W911WN19B8010_Amendment_0002_Lick_Run_Streambank_Restortation.pdf

PDF 300 KB Posted

Attached to
Lick Run Streambank Restoration
Solicitation number
W911WN19B8010
Issued by

About this file

Amendment 0003 - Solicitation W911WN19B8010 Lick Run Streambank Restoration

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET481375786

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

STREAMBANK PROTECTION PROJECT, LICK RUN IN JEFFERSON HILLS, SOUTH PARK TOWNSHIP, ALLEGHENY COUNTY, PENNSYLVANIA

The purpose of this Amendment is to:

1. Provide revised responses to questions 1 and 2.

2. Update Davis Bacon Wage Determination to PA20190002 08/30/2019.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN19B8010

X 9B. DATED (SEE ITEM 11)

08-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Sep-2019

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN19B8010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been modified:

QUESTIONS AND ANSWERS

Lick Run Streambank Restoration

Questions and Answers

Q 1: Can you supply the easements and rights of way for the Arch Street intersection with Cochrans Mill Road?

A 1: The Cochrans Mill Road right of way in the area of the treatment plant is 33 feet.

The Pleasant Hills Authority (PHA) property line along the Arch Street (private) alignment is 20 feet (from the centerline of the road). The property line extends along that alignment to the center of Cochrans Mill Road. Subsequent to the pre bid meeting, the approximate PHA property line location (along Arch Street) was field marked with orange paint.

(Revised) There are no easements. Location of property line is shown on sheet G-1006. Arch Street is a private street bounded on the Pleasant Hills Municipal Authority side by the Pleasant Hills Authority property line. No access to site from Arch Street is allowed. Access to that area of Pleasant Hills Authority property is to be ONLY from Cochran Mills Road. The Cochrans Mill Road right of way in the area of the treatment plant is 33 feet.

Q 2: Can you clarify the steep excavation layback, 0.5:1? This is 3 times steeper than allowed by OSHA. If this is part of the designed construction plan, and we follow it, what happens when the excavation starts to slide? There is going to end up with a lot more excavation. Also, if this portion is on the contractor, does all of the backfill have to still be #57 stone?

A 2: Section 32 32 16.00 08, Para 2.1 states that the wall work elements include engineering services in addition to construction services. Contractor is responsible for providing wall design services to include any required temporary shoring. Other Paragraphs in that Section are related to Design Requirements, Parameters; etc.

Retained backfill within the failure zone consists of No. 57 aggregate. Any changes from what is shown in the Contract Drawings or Specifications should be addressed in the wall design submitted for review.

Additionally, Section 31 00 00, Para. 1.1 describes criteria for bidding Earthwork. Specifically, “ …if Contractor decides to use shoring in performance of the work, it shall be at no cost to the Government and considered incidental to the applicable work item.”

(Revised) The excavation and backfill lines shown on the drawings are part of the Government's conceptual design to meet overall global stability. Actual design of the wall is to be done by the contractor.

The installation of the wall and exact excavation limits for wall installation are deemed to be part of the contractor's means and methods (31 00 00 Para 3.2). The contractor is expected to develop a work plan and shop drawings that details their means and methods for excavation (31 00 00 Para 3.2, 32 32 16.00 08 Para 2.1, 2.1.1, 2.1.3). This will require them to excavate to appropriate cutbacks in accordance with EM 385-1- 1 (01 35 23.00 08 Para 1.7.2.6) or design shoring (31 00 00 Para 3.4.1).

Retained backfill within the failure zone consists of No. 57 aggregate. Any changes from what is shown in the Contract Drawings or Specifications should be addressed in the wall design submitted for review.

Additionally, Section 31 00 00, Para. 1.1 describes criteria for bidding Earthwork. Specifically, “ …if

Contractor decides to use shoring in performance of the work, it shall be at no cost to the Government and considered incidental to the applicable work item.”

Q 3: Please verify the required information and content for submittal on Sept. 10, 2019 includes:

a. Completed and signed SF 1442

b. Price breakdown per line item list provided in the solicitation

c. Completed Reps and Certs

d. Bid Bond

e. Proof of registration on SAM.gov

A 3: Bid submission shall include the SF 1442, Section 00 10 00 (all CLINs and Price Schedule), and the required Bid Guarantee. The Contracting Officer will verify SAM registration in accordance with provision 52.204-7 and review annual representations and certifications, which, in accordance with provision 52.204-8, are required to be completed electronically in SAM.

Q 4: Please verify that any additional information (past performance, experience, references, resumes for key personnel, technical narrative, project schedule, etc.) is not due at the time of bid on Sept. 10, but will be requested upon decision of lowest bidder.

A 4: The Government is not conducting a best value tradeoff; therefore, the information required for bid submission is limited to what was identified in the response to Q3. After receipt of bids, and prior to award, the Contracting Officer will conduct a pre-award survey per ADDENDUM TO SECTION 00 21 00 -14. Any additional information (project schedule, names and qualifications of personnel, etc.) required by the technical specifications shall be submitted after award.

Q 5: Please clarify location of delivery for bids.

A 5: Bids are to be submitted to:

U.S. Army Engineer District, Pittsburgh

ATTN CELRP-RC-P

W S Moorhead Federal Building 1000 Liberty Avenue Room 2203 Pittsburgh, PA 15222-4186

Q 6: Are bidders permitted to provide hand delivered bids?

A 6: Yes, Bids can been hand delivered.

Q 7: Is there a specific format and submission process for the daily inspections of filter bags and the weekly inspections of the erosion control blankets? See Contract Drawings page X-5005 subtitle erosion control blankets and pumped water filter bag.

A 7: Refer to SECTION 01 57 23.00 08 STORM WATER POLLUTION CONTROL paragraph 3.9 for information regarding inspection reports. There is not specific format other than the report shall be furnished to the Contractor Officer [or designated representative] within 24 hours of the inspection as a part of the Contractor's daily CQC Report.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

WAGE DETERMINATION

"General Decision Number: PA20190002 08/30/2019

Superseded General Decision Number: PA20180004

State: Pennsylvania

Construction Types: Heavy and Highway

Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 01/11/2019 2 02/15/2019 3 05/17/2019 4 06/07/2019 5 06/14/2019 6 07/05/2019 7 08/16/2019 8 08/30/2019

BOIL0013-005 03/01/2018

CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND

MIFFLIN COUNTIES

Rates Fringes

BOILERMAKER......................$ 45.89 33.39

BOIL0154-004 01/01/2017

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA,

CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST,

GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES

BOILERMAKER......................$ 40.90 27.27

BOIL0744-003 07/01/2008

ERIE COUNTY

Rates Fringes

BOILERMAKER......................$ 35.34 18.48

BRPA0005-033 05/01/2018

MIFFLIN COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 31.36 17.73

BRPA0005-046 05/01/2016

FRANKLIN COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 32.21 14.18

BRPA0005-071 05/01/2018

CLINTON COUNTY

Rates Fringes

BRICKLAYER.......................$ 33.16 16.31

BRPA0009-004 12/01/2018

BEDFORD, BLAIR,CAMBRIA, CENTRE COUNTY (Halfmoon, Houston, Patton, Rush,Taylor and Worth Townships),FULTON, HUNTINGDON, and SOMERSET COUNTIES

Bricklayer, Stonemason & Marble Setter....................$ 29.46 19.58

BRPA0009-006 12/01/2018

CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION (Except Brady, Madison, Perry, Porter, Redbank, and Toby Townships)

COUNTIES

Bricklayer, Stonemason...........$ 29.90 19.91 Marble mason.....................$ 29.90 19.91

BRPA0009-023 06/01/2018

BEAVER COUNTY

Rates Fringes

BRICKLAYER.......................$ 30.16 21.41

BRPA0009-025 06/01/2019

BUTLER, LAWRENCE, AND MERCER COUNTIES

BRICKLAYER.......................$ 30.51 21.94

BRPA0009-032 06/01/2017

FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Rostraver Twp) COUNTIES

BRICKLAYER.......................$ 31.00 20.66

BRPA0009-033 06/01/2019

ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp) COUNTIES

BRICKLAYER.......................$ 32.35 22.26

BRPA0009-034 11/01/2017

ERIE COUNTY

Rates Fringes

BRICKLAYER.......................$ 27.55 19.76

BRPA0009-058 12/01/2017

ALLEGHENY, WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps)

BRICKLAYER.......................$ 31.69 21.27

BRPA0009-059 06/01/2019

CAMERON, ELK, McKEAN, POTTER AND WARREN COUNTIES

Rates Fringes

BRICKLAYER.......................$ 27.86 20.17

CARP2235-005 01/01/2019

Rates Fringes

PILEDRIVERMAN

Piledriverman (welder)......$ 35.25 19.30 Piledriverman...............$ 34.30 19.30

CARP2235-006 01/01/2019

Diver............................$ 51.45 19.30

Tender...........................$ 34.30 19.30

CARP2274-001 01/01/2019

Rates Fringes

CARPENTER (ALLEGHENY,

ARMSTRONG, BEAVER, BUTLER,

ERIE, FAYETTE, GREENE,

LAWRENCE, MERCER, WASHINGTON,

AND WESTMORELAND COUNTIES)

Carpenters (Welders)........$ 34.97 18.42 Carpenters..................$ 34.02 18.42

CARPENTER (BEDFORD, BLAIR,

CAMBRIA, CAMERON, CENTRE,

CLARION, CLINTON, CLEARFIELD,

CRAWFORD, ELK, FOREST,

FRANKLIN, FULTON, HUNTINGDON,

INDIANA, JEFFERSON, MCKEAN,

MIFFLIN, POTTER, SOMERSET,

VENANGO, AND WARREN COUNTIES)

Carpenters (Welders)........$ 34.72 18.42 Carpenters..................$ 33.77 18.42

ELEC0005-006 12/21/2018

ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON,

CENTRE (Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES

ELECTRICIAN......................$ 40.76 26.34

ELEC0056-004 06/03/2019

ERIE, FOREST AND WARREN COUNTIES

Rates Fringes

ELECTRICIAN......................$ 34.34 22.27

ELEC0126-005 05/24/2019

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE,

CLARION, CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON,

INDIANA, JEFFERSON, SOMERSET, WASHINGTON AND WESTMORELAND

Line Construction:

Cable Splicer...............$ 47.38 30.25%+11.50 Groundman...................$ 28.43 30.25%+11.50 Lineman.....................$ 47.38 30.25%+11.50 Truck Driver................$ 30.80 30.25%+11.50 Winch Truck Operator........$ 33.17 30.25%+11.50

ELEC0126-007 05/28/2018

FRANKLIN AND MIFFLIN COUNTIES

Rates Fringes

Line Construction:

Cable Splicer...............$ 45.25 29.25%+11.25 Groundman...................$ 27.15 29.25%+11.25 Lineman.....................$ 45.25 29.25%+11.25

Truck Driver................$ 29.41 29.25%+11.25 Winch Truck Operator........$ 31.68 29.25%+11.25

ELEC0143-007 06/01/2019

FRANKLIN and MIFFLIN COUNTIES

Rates Fringes

ELECTRICIAN......................$ 31.60 24.07

ELEC0712-003 12/31/2018

CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 38.55 23.49

ELEC0812-008 06/01/2017

CLINTON COUNTY

Rates Fringes

ELECTRICIAN......................$ 33.59 18.61

ELEC0812-009 06/01/2017

POTTER COUNTY

Rates Fringes

ELECTRICIAN......................$ 34.60 18.64

ELEC0812-011 06/01/2017

CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)

ELECTRICIAN......................$ 33.59 18.61

ELEC1319-004 09/02/2018

BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST,

LAWRENCE, MCKEAN, MERCER, VENANGO, WARREN AND POTTER COUNTIES

Line Construction:

Equipment Operator..........$ 56.43 19.84 Groundmen...................$ 34.99 11.28 Linemen.....................$ 56.43 22.84 Truck Driver................$ 36.68 11.41

ENGI0066-016 01/01/2019

Rates Fringes

Power equipment operators:

(ALLEGHENY, ARMSTRONG,

BEAVER, BLAIR, BUTLER,

CAMBRIA, CENTRE, CLARION,

CLEARFIELD, CRAWFORD, ERIE,

ELK, FAYETTE, GREENE,

INDIANA, JEFFERSON, LAWRENCE,

MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON,

AND WESTMORELAND COUNTIES)

GROUP 1.....................$ 31.89 21.68

GROUP 2.....................$ 31.63 21.68

GROUP 3.....................$ 27.98 21.68

GROUP 4.....................$ 27.52 21.68

GROUP 5.....................$ 27.27 21.68

Power equipment operators:

(BEDFORD, CAMERON, CLINTON,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, MIFFLIN, AND

POTTER COUNTIES)

GROUP 1.....................$ 31.60 21.68

GROUP 2.....................$ 31.32 21.68

GROUP 3.....................$ 27.68 21.68

GROUP 4.....................$ 27.19 21.68

GROUP 5.....................$ 26.98 21.68

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1 - Asphalt Paving Machine (Spreader), Autograde (C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill (similar to Hugh Williams), Central Mix Plant; Cooling Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes (Tower Stationary- Climbing Tower Crane); Derrick; Derrick Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;

Dredge Hydraulic; Elevating Grader; Franki Pile Machine;

Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar), (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;)

Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading Attachment), Mucking Machine (tunnel); Pile Driver Machine;

Pipe Extrusion Machine; Prespliter Drill (self contained);

Refrigeration Plant (soil Stablization) Rough Terrain Crane (25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain Crane (under 25 ton), Scrapers; Shovel-Power; Slip form Paver (C.M.I. and similar); Trenching Machine (30,000 lbs.

and over), Trenching Machine (under 30,000 lb.), Tunnell Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Compactor with blade

GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger (truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; Directional drill over 3,000 lbs thrust; concrete batch plant (electronically synchronized); concrete belt placer (C.M.I. and similar);

concrete finishing machine and spreader, concrete mixer (over 1 cy.) concrete pump (stationary); core drill (truck or skid mtd. - similar to penn drill), dozer (25,000 lbs or less); Ditch Witch Saw, force feedloader; fork lift (lull or similar); grader - power; grease unit opertor (head);

guard rail post driver (truck mounted) guard rail post driver (skid type); hilift (under 4 cy.); skid steer loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage);

minor equipment operator (accumulative four units); mucking machine; multi-head saw (groover); overhead crane; roller -power- asphalt; ross carrier; side boom or tractor mounted boom; shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator; bidwell concrete finishing machine (or similar).

GROUP 3: Broom Finisher (C.M.I. or similar);

Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker (self-propelled or ridden); Soil Stablizer Machine; Tire Repairman; Tractor (snaking and hauling); Well Driller and Horizontal: Winch or ""A"" Frame Truck (when hoisting and lowering).

GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1

cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line Machine; Generator; Groute Pump; Heater (Machinical); Hoist (single Drum); Ladavator, Light Plant; Mulching Machine;

Personnel Boat (Powered), Pulverizer, Pumps, Seeding Machine, spray Cure Machine (powered Driven); Subgrader;

Tie Puller; Tugger; Welding Machine (Gas or Diesel).

GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;

Power Broom; Side Delivery Shoulder Spreader (attachment);

IRON0003-001 06/01/2019

ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG,

BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES

IRONWORKER.......................$ 35.49 31.84

IRON0003-007 06/01/2019

BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,

MCKEAN, AND POTTER COUNTIES

IRONWORKER.......................$ 29.58 29.92

IRON0003-011 06/01/2019

CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES

Rates Fringes

IRONWORKER.......................$ 30.75 29.70

IRON0207-002 06/01/2018

LAWRENCE, MERCER, AND VENANGO COUNTIES

Rates Fringes

IRONWORKER.......................$ 28.92 24.90

IRON0404-008 07/01/2019

FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN

IRONWORKER, STRUCTURAL...........$ 32.76 29.88

IRON0549-002 12/01/2012

GREENE COUNTY

Rates Fringes

IRONWORKER.......................$ 30.45 16.04

* IRON0568-004 05/01/2019

BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western

2/3), AND SOMERSET COUNTIES

IRONWORKER

Structural, Ornamental, Reinforcing, Machinery Mover, Rigger & Machinery Erector, Welder, Fence Erector.....................$ 28.66 21.51

LABO1058-001 01/01/2019

Rates Fringes

LABORER (BEDFORD, CAMERON,

CENTRE, CLINTON, CRAWFORD,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, JEFFERSON,

MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 25.35 23.25

GROUP 2.....................$ 25.51 23.25

GROUP 3.....................$ 26.00 23.25

GROUP 4.....................$ 26.45 23.25

GROUP 5.....................$ 26.86 23.25

GROUP 6.....................$ 23.70 23.25

GROUP 7.....................$ 26.35 23.25

GROUP 8.....................$ 27.85 23.25

Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND

COUNTIES)

GROUP 1.....................$ 25.45 23.25

GROUP 2.....................$ 25.61 23.25

GROUP 3.....................$ 26.00 23.25

GROUP 4.....................$ 26.45 23.25

GROUP 5.....................$ 26.86 23.25

GROUP 6.....................$ 23.70 23.25

GROUP 7.....................$ 26.45 23.25

GROUP 8.....................$ 27.95 23.25

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman (weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction (Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;

Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street Sweeper, and Wood Chipper; water boy

GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper (tunnel) Fork Lift, (walk behind), Form Setter (Road Forms Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron (Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, All RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING: adzing machine, ballast Router, Bolting Machine, Power Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike Drivers (Manually or hand held tool) Spike Pullers Tamping Machine, Thermitweld

GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;

concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers (including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);

Walk behind ditching machine (trencher or similar);crown screed adjuster and welder

GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)

GROUP 5:High Burner, (Any burning not done from deck), Welder (Pipeline)

GROUP 6: Uniformed Flagperson, Watchman

GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D

GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B

PAIN0021-019 05/01/2018

CLINTON COUNTY

Rates Fringes

Painters:

Bridge......................$ 36.67 18.80 Brush & Roller..............$ 27.67 18.80 Spray.......................$ 28.67 18.80

PAIN0021-024 05/01/2018

FRANKLIN COUNTY

Rates Fringes

PAINTER

Brush.......................$ 23.92 14.23

PAIN0057-014 06/01/2019

ALLEGHENY, FAYETTE, GREENE, WASHINGTON COUNTIES

Rates Fringes

Painters:

Bridge......................$ 35.25 19.82 Brush & Roller..............$ 28.50 19.82 Spray.......................$ 28.50 19.82

PAIN0057-015 06/01/2019

ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE,

CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA,

JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND

WESTMORELAND COUNTIES

Painters:

Bridge......................$ 35.25 19.82 Brush and Roller............$ 28.50 19.82 Spray.......................$ 28.50 19.82

PAIN0057-022 05/01/2019

Rates Fringes

Painters: (ERIE, McKEAN, AND WARREN (Including Columbus and Freehold twps) COUNTIES) Bridges,Stacks,Towers.......$ 25.37 18.71 Brush and Roller............$ 22.87 18.71 Spray and Sandblasting......$ 23.62 18.71

PAIN0057-027 06/01/2019

CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and Freehold twps)

PAINTER

Brush and Roller............$ 25.11 19.14

PLAS0526-002 01/01/2019

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 31.94 20.50

PLUM0027-001 06/01/2019

ALLEGHENY, ARMSTRONG, GREENE (Except extreme Eastern portion), WASHINGTON (Except extreme Eastern portion) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES

Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 42.30 22.47

PLUM0047-005 05/01/2013

BEAVER, BUTLER, MCKEAN, MERCER, VENANGO, CLARION, LAWRENCE,

FOREST, WARREN, CRAWFORD, AND ERIE COUNTIES

(Bridge Drain Pipe)..............$ 38.52 20.11

PLUM0354-005 06/01/2012

BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE,

GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND

WESTMORELAND COUNTIES

(Bridge Drain Pipe)..............$ 35.54 19.97

TEAM0040-001 01/01/2019

Rates Fringes

TRUCK DRIVER (ALLEGHENY,

ARMSTRONG, BEAVER, BLAIR,

BUTLER, CAMBRIA, CENTRE,

CLARFIELD, CRAWFORD, ERIE,

FAYETTE, GREENE, INDIANA,

JEFFERSON, LAWRENCE, MCKEAN,

MERCER, SOMERSET, VENANGO,

WARREN, WASHINGTON, AND

WESTMORELAND)

GROUP 1.....................$ 28.99 19.43

GROUP 2.....................$ 29.13 19.51

GROUP 3.....................$ 29.59 19.82

Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 28.83 19.32

GROUP 2.....................$ 28.99 19.43

GROUP 3.....................$ 29.45 19.73

FOOTNOTES: A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate

B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Single Axle (2 axles including steering axle);

Includes partsman and warehoueman

GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)

GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);

Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

The following have been modified:

ADDENDUM TO SECTION 00 73 00

00 73 00 – 1 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS

a. In order to ensure that sufficient funds have been set-aside for payment of Performance and Payment Bond Premiums, Bidders shall insert in Price Schedule Line Item No. 0001, 1001 and 2001 an appropriate not-to-exceed dollar amount. Failure of bidders to insert a not-to-exceed dollar amount in Price Schedule Line Item No. 0001, 1001 and 2001 will cause the bid to be rejected as non-responsive.

b. The Contractor shall be reimbursed the actual Bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Price Schedule Line Item No. 0001, 1001 and 2001. In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Price Schedule Line Item No.

0001, 1001 and 2001.

c. The Government will reimburse only the Prime Contractor for actual paid Bond Premiums. The Government will not reimburse any subcontractor's paid Bond Premiums.

00 73 00 – 2 REQUIRED INSURANCE

a. The Contractor shall procure and maintain during the entire period of their performance under this contract, the following minimum insurance.

Type Bodily Injury Amount Property Damage

Comprehensive General Liability $500,000 Per Occurrence $100,000

Automobile Liability $200,000

$500,000 Each Person

Per Occurrence

$ 20,000

Workmen’s Compensation and Employer’s Liability

$100,000

b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately comply. Such notice, when delivered to the Contractor or their representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor.

c. Longshoreman and Harbor Worker's Insurance MAY be required for this work. Please consult with your insurance carrier and applicable statutes (33 USC 901, et. seq.).

00 73 00 – 3 SAFETY AND HEALTH REQUIREMENTS MANUAL

A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at http://www.usace.army.mil/CESO/pages/home.aspx . The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

00 73 00 – 4 WORK UNDER OTHER CONTRACTS

Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these Specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and the Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern? (See also clause FAR 52.236-8 Other Contracts (APR 1984)).

00 73 00 – 5 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the clause 52.249-10 Default (Fixed-Price Construction). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.

(1) The weather experienced at the project site during the contract period must be found to be unusually severe;

that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. This delay must be beyond the control and without the fault or negligence of the Contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all-weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

http://www.usace.army.mil/CESO/pages/home.aspx

9 6 6 5 5 4 4 4 3 3 4 7

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more on the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to work days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with clause 52.249-10 Default (Fixed-Price Construction).

d. The anticipated adverse weather work days listed above are based on days with precipitation greater than 0.1 inch and/or maximum temperature below 32 degrees F. The numbers shown represent the number of work days (not calendar days) normally expected to have these particular weather conditions based on historical data obtained from the "Climatography of the United States No. 20". The actual number of days will vary. This information is furnished for computation of possible time extensions due to weather delays and is not intended to imply that no work can be done on these days. The Contractor shall make their own determination of the effect of these conditions on their operations under this contract, and schedule their work accordingly.

00 73 00 – 6 CONTRACTOR QUALITY CONTROL

Section 01 45 00.00 08, QUALITY CONTROL, of this specification requires that the Contractor's Quality Control System Manager or person responsible for Contractor Quality Control complete the Corps of Engineers' "Construction Quality Management for Contractors" course not later than 90 days after receipt of the Notice to Proceed. The course consists of approximately 12 hours of classroom instruction and is offered periodically by the Pittsburgh District. For additional information on scheduling and location of the training, contact U.S. Army Corp of Engineers District, Pittsburgh, Theresa Bonanno, U.S. Army Corp of Engineers, Pittsburgh District, Upper Ohio Area Office, 3510 Grand Avenue, Pittsburgh, Pennsylvania 15225, telephone (412)395-7677. Certification of course completion is valid for 5 years. Completion of training offered by other Corps of Engineers Districts will be acceptable provided a valid certification is presented.

00 73 00 – 7 COPYING, DISSEMINATION OR DISTRIBUTION OF INFORMATION.

Those who disseminate information contained in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient: Business name and address, and name and telephone number of person receiving the information.

00 73 00 – 8 SUBMISSION OF CONTRACT DOCUMENTATION

Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:

• Submittals, including ENG 4025 transmittal form

• Meeting Minutes

• Construction Photographs

• Correspondence

• Requests for Information

• Payroll Documents

• Statement and Acknowledgement Forms (SF 1413)

• Request for Additional Classification (SF 1444)

• Progress Payment Requests and Supporting Documentation

• Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing Audit Report, and Certificate of Current Cost or Pricing Data

• Contractor Quality Control Reports (with attachments)

• Accident Reports

• Schedules and Schedule Updates

• Closeout Documentation, including Release of Claims

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic documents fewer than 10MB to an email address as directed by the Contracting Officer.

Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

https://safe.apps.mil/

The Contractor shall be prepared to provide up to five (5) additional paper hard copies of any contract document at the discretion of the Contracting Officer, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format because law or other regulations require signed originals be kept in accordance with FAR 4.805 -- Storage, Handling, and Disposal of Contract Files:

• Advance Payment Bond

• Bid Bond including Annual Bid Bond

• Performance Bond including Annual Performance Bond

• Payment Bond

• Patent Infringement Bond

• Any performance security instruments

• Certificate of Insurance

• Novation/Change of Name Agreement

• Assignment of Claims

• Any document containing a raised seal. Examples include o Notarized documents o Architecture Drawings

• Paper Payroll Documents

• Physical signatures on contracts and modifications o SF 1442 o SF 30

00 73 00 – 9 WAGE RATES

The attached schedule of wage rates applicable to all work under the contract:

General Decision No. PA20190002 08/30/2019 Superseded General Decision Number PA20180004 State: Pennsylvania Construction Type: Heavy and Highway Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.

https://safe.apps.mil/ https://beta.sam.gov/wage-determination/PA20190002/8/document

The following have been deleted:

WAGE DETERMINATION

(End of Summary of Changes) https://beta.sam.gov/wage-determination/PA20190002/8/document

File details come from the government source that posted it.