Amend_01_W911XK-15-B-0004.pdf
PDF 19 KB Posted
- Attached to
- Green Bay Maintenence Dredging FY15
- Solicitation number
- W911XK-15-B-0004
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES43281625
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 1 GM MD This amendment is being issued to add instructions to offerors as described under summary of changes. There are no further changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Apr-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-15-B-0004
X 9B. DATED (SEE ITEM 11)
02-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Apr-2015
CODE
CONTRACTING BRANCH
USACE DETROIT DISTRICT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-15-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
CHANGES TO SPECIFICATIONS
ADD: Add the following language to Specifications section 35 20 23 paragraph titled “Restriction”.
“For the Dredge Areas between C.S.0+00 to C.S.60+00 west bay, option 1 C.S.21+00 to C.S.27+00 river, option 2 C.S.60+00 to C.S.72+49 and option 3 C.S.60+00 to C.S.72+49 east river turning basin, the Contractor shall use a closed top production bucket in good repair with tight fitting bottom lips and sealing baffles on the top to expel air and water - in order to prevent loss of material as it is lifted through the water column. ”
INSTRUCTIONS TO OFFERORS 2
1. Notice to bidders: per specification section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS section 1.6.1, and EM 385-1-1 section 16.L, a Naval Architectural Analysis is a required element of the APP for all floating load handling equipment (LHE) and shall be submitted for Government acceptance prior to the start of work. For these purposes, floating LHE includes all floating plant that is engaged in lifting or duty-cycle load handling (to include hydraulic dredges, land LHE such as excavators, cranes, etc. mounted on barges, pontoons, vessels or other means of flotation, and auxiliary shipboard mounted cranes).
In order to determine the responsibility of a prospective contractor (see FAR Subpart 9.1), the government may request, prior to contract award, proof that all equipment proposed for use on the subject contract meets (or is capable of meeting prior to the start of work) all requirements of the most current version of EM 385-1-1.
Specifically, verification that all floating load handling equipment (as described above) have a current Floating Service Naval Architectural Analysis (NAA) that meets the standards described in EM 385-1-1, 16.L.05.”
(End of Summary of Changes)
File details come from the government source that posted it. Updated .