Amendment to Solicitation for East Branch Wire Rope
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing1.pdf | ||
| Drawing2.pdf | ||
| W911WN-15-T-0035_03.pdf | ||
| W911WN-15-T-0035_02.pdf | ||
| Drawing1.pdf | ||
| W911WN-15-T-0035.pdf | ||
| Drawing2.pdf | ||
| W911WN-15-T-0035_01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET451113063
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: East Branch Wire Rope Replacment This Amendment is being issued to update: 1.Technical specifications of the flat w ire ropes. 2. Fabrication: Increase fabrication to 2 flat w ire ropes from 1 flat w ire rope. 3. Removal of 'Additional Wire' Option. 4. Extend due date for solicitation to September 01, 2015.
See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-15-T-0035
X 9B. DATED (SEE ITEM 11)
08-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2015
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-RC-P
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Flat Wire Rope for Service Gates East Branch Lake
— 2 —
W911WN-15-T-0035
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SPECIFICATIONS
Technical Specifications
1. Scope of Work. The work to be performed under this contract includes the following:
1.1 Fabrication of two flat wire ropes, including excess length to allow a coupon to be cut off one of the rope for destructive testing.
All the flat wire rope strands shall be constructed from the same lot of wires.
1.2 Performing destructive testing of coupon to determine breaking strength of assembled flat wire rope
1.3 Fabrication of two end sockets for testing the wire rope test coupon and installation of the end fittings on test coupon. The end sockets and test coupon shall become the property of the contractor once the tests are complete.
1.4 Preparation of wire rope for transport;
1.6 Delivery of wire ropes to Pittsburgh Engineering Warehouse and Repair Station.
2. Intended Use. The flat wire rope will be used for supporting and operating vertical lift type flood control gates at East Branch Dam.
3. References. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A 148/A 148M (2003) Steel Castings, High Strength, for Structural
Purpose
ASTM A 351/A 351M (2005) Castings, Austenitic, Austenitic-Ferritic (Duplex), for Pressure-Containing Parts
ASTM E 446 (1998; R 2004e1) Radiographs for Steel
Castings Up to 2 In. (51mm) in Thickness
— 3 —
ASTM E 94 (2004) Radiographic Examination
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS RR-W-410 (Rev E) Wire Rope and Strand
WIRE ROPE TECHNICAL BOARD (WRTB)
WRTB (1993) Wire Rope Users Manual
— 4 —
4. GENERAL REQUIREMENTS
4.1. Wire Rope Manufacturers Qualifications. The flat wire rope shall be the standard product of a manufacturer regularly engaged in the manufacture of flat wire rope, and shall essentially duplicate products having been in satisfactory use for at least 5 years prior to bid opening. The round wire rope incorporated into the work shall be made in the United States by a member of the Wire Rope Technical Board.
4.2. Load-bearing Capacity. The breaking strength of the flat wire rope shall be guaranteed not be less than 108.9 short tons after deductions for a double serving of stitching wire. All flat wire ropes provided under this contract shall have the same capacity. The flat wire rope shall be constructed from 11 strands of ½” diameter 4 x 19 IPS wire rope. The elastic limit shall be 50 to 55 percent of the breaking strength.
4.3. Type of Wire Rope. The round wire rope used to manufacture the flat wire rope shall be of the following type:
Strand configuration: 4x19, round strand.
Lay: Alternating right-hand and left-hand regular lay. Adjacent round wire ropes shall be opposite- hand to minimize breakage of stitching wires as the wire rope stretches under load. For flat wire ropes containing an odd number of round wire ropes, the outer wire ropes shall be right-hand lay.
Pitch: Strand pitch length shall not be less than 4½ times the nominal rope diameter, and shall be the same for all round wire ropes used regardless of right- or left-hand lay.
Diameter: 1/2 inch, with a tolerance of -0% and +5%
Finish: Plain (Bright)
Material: Extra improved plow steel.
All wire ropes of a particular lay shall be of one lot (i.e. one lot for right-hand lay and one lot for left-hand lay) to ensure the maximum consistency of materials within the wire rope.
4.4. Pre-Stretching. The Contractor shall pre-stretch the round wire ropes before assembling them into flat wire ropes. This shall be done by subjecting them to three cycles at 40% of its nominal strength. The 40% loads shall be held for 15 minutes each with 5% loads for 5 minutes between cycles. The manufacturer may propose a method of dynamic pre-stretching.
4.5. Wire Strength and Ductility. The Manufacturer shall perform testing in accordance with Federal Specification RR-W-410 to verify wire strength and ductility.
4.6. Stress Relief. The wire rope shall be stress relieved, and the manufacturer shall perform testing in accordance with Federal Specification RR-W-410 to verify stress relief.
— 5 —
4.7. Weld Distribution. Wire joints shall not be closer than 18 inches in any strand.
4.8. Lubrication. The wire ropes shall be provided unlubricated other than the amount of lubricant required for fabrication of the rope.
4.9. Fabrication. The individual wire ropes used to fabricate the flat wire rope shall be stitched together transversely by means of wires inserted and secured between the individual strands of the lay such that the completed transverse stitching is not exposed to wear or damage. Stitching shall ensure that adjacent round wire ropes do not move or twist relative to each other and all strands contribute equally to the load bearing capacity of the whole. The flat wire rope shall be provided with a double serving of one 1/8 inch diameter stitching wire constructed from 7 strands of soft galvanized iron wires within one lay length of the wire rope. The transverse stitching shall be performed in a manner that ensures that the stitching shall not break or loosen when the flat wire rope is wound onto the drum of the gate hoist.
4.10. Dimensions. All flat wire ropes provided under this contract shall have identical dimensions. The finished length of each flat wire rope shall be 390 feet in the unloaded condition. The flat wire rope shall have a maximum thickness of 3/4-inch.
All flat wire rope shall have a maximum width of 5 1/2 inches. The maximum width shall include any seizing wires and/or transverse stitching. However, additional length shall be fabricated on one flat wire rope, sufficient to allow the excess length to be cut off as sample for destructive testing.
4.11. Seizing. Wire rope ends shall be seized to prevent fraying or un-laying. Each end shall be seized in at least two locations, one location within one wire rope thickness of the finished ends and one location 10 inches away from the end, NOT including the excess lengths fabricated for destructive testing (i.e. the seizing shall be 10 inches from the cut ends after the sample coupon have been cut off). Seizing of adjacent round wire ropes shall be offset to ensure that only one thickness of seizing wire separates adjacent round wire ropes (i.e. seizing on adjacent wire ropes is not. When the end fittings are installed for testing (See “End Fittings” below), the seizing at the finished end of the flat wire rope shall be removed to allow the wire rope and zinc to be placed into the end fittings that will be used, and the seizing 10 inches from the finished end will be used to prevent unraveling the wire rope beyond that point when the wire rope is swaged to the fittings.
The number of complete wraps on each seizing shall be at least equal to the wire rope thickness in eighths of an inch (for example, a three-quarter-inch wire rope shall have at least six wraps of seizing). Ends of the seizing wires shall be twisted together and arranged parallel to the lay of the wire rope around which it is wrapped such that the twisted ends do not protrude above the seizing. Finishing the ends of the flat wire rope by brazing may be substituted for wire seizing providing the lengths of flat wire rope are 390 feet after the heat damaged ends are cut off. The length shall be measured while the flat wire ropes are in the unloaded condition.
4.12. Socket Fittings. The wire rope end terminations (sockets) shall be fabricated as indicated on the enclosed drawings, and shall be cast from steel conforming to ASTM A 148/A 148M, Grade 105-85. The socket fittings shall be free of cracks, honeycombing and other defects, and shall have a tensile strength at least equal to the tensile strength of the flat wire rope. End fittings shall be installed on the wire rope test coupon for the break test. Installation shall be performed with the end fittings and wire rope held in a vertical and plumb position to ensure optimum placement of the zinc used to fill the void spaces. End fittings shall be installed such that a pin inserted through the holes opposite
— 6 — the throat of the fitting will be perpendicular to the centerline of the flat wire rope and loads applied will be distributed equally to all strands. Failure to orient the end fitting properly relative to the wire rope may cause some strands of wire to bear a greater proportion of the load than others, leading to failure of the stitching wires due to uneven stretching, and/or failure of the wire rope due to deformation or breakage of overloaded strands.
4.13. Castings. Deviations from the dimensions of castings shown shall not exceed amounts that will impair the strength of castings by more than 10 percent as computed from the dimensions shown, nor below the ultimate strength of the wire rope.
Dimensions of castings shown on detail drawings provided are finished dimensions.
Castings that are warped or otherwise distorted will be rejected. The structure of metal in castings shall be homogeneous and free from excessive nonmetallic inclusions.
Excessive segregation of impurities or alloys at critical points in castings will be cause for rejection. Minor surface imperfections not affecting the strength of casting may be welded in the "green". Surface imperfections will be considered minor when the depth of the cavity prepared for welding is less than 20 percent of the actual thickness.
4.14. Pin Holes. Pin holes are to be bored true to gauges, smooth, straight and at right angles to the axis of the member. The boring shall be done after the member is securely fastened in position.
4.15. Tests, Inspections, and Verifications. Perform material tests and analyses certified by an approved laboratory to demonstrate that materials are in conformity with the specifications. These tests and analyses shall be performed and certified at the Contractor's expense. Perform tests, inspections, and verifications conforming to the requirements of the particular sections of these specifications for the respective items of work unless otherwise specified or authorized.
4.16. Inspection of Steel Castings. Perform radiographic inspection of steel castings.
The procedure for making, evaluating and reporting the radiographic inspection shall conform to the requirements of ASTM E 94. The castings will be unacceptable if shown to have defects of greater severity than the applicable reference standard as illustrated in ASTM E 446. The evaluation of the radiographs will be subject to approval and all records will become the property of the Government.
4.17. Material Substitution. In the event of non-availability of the materials specified, material substitutions are allowable with Government approval, provided all material properties equal or exceed those of the specified material. A request for material substitution shall include complete description of the material properties of the original and substitute materials, with all differences highlighted.
4.18. Attaching Sockets. The Contractor shall attach the end terminations to the wire rope test coupon in accordance with the recommendations of FS RR-W-410 Wire Rope and Strand, and the WRTB Wire Rope Users Manual.
4.19. Replacement of Defective Wire Rope. Any wire rope which has been returned for replacement, whether due to defective materials or manufacture or damage during delivery, shall be replaced at no cost to the Government with wire ropes meeting all requirements of these specifications.
4.20. Handling. The flat wire rope shall be wound onto disk-layered spools with the same general dimensions. Each rope shall be crated, boxed or otherwise packaged
— 7 — to the extent necessary to prevent damage during shipment.
4.21. Destructive Testing. The Contractor shall fabricate one flat wire rope to an excess length that provides sufficient additional material to allow a coupon to be cut off one end and used for destructive load testing (pull-testing to failure). The rope sample shall be cut to no less than 3 feet in length, and shall not reduce the remaining length of flat wire rope to less than the required finished length as per the paragraph above entitled “Dimensions”. The test shall be performed using suitable tension testing equipment and by qualified personnel, both furnished by the Contractor. The test will not be considered valid if the failure occurs less than 2 inches from either socket or holding mechanism. Relative speed between the machine heads shall not exceed 1 inch per minute. Prior to delivery, the results shall be recorded for each test, and keyed to the numbers of the wire ropes (“X” of “Y”) marked on the reels. Test results shall be provided with the Certification of Conformance to the Contracting Officer. If any tested sample fails to show an ultimate strength at least equal to 108.9 short tons, the entire length of the wire rope from which the sample was taken shall be discarded and shall be replaced at no cost to the Government. Replacements shall meet all the requirements of these specifications.
4.22. Certification of Conformance. (APR 1984) FAR 52.246-15
(a) When authorized in writing by the cognizant Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require inspection at source. In no case shall the Government’s right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the Certificate of Conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.
(b) The Contractor’s signed certificate shall be attached to or included on the top copy of the inspection or receiving report distributed to the payment office or attached to the CAO copy when contract administration (Block 10 of the DD Form
250) is performed by the Defense Contract Administration Services. In addition, a copy of the signed certificate shall also be attached to or entered on copies of the inspection or receiving report accompanying the shipment including the results of the break test for the coupon sample.
(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor’s expense.
— 8 —
(d) The certificate shall read as follows:
I certify that on [insert date], the [insert Contractor’s name] furnished the supplies or services called for by Contract No. via [Carrier] on [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.
DATE OF EXECUTION:
SIGNATURE:
TITLE:
e. Acceptance. Final acceptance of the equipment to be furnished under the terms of this contract will be made when the equipment, as called for under the terms of these specifications has been delivered, examined and accepted at the destination specified in the contract.
5. DELIVERY. Delivery shall be made to the US Army Engineer District, Pittsburgh, Corps of Engineers, F.O.B. as specified below, transportation charges prepaid. Delivery shall be made within the time stated in the offer. Offers submitted on other than F.O.B. destination basis will be rejected as non-responsive.
DELIVERY DATE IS 240 CALENDAR DAYS FROM DATE OF AWARD
The price indicated shall include the cost of transportation from the point of origin to the destination specified below, and all shipments hereunder shall be prepaid and made at the contractor’s expense. Title will pass to the Government after inspection and acceptance by the Government at the destination specified.
Deliver:
a) 3/4” x 5-1/2” (nominal dimensions) x 390’ Hoisting Rope - Quantity: 2 (two)
All of the ropes shall be delivered to:
U.S. Army Corps of Engineers Pittsburgh Engineering Warehouse and Repair Station 3500 Grand Avenue Pittsburgh, PA 15225-1584 Attn: Dan Gray (ULO), Phone (412) 395-7627
NOTE: SHIPMENTS WILL ONLY BE RECEIVED MONDAY THROUGH FRIDAY
BETWEEN 7:30 AM AND 3:00 PM. PROVIDE PROJECT PERSONNEL A MINIMUM
24 HOURS NOTICE BEFORE DELIVERY AT THE ADDRESS LISTED ABOVE.
PACKAGING AND MARKING
1. PACKING AND SHIPMENT. The flat wire rope shall be furnished on nonreturnable reels.
The material shall be crated, boxed or otherwise packaged to the extent necessary to prevent damage during shipment. All damage incurred due to inadequate protection shall be repaired by the Contractor at his expense. The Contractor shall provide all materials required for protection during shipment. The wire ropes shall be shipped on an open flat bed truck to enable the wire ropes and spools to be off loaded with equipment available at the F.O.B.
destination.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 26-Jun-2015 11:00 AM to 01-Sep-2015 11:00 AM.
SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 1001
The pricing detail quantity has increased by 1.00 from 1.00 to 2.00.
CLIN 0001
The CLIN description has changed from FABRICATE WIRE ROPE to Material.
The CLIN extended description Furnish mateials for two flat wire ropes, including rope sample for testing.
In accordance with attached Statement of Work and Drawings. has been added.
CLIN 1001
This CLIN has been renumbered to CLIN 0002.
The CLIN description has changed from ADDITIONAL WIRE to Fabricate end sockets.
The CLIN extended description Fabricate end sockets for testing rope sample. In accordance with attached Statement of Work and Drawings. has been added.
The option status has changed from Option to No Status.
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 2 Each Fabricate flat wire rope
FFP
Fabricate flat wire rope including wire rope sample for testing and performing breaking strength test on new wire rope for East Branch Lake. In accordance with attached Statement of Work and Drawings.
FOB: Destination
NET AMT
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
30-SEP-2015 1 EAST BRANCH CLARION RIVER
US ARMY CORPS OF ENGINEER EAST
BRANCH LAKE 63
NCH DAM ROAD
WILCOX PA 15870-9748
963634
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
21-APR-2016 2 EAST BRANCH CLARION RIVER
US ARMY CORPS OF ENGINEER EAST
BRANCH LAKE 63
NCH DAM ROAD
WILCOX PA 15870-9748
963634
The following Delivery Schedule item has been added to CLIN 0002:
21-APR-2016 2 N/A
The following Delivery Schedule item has been added to CLIN 0003:
21-APR-2016 2 N/A
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
(End of Summary of Changes)
File details come from the government source that posted it. Updated .