Braddock Dam Gate Control Upgrade Federal contract opportunity
Solicitation number
W911WN-17-B-8002
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Braddock Dam Gate Control Upgrade, newest first.
File Type Posted
BidResults.pdf PDF
40_95_00.pdf PDF
braddock_V04.RSS RSS file
Site_Visit_Sign-Up_Sheet.pdf PDF
Updated_Specifications_40_95_00.pdf PDF
Braddock_Water_HMI_Project.zip ZIP file
W911WN-17-B-8002_0001.pdf PDF
W911WN-17-B-8002.pdf PDF
W911WN-17-B-8002_-_Plans.pdf PDF
Certified_Final_RTA_W911WN-17-B-8002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET462220383

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RE: Braddock Locks and Dam Gate Control System Upgrade.

The purpose of this amendment is to provide responses to additional contractor's questions received and to update the specifications based on those answ ers.

See Summary of Changes for Details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-17-B-8002

X 9B. DATED (SEE ITEM 11)

31-Oct-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Dec-2016

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-17-B-8002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

QUESTIONS AND ANSWERS

Question and Answer

Q53. I need help interpreting the portion of the spec below. Section 40 95 00, Para 1.6. I do not believe we as a supplier to the contractor would have to be officially recognized as a “Rockwell Automation Recognized Systems Integrator”. The Contractor's qualified control system integrator shall provide evidence they have worked with and installed Rockwell Automation RSLogix5000 programming software for at least the past five years. The Contractor performing the software and PLC upgrades shall submit evidence they are officially recognized by Rockwell Automation as a Rockwell Automation Recognized Systems Integrator. The way I read it the “contractor” will have to be a “Rockwell Automation Recognized Systems Integrator”. We would be a supplier to the contractor. As a supplier to the contractor we would be the “contractors qualified control system integrator” and that entity has to provide evidence that they have worked with and installed Rockwell automation RSLogix5000 programming software for at least the past five years. Is my interpretation correct?

A53. Intent is to have the entity performing the software and PLC upgrades submit evidence they are officially recognized by Rockwell Automation as a Rockwell Automation Recognized Systems Integrator. Changed Section 40 95 00, 1.6 Qualifications, second sentence to read “The Contractor’s qualified control system integrator performing the software and PLC upgrades shall submit evidence they are officially recognized by Rockwell Automation as a Rockwell Automation Recognized Systems Integrator.”

The prime contractor is permitted to use a subcontractor/supplier that meets these requirements.

The prime contractor is responsible for providing this information to the United States Army Corps of Engineers.

Q54. Can you provide me with a reference part for the fiber optic cable, as you have with the breakout panels and whether the terminations must be polished in the field or if a pre-polished spliced type connector can be used?

A54. Actual part numbers are provided for reference only. Fiber Optic Cables shall meet the specification requirements in Specification Section 27 21 10.00 10. Fiber Optic Connections shall be as specified in Specification Section 27 21 10.00 10, 2.6 - FO Connectors.

W911WN-17-B-8002

(End of Summary of Changes)