Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Thieme Drive Abstract.pdf | ||
| W911XK-10-B-0001-0002 Thieme Drive Amendment.pdf | ||
| Thieme Drive Q A 27 May 2010.pdf | ||
| W911Xk-10-B-0001-0001 Thieme Drive.pdf | ||
| Plans.zip | ZIP file | |
| W911XK-10-B-0001 Thieme Drive.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Thieme Drive, Section 14, Fort Wayne, Indiana THIEME09
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10 REAL ESTATE
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 35 13.10 SPECIAL PROJECT PROCEDURES
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02.00 10 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 10 CONTRACTOR QUALITY CONTROL
01 57 20.00 20 ENVIRONMENTAL PROTECTION
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILES USED AS FILTERS
31 11 00 SITE PREPARATION, CLEARING AND GRUBBING
31 36 00 WIRE MESH GABIONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19 SITE RESTORATION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 10
REAL ESTATE
PART 1 GENERAL
1.1 SUBMITTALS
1.2 REGULATORY REQUIREMENTS
1.2.1 Real Estate Rights
1.2.2 Additional Real Estate Rights
1.3 PROJECT/SITE CONDITIONS
1.3.1 Location and Verification
1.3.2 Survey Markers
1.3.2.1 Semipermanent Markers
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
SECTION 01 10 10 Page 2
SECTION 01 10 10
REAL ESTATE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Additional Property Agreements; G-RED.
Copies of any agreements for Contractor-acquired real estate rights for this project shall be furnished before entering thereon.
1.2 REGULATORY REQUIREMENTS
1.2.1 Real Estate Rights
Rights for the use of the City work and storage areas will be provided and the general limits of the areas are shown on the Real Estate Drawing.
1.2.2 Additional Real Estate Rights
Any additional property agreements and/or real estate rights desired by the Contractor shall be obtained by the Contractor at its own expense. Such agreements shall clearly relieve the Government of any responsibility for damages or liability resulting from the Contractor's use of such grounds.
1.3 PROJECT/SITE CONDITIONS
1.3.1 Location and Verification
It shall be the Contractor's responsibility to accurately locate the limits of all lands utilized under the contract. The corner and angle points of each area for which rights have been obtained shall be marked with semipermanent markers except where there is an approved existing property marker. Temporary markers shall be placed at points on alignment. The points on alignment shall be marked at stations so that intervals between points do not exceed 200 feet.
1.3.2 Survey Markers
All markers shall be installed in an area prior to its use and they shall be available for reference during and upon completion of use of the area.
Where approved existing property markers are found, a witness stake, as specified in Subparagraph, "Semipermanent Markers" below, shall be provided. If the types of markers specified hereinafter cannot be used, other types, as approved by the Contracting Officer, shall be provided.
SECTION 01 10 10 Page 3
1.3.2.1 Semipermanent Markers
The markers shall be a steel rod one-half inch in diameter and four (4) feet long. The steel rod shall be driven vertically into the ground so that the top is flush with the finished ground surface. Each marker shall be witnessed by a 2" x 2" yellow stake extending two (2) feet above the ground surface and driven into the ground until stable, with not less than one (1) foot penetration.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
SECTION 01 10 10 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 General
1.1.2 Lump Sum Item
1.2 UNIT PRICE PAYMENT ITEMS
1.2 General
1.3 Unit Price Items
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 01 22 00.00 10 Page 5
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 General
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.2 Lump Sum Item
a. "Site Preparation" Item No. 0001
(1) Payment will be made for costs associated with mobilization and demobilization, site preparation, clearing and grubbing as defined in Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION and
SECTION 31 11 00, "SITE PREPARATION, CLEARING AND GRUBBING".
(2) Unit of measure: Lump Sum
b. "Gabion Baskets": Item No. 0002
(1) Payment will be made for costs associated with the Gabion Baskets including basket and stone fill material, tie back and installation as required in Section 31 36 00, "WIRE MESH GABIONS".
(2) Unit of measure: Lump Sum
1.2 UNIT PRICE PAYMENT ITEMS
1.2 General
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.3 Unit Price Items
a. "Geotextile": Item No. 0003
SECTION 01 22 00.00 10 Page 6
(1) Payment will be made for costs associated with the geotextile material as required in Section 31 05 19, "GEOTEXTILES USED AS
FILTERS".
(2) Unit of measure: Square Yard
b. "Backfill": Item No. 0004
(1) Payment will be made for costs associated with the backfill material as required in Section 31 00 00, "EARTHWORK".
(2) Measurement for Payment will be at the Contract Unit Price per Cubic Yard; "First 1200 cubic yards" - Item No. 0004AA and "Over 1200 cubic yards" - Item No. 0004AB for "Backfill".
(3) Unit of measure: Cubic Yard
c. "Top Soil, Seed and Mulch": Item No. 0005
(1) Payment will be made for costs associated with top soil, seed and mulch as required in accordance with Section 32 92 19, "SITE
RESTORATION".
(2) Measurement for Payment will be at the Contract Unit Price per Square Yards for "Top Soil, Seed and Mulch".
(3) Unit of measure: Square Yards
d. Filter Material": Item No. 0006
(1) Payment will be made for costs associated with filter material as required in accordance with Section 31 36 00, "WIRE
MESH GABIONS".
(2) Measurement for Payment will be at the Contract Unit Price for Filter Material".
(3) Unit of measure: Cubic Yard
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section -- -- End of Section --
SECTION 01 22 00.00 10 Page 7
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
1.1.2 Approving Authority
1.1.3 Work
1.2 SUBMITTALS
1.3 SUBMITTAL CLASSIFICATION
1.4 SUBMITTAL REGISTER
1.5 SCHEDULING
1.6 TRANSMITTAL FORM (ENG FORM 4025)
1.7 SUBMITTAL PROCEDURES
1.7.1 Deviations
1.8 CONTROL OF SUBMITTALS
1.9 GOVERNMENT APPROVED SUBMITTALS
1.10 INFORMATION ONLY SUBMITTALS
1.11 STAMPS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 33 00 Page 8
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by SD numbers and titles as follows.
SD-01 Preconstruction Submittals
Certificates of insurance.
Surety bonds.
List of proposed subcontractors.
List of proposed products.
Construction Progress Schedule.
Submittal register.
Schedule of prices.
Health and safety plan.
Work plan.
Quality control plan.
Environmental protection plan.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a
SECTION 01 33 00 Page 9 material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
1.1.2 Approving Authority
Office authorized to approve submittal; such as
Area Office Field (AOF) Real Estate Office (REO) Engineering, Design and Construction Office (EDC)
SECTION 01 33 00 Page 10
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submittal register; G-AOF
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.4 SUBMITTAL REGISTER
At the end of this section is a submittal register showing items of equipment and materials for which submittals are required by the specifications; this list may not be all inclusive and additional submittals may be required. The Contractor shall maintain a submittal register for the project in accordance with Section 01 45 02.00 10 QUALITY CONTROL SYSTEM (QCS).The Government will provide the initial submittal register in electronic format. Thereafter, the Contractor shall maintain a complete list of all submittals, including completion of all data columns.
Dates on which submittals are received and returned by the Government will be included in its export file to the Contractor. The Contractor shall track all submittals.
1.5 SCHEDULING
Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of 10 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals.
1.6 TRANSMITTAL FORM (ENG FORM 4025)
The sample transmittal form (ENG Form 4025) shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.
SECTION 01 33 00 Page 11
1.7 SUBMITTAL PROCEDURES
Submittals shall be made as follows:
1.7.1 Deviations
For submittals which include proposed deviations requested by the Contractor, the column "variation" of ENG Form 4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.8 CONTROL OF SUBMITTALS
The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.9 GOVERNMENT APPROVED SUBMITTALS
Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. The distribution of approved copies will be as specified in CLAUSE titled "SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION".
1.10 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.11 STAMPS
Stamps, approximately 2 inches high by 3 inches wide, used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:
SECTION 01 33 00 Page 12
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s). |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 13
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
Thieme Drive, Section 14, Fort Wayne, Indiana
01 10 10 SD-01 Preconstruction Submittals
1.2.2 G REDAdditional Property Agreements
01 33 00 SD-01 Preconstruction Submittals
1.1.1 G AOFSubmittal register
01 35 13.10 SD-01 Preconstruction Submittals 1.6.1Accident Prevention Plan 1.6.2Payrolls and Basic Records
1.6.3 G AOFProgress Chart
2.1.1 G EDCNon-listed, Non-Commercially
Active Stone or Material Source
1.4.2 G AOFUtility Locating Plan
1.4.2 G AOFUtility Location Findings
1.4.7.2 G AOFSurvey Note Format
SD-07 Certificates 2.2As-Built Technician's
Qualifications
2.2 G AOFAs-built Drawings
1.4.7.2Survey Information
01 35 29 SD-01 Preconstruction Submittals
1.6 G AOFAccident Prevention Plan (APP)
1.7 G AOFActivity Hazard Analysis (AHA)
1.6.1 G AOFCrane Critical Lift Plan
1.5.1.2 G AOFCrane Operators
SD-06 Test Reports 1.11Reports 1.11.1Accident Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 35 29 1.11.3Monthly Exposure Reports 1.11.4Crane Reports
Regulatory Citations and Violations
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.11.5Certificate of Compliance
01 45 04.00 10 SD-01 Preconstruction Submittals G AOFContractor Quality Control Plan
01 57 20.00 20 SD-01 Preconstruction Submittals
1.5 G AOFEnvironmental Protection Plan
31 00 00 SD-06 Test Reports G AOFBackfill Testing
3.5.3 G AOFCompaction Testing
SD-07 Certificates Testing
SD-09 Manufacturer’s Field Reports Earthwork
31 05 19 SD-03 Product Data 2.1.1.1Geotextile
31 11 00 SD-01 Preconstruction Submittals Equipment; GA. Work Plan; GA.
Check Survey; FIO.
31 36 00 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
31 36 00 Gabions
G,AOF & EDC
2.1.2Alternative Wire Fasteners SD-07 Certificates
2.1.4 G AOFStone Fill
2.1.5 G AOFFilter Material
32 92 19 SD-01 Preconstruction Submittals Equipment
1.5.1Delivery 3.2.1Finished Grade and Topsoil 2.2Topsoil 3.1.3Equipment Calibration 3.1.4Soil Test
SD-07 Certificates 2.1Seed 2.2Topsoil
Fertilizer SD-04 Samples
1.5.1.1Delivered Topsoil SD-01 Preconstruction Submittals
3.4Quantity Check 3.7Seed Establishment Period 3.7.3.4Maintenance Record
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 13.10
SPECIAL PROJECT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 REGULATORY REQUIREMENTS
1.3.1 Additional Work Proposed and Not Authorized
1.3.1.1 Work Subject to 33 CFR 320-330
1.4 PROJECT/SITE CONDITIONS
1.4.1 Condition and Use of Project Site
1.4.1.1 Physical Conditions
1.4.1.2 Work and Storage Areas
1.4.2 Existing Vegetation, Structures, Equipment, Utilities &
Improvements
1.4.3 Vehicular Access
1.4.4 Utility Services
1.4.4.1 Contractor-Furnished Utility Services
1.4.5 Protection and Maintenance of Traffic
1.4.5.1 Haul Roads
1.4.5.2 Barricades
1.4.6 Contract Supervision and Representation
1.4.7 Layout of Work and Surveys
1.4.7.1 Layout of Work
1.4.7.2 Surveyor Requirements
1.4.7.3 Suspension
1.4.7.4 Verification
1.5 SEQUENCING AND SCHEDULING
1.5.1 Construction Period Restriction
1.5.2 Sunday, Holiday' Night and Extended Hours of Operations
1.5.3 Work Period Restrictions
1.5.4 Start Work
1.6 REPORT REQUIREMENTS
1.6.1 Accident Prevention Plan
1.6.2 Payrolls and Basic Records
1.6.3 Progress Chart
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Use of Materials from Non-Listed, Non-Commercially Active
Sources
2.2 AS-BUILT DRAWINGS
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 01 35 13.10 Page 14
SECTION 01 35 13.10
SPECIAL PROJECT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. GOVERNMENT CODE OF FEDERAL REGULATIONS (CFR)
33 CFR 320-330 General Regulatory Policies, Permits, Enforcement and Definitions
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan
Contractor shall provide an accident prevention plan including an activity hazard analysis to the Contracting Officer within 15 calendar days after receipt of award. Plan shall be in accordance with Contract Clause entitled "ACCIDENT PREVENTION (NOV 1991) - ALTERNATE 1.
Payrolls and Basic Records
Contractor shall submit payrolls and basic records in accordance with the CLAUSE entitled "PAYROLLS AND BASIC RECORDS (FEB 1988)".
Progress Chart; G-AOF
Contractor shall submit progress chart in accordance with the Contract clause entitled "SCHEDULE FOR CONSTRUCTION CONTRACTS (APR 1984)".
Non-listed, Non-Commercially Active Stone or Material Source; G-EDC.
If after award of a contract, the Contractor proposes to furnish stone, or granular materials from non-listed, or non-commercially active sources, the following information and data for each non-listed or non-commercially active source of stone, or granular material shall be furnished forty-five
(45) or more calendar days prior to the date the Contractor is scheduled to obtain materials from such source(s).
a. Name and address (Property Owner).
b. Location, site map, and legal description (or appropriate
SECTION 01 35 13.10 Page 15 substitute) of the area.
c. Previous land use information.
d. A topographic map of the area.
e. Photographs showing the area proposed for use.
f. Written permission of the owners of the proposed non-listed or non-commercially active sources(s).
g. Written permission of the owners of the access properties involved.
h. All data required to assess potential environmental impacts. This information is required in order to determine the necessity for environmental documentation for any non-commercially active, non-listed source(s).
i. Documentation of coordination of the use of proposed non-commercially active, non-listed source(s) with Federal, State and local agencies having an interest and furnish written approval of these agencies for use of such source(s).
(1) Supervisor, Bloomington Field Office, U.S. Fish and Wildlife Service, 620 South Walker, Bloomington, Indiana 47403.
(2) Chief, Office of Strategic Environmental Analysis, B 19J,, U.S. Environmental Protection Agency, 77 West Jackson Blvd., Chicago, Illinois 60604-3590.
(3) Chief, Division of Water, Indiana Department of Natural Resources, 402 West Washington Street, Room 264, Indianapolis, Indiana 46204.
(4) Chief, Division of Fish and Wildlife, Indiana Department of Natural Resources, 402 West Washington Street, Room W264, Indianapolis, Indiana 46204.
(5) Chief, Division of Forestry, Indiana Department of Natural Resources, 402 West Washington Street, Room W264, Indianapolis, Indiana 46204.
(6) Chief, Division of Historic Preservation and Archaeology, Indiana Department of Natural Resources, 402 West Washington Street, Room W264, Indianapolis, Indiana 46204.
(7) Chief, Division of Soil Conservation, Indiana Department of Natural Resources, 402 West Washington Street, Room W264, Indianapolis, Indiana 46204.
(8) Indiana Department of Environmental Management Office of Water Management, Mr. Marty Maupin, Section 401 WQC Program, P.O.
Box 6015, Indianapolis, Indiana 46206-6015.
j. The proposed reduction, if any, in the applicable unit or lump-sum prices the BIDDING SCHEDULE if the request were to be approved by the Government.
Utility Locating Plan; G-AOF.
SECTION 01 35 13.10 Page 16
Submit a plan of the proposed procedure for locating existing utilities prior to commencing work at the project site. The plan shall include the local telephone number of HOLEY MOLEY (800-381-5544), if work includes excavation.
Utility Location Findings; G-AOF.
Submit a copy of the utility location findings prior to commencing work on the site.
Survey Note Format; G-AOF.
Submit the proposed survey note format prior to performing any survey work at the work site.
SD-07 Certificates
As-Built Technician's Qualifications
Submit the identity and qualifications of the persons assigned to prepare the as-built information at least 10 calendar days in advance of preparing the drawings.
As-built Drawings; G-AOF.
Within ten (10) calendar days after the substantial completion date as established by the Contracting Officer, submit the as-built details of the work performed under this contract on a set of blue-line prints of the contract drawings marked in red. Following review and approval by the Government, the Contractor shall prepare electronic and mylar copies of as-built drawings for submittal within 15 calendar days following receipt of comments from the Government. Electronic files shall be submitted in latest version of Microstation, CADD file format, suitable for plotting with Intergraph IPLOT Software. The electronic medium for file transfers shall be agreed to prior to the time of submittal and shall be compatible with current industry standards and hardware configurations.
Survey Information
Upon completion of the contract work, the originals of all field notes, sketches, recordings and computations made by the Contractor in performing the layout work shall be submitted in ring binders.
1.3 REGULATORY REQUIREMENTS
1.3.1 Additional Work Proposed and Not Authorized
1.3.1.1 Work Subject to 33 CFR 320-330
Any additional work (not specifically shown on the plans or delineated in the specifications) proposed by the Contractor in or affecting navigable waters, including wetlands (as defined in 33 CFR 320-330, http://ecfr.gpoaccess.gov) shall not be performed without a Department of the Army Permit. This requirement shall be applicable to all work, permanent or temporary, and/or fill(s). The Department of the Army Permit shall be approved by the District Engineer or Deputy District Engineer in accordance with the laws of the United States and the regulations promulgated thereunder, including, but not limited to, the River and Harbor
SECTION 01 35 13.10 Page 17
Act of 1899, the Clean Water Act and the National Environmental Policy Act of 1969, as amended. Corps employees (Contracting Officer's Representatives (COR) or inspectors) are not delegated authority to authorize such work. Information on making application for such permit(s) may be obtained by contacting one of the offices as listed hereinafter.
When applying for information or a permit, a copy of any correspondence should be directed to the Contracting Officer of this contract. If a permit is not obtained, the additional work cannot be accomplished. Any delay in processing the permit will not constitute the basis of a claim under this contract. The fact that the Contractor is performing work under a Department of the Army Contract will give the Contractor no greater rights than any other applicant for a Department of the Army Permit.
MICHIGAN-INDIANA
Regulatory Branch Engineering and Technical Services Division U.S. Army Engineer District, Detroit P. O. Box 1027 Detroit, MI 48231 Telephone: 313-226-6813
1.4 PROJECT/SITE CONDITIONS
1.4.1 Condition and Use of Project Site
The drawings indicate elevations at the project site as found in condition surveys made as stated on the contract drawings. A notification of at least five (5) calendar days shall be given to the Contracting Officer prior to bringing any construction equipment or material upon the work site. The Contractor shall be responsible for damages that may be suffered due to its operations. The Contractor shall note CLAUSE titled "PROTECTION
OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS."
1.4.1.1 Physical Conditions
The physical conditions shown on the drawings are indicative of those that prevailed at the time of the site investigations and may be different than those at the time of construction. Significant variations that would require changes to the plans or specification shall be reported to the Contracting Officer immediately. The information shown on the logs of soil borings on the contract drawings is from borings located within or near the work areas. While the borings are representative of subsurface conditions at their respective locations and for their respective vertical reaches, localized variations of characteristics of the subsurface materials of this region are anticipated.
1.4.1.2 Work and Storage Areas
Work and storage areas will be provided by the City at the site as designated on the Real Estate Drawing.
1.4.2 Existing Vegetation, Structures, Equipment, Utilities & Improvements
General locations of applicable existing utilities, vegetation, structures, equipment and improvements, based upon latest information available to the Government have been shown on the drawings. However, it is the Contractor's obligation to establish the exact horizontal and vertical location and size of all existing utility lines which are located within
SECTION 01 35 13.10 Page 18 the required work area. The Contractor shall submit a utility locating plan for locating existing utilities and a copy of its utility location findings prior to commencing work on the site. Any utility lines which are not found by the Contractor, but which are known to exist at the project site, shall be reported to the Contracting Officer immediately. The Contracting Officer will have the option of directing commencement of work at the site or requiring the Contractor to submit further plans for locating the utility lines. Once the utilities have been located and marked, the Contractor shall be deemed to have the location made known to it pursuant to CLAUSE titled "PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS." If the Contractor damages any existing utility line, vegetation, structure, equipment or improvement, a report thereof shall be made immediately to the Contracting Officer. In any event, existing utility lines, vegetation, structures, equipment or improvements shall be protected from damage, and if damaged, shall be repaired by the Contractor at its own expense.
1.4.3 Vehicular Access
Throughout the period of work on this contract, the Contractor shall maintain an all-weather roadway through or around its work area when work therein would otherwise block an existing roadway. Such permanent or temporary roadways shall be kept open for use by emergency vehicles, as well as residential and commercial traffic at all times.
1.4.4 Utility Services
1.4.4.1 Contractor-Furnished Utility Services
The Contractor shall furnish, all water, electric current and other utilities required for its use.
1.4.5 Protection and Maintenance of Traffic
1.4.5.1 Haul Roads
The Contractor shall, at its own expense, construct access and haul roads necessary for proper prosecution of the work under this contract. Haul roads shall be constructed with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic shall be avoided. The Contractor shall provide necessary lighting, signs, barricades, and distinctive markings for safe movement of traffic. The method of dust control shall be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads shall be subject to approval by the Contracting Officer. Lighting shall be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations. Upon completion of the work, haul roads shall be removed unless otherwise approved by the Contracting Officer. Any dirt or mud which is tracked onto paved or surfaced roadways shall be promptly cleaned away.
1.4.5.2 Barricades
The Contractor shall erect and maintain temporary barricades to limit public access to hazardous areas. Such barricades shall be required whenever safe and public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic.
Barricades shall be securely placed, clearly visible with adequate
SECTION 01 35 13.10 Page 19 illumination to provide sufficient visual warning of the hazard during both day and night.
1.4.6 Contract Supervision and Representation
The Contractor's local representative shall be available to Government representatives during duty hours, 8 a.m. to 4:30 p.m., on normal working days and shall be available by telephone at other times. The name of the Contractor's representative and the contact telephone number shall be furnished to the Government.
1.4.7 Layout of Work and Surveys
1.4.7.1 Layout of Work
The following requirements are in addition to the requirements of CLAUSE titled "LAYOUT OF WORK." The Government has established bench marks and horizontal control points at the site of the work. Horizontal control points and descriptions of bench marks are shown on the drawings. The elevations of bench marks are referred to mean water level (NAD 83).
1.4.7.2 Surveyor Requirements
From these control points and bench marks, the Contractor shall lay out the work by establishing all lines, grades, range markers and gauges at the site as necessary to control the work. All survey information shall be recorded in accordance with standard and approved methods and in the survey note format approved by the Contracting Officer. All field notes, sketches, recordings and computations made by the Contractor in performing the layout work shall be available at all times during the progress of the work for ready examination by the Contracting Officer or his or her duly authorized representative and upon completion of the contract work the originals shall be turned over to the Contracting Officer in ring binders.
1.4.7.3 Suspension
The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking the work. Such suspension will be withdrawn upon satisfactory replacement of location and limit marks. Such suspension shall be at no additional cost to the Government and shall not entitle the Contractor to an extension of time for completing the work.
1.4.7.4 Verification
The Government may make checks as the work progresses to verify lines and grades established by the Contractor and to determine the conformance of the completed work as it progresses with the requirements of contract specifications and drawings. Such checking by the Contracting Officer or his or her representative shall not relieve the Contractor of its responsibility to perform all work in accordance with the contract drawings and specifications and the lines and grades given therein.
1.5 SEQUENCING AND SCHEDULING
Gabion Baskets (Item No. 0002) and Suitable Fill (Item No. 0004) portions of work must be complete within sixty (60) days of Notice to Proceed.
SECTION 01 35 13.10 Page 20
1.5.1 Construction Period Restriction
The Contractor's attention is directed to the allowed and prohibited construction periods as established by the State of Indiana for this project as specified in SECTION 01 57 20.00 20, "ENVIRONMENTAL PROTECTION" Paragraph, "PROTECTION OF FISH AND WILDLIFE RESOURCES", Subparagraph, "State of Indiana - Allowed and Prohibited Work Periods". The number of calendar days within which the Contractor is required to complete the work under this contract, as established in the Clause titled "COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK", is exclusive of the above referenced periods during which construction is prohibited and the days in these periods will not be counted when computing the required completion date.
1.5.2 Sunday, Holiday' Night and Extended Hours of Operations
When the Contractor elects to work more than 8 hours per day, Monday through Friday or on Saturdays, Sundays, holidays or nights when not prohibited herein, notice of its intention to do so shall be given to the Contracting Officer not less than forty-eight (48) hours in advance thereof. Adequate lighting for thorough inspection of night operations shall be provided by the Contractor at its expense.
1.5.3 Work Period Restrictions
No work is allowed at the project sites during the following periods:
a. Weekdays between 6 p.m. and 8 a.m.
b. Regular weekends between 6 p.m. Friday and 8 a.m. Monday.
c. Holiday periods as follows:
(1) 6 p.m. 25 November to 6 a.m. 30 November 2009
(2) 6 p.m. 23 December to 6 a.m. 4 January 2010
(3) 6 p.m. 28 May to 6 a.m. 1 June 2010
(4) 6 p.m. 2 July to 6 a.m. 5 July 2010
(5) 6 p.m. 3 September to 6 a.m. 7 September 2010
(6) 6 p.m. 24 November to 6 a.m. 29 November 2010
(7) 6 p.m. 23 December to 6 a.m. 3 January 2011
The above-stated no-work periods, as applicable, are included in the number of calendar days within which the Contractor is required to complete the work as established in CLAUSE titled "COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK" and therefore the above-stated no-work periods will not entitle the Contractor to additional time for completing the work.
1.5.4 Start Work
Evidence that the Contractor has started procurement of materials, preparation and submission of shop drawings, preparation of subcontracts, and other preparatory work will satisfy the requirement that work commence within ten (10) calendar days after receipt of Notice to Proceed. (See
SECTION 01 35 13.10 Page 21
Clause titled COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, FAR 52.212-0003.)
1.6 REPORT REQUIREMENTS
1.6.1 Accident Prevention Plan
Contractor shall provide an accident prevention plan including an activity hazard analysis to the Contracting Officer within 15 calendar days after receipt of award. Plan shall be in accordance with Contract Clause entitled "ACCIDENT PREVENTION (NOV 1991) - ALTERNATE 1.
1.6.2 Payrolls and Basic Records
Contractor shall submit payrolls and basic records in accordance with the CLAUSE entitled "PAYROLLS AND BASIC RECORDS (FEB 1988)".
1.6.3 Progress Chart
Contractor shall submit progress chart in accordance with the Contract clause entitled "SCHEDULE FOR CONSTRUCTION CONTRACTS (APR 1984)".
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Use of Materials from Non-Listed, Non-Commercially Active Sources
If after award of the contract, the Contractor proposes to use stone from a source or sources other than approved commercially active sources or to use soil, granular or aggregate materials for fill from a non-commercially active source or sources, the Contractor shall submit data as required in the Paragraph entitled "SUBMITTALS". The data shall be accompanied by a request for approval. Non-listed, non-commercially active stone or material sources shall not be used unless the proposal and use of the source(s) are approved by the Contracting Officer in accordance with applicable provisions of the contract. All expenses incurred by the Government and the Contractor in connection with the Contractor's request for approval for the use of materials from non-listed, non-commercially active sources shall be borne by the Contractor and all use of such materials and all operations in connection therewith shall be at the Contractor's risk. No extension of the time for completion of the work will be granted as the result of disapproval or approval of the Contractor's request to use a non-listed, non-commercially active source or sources. If not approved, the Contractor shall use materials from the applicable listed or commercially active source(s).
2.2 AS-BUILT DRAWINGS
The as-built drawing details shall be accurate and of professional quality prepared those with adequate as-built technician's qualifications.
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 01 35 13.10 Page 22
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 29
SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.4 REGULATORY REQUIREMENTS
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO)
1.5.1.2 Crane Operators
1.5.2 Personnel Duties
1.5.2.1 Site Safety and Health Officer (SSHO)/Superintendent
1.5.3 Meetings
1.5.3.1 Preconstruction Conference
1.6 ACCIDENT PREVENTION PLAN (APP)
1.6.1 EM 385-1-1 Contents
1.7 ACTIVITY HAZARD ANALYSIS (AHA)
1.8 DISPLAY OF SAFETY INFORMATION
1.9 SITE SAFETY REFERENCE MATERIALS
1.10 EMERGENCY MEDICAL TREATMENT
1.11 REPORTS
1.11.1 Accident Reports
1.11.2 Accident Notification
1.11.3 Monthly Exposure Reports
1.11.4 Crane Reports
1.11.5 Certificate of Compliance
1.12 HOT WORK
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONSTRUCTION AND/OR OTHER WORK
3.1.1 Hazardous Material Exclusions
3.1.2 Unforeseen Hazardous Material
3.2 PRE-OUTAGE COORDINATION MEETING
3.3 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
3.3.1 Training
3.3.2 Fall Protection Equipment and Systems
3.3.2.1 Personal Fall Arrest Equipment
3.3.3 Existing Anchorage
3.3.4 Horizontal Lifelines
3.3.5 Guardrails and Safety Nets
3.3.6 Rescue and Evacuation Procedures
3.4 SCAFFOLDING
SECTION 01 35 29 Page 23
3.5 EQUIPMENT
3.5.1 Material Handling Equipment
3.5.2 Weight Handling Equipment
3.6 EXCAVATIONS
3.6.1 Utility Location Verification
3.6.2 Shoring Systems
3.6.3 Trenching Machinery
3.7 UTILITIES WITHIN CONCRETE SLABS
3.8 ELECTRICAL
3.8.1 Conduct of Electrical Work
3.8.2 Portable Extension Cords
3.9 WORK IN CONFINED SPACES
SECTION 01 35 29 Page 24
SECTION 01 35 29
SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A10.32 Personal Fall Protection - Safety Requirements for Construction and Demolition Operations
ANSI Z359.1 (1992; R 1999) Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components
ANSI/ASSE A10.34 (2001) Protection of the Public on or Adjacent to Construction Sites
ASME INTERNATIONAL (ASME)
ASME B30.22 (2005) Articulating Boom Cranes
ASME B30.3 (2004) Construction Tower Cranes
ASME B30.5 (2007) Mobile and Locomotive Cranes
ASME B30.8 (2004) Floating Cranes and Floating Derricks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2007; Errata 2007; AMD 1 2007) Standard for Portable Fire Extinguishers
NFPA 51B (2009) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70 (2008; AMD 1 2008) National Electrical Code - 2008 Edition
NFPA 70E (2009; Errata 2009) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008) Safety and Health Requirements Manual
SECTION 01 35 29 Page 25
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.500 Fall Protection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Government acceptance is required for submittals with a "G, A" designation.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); G, AOF
Activity Hazard Analysis (AHA); G, AOF
Crane Critical Lift Plan; G, AOF
Proof of qualification for Crane Operators; G, AOF
SD-06 Test Reports
Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Reports."
Accident Reports
Monthly Exposure Reports
Crane Reports
Regulatory Citations and Violations
SD-07 Certificates
Confined Space Entry Permit
Hot work permit
Certificate of Compliance (Crane)
1.3 DEFINITIONS
b. High Visibility Accident. Any mishap which may generate publicity and/or high visibility.
SECTION 01 35 29 Page 26
c. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
d. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
(1) Death, regardless of the time between the injury and death, or the length of the illness;
(2) Days away from work (any time lost after day of injury/illness onset);
(3) Restricted work;
(4) Transfer to another job;
(5) Medical treatment beyond first aid;
(6) Loss of consciousness; or
(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.
e. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
1.4 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1, and the following federal laws, ordinances, criteria, rules and 29.CFR 1910 and 29.
CFR 1926. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO)
Site Safety and Health Officer (SSHO) shall be provided at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (QC) person can be the SSHO on this project. The SSHO shall meet the following requirements:
Level 3:
A minimum of 5 years safety work on similar projects.
30-hour OSHA construction safety class or equivalent within the last 5 years.
An average of at least 24 hours of formal safety training each
SECTION 01 35 29 Page 27 year for the past 5 years.
Competent person training as needed.
1.5.1.2 Crane Operators
Crane operators shall meet the requirements in USACE EM 385-1-1, Section 16 and Appendix I. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, crane operators shall be designated as qualified by a source that qualifies crane operators (i.e., union, a government agency, or and organization that tests and qualifies crane operators, qualified consultant (can be an in-house resource). Proof of current qualification shall be provided.
1.5.2 Personnel Duties
1.5.2.1 Site Safety and Health Officer (SSHO)/Superintendent
a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Safety inspection logs shall be attached to the Contractors' daily quality control report.
b. Conduct mishap investigations and complete required reports.
Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors.
c. Maintain applicable safety reference material on the job site.
d. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.
e. Implement and enforce accepted APPS and AHAs.
f. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. A list of unresolved safety and health deficiencies shall be posted on the safety bulletin board.
g. Ensure sub-contractor compliance with safety and health requirements.
Failure to perform the above duties will result in dismissal of the superintendent and/or SSHO, and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement.
1.5.3…