01_22_00.00_10.pdf
PDF 18 KB Posted
- Attached to
- Emsworth Bulkhead Painting Federal contract opportunity
- Solicitation number
- W911WN-17-B-8008
About this file
Revised Spec 01 22 00.00 10
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Results_-_W911WN-17-B-8008.pdf | ||
| W911WN-17-B-8008-0001.pdf | ||
| 01_35_00.00_08.pdf | ||
| Pre-Bid_Site_Visit_Agenda.pdf | ||
| Pre-Bid_Attendee_Sign-in_08292017.pdf | ||
| Pre-Bid_Solicitation_Information.pdf | ||
| Plans.pdf | ||
| W911WN-17-B-8008.pdf | ||
| Technical_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Emwsorth Locks and Dam, Painting Emergency Bulkheads
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Reimbursement For Actual Performance And Payment Bond Premiums
1.1.2 Cleaning and Painting Emergency Bulkhead Units
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Items
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Digital Progress Images
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.1.4 Payment Item
1.2.2 Corrosion Repair
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.2.4 Payment Items
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 1 Certified Final Documents W911WN-17-B-8008 Revised by Amendment 1
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Reimbursement For Actual Performance And Payment Bond Premiums
Payment for reimbursement for actual performance and payment bond premiums will be made as specified in 00800 SPECIAL CONTRACT REQUIREMENTS, paragraph
00800-2 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS.
0001 REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS
1.1.2 Cleaning and Painting Emergency Bulkhead Units
1.1.2.1 Payment
Payment shall constitute full compensation for all costs in connection with completing this item of work as specified in Section 09 97 02 PAINTING:
HYDRAULIC STRUCTURES. Payment shall include all costs of providing blocking, containment, and environmental controls, surface preparation and painting, testing, removal and installation of rollers, and disposal of debris. Payment for corrosion repairs will be made under the applicable CORROSION REPAIR items.
1.1.2.2 Unit of Measure
Unit of measure: Job
1.1.2.3 Payment Items
0003 CLEAN AND PAINT EMERGENCY BULKHEAD UNITS, MAIN CHANNEL DAM
0004 CLEAN AND PAINT EMERGENCY BULKHEAD UNITS, BACK CHANNEL DAM
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract progress payments will be based are listed in the PRICE SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, SECTION 01 22 00.00 10 Page 2 and for performing all work required for each of the unit price items.
1.2.1 Digital Progress Images
1.2.1.1 Payment
Payment shall constitute full compensation for all costs in connection with completing this item of work as specified in Section 01 32 33 DIGITAL
PROGRESS IMAGES.
1.2.1.2 Measurement
Measurement shall be based on monthly sets of progress photographs that are approved and accepted by the Contracting Officer.
1.2.1.3 Unit of Measure
Unit of measure: Sets
1.2.1.4 Payment Item
0002 DIGITAL PROGRESS IMAGES
1.2.2 Corrosion Repair
1.2.2.1 Payment
Payment shall constitute full compensation for all costs in connection with completing this item of work as specified in Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES, paragraph CORROSION REPAIR.
1.2.2.2 Measurement
Measurement shall be along the exposed edge of the repair.
1.2.2.3 Unit of Measure
Unit of measure: Linear Foot
1.2.2.4 Payment Items
0005 CORROSION REPAIR, EMERGENCY BULKHEAD UNITS, MAIN CHANNEL DAM
0006 CORROSION REPAIR, EMERGENCY BULKHEAD UNITS, BACK CHANNEL DAM
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --