Construction Abstract
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
8/20/2014 9/24/2014 1 2
DATE SIGNED
7A. ITEM
NO 7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT E. UNIT PRICE F. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT
0001 Mob & DeMob 1 JOB $75,081.00 $75,081.00 $343,000.00 $343,000.00 $350,000.00 $350,000.00
0002 Temporary Construction Facilities and Project Sign
1 JOB $327,627.00 $327,627.00 $135,540.00 $135,540.00 $50,000.00 $50,000.00
0003 Control of Water 1 JOB $2,070,616.00 $2,070,616.00 $2,300,000.00 $2,300,000.00 $1,742,000.00 $1,742,000.00
0004 Concrete Channel Demolition, Salvage and Disposal of Materials
1 JOB $1,013,577.00 $1,013,577.00 $396,000.00 $396,000.00 $500,000.00 $500,000.00
0005 Soil Erosion and Sedimentation Control
1 JOB $112,869.00 $112,869.00 $49,000.00 $49,000.00 $150,000.00 $150,000.00
0006 Boulder Installation Training Meetings
1 JOB $2,311.00 $2,311.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00
0007 Excavation of Subgrade Material 18,700.00 CY $25.20 $471,240.00 $3.50 $65,450.00 $10.00 $187,000.00
0008 Reuse or Disposal of "Clean" Excavated Material
0008AA First 10,180 Cubic Yards 10,180.00 CY $18.25 $185,785.00 $30.00 $305,400.00 $40.00 $407,200.00 0008AB Over 10,180 Cubic Yards 4,360.00 CY $18.25 $79,570.00 $30.00 $130,800.00 $40.00 $174,400.00
0009 Disposal of Contaminated Excavated Material
0009AA First 2,910 Cubic Yards 2,910.00 CY $17.90 $52,089.00 $56.00 $162,960.00 $150.00 $436,500.00 0009AB Over 2,910 Cubic Yards 1,250.00 CY $17.90 $22,375.00 $56.00 $70,000.00 $150.00 $187,500.00
0010 Grade Control Base Granular Fill 0010AA First 560 Tons 560.00 TON $28.20 $15,792.00 $27.00 $15,120.00 $40.00 $22,400.00 0010AB Over 560 Tons 240.00 TON $28.20 $6,768.00 $27.00 $6,480.00 $40.00 $9,600.00
0011 Grade Control Base Stone Grade I 0011AA First 2,030 Tons 2,030.00 TON $32.80 $66,584.00 $27.00 $54,810.00 $95.00 $192,850.00 0011AB Over 2,030 Tons 870.00 TON $32.80 $28,536.00 $27.00 $23,490.00 $95.00 $82,650.00
0012 Grade control Base Stone Grade Ii 0012AA First 18,410 Tons 18,410.00 TON $44.70 $822,927.00 $41.50 $764,015.00 $125.00 $2,301,250.00 0012AB Over 18,410 Tons 7,890.00 TON $44.70 $352,683.00 $41.50 $327,435.00 $125.00 $986,250.00
0013 Boulders 0013AA First 315 tons 315.00 TON $130.80 $41,202.00 $210.00 $66,150.00 $250.00 $78,750.00 0013AB Over 315 tons 135.00 TON $130.80 $17,658.00 $210.00 $28,350.00 $250.00 $33,750.00
$5,765,290.00 $5,250,000.00 $7,902,100.00 TOTAL AMOUNT OF BID
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER
W911XK-14-B-0018
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
Sandra M. Kenzie, Contracting Officer
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
US Army Corps of Engineers Detroit District SIGNATURE
CW PURPERO KOVILIC CONSTRUCTION
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
NO. 1 NO. 2
A. HIRED LABOR
A. OFFEROR: A. OFFEROR:
Yes
B. BID SECURITY (Type and Amount) Bid Bond 20%
C. AMENDMENTS ACKNOWLEDGED
B. BID SECURITY (Type and Amount) Bid Bond 20%
C. AMENDMENTS ACKNOWLEDGED
Yes
6. NUMBER OF AMENDMENTS ISSUED
FY14 Menomnee River Ecosystem Restoration
X
(Check A, B, or C and complete D, E, and F)
B. REASONABLE CONTRACT (Without Profit) C. REASONABLE CONTRACT (Including Profit)
PAGE OF PAGES
2 2
7A. ITEM
NO
7B. DESCRIPTION OF OFFERED
ITEM
7C. EST.
QUANTITY D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT
0001 Mob & DeMob 1 $622,750.00 $622,750.00 $320,000.00 $320,000.00 $2,200,000.00 $2,200,000.00 $693,774.50 $693,774.50
0002 Temporary Construction Facilities and Project Sign
1 $22,500.00 $22,500.00 $87,000.00 $87,000.00 $135,000.00 $135,000.00 $268,252.90 $268,252.90
0003 Control of Water 1 $2,259,000.00 $2,259,000.00 $1,600,000.00 $1,600,000.00 $750,000.00 $750,000.00 $4,247,408.20 $4,247,408.20
0004 Concrete Channel Demolition, Salvage and Disposal of
1 $418,000.00 $418,000.00 $331,000.00 $331,000.00 $275,000.00 $275,000.00 $803,458.10 $803,458.10
0005 Soil Erosion and Sedimentation Control
1 $150,500.00 $150,500.00 $57,000.00 $57,000.00 $200,000.00 $200,000.00 $83,021.00 $83,021.00
0006 Boulder Installation Training Meetings
1 $4,800.00 $4,800.00 $98,000.00 $98,000.00 $13,000.00 $13,000.00 $1,475.00 $1,475.00
0007 Excavation of Subgrade Material
18,700.00 $18.50 $345,950.00 $37.00 $691,900.00 $31.00 $579,700.00 $22.80 $426,360.00
0008 Reuse or Disposal of "Clean" Excavated Material
0008AA First 10,180 Cubic Yards 10,180.00 $16.50 $167,970.00 $38.00 $386,840.00 $38.00 $386,840.00 $17.30 $176,114.00 0008AB Over 10,180 Cubic Yards 4,360.00 $16.50 $71,940.00 $37.00 $161,320.00 $38.00 $165,680.00 $17.30 $75,428.00
0009 Disposal of Contaminated Excavated Material
0009AA First 2,910 Cubic Yards 2,910.00 $41.00 $119,310.00 $91.00 $264,810.00 $175.00 $509,250.00 $91.80 $267,138.00 0009AB Over 2,910 Cubic Yards 1,250.00 $41.00 $51,250.00 $91.00 $113,750.00 $175.00 $218,750.00 $91.80 $114,750.00
0010 Grade Control Base Granular 0010AA First 560 Tons 560.00 $70.00 $39,200.00 $22.00 $12,320.00 $54.00 $30,240.00 $48.20 $26,992.00 0010AB Over 560 Tons 240.00 $70.00 $16,800.00 $22.00 $5,280.00 $54.00 $12,960.00 $48.20 $11,568.00
0011 Grade Control Base Stone 0011AA First 2,030 Tons 2,030.00 $64.00 $129,920.00 $44.00 $89,320.00 $43.00 $87,290.00 $50.30 $102,109.00
0011AB Over 2,030 Tons 870.00 $64.00 $55,680.00 $44.00 $38,280.00 $43.00 $37,410.00 $50.30 $43,761.00 0012 Grade control Base Stone
0012AA First 18,410 Tons 18,410.00 $61.50 $1,132,215.00 $63.00 $1,159,830.00 $55.00 $1,012,550.00 $65.20 $1,200,332.00 0012AB Over 18,410 Tons 7,890.00 $61.50 $485,235.00 $63.00 $497,070.00 $55.00 $433,950.00 $65.20 $514,428.00
0013 Boulders 0013AA First 315 tons 315.00 $178.00 $56,070.00 $150.00 $47,250.00 $150.00 $47,250.00 $173.60 $54,684.00 0013AB Over 315 tons 135.00 $178.00 $24,030.00 $150.00 $20,250.00 $150.00 $20,250.00 $173.60 $23,436.00
$6,173,120.00 $5,981,220.00 $7,115,120.00 $9,134,489.70TOTAL AMOUNT OF BID
*TOTAL PRICE BASED ON UNIT PRICE*
INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419s for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION
SHEET
1. SOLICITATION NUMBER
W911XK-14-B-0018
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR:
Bid Bond 20%
C. AMENDMENTS ACKNOWLEDGED
3. CONTRACT ITEMS
RAMS CONTRACTING SUPER WESTERN INC
NO. 3 NO. 4
Yes Yes Yes
4. OFFERS (Continued)
NO. 6
A. OFFEROR:
TERRA ENG & CONSTRUCTION
B. BID SECURITY (Type and Amount)
Bid Bond 20% Bid Bond 20%
A. OFFEROR:
MICHELS CORPS
B. BID SECURITY (Type and Amount)
C. AMENDMENTS ACKNOWLEDGED
Yes
B. BID SECURITY (Type and Amount)
2. PROJECT TITLE
NO. 5
B. BID SECURITY (Type and Amount)
Bid Bond 20%
A. OFFEROR:
FY14 Menomonee River Ecosystem Restoration