SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: W911WN-15-T-0030 Hydraulic Pump System, Allegheny River Lock 8 and 9
The purpose of this amendment is to provide responses to subsequent questions received.
See Summary of Changes for details.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jun-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-15-T-0030
X 9B. DATED (SEE ITEM 11)
14-May-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jun-2015
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-RC-P
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Michelle.L.Anderson@usace.army.milEMAIL:412-395-7417TEL:
MICHELLE L ANDERSON / CONTRACTING OFFICER
W911WN-15-T-0030
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS - 2
Solicitation: W911WN‐15‐T‐0030 Project: Hydraulic Pump Systems with Structural Steel Support Frames
Questions and Answers ‐ 2
Q1. I do not see where motor starters are called out to be supplied in the spec but I see them on the pictures of old unit. Are they to be included?
A1. Yes, motor starters suitable for use with the specified motors are to be included.
Q2. Is hydraulic oil to be included? Only mention of oil is where it calls out the existing type.
A2. Hydraulic oil is not to be included; the hydraulic oil required for operation will be added by Government personnel once the HPUs are installed. However, the Contractor must supply any and all fluids for shop tests required by the Specification.
Q3. Refer to Specifications – Paragraph 2.1.2.2 Capacity
a. Can the USACE advise if the two installed 70 gpm pumps on each power unit will be operated individually or simultaneously?
b. Will the power units ever be used to provide a total flow of 140 GPM (the output of both pumps combined) to the lock cylinders, or will one pump/motor group serve as a standing spare (backup)?
A3. The two pump/motor groups on each power unit may be operated individually or simultaneously based on operational considerations, so HPUs should be designed for simultaneous operation of the pump/motor groups.
Q4. Please advise if Single phase Converters running 3 phase motors is acceptable?
A4. No. The Contractor should supply the single phase motors as requested.
(Note: We have contacted and verified that a major motor manufacturer can supply 20 HP single phase motors for our application.)
Q5. How much 230 VAC single phase service (AMPS) is available on site?
W911WN-15-T-0030
A5. The service at each site can accommodate the requested single phase motors.
(End of Summary of Changes)