W911WN-15-T-0035_03.pdf
PDF 29 KB Posted
- Attached to
- East Branch Wire Rope Replacement
- Solicitation number
- W911WN15T0035
About this file
Amendment to answer questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN15T003504.pdf | ||
| Drawing1.pdf | ||
| Drawing2.pdf | ||
| W911WN-15-T-0035_02.pdf | ||
| Drawing1.pdf | ||
| W911WN-15-T-0035.pdf | ||
| Drawing2.pdf | ||
| W911WN-15-T-0035_01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET451113063
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: East Branch Wire Rope Replacment This Amendment is being issued to answ er questions about the specifications of the w ire rope replacement.
See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-15-T-0035
X 9B. DATED (SEE ITEM 11)
08-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2015
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-RC-P
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-15-T-0035
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
QUESTIONS
Question
I am unable to see where you have a capacity or working load limit – you have a break strength of 108.9 short tons, however, we are required to rate in working loads according to the ASME, WRTB, OSHA, so that someone does not take that rating as the safe working load. Would you please give a working load limit?
The length you have as 390’ is that bearing point to bearing point or overall length or from inside the sockets?
Is there a specific point you want the anchors attached?
Answer
1. The maximum working load on the flat wire rope hoist is 43.1 tons and it is installed on a hoist with a 2 part line. The breaking strength requirements provided in the contract incorporates parts of line, deductions in the breaking strength for weaving the wire rope strands together, factors for dynamic rope tension, rope efficiency bending over a sheave and provides a safety factor.
2. The 390 Ft length is the finished length of the wire rope provided under the contract after a coupon is cut off for destructive testing. The sockets are used for performing the destructive testing on the flat wire rope test coupon only. Sockets are not to be installed on the finished flat wire rope that is delivered.
3. Wire Rope Manufacturers Qualifications shall be submitted as required in the General Requirements paragraph of the contract.
Question
If the wire does not terminate in the sockets – what kind of end terminations does it have?
Answer Once the new flat wire rope is received by the Government the sockets from our existing wire rope will be removed and installed on the new wire rope by our Repair Personnel prior to
W911WN-15-T-0035
installation of the rope. After fabrication of the new wire rope the ends of the wire rope shall be seized to prevent the strands from unraveling during shipping as required in the contract.
(End of Summary of Changes)