W911XK-16-B-0011_Amendment_0003.pdf

PDF 109 KB Posted

Attached to
West Center Pier Repairs
Solicitation number
W911XK-16-B-0011
Issued by

About this file

Amendment 0003

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES53289094

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY16 West Center Pier Repair, Phase 3, Saulte Ste. Marie, MI

The purpose of this amendment is to make various changes and extend the bid date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-16-B-0011

X 9B. DATED (SEE ITEM 11)

20-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2016

CODE

CONTRACTING BRANCH

USACE DETROIT DISTRICT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-16-B-0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 3

CHANGES TO SOLICITATION

A) The required response date/time has changed from 02 August 2016 to 09 August 2016 02:00 PM EST.

B) DELETE Wage Decision MI160033 06/10/2016 MI33

ADD: Wage Decision MI160033 07/22/2016 MI33

C) DELETE the following language from clause 52.236‐27 SITE VISIT section (c): All offerors must attend this meeting.

ADD the following language to clause 52.236‐27 SITE VISIT section (c): All offerors are encouraged but not required to attend this meeting.

CHANGES TO SPECIFICATIONS

A) SECTION 01 35 13 SPECIAL PROJECT PROCEDURES

SECTION 01 35 13 SPECIAL PROJECT PROCEDURES is NOT being re‐issued as part of this amendment.

ADD the following to the end of paragraph 1.4.4: A load limit of 500 pounds per square foot shall be enforced at Gate 24 within 50 feet of the water’s edge. Crane mats shall be installed for any large equipment that is to be used within 50 feet of the water’s edge. The Contractor shall submit a plan for approval by the Contracting Officer that addresses protection of the pier walls. The Contractor shall physically mark the wall prior to initiating construction and monitor for lateral and rotational movement. The pier monoliths are not perfectly aligned so this can be done by marking the existing junction between monoliths with a bright paint or marker. If movement is noted, the Contractor shall immediately remove all equipment that is within 50 feet from water’s edge on the structure. The Contracting Officer shall be notified immediately of any movement. The Contractor shall take extreme caution while working near the water’s edge of the pier. Any damage to the walls shall by repaired by the Contractor, at no additional cost to the Government.

END OF AMENDMENT

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 02-Aug-2016 02:00 PM to 09-Aug-2016 02:00 PM.

SECTION 00700 - CONTRACT CLAUSES

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit and preproposal conference has been scheduled for-- 18 May 2016 1300 hours EDT

(c) Participants will meet at--

312 Portage Ave, Sault Ste Marie, Michigan

All offerors are encouraged but not required to attend this meeting.

Email the following information for all attendees to Ms Brittney Bender, 906-632-3312 at the following addresses: brittney.j.bender@usace.army.mil

Company Name:

DOB:(MM/DD/YYYY)

Last Name:

First Name:

Driver's License Number:

Expiration Date:

State of Issue:

The following shall be worn at the site visit: PPE including a hard hat, safety boots, long pants, shirt with sleeves.

This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the site visit attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to this meeting. This information will be provided to the Facility’s Security Forces who will authorize your entrance to the site.

Visitors must wait at the Facility’s Main Point of Entry (312 Portage Ave.), from there you will be escorted in (on foot) to the meeting.

(End of provision)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

WAGE DET MI160033 07 22 2016

General Decision Number: MI160033 07/22/2016 MI33

Superseded General Decision Number: MI20150033

State: Michigan

Construction Type: Heavy

County: Chippewa County in Michigan.

Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 05/20/2016 2 06/10/2016 3 06/24/2016 4 07/22/2016

BRMI0006-002 05/01/2016

Rates Fringes

BRICKLAYER.......................$ 27.47 18.60

* CARP1510-002 06/01/2016

Rates Fringes

CARPENTER, Includes Form Work....$ 23.42 19.33

ELEC1070-003 06/01/2014

Rates Fringes

ELECTRICIAN

Contracts $135,000 and under.......................$ 29.75 18.12 Contracts over $135,000.....$ 31.75 18.20

ENGI0325-021 09/01/2015

POWER EQUIPMENT OPERATORS: Underground Construction (Including Sewer)

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 29.47 21.85

GROUP 2.....................$ 24.58 21.85

GROUP 3.....................$ 24.08 21.85

GROUP 4.....................$ 23.80 21.85

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Backhoe/ Excavator, Boring Machine, Bulldozer, Crane, Scraper, Loader, Trencher (over 8 ft. digging capacity)

GROUP 2: Trencher (8-ft digging capacity and smaller)

GROUP 3: Boom Truck (non-swinging, non- powered type boom)

GROUP 4: Broom/ Sweeper, Fork Truck, Tractor

ENGI0326-006 05/01/2016

EXCLUDES UNDERGROUND CONSTRUCTION

Rates Fringes

OPERATOR: Power Equipment Crane, main boom & jib 120' or longer..............$ 28.81 22.55 Crane, main boom & jib 140' or longer..............$ 29.06 22.55 Crane, main boom & jib 220' or longer..............$ 29.31 22.55

GROUP 1 -

Backhoe/Excavator;

Bulldozer; Crane;

Compactor; Scraper; Loader..$ 28.31 22.55 GROUP 2 - Boom truck (non-swing)......................$ 25.06 22.55 GROUP 3 - Oiler.............$ 23.54 22.55

FOOTNOTES: Premium rate: main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.

IRON0008-009 05/01/2015

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL

Contracts $10,000,000 or greater.....................$ 26.52 24.35 Contracts less than $10,000,000.................$ 23.11 24.35

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

LABO0334-002 09/01/2014

SCOPE OF WORK:

OPEN CUT CONSTRUCTION: Excavation of earth and sewer, utilities, and improvements, including underground piping/conduit (including inspection, cleaning, restoration, and relining)

Rates Fringes

LABORER

(1) Common or General.......$ 19.86 12.75

(2) Mason Tender- Cement/Concrete.............$ 20.00 12.75

(4) Grade Checker...........$ 20.18 12.75

(5) Pipelayer...............$ 20.23 12.75

LABO1329-002 05/01/2016

EXCLUDES OPEN CUT CONSTRUCTION

Rates Fringes

LABORER

Common or General; Mason Tender - Cement/Concrete....$ 22.10 12.88 Pipelayer...................$ 22.51 12.88

PLAS0016-035 04/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 20.17 10.13

PLUM0111-009 06/01/2015

Rates Fringes

PLUMBER/PIPEFITTER...............$ 31.59 21.98

TEAM0007-010 06/01/2015

Rates Fringes

TRUCK DRIVER

Lowboy/Semi-Trailer Truck...$ 25.15 .50 + a+b

FOOTNOTE:

a. $419.45 per week.

b. $59.50 daily.

SUMI2010-031 11/09/2010

Rates Fringes

LABORER: Landscape..............$ 10.89 1.74

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 12.98 6.12

OPERATOR: Grader/Blade..........$ 16.63 5.85

OPERATOR: Roller................$ 13.74 7.93

TRUCK DRIVER: Dump Truck........$ 12.63 1.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)