W911XK-17-R-0021-0001.pdf
PDF 192 KB Posted
- Attached to
- FY17 DULUTH HEAVY EQUIPMENT RENTAL, DULUTH, MN
- Solicitation number
- W911XK-17-R-0021
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY16_Geotechnical_Evaluation.pdf | ||
| Salient_Features.pdf | ||
| W911XK-17-R-0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES70949436
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W911XK-17-R-0021
This amendment is issued to revise the period of performance as detailed herein.
The required response date/time has changed from 08-Jun-2017 02:00 PM to 15-Jun-2017 02:00 PM.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-17-R-0021
X 9B. DATED (SEE ITEM 11)
24-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jun-2017
CODE
CONTRACTING BRANCH
USACE DETROIT DISTRICT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-17-R-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0001
This amendment is issued to revise the period of performance and response date.
The period of performance has changed as follows:
0001 from 31 July 2017– 20 November 2017 to 21 August 2017– 20 November 2017
0002 from 31 July 2017– 20 November 2017 to 21 August 2017– 20 November 2017
0003 from 31 July 2017– 20 November 2017 to 21 August 2017– 10 November 2017
0004 from 31 July 2017– 20 November 2017 to 21 August 2017– 20 November 2017
0005 from 31 July 2017– 20 November 2017 to 21 August 2017– 20 November 2017
0006 NO CHANGE
0007 from 31 July 2017– 20 November 2017 to 21 August 2017– 20 November 2017
The required response date/time has changed from 08-Jun-2017 02:00 PM to 15-Jun-2017 02:00 PM.
-----End of Summary of Changes---
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Jun-2017 02:00 PM to 15-Jun-2017 02:00 PM.
W911XK-17-R-0021
The following have been modified:
PRICE BREAKOUT SCHEDULE
EQUIPMENT LIST
Item Equipment Brand Name or Equal Qty
Max Rental Period
(Month)
Delivery Date Price Per
Month Total
Hydraulic Excavator Komatsu PC360LC-10 1 3 21-AUG-2017 $ $
Must be provided with a Quick Coupler, Hydraulically Operated Thumb, HPX 1.54 cubic yard Bucket, and a Flat Bottom Round Corner Sand Bucket that is 60" wide and 3 cubic yards with pins installed. See Salient Features Attachment
Front End Loader Komatsu WA470-7
1 3
21-AUG-2017 $ $
Must be provided with a 5.8 cubic yard Loose Material Bucket with a Bolt-On Cutting Edge, Heavy Duty Forks with a minimum length of 72 in. Tines, and a Quick Coupler to quickly change the bucket and forks. See Salient Features
Attachment.
Vibratory SSP Driver
HS-6600 Vibratory Driver/Extractor
1 2
21-AUG-2017 $ $
Unit must include both the hammer and the associated power unit. It also must include a standard universal clamp. See Salient Features Attachment.
Hydraulic Hammer NPK GH-12
1 3
21-AUG-2017 $ $
The attachment is required to correspond to the excavator and attach by means of a quick coupler. The hydraulic hammer is required to have a defined chisel tip end. See Salient Features Attachment.
Training N/A 1 N/A 21-AUG-2017 $ $
Heavy Equipment Employee Training (15 employees) - Each piece of equipment. See Section C.
OPTIONAL EQUIPMENT
OPTION ONE (1)
0006 Bulldozer Komatsu D61PX-23 1 1 16-OCT-2017 $ $
See Salient Features Attachment
OPTION TWO (2)
500 Gallon #2 Diesel Fuel Tank None 1 3 21-AUG-2017 $ $
Tank must provide secondary spill containment and be equipped for use near waters.
TOTAL OF ALL OPTIONS $
TOTAL OF PROPOSAL $
(End of Summary of Changes)
File details come from the government source that posted it. Updated .