SPECIFICATION COVER SHEET
PLANS & SPECIFICATIONS FOR
FY15 MAINTENANCE DREDGING, GREEN BAY
KEWAUNEE AREA OFFICE
GREEN BAY, WISCONSON
W911XK-15-B-0004
READY TO ADVIRTISE 02 APRIL 2015
(Keep past types and date on document and cross out when superseded)
Submitted By: Cost & General Engineering Branch
U.S. ARMY CORPS OF ENGINEERS
DETROIT DISTRICT
FY15 MD Green Bay Harbor RTA FY15MDGREENBAY
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10 REAL ESTATE
01 22 00 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 13.10 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 10 CONTRACTOR QUALITY CONTROL
01 57 20.00 20 ENVIRONMENTAL PROTECTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23.13 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM Scow - Tracking Profile
35 20 23 DREDGING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 10
REAL ESTATE
PART 1 GENERAL
1.1 SUBMITTALS
1.2 REGULATORY REQUIREMENTS
1.2.1 Real Estate Rights
1.2.2 Additional Real Estate Rights
1.3 PROJECT/SITE CONDITIONS
1.3.1 Location and Verification
1.3.2 Survey Markers
1.3.2.1 Semipermanent Markers
1.3.2.2 Temporary Markers
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
SECTION 01 10 10 Page 1
SECTION 01 10 10
REAL ESTATE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Additional Property Agreements; G-REO.
Copies of any agreements for Contractor-acquired real estate rights for this project shall be furnished before entering thereon.
Certified Survey Results
Furnish a copy of certified results of surveys which verify areas and limits of Contractor-acquired real estate rights.
1.2 REGULATORY REQUIREMENTS
1.2.1 Real Estate Rights
Rights for the use of the placement areas have been obtained and the general limits of the areas are shown on the Request For Proposal drawings. All real estate lakeward of the Ordinary High Water Mark is under Federal jurisdiction and no permit or agreements are necessary for work therein except as specified in SECTION 01 35 13 10, "SPECIAL PROJECT PROCEDURES", Paragraph, "Additional Work Proposed and Not Authorized". No other real estate rights have been obtained by the Government for this project.
1.2.2 Additional Real Estate Rights
Any additional property agreements and/or real estate rights desired by the Contractor shall be obtained by the Contractor at its own expense. Such agreements shall clearly relieve the Government of any responsibility for damages or liability resulting from the Contractor's use of such grounds.
SECTION 01 10 10 Page 2
1.3 PROJECT/SITE CONDITIONS
1.3.1 Location and Verification
It shall be the Contractor's responsibility to accurately locate the limits of all lands utilized under the contract. The corner and angle points of each area for which rights have been obtained shall be marked with semipermanent markers except where there is an approved existing property marker. Temporary markers shall be placed at points on alignment. The points on alignment shall be marked at stations so that intervals between points do not exceed 200 feet.
1.3.2 Survey Markers
All markers shall be installed in an area prior to its use and they shall be available for reference during and upon completion of use of the area.
Where approved existing property markers are found, a witness stake, as specified in Subparagraph, "Semipermanent Markers" below, shall be provided. If the types of markers specified hereinafter cannot be used, other types, as approved by the Contracting Officer, shall be provided.
1.3.2.1 Semipermanent Markers
The markers shall be a steel rod one-half inch in diameter and four (4) feet long. The steel rod shall be driven vertically into the ground so that the top is flush with the finished ground surface. Each marker shall be witnessed by a 2" x 2" yellow stake extending two (2) feet above the ground surface and driven into the ground until stable, with not less than one (1) foot penetration.
1.3.2.2 Temporary Markers
Markers shall be 2" x 2", red-colored, wood hub stakes driven into the ground until stable (not less than one (1) foot penetration) with two (2) feet projecting above the ground surface. If the period in which temporary markers are to be in place exceeds one (1) construction season, a more permanent type of marker, as approved, shall be provided.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
SECTION 01 10 10 Page 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
04/10
PART 1 GENERAL
1.1 LUMP SUM (JOB) PAYMENT ITEMS
1.2 UNIT PRICE PAYMENT ITEMS
1.3 BID SCHEDULE
SECTION 01 22 00 Page 1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
04/10
PART 1 GENERAL
1.1 LUMP SUM (JOB) PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum (Job) payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.3 BID SCHEDULE
Item No. 0001 Mobilization and Demobilization
1. Payment will be made for lump sum costs associated with mobilization and demobilization, as defined in Special Clause
PAYMENT FOR MOBILIZATION AND DEMOBILIZATION.
2. Unit of measure: Job.
Dredging Item No's: 0002, 0003, 0004 and 0005
1. These items shall include all work as specified in SECTION 35 20 23 DREDGING. The Contract unit price per cubic yard of dredging shall include the cost of removal, conveyance and disposal of all materials as shown on the drawings and as specified herein, except original materials, ledge rock, boulders, cobbles, rock fragments, wrecks, scrap materials, snags, stumps, piles, debris or other material which cannot be removed or buried below the required depth by the plant specified in the accepted bid, or the equivalent of such plant, without blasting or special apparatus. The unit price shall also include the cost of all work required to be performed for the use of the disposal areas.
Nothing in this paragraph shall be construed as prohibiting the
SECTION 01 22 00 Page 2 removal of excepted material by special means at the prices agreed and approved in accordance with applicable provisions of the contract.
2. This item shall also include all work as specified in SECTION 35 20 23 13 "SCOW SILENT INSPECTOR". The contract unit price per cubic yard for "Dredging," shall constitute full compensation for all labor, equipment, tools, and incidentials necessary to operate and maintain the system as specified herein for the duration of the dredging operation.
3. Unit of measure: Payment for all acceptably completed work required under SECTION 35 20 23 of the specifications will be made at the applicable contract unit price per cubic yard for the payment items:
0002 Base Dredging C.S. 0+00 to 60+00 W Bay to 24 ft below L.W.D.
0002AA First 22,000 Cubic Yards 0002AB Over 22,000 Cubic Yards
0003 Option 1 Dredging C.S. 21+00 to 27+00 River to 24 ft below L.W.D.
0003AA First 3,000 Cubic Yards 0003AB Over 3,000 Cubic Yards
0004 Option 2 Dredging C.S. 60+00 to 72+49 (East River Turning Basin) to 24 ft below L.W.D.
0004AA First 9,000 Cubic Yards 0004AB Over 9,000 Cubic Yards
0005 Option 3 Dredging C.S. 60+00 to 72+49 (East River Turning Basin) to 24 ft below L.W.D.
0005AA First 10,000 Cubic Yards 0005AB Over 10,000 Cubic Yards
Item No. 0006 Locate & Find I-43 Bridge High Pressure Underground Petroleum Pipeline
1. Payment will be made for lump sum costs to include all work as specified in SECTION 35 20 23, paragraph 3.1.3 titled 'I-43 Bridge Underground High Pressure Petroleum Pipeline'.
2. Unit of measure: Job.
SECTION 01 22 00 Page 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
04/06
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
1.1.2 Approving Authority
1.1.3 Work
1.2 SUBMITTALS
1.3 SUBMITTAL CLASSIFICATION
1.4 SUBMITTAL REGISTER
1.5 SCHEDULING
1.6 TRANSMITTAL FORM (ENG FORM 4025)
1.7 SUBMITTAL PROCEDURES
1.7.1 Deviations
1.8 CONTROL OF SUBMITTALS
1.9 GOVERNMENT APPROVED SUBMITTALS
1.10 INFORMATION ONLY SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
04/06
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by SD numbers and titles as follows.
SD-01 Preconstruction Submittals
Certificates of insurance.
Surety bonds.
List of proposed subcontractors.
List of proposed products.
Construction Progress Schedule.
Submittal register.
Schedule of prices.
Health and safety plan.
Activity Hazard Analysis.
Work plan.
Quality control plan.
Environmental protection plan.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and
SECTION 01 33 00 Page 2 clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
1.1.2 Approving Authority
Office authorized to approve submittal; such as
Area Office Field (AOF) Real Estate Office (REO) Engineering, Design and Construction Office (EDC) Mobile District (TSD)
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submittal register; G
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.4 SUBMITTAL REGISTER
At the end of this section is a submittal register showing items of equipment and materials for which submittals are required by the specifications; this list may not be all inclusive and additional submittals may be required. The Contractor shall maintain a submittal register for the project in accordance with Section 01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS).The Government will provide the initial submittal register in electronic format. Thereafter, the Contractor shall
SECTION 01 33 00 Page 3 maintain a complete list of all submittals, including completion of all data columns. Dates on which submittals are received and returned by the Government will be included in its export file to the Contractor. The Contractor shall track all submittals.
1.5 SCHEDULING
Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of 10 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals.
1.6 TRANSMITTAL FORM (ENG FORM 4025)
The sample transmittal form (ENG Form 4025) attached to this section shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.
1.7 SUBMITTAL PROCEDURES
Submittals shall be made as follows:
1.7.1 Deviations
For submittals which include proposed deviations requested by the Contractor, the column "variation" of ENG Form 4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.8 CONTROL OF SUBMITTALS
The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.9 GOVERNMENT APPROVED SUBMITTALS
Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. The distribution of approved copies will be as specified in CLAUSE titled "SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION".
1.10 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans
SECTION 01 33 00 Page 4 and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
FY15 MD Green Bay Harbor RTA
01 10 10 SD-01 Preconstruction Submittals
1.2.2 G REOAdditional Property Agreements
Certified Survey Results 01 33 00 SD-01 Preconstruction Submittals
GSubmittal register 01 35 13.10 SD-01 Preconstruction Submittals
1.7.2Payrolls and Basic Records
1.7.3 G AOFProgress Chart
SD-07 Certificates Survey Technician's Qualifications
01 35 26 SD-01 Preconstruction Submittals
1.6 G AOFAccident Prevention Plan (APP)
G AOFActivity Hazard Analysis (AHA) G AOFCrane Critical Lift Plan G AOFCrane Operators G AOFSite Layout Plan
SD-06 Test Reports 1.11Notifications and Reports
G AOFAccident Reports Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.13License Certificates
1.11.4 G AOFCertificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 57 20.00 20 SD-01 Preconstruction Submittals Environmental Protection Plan
35 20 23.13 SD-01 Preconstruction Submittals Dredge Plant Instrumentation Plan Revisions or Addendum
G, SAM-OP-J
G AOFContract Quality Control Plan, section 3.5 SD-06 Test Reports
G AOFData Appropriately Archived e-mail, section 3.2.6
SD-07 Certificates G AOFLetter of National Dredging
Quality Management Program Certification
35 20 23 SD-01 Preconstruction Submittals Sounding Equipment Description and Calibration Data
1.6 G AOFDredging, Conveyance and
Placement Plan
G AOFDredging Placement Safety Plan;
3.1Notice of Start of Dredging;
I-43 Bridge Underground Petroleum Pipeline Survey Report
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
35 20 23 G AOFDaily Report of Dredging Operations;
SD-11 Closeout Submittals Material Disposal Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 13.10
SPECIAL PROJECT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 REGULATORY REQUIREMENTS
1.3.1 Additional Work Proposed and Not Authorized
1.3.1.1 Work Subject to 33 CFR 320-330
1.3.1.2 Work Subject to 40 CFR 233
1.4 PROJECT/SITE CONDITIONS
1.4.1 Condition and Use of Project Site
1.4.1.1 Physical Conditions
1.4.2 Waterways Navigation and Traffic
1.4.2.1 Navigation
1.4.2.2 Traffic
1.4.3 Existing Vegetation, Structures, Equipment, Utilities &
Improvements
1.4.4 Identification of Employees
1.4.5 Contract Supervision and Representation
1.4.6 Coordination with Others
1.4.7 Traffic Control Plan
1.4.8 Temporary Lights, Signals and Buoys Required by Coast Guard
1.4.9 Navigation Buoys
1.4.9.1 Relocation of Existing Buoys
1.4.9.2 Temporary Dredging and Construction Buoys
1.4.9.3 Buoy Markings
1.4.10 Layout of Work and Surveys
1.4.10.1 Layout of Work
1.4.10.2 Surveyor Requirements
1.4.10.3 Suspension
1.4.10.4 Verification
1.5 SEQUENCING AND SCHEDULING
1.5.1 Exclusion of Period in Computing Completion Schedules
1.5.2 Sunday, Holiday And Night Operations
1.5.3 Start Work
1.6 SECURITY REQUIREMENTS
1.7 REPORT REQUIREMENTS
1.7.1 Accident Prevention Plan
1.7.2 Payrolls and Basic Records
1.7.3 Progress Chart
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 01 35 13.10 Page 1
SECTION 01 35 13.10
SPECIAL PROJECT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. GOVERNMENT CODE OF FEDERAL REGULATIONS (CFR)
33 CFR 320-330 General Regulatory Policies, Permits, Enforcement and Definitions
40 CFR 233 State Program Regulations
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Payrolls and Basic Records
Contractor shall submit payrolls and basic records in accordance with the CLAUSE entitled "PAYROLLS AND BASIC RECORDS (FEB 1988)".
Progress Chart; G-AOF
Contractor shall submit progress chart in accordance with the Contract clause entitled "SCHEDULE FOR CONSTRUCTION CONTRACTS (APR 1984)".
SD-07 Certificates
Survey Technician's Qualifications
Submit the identity and qualifications of the persons assigned to conduct surveys at least ten (10) calendar days in advance of conducting any surveys.
SECTION 01 35 13.10 Page 2
1.3 REGULATORY REQUIREMENTS
1.3.1 Additional Work Proposed and Not Authorized
1.3.1.1 Work Subject to 33 CFR 320-330
Any additional work (not specifically shown on the plans or delineated in the specifications) proposed by the Contractor in or affecting navigable waters, including wetlands (as defined in 33 CFR 320-330, published in the Federal Register Vol.51, No. 219, Thursday, November 13, 1986) shall not be performed without a Department of the Army Permit. This requirement shall be applicable to all work, permanent or temporary, and/or fill(s).
The Department of the Army Permit shall be approved by the District Engineer or Deputy District Engineer in accordance with the laws of the United States and the regulations promulgated thereunder, including, but not limited to, the Rivers and Harbors Act of 1899, the Clean Water Act and the National Environmental Policy Act of 1969, as amended. Corps employees (Contracting Officer's Representatives (COR) or inspectors) are not delegated authority to authorize such work. Information on making application for such permit(s) may be obtained by contacting one of the offices as listed hereinafter. When applying for information or a permit, a copy of any correspondence should be directed to the Contracting Officer of this contract. If a permit is not obtained, the additional work cannot be accomplished. Any delay in processing the permit will not constitute the basis of a claim under this contract. The fact that the Contractor is performing work under a Department of the Army Contract will give the Contractor no greater rights than any other applicant for a Department of the Army Permit.
WISCONSIN-MINNESOTA
Regulatory Functions Branch Construction-Operations Division U.S. Army Engineer District, St. Paul
190 Fifth Street East St. Paul, MN 55101 Telephone: 651-290-5376
1.3.1.2 Work Subject to 40 CFR 233
Any additional work (not specifically shown on the plans or included in the specifications), proposed by the Contractor, in or affecting waters of the United States, including wetlands, in the States of Michigan, Illinois, Indiana, Ohio, Pennsylvania, New York, Wisconsin or Minnesota (as defined in 40 CFR 233, published in the Federal Register, Vol. 49 No. 192, Tuesday October 2, 1984) shall not be performed without a proper regulatory permit. Information on making an application for such permit may be obtained by contacting one of the offices listed hereinafter. When applying for a permit or for information, a copy of any correspondence shall be furnished to the Contracting Officer. If a permit is not obtained, the additional work shall not be performed. Any delay in obtaining or processing the permit will not constitute a basis for a claim under this contract.
STATE OF WISCONSIN
Department of Natural Resources 101 S. Webster St.
P.O. Box 7921
SECTION 01 35 13.10 Page 3
Madison, WI 53707-7921 Telephone: 608-266-2621
1.4 PROJECT/SITE CONDITIONS
1.4.1 Condition and Use of Project Site
The drawings will indicate soundings and elevations at the dredging and placement site as found in condition surveys made as stated on the contract drawings. A notification of at least five (5) calendar days shall be given to the Contracting Officer prior to bringing any construction equipment or material upon the work site. The Contractor shall be responsible for damages that may be suffered due to its operations. The Contractor shall note CLAUSE titled "PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS."
1.4.1.1 Physical Conditions
The physical conditions shown on the drawings are indicative of those that prevailed at the time of the site investigations and may be different than those at the time of construction. Significant variations that would require changes to the plans or specification shall be reported to the Contracting Officer immediately.
1.4.2 Waterways Navigation and Traffic
The Contractor shall acquaint itself with all information and regulations pertaining to navigation and vessel traffic within the waterways at the project site. The Contractor shall coordinate with the U.S. Coast Guard to assure that a "NOTICE TO MARINERS" is issued prior to its work activity at the project site. The completed form shall be sent to the address stated in the Subparagraph entitled "Temporary Lights, Signals and Buoys Required by U.S. Coast Guard". The Government will not undertake to keep the waterways free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the Rivers and Harbors Act approved 8 August 1917 (see Title 33, U.S.C.A. Sec. 1). The Contractor is required to conduct its work in such manner as to obstruct navigation as little as possible and, in case the Contractor's plant so obstructs a channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage.
Upon completion of the work, the Contractor shall promptly remove its plant, including ranges, buoys, piles, and other marks placed by it under the contract in navigable waters or on shore.
1.4.2.1 Navigation
Information and regulations pertaining to navigation may be obtained from the current issue of the "UNITED STATES COAST PILOT 6," issued annually by the Department of Commerce, National Oceanic and Atmospheric Administration (NOAA). The "UNITED STATES COAST PILOT" may be obtained from National Ocean Survey, NOAA, Distribution Division-C44, Riverdale, Maryland 20840.
1.4.2.2 Traffic
Vessels that may use the waterways at the project site consist of recreational craft and commercial vessels. This traffic may interfere with contract operations and the Contractor shall conduct its work with due
SECTION 01 35 13.10 Page 4 regard to and in coordination with the requirements of all navigation.
Information regarding the types and amount of passages made by commercial vessels that may use the waterways at the project site may be obtained from the current issue of the "Waterborne Commerce of the United States, Part 3, Waterways and Harbors, Great Lakes," published by the Department of Army, Corps of Engineers. The Department of the Army publication may be obtained at no charge from the following:
District Engineer, U.S. Army Engineer District, New Orleans, Waterborne Commerce Section, P.O. Box 60267, New Orleans, Louisiana 70160. Phone
504-862-1425, FAX 504-862-1091.
1.4.3 Existing Vegetation, Structures, Equipment, Utilities & Improvements
General locations of applicable existing utilities, vegetation, structures, equipment and improvements, based upon latest information available to the Government will be shown on the drawings. However, it is the Contractor's obligation to establish the exact horizontal and vertical location and size of all existing utility lines which are located within the required work area. The Contractor shall submit a utility locating plan for locating existing utilities and a copy of its utility location findings prior to commencing work on the site. Any utility lines which are not found by the Contractor, but which are known to exist at the project site, shall be reported to the Contracting Officer immediately. The Contracting Officer will have the option of directing commencement of work at the site or requiring the Contractor to submit further plans for locating the utility lines. Once the utilities have been located and marked, the Contractor shall be deemed to have the location made known to it pursuant to CLAUSE titled "PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS." If the Contractor damages any existing utility line, vegetation, structure, equipment or improvement, a report thereof shall be made immediately to the Contracting Officer. In any event, existing utility lines, vegetation, structures, equipment or improvements shall be protected from damage, and if damaged, shall be repaired by the Contractor at its own expense.For specifics regarding the I-43 Bridge Underground High Pressure Petroleum Pipeline refer to specifications section 35 20 23 / 3.1.3
1.4.4 Identification of Employees
The Contractor shall be responsible for requiring each employee engaged on the work to wear a hardhat with labeling as required to identify that the person is an employee of the Contractor or to display other identification as may be approved.
1.4.5 Contract Supervision and Representation
The Contractor's local representative shall be available to Government representatives during duty hours, 8 a.m. to 4:30 p.m., on normal working days and shall be available by telephone at other times. The name of the Contractor's representative and the contact telephone number shall be furnished to the Government.
1.4.6 Coordination with Others
Reference is made to CLAUSE titled, "OTHER CONTRACTS". The Contractor is informed that the Government and/or Brown County may have other Contractors engaged in work at approximately the same Government-furnished disposal area provided for use under this contract. Sharing use of the Government's
SECTION 01 35 13.10 Page 5 mooring facilities with others may also be necessary. The Contractor shall coordinate its operations with the work of others and share use of the facilities at no additional cost to the Government.The Dredging work shall be coordinated with Buckeye Pipeline LLC, Brown County and Fox River Dock Company. The coordination shall be such that the required work under each affected contract is not prevented from being completed within its allowed completion time as a result of failure to cooperate and coordinate operations. Coordination with others shall be through the Contracting Officer's Representative at the site
1.4.7 Traffic Control Plan
The Contractor shall control traffic in accordance with its approved plan.
The traffic control plan shall be in detail and size specific for the control of traffic on the public roadways adjacent to the work area.
Coordination of construction traffic with public use of the roadways shall be fully described, including all safety related characteristics.
1.4.8 Temporary Lights, Signals and Buoys Required by Coast Guard
All temporary lights, signals and buoys required by the U.S. Coast Guard must be displayed during the required work. Information regarding required signals, lights, buoys and other requirements may be obtained from the Commander (oan), Ninth Coast Guard District, 1240 East Ninth Street, Cleveland, Ohio 44199-2060, Telephone (216) 522-3990.
1.4.9 Navigation Buoys
1.4.9.1 Relocation of Existing Buoys
If the relocation of existing navigation buoys is required to perform the contract work, the Contractor shall request permission for their relocation from the U.S. Coast Guard through the Contracting Officer. Once relocated, a record shall be maintained of the buoy relocation position(s). The request shall be provided to the Contracting Officer not less than three
(3) weeks prior to need of the buoy relocation. The Contractor shall be responsible for performing the relocation work, which shall be in accordance with U.S. Coast Guard requirements.
1.4.9.2 Temporary Dredging and Construction Buoys
In order to distinguish temporary buoys placed and maintained by the Contractor for dredging or construction purposes from aids to navigation placed by the U.S. Coast Guard, the Contractor's buoys shall be white and the top two (2) feet shall be light green in color. The Contractor shall remove its temporary buoys at the completion of the work.
1.4.9.3 Buoy Markings
If buoys with special markings are needed to indicate the different sides of the navigable channel, prior arrangements shall be made with the U.S.
Coast Guard, through the Contracting Officer.
1.4.10 Layout of Work and Surveys
1.4.10.1 Layout of Work
The following requirements are in addition to the requirements of CLAUSE titled "LAYOUT OF WORK, (APR 1984)." The Government has established bench
SECTION 01 35 13.10 Page 6 marks and horizontal control points at the site of the work. Horizontal control points and descriptions of bench marks shall be provided.The elevations of bench marks are referred to mean water levels indicated on the drawings.
1.4.10.2 Surveyor Requirements
From these control points and bench marks, the Contractor shall lay out the work by establishing all lines, grades, range markers and gauges at the site as necessary to control the work. All survey information shall be recorded in accordance with standard and approved methods and in the survey note format approved by the Contracting Officer. All field notes, sketches, recordings and computations made by the Contractor in performing the layout work shall be available at all times during the progress of the work for ready examination by the Contracting Officer or his or her duly authorized representative and upon completion of the contract work the originals shall be turned over to the Contracting Officer in ring binders.
1.4.10.3 Suspension
The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking the work. Such suspension will be withdrawn upon satisfactory replacement of location and limit marks. Such suspension shall be at no additional cost to the Government and shall not entitle the Contractor to an extension of time for completing the work.
1.4.10.4 Verification
The Government may make checks as the work progresses to verify lines and grades established by the Contractor and to determine the conformance of the completed work as it progresses with the requirements of contract specifications and drawings. Such checking by the Contracting Officer or his or her representative shall not relieve the Contractor of its responsibility to perform all work in accordance with the contract drawings and specifications and the lines and grades given therein.
1.5 SEQUENCING AND SCHEDULING
1.5.1 Exclusion of Period in Computing Completion Schedules
No work will be required during the period between 16 November and 31 March inclusive and the days in this period will not be counted when computing the required completion date. The Contractor may perform work, unless otherwise prohibited, during all or any part of this period upon giving prior written notice to the Contracting Officer.
1.5.2 Sunday, Holiday And Night Operations
When the Contractor elects to work on Saturdays, Sundays, holidays or nights when not prohibited herein, notice of its intention to do so shall be given to the Contracting Officer not less than forty-eight (48) hours in advance thereof. Adequate lighting for thorough inspection of night operations shall be provided by the Contractor at its expense.
1.5.3 Start Work
Evidence that the Contractor has started mobilization and preparation of
SECTION 01 35 13.10 Page 7 submittal register, and other preparatory work will satisfy the requirement that work commence within ten (10) calendar days after issue of the Notice to Proceed. (See Clause titled COMMENCEMENT, PROSECUTION, AND COMPLETION
OF WORK, FAR 52.211-10.)
1.6 SECURITY REQUIREMENTS
All personnel employed by the contractor in the performance of the services specified in this contract or any representative of the contractor entering the dredging and disposal area shall conform and comply with all applicable Federal/State/County /City Laws, Rules, Regulations or Policies. It is the contractor's responsibility to be aware of the prevailing Laws, Rules, Regulations or Policies of the dredging and disposal area.
Pre-screening of contractor candidates via E-verify Program: The Contractor must pre?screen candidates using the E?verify Program http://www.uscis.gov/e-verify website to meet the established employment eligibility requirements. The Vendor must ensure that all contractors working on the site have two valid forms of Government issued identification prior to entering the information in E-Verify. The vendor must ensure the correct information is entered into the E?verify system. A verification sheet for each verified/eligible contractor candidate must be provided by the awarded contractor to the U.S. Army Corps of Engineers (USACE) Contracting Officer Representative (COR) or the site representative, no later than 3 business days after the initial contract award. (The purpose of using E-Verify is to ensure all contractors are U.S.
citizens or documented foreign citizens with authority to work in the United States of America). The COR will forward the verification sheets to the USACE, Detroit District Security Office for validation.
All contract employees must carry pictured identification at all times.
They must show I.D. upon request by City/State/Government personnel. The Contractor's employee must carry a copy of the contract requirements with them during the implementation of this contract.
1.7 REPORT REQUIREMENTS
1.7.1 Accident Prevention Plan
Contractor shall submit the Accident Prevention Plan shall be in accordance with Contract Clause entitled "ACCIDENT PREVENTION (NOV 1991) - ALTERNATE 1.
1.7.2 Payrolls and Basic Records
Contractor shall submit payrolls and basic records in accordance with the CLAUSE entitled "PAYROLLS AND BASIC RECORDS (FEB 1988)".
1.7.3 Progress Chart
Contractor shall submit progress chart in accordance with the Contract clause entitled "SCHEDULE FOR CONSTRUCTION CONTRACTS (APR 1984)".
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 01 35 13.10 Page 8
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 26
GOVERNMENTAL SAFETY REQUIREMENTS
03/15
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 REGULATORY REQUIREMENTS
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO)
1.5.1.1.1 Contractor Quality Control (QC) Person:
1.5.1.2 USACE Dredging Contract Requirements
1.5.1.2.1 SSHO Staffing for USACE Dredging Contracts
1.5.1.2.2 SSHO Requirements for Dredging
1.5.1.2.3 Designated Representative (DR) Requirements for Dredging
1.5.1.2.4 Safety Personnel Training Requirements for Dredging
1.5.1.3 Load Handling Equipment and Crane Operators
1.5.2 Personnel Duties
1.5.2.1 Contractor Site Safety and Health Officer (SSHO)
1.5.3 Meetings
1.5.3.1 Preconstruction Conference
1.6 ACCIDENT PREVENTION PLAN (APP)
1.6.1 APP Contents
1.7 CONTRACTOR RISK MANAGEMENT PROCESS (AHAs)
1.8 DISPLAY OF SAFETY INFORMATION
1.9 SITE SAFETY REFERENCE MATERIALS
1.10 EMERGENCY MEDICAL TREATMENT
1.11 NOTIFICATIONS and REPORTS
1.11.1 Mishap Notification
1.11.2 Mishap Reports
1.11.3 LHE and Crane Reports
1.11.4 Certificate of Compliance
1.12 HOT WORK
1.13 RADIATION SAFETY REQUIREMENTS
1.14 FACILITY OCCUPANCY CLOSURE
1.15 SEVERE STORM PLAN
1.16 CONFINED SPACE ENTRY REQUIREMENTS.
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 Hazardous Material Exclusions
3.1.2 Unforeseen Hazardous Material
3.2 PRE-OUTAGE COORDINATION MEETING
SECTION 01 35 26 Page 1
3.3 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
3.4 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
3.4.1 Fall Protection Training Program
3.4.2 Fall Protection Equipment and Systems
3.4.2.1 Personal Fall Arrest Equipment
3.4.3 Fall Protection for Roofing Work
3.4.4 Horizontal Lifelines
3.4.5 Guardrails and Safety Nets
3.4.6 Rescue and Evacuation Procedures
3.5 EQUIPMENT
3.5.1 Material Handling Equipment
3.5.2 Load Handling Equipment
3.5.3 USE OF EXPLOSIVES
3.6 EXCAVATIONS
3.6.1 Utility Locations
3.6.2 Utility Location Verification
3.6.3 Utilities Within and Under Concrete, Bituminous Asphalt, and
Other Impervious Surfaces
3.7 WORK IN CONFINED SPACES
SECTION 01 35 26 Page 2
SECTION 01 35 26
GOVERNMENTAL SAFETY REQUIREMENTS
03/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.32 (2012) Fall Protection
ASSE/SAFE A10.34 (2001; R 2012) Protection of the Public on or Adjacent to Construction Sites
ASSE/SAFE Z359.1 (2007) Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components
ASME INTERNATIONAL (ASME)
ASME B30.22 (2010) Articulating Boom Cranes
ASME B30.3 (2012) Tower Cranes
ASME B30.5 (2011) Mobile and Locomotive Cranes
ASME B30.8 (2010) Floating Cranes and Floating Derricks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2013) Standard for Portable Fire Extinguishers
NFPA 51B (2014) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 20 Standards for Protection Against Radiation
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1926 Safety and Health Regulations for
SECTION 01 35 26 Page 3
Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.500 Fall Protection
CPL 2.100 (1995) Application of the Permit-Required Confined Spaces (PRCS) Standards, 29 CFR 1910.146
1.2 DEFINITIONS
a. Mishap. Any unplanned, undesired event that occurs during the course of work being performed. The term "mishap" includes accidents, incidents and near-misses.
b. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
c. Load Handling Equipment (LHE). Load Handling Equipment includes cranes, derricks, hoists, and power-operated equipment that can be used to raise, lower and/or horizontally move a suspended load.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); G-AOF
Activity Hazard Analysis (AHA); G-AOF
Crane Critical Lift Plan; G-AOF
Proof of qualification for Crane Operators; G-AOF
Site Layout Plan; G-AOF
SD-06 Test Reports
Notifications and Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph, "Notifications and Reports."
Accident Reports; G-AOF
Crane Reports
SD-07 Certificates
Confined Space Entry Permit
SECTION 01 35 26 Page 4
Hot work permit
License Certificates
Certificate of Compliance; G-AOF
See paragraph 1.11.4, "Certificate of Compliance"
1.4 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, comply with the most recent edition of USACE EM 385-1-1, and all federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.
Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO)
The SSHO must meet the requirements of EM 385-1-1 section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one (1) person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled CONTRACTOR SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.
1.5.1.1.1 Contractor Quality Control (QC) Person:
The Contractor Quality Control Person can be the SSHO on this project.
1.5.1.2 USACE Dredging Contract Requirements
1.5.1.2.1 SSHO Staffing for USACE Dredging Contracts
a. Dredging contracts may include several project sites; this contract will require a minimum of one full time SSHO(s) assigned per project site. SSHO may be collateral duty in specific conditions listed below.
b. Example of one dredging project site is reflected in each of the following:
SECTION 01 35 26 Page 5
(1) a mechanical dredge, tug(s) and scow(s), scow route, and material placement site; or
(2) a hydraulic pipeline dredge, attendant plant, and material placement site; or,
(3) a hopper dredge (include land-based material placement site - if applicable.)
c. Individual dredging project sites with work force less than 8 employees, the SSHO may be a collateral duty, with the same responsibilities of a full time SSHO.
d. Hopper dredges with USCG-Documented crews may designate an officer as a collateral-duty SSHO instead of having a full-time SSHO if the officer meets the SSHO training and experience requirements.
1.5.1.2.2 SSHO Requirements for Dredging
a. In addition to requirements stated elsewhere in this specification, the SSHO shall be present at the project site, located so they have full mobility and reasonable access to all major work operations, for at least one shift in each 24 hour period when work is being done. The SSHO, or Alternate SSHO, shall be available during all shifts for immediate verbal consultation and notification, either by phone or radio. The SSHO shall be a full-time, dedicated position, except as noted above. The SSHO shall report to a senior project (or corporate) officials.
b. The SSHO shall inspect all work areas and operations during initial set-up and at least monthly observe and provide personal oversight on each shift during dredging operations for projects with many work sites, more often for those with less work sites.
c. For projects with multiple shifts or when SSHO is temporarily off-site for a period longer than 24 hours, an Alternate SSHO will be assigned to insure SSHO coverage for the project at all times work activities are conducted. The Alternate SSHO must meet the same requirements and assume the responsibilities of the project SSHO. The Alternate SSHO position may be a collateral duty.
d. If the SSHO is temporarily off-site for less than 24 hours, a Designated Representative (DR) can be used in lieu of an Alternate SSHO and shall be on the project site at all times when work is being performed. See section 1.5.1.2.3. for DR requirements.
1.5.1.2.3 Designated Representative (DR) Requirements for Dredging
a. Designated Representatives (DR) are collateral duty safety personnel, with safety duties in addition to their full-time occupation, and support and supplement the SSHO efforts in managing, implementing and enforcing the Contractor's Safety and Health Program. DRs shall be individual(s) with work oversight responsibilities, such as masters, mates, fill foremen, and superintendents. DRs should not be positions requiring continuous mechanical or equipment operations, such as equipment operators.
b. If…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .