSTRACT OF OFFERS
1. SOLICITATION NUMBER
W911XK23B0007
4. ISSUING OFFICE I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US Army Corps of Engineers Detroit District
Teresa Kelly
SIGNATURE
PAGE OF PAGES
A. ITEM
NO
B. ESTIMATED
QUANTITY
C. UNIT D. UNIT PRICE
E. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
0001 1 job $412,000.00 $412,000.00
0002 $0.00
0002AA 6600 CY $34.50 $227,700.00
0002AB 11100 CY $34.50 $382,950.00
0003 $0.00
0003AA 1300 CY $29.50 $38,350.00
0003AB 2000 CY $29.50 $59,000.00
0004 $0.00
0004AA 2900 CY $34.00 $98,600.00
0004AB 4900 CY $34.00 $166,600.00
0005 $0.00
0005AA 5700 CY $42.25 $240,825.00
0005AB 10200 CY $42.25 $430,950.00
0006 $0.00
0006AA 1900 CY $28.35 $53,865.00
0006AB 3600 CY $28.35 $102,060.00
0007 5000 CY $31.00 $155,000.00
0008 10000 CY $31.00 $310,000.00
0009 20000 CY $31.00 $620,000.00
$0.00
$0.00
$0.00
$3,297,900.00 $0.00 $0.00 $0.00 Total Price
KO confirmed
3. CONTRACT ITEMS
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
NA
Duluth MD NO. 3
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
VEIT
NO. 4 NO. 5 NO. 6
A. OFFEROR: A. OFFEROR: A. OFFEROR: A. OFFEROR:
ABSTRACT OF OFFERS -
CONSTRUCTION CONTINUATION
SHEET
1. SOLICITATION NUMBER
INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419s for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE 4. OFFERS (Continued)
| 2023-07-05T17:23:55-0400 | |
| Teresa Kelly |
File details come from the government source that posted it. Updated .