Emsworth_Back_Channel_Ref_Dwgs.pdf

PDF 1 MB Posted

Attached to
Emsworth Locks ARC Flash Study
Solicitation number
W911WN-15-T-0020
Issued by

About this file

Emsworth Back Channel Reference Drawings

View the file

Other files

File Type Posted
W911WN-15-T-0020-0003.pdf PDF
W911WN-15-T-0020_0002.pdf PDF
W911WN-15-T-0020_0001.pdf PDF
W911WN-15-T-0020.pdf PDF
Emsworth_Main_Channel_Ref_Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

fi

Pittsburgh District of Engineers US Army Corps

PENNSYLVANIA

ALLEGHENY COUNTY

EMSWORTH LOCKS AND DAMS

OHIO RIVER

DAM

EMSWORTH BACK CHANNEL

REFERENCE DRAWINGS

JANUARY, 2015

J E

N

G E

N E

R A

L

P

A N

E L

E C

T R

IC

S Y

S T

E M

E-7002-A

O H

IO

R

IV

E R

D A

M

B

C K

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

T

O

C

N

D

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

A s

P A

U

G

B O

R E

N

P .E

R S

Z R

R G

J

U L

R E

V

IS

M E

N D

M E

J E

N

U

A U

G

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s io n a t e

S u b m it t e d b y

R e v is t e

IF

U s e r

D a t e

P lo t

S c a le

P e b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

TO BE RELOCATED

TO CONTROL BLDG

EXISTING OVERHEAD SERVICE

TO REMAIN.

EXISTING CAMERA TOWER

PDP-D

(MCC-CB LOCATION)

A

AA

A

EARTH ROAD

D A

M

PITTSBURGH AND LAKE ERIE RAILROAD

0+00

PENNSYLVANIA

ALLEGHENY COUNTY

PIER 12

PIER 14

PIER 10

NEVILLE ISLAND

NEVILLE ROAD

STRUCTURE

BULKHEAD STORAGE

AREA

PARKING

G A

T E

G A

T E

G A

T E

G A

T E

G A

T E

G A

T E

OHIO RIVER

FLOW

SCALE: 1"= 60’- 0"

PIER 16

PIER 11 (OPERATING PIER)

PIER 13 (OPERATING PIER)

PIER 15 (OPERATING PIER)

T

Y P

HPU-1009

HPU-1109

HPU-1110

HPU-1210

HPU-1211

HPU-1311

HPU-1312

HPU-1412

HPU-1413

HPU-1513

HPU-1514

HPU-1614

LEGEND:

HPU-1312

PIER NO. GATE NO.

BACK CHANNEL DAM - GENERAL PLAN

HPU- HYDRAULIC POWER UNIT

PROPOSED NEW TRANSFORMER POLE

TO REMAIN.

EXISTING CAMERA TOWER

TO REMAIN.

EXISTING CAMERA TOWER

EXISTING TRANSFORMER POLE

SEE DRAWING E-7025.

CONTROL BUILDING

SHALL REMAIN (TYP)

EXISTING CONDUITS UNDER BRIDGE

N

O N

E

L

IN

IA

G R

A M

E L

E C

T R

IC

S T

E M

E-7003-A

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

A s

P A

U

B O

R E

N

P .E

R S

Z R

R G

J

U L

R E

V

IS

E N

D M

E

A U

G

A U

G

J E

N

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

M

3/C#4/0 W/GRD, 2�"C

3/C#4/0 W/GRD, 2�"C 3/C#2 W/GRD, 2"C

#2/0GRD, 2-3"C

2 SETS OF 4#350KCMIL,

#2/0GRD, 2-3"C

2 SETS OF 4#350KCMIL,

#2/0GRD, 2-3"C

2 SETS OF 4#250KCMIL,

2-3"C

2 SETS OF 4#350KCMIL,

2-3"C

2 SETS OF 4#350KCMIL,

PIER 11PIER 10 PIER 12 PIER 13 PIER 14 PIER 15 PIER 16

GRD

#2/0 BARE COPPER

18KAIC

PDP-D (PIER 12)

#2/0 BARE COPPER GRD

PROTECTION SYSTEM WITH

BOND TO LIGHTNING

MCC-CB

(14KAIC) (14KAIC) (14KAIC) (14KAIC) (14KAIC) (14KAIC) (14KAIC)

2 SETS OF 3#250KCMIL, #2GRD, 2-2�"C

NOTES:

K

3P3P

20AT

150AF

3P 3P 3P

500AT

600AF

500AT

600AF

100AT

100AF

TVSS

600A BUS

480/277 V,3PH,4W

MCC, 42KAIC

CONTROL BLDG

3P

600AT

600AF

GN

G

CABINET

METERING

METERING

SOLID STATE

SUPPRESSOR

SURGE

G

N

CLAD GROUND RODS

3-�" X 10’ COPPER

GROUND TRIAD

3P

200A

3P

200A

3P

200A

3P

200A

3P

200A

3P

200A

3P

200A G G

CTS

PTS KVA

3P

100A

MCC-CB

50AT

150AF

3P

3P

500A

3P

100A 3P

3P

500A

BH AUXC

480V, 3PH, 3W, 600A

50AT

100AF

POWER COMPANY

HV TO 480/277V, 3PH, 4W BY

(3) POLE MOUNTED XFMRS

480/277V, 3PH, 4W

250KW STANDBY GENERATOR

NEMA 12

FUSED AT 600 AMPS

SE RATED, 600A, 3P, 4W

MAIN DISCONNECT SWITCH

A

A

A A

A

PADLOCKING IN THE OPEN POSITION.

3. PDP-D BREAKERS TO INCLUDE PROVISIONS FOR

PROVIDED WITH AUXILIARY CONTACTS FOR BREAKER STATUS.

2. SEE DRAWING E-7026 FOR LAYOUT. MCC BREAKERS TO BE

BE CLOSED AT A TIME.

1. "K" INTERLOCK TO PERMIT ONLY ONE BREAKER TO

A

SPARE

RAIL

CONDUCTOR

HOIST

BULKHEAD

SPARELP-DCB

CRANE

AUXILIARY

TR-CB

TRANSFORMER

MAIN

TRANSFORMER

42KAIC, NEMA 12 ENCL.

600A, 3P, 4W, 480/277V

AUTOMATIC TRANSFER SWITCH

PP-D10 PP-D11 PP-D12 PP-D13 PP-D14 PP-D15 PP-D16

PPD10 PPD11 PPD12 PPD13 PPD14 PPD15 PPD16

DF2DF1

MCC

GEN

ATS

ONE LINE DIAGRAM

NO SCALE

N

O N

E

L

G R

IE

R

E L

E C

T R

IC

S T

E M

E-7004-A

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

A s

P A

U

B O

R E

N

P .E

R S

Z R

R G

J

U L

R E

V

IS

E N

D M

E

A U

G

J E

N

A U

G

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

A

PP-D10 PANELBOARD

480V

208/120V

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

SPARE

LIGHTING

OUTDOOR

UH-001

HEATER

UNIT

KW

1.6KW

3P

20A

3P

40A

XFMR

CONTROL

XFMR

CONTROL

HPU-1009

LC

1KVA 1KVA

ONE LINE DIAGRAM - PIER 10

NO SCALE

OLOL

TR-D10

3P

45A

3P

100A

3P

60A

3P

50A

M1 M2 H1

3P

200A

3P

60A

3P

60A

3P

20A

P1009

PPD10

480V, 3PH, 225A, 14K AIC (MIN)

3PH

15KVA

4A 4A

3#8,#10GRD, 1"C

3#1,#8GRD, 1�"C

3#6,#10GRD, 1"C 3#12,#12GRD, �"C

FROM PDP-D

3/C #3/0 W/GRD, 2�"C

PTRD10

3P

6A

4#6,#10GRD, 1�"C

PLPD10

RECEPTACLE

WELDING

LCE10

3#8,#10GRD, 1"C

PUMP MOTOR.

3. 3#10, #10GRD, �"C FOR EACH HYDRAULIC

ENCLOSURE AND WIRING DIAGRAM.

2. SEE DRAWING E-7024 FOR LIGHTING CONTACTOR

1. SEE DRAWING E-7015 FOR HPU WIRING DIAGRAM.

NOTES:

E-7041

SEE DWG

SCHEDULE

SEE PANEL

LP-D10

SPARE A

N

O N

E

L

G R

E L

E C

T R

IC

S T

E M

E-7005-A

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

A s

P A

U

B O

R E

N

P .E

R S

Z R

R G

J

U L

J E

N

A U

G

R E

V

IS

E N

D M

E

A U

G

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

A

PP-D11 PANELBOARD

480V

208/120V

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

XFMR

CONTROL

XFMR

CONTROL

HPU-1109

1KVA 1KVA

ONE LINE DIAGRAM - PIER 11

NO SCALE NOTES:

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

SPARE

LIGHTING

OUTDOOR

UH-001

HEATER

UNIT

KW

1.6KW

3P

20A

3P

40A

XFMR

CONTROL

XFMR

CONTROL

HPU-1110

LC

1KVA 1KVA

M1 M2 H1 M1 M2 H1

OLOLOLOL

1 1

TR-D11

3P

45A

3P

100A

3P

100A

3P

50A

3P

60A

3P

60A

3P

60A

3P

60A

3P

60A

3P

200A

3P

20A

P1109 P1110

PPD11

480V, 3PH, 225A, 14K AIC (MIN)

15KVA

4A 4A

3P

60A

3#8,#10GRD, 1"C

3#1,#8GRD, 1�"C 3#1,#8GRD, 1�"C 3#12,#12GRD, �"C

FROM PDP-D

3/C#3/0 W/GRD, 2�"C

PTRD11

PLPD11

4#6,#10GRD, 1�"C

3P

6A

4A 4A

3P

6A

RECEPTACLES

WELDING

LCE11

3#8,#8GRD, 1"C

PUMP MOTOR.

3. 3#10,#10GRD, �"C FOR EACH HYDRAULIC

SEE DWG

SCHEDULE

SEE PANEL

LP-D11

ASPARE

N

O N

E

L

G R

R

E L

E C

T R

IC

S T

E M

E-7006

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X s

P A

U

B O

R E

N

P .E

R S

Z R

R G

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

A

PP-D12 PANELBOARD

480V

208/120V

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

XFMR

CONTROL

XFMR

CONTROL

HPU-1210

1KVA 1KVA

ONE LINE DIAGRAM - PIER 12

NO SCALE NOTES:

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

SPARE

LIGHTING

OUTDOOR

UH-001

HEATER

UNIT

KW

1.6KW

3P

20A

3P

40A

XFMR

CONTROL

XFMR

CONTROL

HPU-1211

LC

1KVA 1KVA

M1 M2 H1 M1 M2 H1

OLOLOLOL

1 1

3P

45A

3P

100A

3P

100A

3P

60A

3P

60A

3P

50A

3P

50A

3P

200A

3P

60A

3P

50A

3P

20A

P1210 P1211

TR-D12

480V, 3PH, 225A, 14K AIC (MIN)

15KVA

4A 4A

PPD12

3#8,#10GRD, 1"C

3#1,#8GRD, 1�"C

#10AWG #10AWG

3#6,#10GRD, 1"C 3#12,#12GRD,�"C

FROM PDP-D

3/C#3/0 W/GRD, 2�"C

4#6,#10GRD, 1�"C

3P

6A

RECEPTACLES

WELDING

3P

6A

3#1,#8GRD, 1�"C

LCE12

3#8,#10GRD,1"C

SEE DWG

SCHEDULE

SEE PANEL

LP-D12

SPARE

PTRD12

PLPD12

N

O N

E

L

G R

R

E L

E C

T R

IC

S T

E M

E-7007

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

A

PP-D13 PANELBOARD

480V

208/120V

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

XFMR

CONTROL

XFMR

CONTROL

HPU-1311

1KVA 1KVA

ONE LINE DIAGRAM - PIER 13

NO SCALE NOTES:

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

SPARE

LIGHTING

OUTDOOR

UH-001

HEATER

UNIT

KW

1.6KW

3P

20A

3P

40A

XFMR

CONTROL

XFMR

CONTROL

HPU-1312

LC

1KVA 1KVA

M1 M2 H1 M1 M2 H1

OLOLOLOL

1 1

3P

45A

3P

100A

3P

60A

3P

60A

3P

50A

3P

50A

3P

100A

3P

200A

3P

20A

3P

60A

3P

50A

P1311 P1312

TR-D13

15KVA

480V, 3PH, 225A, 14K AIC (MIN)

4A 4A

PPD13

3#8,#10GRD, 1"C

3#1,#8GRD, 1�"C 3#1,#8GRD, 1�"C

3#6,#10GRD, 1"C 3#12,#12GRD, �"C

FROM PDP-D

3/C#3/0 W/GRD, 2�"C

#10AWG #10AWG

4#6,#10GRD, 1�"C

PTRD13

PLPD13 3P

6A

3P

6A

RECEPTACLES

WELDING

LCE13

3#8,#10GRD, 1"C

SEE DWG

SCHEDULE

SEE PANEL

LP-D13

SPARE

N

O N

E

L

G R

E L

E C

T R

IC

S T

E M

E-7008

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X s

P A

U

B O

R E

N

P .E

R S

Z R

R G

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

A

PP-D14 PANELBOARD

480V

208/120V

480V,3PH,225A, 14K AIC (MIN)

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

XFMR

CONTROL

XFMR

CONTROL

HPU-1412

1KVA 1KVA

ONE LINE DIAGRAM - PIER 14

NO SCALE NOTES:

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

SPARE

LIGHTING

OUTDOOR

UH-001

HEATER

UNIT

KW

1.6KW

3P

20A

3P

40A

XFMR

CONTROL

XFMR

CONTROL

HPU-1413

LC

1KVA 1KVA

M1 M2 H1 M1 M2 H1

OLOLOLOL

1 1

3P

45A

3P

100A

3P

60A

3P

60A

3P

100A

3P

50A

3P

50A

3P

200A

3P

20A

3P

60A

3P

50A

P1412 P1413

PPD14

TR-D14

15KVA

4A 4A

3#8,#10GRD, 1"C

3#1,#8GRD, 1�"C 3#1,#8GRD, 1�"C 3#6,#10GRD, 1"C 3#12,#12GRD, �"C

FROM PDP-D

3/C#4/0 W/GRD, 2�"C

#10AWG #10AWG

4A 4A

RECEPTACLES

WELDING

3P

6A

3P

6A

PTRD14

PLPD14

4#6,#10GRD, 1�"C

LCE14

3#8,#10GRD, 1"C

E-7042

SEE DWG

SCHEDULE

SEE PANEL

LP-D14

N

O N

E

L

G R

R

E L

E C

T R

IC

S T

E M

E-7009

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

A

PP-D15 PANELBOARD

480V

208/120V

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

XFMR

CONTROL

XFMR

CONTROL

HPU-1513

1KVA 1KVA

ONE LINE DIAGRAM - PIER 15

NO SCALE NOTES:

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

SPARE

LIGHTING

OUTDOOR

UH-001

HEATER

UNIT

KW

1.6KW

3P

20A

3P

40A

XFMR

CONTROL

XFMR

CONTROL

HPU-1514

LC

1KVA 1KVA

M1 M2 H1 M1 M2 H1

OLOLOLOL

1 1

3P

45A

3P

100A

3P

60A

3P

60A

3P

100A

3P

50A

3P

50A

3P

200A

3P

60A

3P

50A

3P

20A

P1513 P1514

TR-D15

15KVA

480V, 3PH, 225A, 14K AIC (MIN)

PPD15

3#8,#10GRD, 1"C

4A 4A

3#1,#8GRD, 1�"C 3#1,#8GRD, 1�"C 3#6,#10GRD, 1"C 3#12,#12GRD, �"C

FROM PDP-D

3/C#4/0 W/GRD, 2�"C

#10AWG #10AWG

3P

6A

4#6,#10GRD, 1�"C

3P

6A

RECEPTACLES

WELDING

LCE15

3#8,#10GRD, 1"C

SEE DWG

SCHEDULE

SEE PANEL

LP-D15

SPARE

PTRD15

PLPD15

N

O N

E

L

G R

E L

E C

T R

IC

S T

E M

E-7010

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

A

PP-D16 PANELBOARD

208/120V

2 2

15 15

KW

PUMP

HYD.

PUMP

HYD.

HEATER

TANK

OIL

SPARE

LIGHTING

OUTDOOR

UH-001

HEATER

UNIT

KW

1.6KW

3P

20A

3P

40A

XFMR

CONTROL

XFMR

CONTROL

HPU-1615

LC

1KVA 1KVA

ONE LINE DIAGRAM - PIER 16

NO SCALE NOTES:

OLOL

3P

45A

3P

100A

3P

60A

3P

50A

3P

60A

3P

60A

3P

20A

RECEPTACLE

WELDING

P1615

TR-D16

15KVA

480V, 3PH, 225A, 14K AIC (MIN)

4A 4A

3P

200A

PPD16

3#8,#10GRD, 1"C

3#1,#8GRD, 1�"C 3#6,#10GRD, 1"C 3#12,#12GRD, �"C

FROM PDP-D

3/C#4/0 W/GRD, 2�"C

3P

6A

4#6,#10GRD, 1�"C

PTRD16

PLPD16

3#8,#10GRD, 1"C

LCE16

SEE DWG

SCHEDULE

SEE PANEL

LP-D16

N

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

DISPOSED OF BY THE CONTRACTOR.

4. EXISTING EQUIPMENT SHOWN DASHED SHALL BE REMOVED AND

DURING CONSTRUCTION ACTIVITIES AT ALL TIMES. SEE SPECS.

3. CONTRACTOR TO PROVIDE COMMERCIAL AND STANDBY POWER

TANK TO FACILITATE INSTALLATION OF NEW SERVICE AND EQUIPMENT.

2. CONTRACTOR SHALL REMOVE GENERATOR AND FUEL

SHALL BE REMOVED, UNLESS NOTED OTHERWISE.

1. EXISTING EQUIPMENT MADE OBSOLETE BY NEW WORK

A U

G

C O

N T

R

U

IL

D

A N

E L

E C

T R

IC

S T

E M

E-7025-A

R E

V

IS

M E

N D

M E

A

A U

G

J E

N

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

C O

N T

R

N E

L

B A

A N

N E

L LP

PP

METER

CAB

TRANS

TC

SCALE: �"=1’-0"

CONTROL BUILDING - PLAN

ATS

FODCB

FIBER OPTIC BREAKOUT BOX

SWITCH

AUTOMATIC TRANSFER

SWITCH

MAIN DISCONNECT

SEE DRAWING E-7021.

HMI CONTROL ENCL.

MCC-CB

M

METERING CABINET

LP-20

LP-16

LP-18

CONDUITS TO DAM (PIER 10).

SEE DRAWING E-7027 FOR

1�"C

2-3"C

SEE DRAWING E-7027

POWER POLE LOCATION.

2-3"C TO PROPOSED

2 SETS OF 4#350KCMIL

METER

�"C

FO-CB-11 FO-15-CB 2"C

DF2 2-2�"C

DF1 2-2�"C

CABLE 1"C

CAT 5 ETHERNET

TO GENERATOR

#2/0GRD, 2-3"C

2 SETS OF 4#250KCMIL.

TO REMAIN

SECURITY EQUIPMENT

PAD

XFMR

(4) 2�"C

STATUS)

1�"C (BRKR

(4) 3"C

GEN BLOCK HTR

3#12,�"C TO

2"C

FO-CB-11 FO-15-CB

NEMA 3R 18"X18"12"

ALUMINUM PULL BOX

A

NEMA 3R 12"X12"X6"

ALUMINUM PULL BOX

A

12" 0 5’

SCALE: �" =1’-0"

N

B U

L K

H E

R U

C T

U

E A

E L

E C

T R

IC

S T

E M

E-7027

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

CL

PIER 10

LOCATION

SERVICE POLE

PROPOSED NEW

ALUMINUM PULL BOX

4-2�"C, 1-2"C

DRILL THRU WALL FOR

TO REMAIN

AND CONDUITS

EXISTING BOX

FOUNDATION DETAIL.

SEE DRAWING E-7038 FOR

250KW DIESEL GENERATOR,

ALL CONDUITS.

3" OF CONCRETE AROUND

CONCRETE ENCASED WITH

SEE DRAWING E-7029

FO-15-CB 2"C

FO-CB-11

6"-8"

24" MIN

49’-0"

F L

O W

CONTROL BUILDING

BACK CHANNEL DAM - BULKHEAD STRUCTURE AREA

BSECTION

SCALE: �" = 1’-0"

NO SCALE

5. NEMA 3R ALUMINUM PULL BOX 30" X 24" X 12"

D. POWER (2-3"C)

C. MONITORING CKT (3/4"C)

B. BLOCK HEATER (3/4"C)

A. BATTERY CHARGER (3/4"C)

COORDINATE CONDUIT LOCATIONS W/ APPROVED EQUIPMENT.

EMBEDDED CONDUITS AND WIRING FOR A COMPLETE INSTALLATION.

4. FURNISH AND INSTALL ALL COMPONENTS AND ASSOCIATED

WITH UNDERGROUND SERVICE TO CT CABINET BY CONTRACTOR.

WEATHERHEADS MOUNTED ON TOP OF POLE MOUNTED CONDUIT

3 PHASE, 4 WIRE SERVICE. SECONDARY CONDUCTORS AND

3. NEW UTILITY TRANSFORMER POLE TO SUPPLY NEW 480/277V

PAY ALL COSTS.

SHALL COORDINATE ALL REQUIREMENTS FOR NEW SERVICE AND

2. PRIMARY OVERHEAD CONDUCTORS BY UTILITY. CONTRACTOR

1. EXISTING LIGHTING FIXTURES AND CIRCUIT TO REMAIN.

FINISHED GRADEWARNING TAPE

B

A

DF1 2-2�"C

DF2 2-2�"C

FOR CONTINUATION.

SEE DRAWING E-7025

E7038

E7027 E7027

N

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

TOTALS

1 23

BUS CONNECTION

BREAKER

AMP POLE

P W

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/N kVA kVA

A B

225A

3 40 3

2019 60 3

26253 3

SPARE

480V PANEL PP-D10

480V

CB

133 20 14 3

TOTAL LOAD

BUS C (kVA)

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

TOTALS

1 23 3

BUS CONNECTION

BREAKER

AMP POLE

P W

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPS

LOCATION S/N

kVA kVA

A B

3 3

3 3

20193 60 3

2625SPARE 3

SPARE

480V PANEL PP-D11

480V

CB

133 14 20 3

7.8

7.8

7.8

BUS A (kVA)

BUS B (kVA)

TOTAL LOAD

BUS C (kVA)

225A

SPACE

MAIN BREAKER

SPACE

MAIN BREAKER

SPACE

27.5

27.5

27.5

82.5

99.3

19.7 19.5 19.7 7.8 7.8 7.8

SPACE

21.8 21.8 21.8

20041.5

41.5

41.5

19.7 19.5 19.7

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

TOTALS

1 23

BUS CONNECTION

BREAKER

AMP POLE

P W

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/N kVA kVA

A B

225A

3 3

2019 60 3

2625SPARE 3

SPARE

480V

CB

133 20 14 3

TOTAL LOAD

BUS C (kVA)

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

TOTALS

1 23 3

BUS CONNECTION

BREAKER

AMP POLE

P W

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPS

LOCATION S/N

kVA kVA

A B

3 3

3 3

20193 60 3

2625SPARE 3

SPARE

480V

CB

133 14 20 3

BUS A (kVA)

BUS B (kVA)

TOTAL LOAD

BUS C (kVA)

225A

SPACE

MAIN BREAKER

SPACE

MAIN BREAKER

SPACE

41.5

41.5

41.5

19.7 19.5 19.7 21.8 21.8 21.8

SPACE

21.8 21.8 21.8

20041.5

41.5

41.5

19.7 19.5 19.7

SURFACE

HPU 1009

TR-D10

SURFACE

HPU 1110

TR-D11

HPU 1109

480V PANEL PP-D12

SURFACE

HPU 1210

TR-D12

HPU 1211

SURFACE

480V PANEL PP-D13

HPU 1311

TR-D13

HPU 1312

OUTDOOR LIGHTING

PIER 10

UNIT HEATER

PNL PDP-D

PNL PDP-D

PIER 13

PDP-D

PIER 11

PDP-D

WELDING RECEPTACLE

SPARE

0.5

0.7

0.7

WELDING RECEPTACLE

UNIT HEATER

100100

20OUTDOOR LIGHTING .7

.5

.7

WELDING RECEPTACLE

UNIT HEATER

OUTDOOR LIGHTING

100 100

0.7

0.5

0.7

PIER 12

UNIT HEATER

WELDING RECEPTICLE

OUTDOOR LIGHTING

0.7

0.5

0.7

3/C #4/0 W/GRD

3/C #4/0 W/GRD3/C #4/0 W/GRD

3/C #4/0 W/GRD

40 7.8

7.8

7.8

40 7.8

7.8

7.8

40 7.8

7.8

7.8

E-7028

E-7030

E-7032

E-7030

SPARE

SPARE

SPARE

SPARE

2. ALL PANELS TO BE PROVIDED WITH INTERNAL PLUG-ON SURGE PROTECTION

1. PANEL ENCLOSURES SHALL BE NEMA TYPE 12.

NOTES:

TOP

TOP TOP

TOP

124.5

124.5

124.5

A

A

A

A

E L

E C

T R

IC

S T

E M

V

W

N

S H

E

E-7039-A

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

A

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

R E

V

IS

E N

D M

E

J E

N

A U

G

A U

G

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

N

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

TOTALS

1 23 3

BUS CONNECTION

BREAKER

AMP POLE

P W

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPS

LOCATION S/N

kVA kVA

A B

3 3

3 40 3

20193 60 3

2625SPARE 3

SPARE

480V PANEL PP-D14

480V

CB

133 14 20 3

7.8

7.8

7.8

BUS A (kVA)

BUS B (kVA)

TOTAL LOAD

BUS C (kVA)

225A

SPACE

MAIN BREAKER

SPACE

21.8 21.8 21.8

20041.5

41.5

41.5

19.7 19.5 19.7

SURFACE

HPU 1110

TR-D14

HPU 1412

PIER 14

PDP-D

WELDING RECEPTACLE

UNIT HEATER

100100

20OUTDOOR LIGHTING .7

.5

.7

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

TOTALS

1 23 3

BUS CONNECTION

BREAKER

AMP POLE

P W

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPS

LOCATION S/N

kVA kVA

A B

3 3

3 3

20193 60 3

2625SPARE 3

SPARE

480V PANEL PP-D15

480V

CB

133 14 20 3

BUS A (kVA)

BUS B (kVA)

TOTAL LOAD

BUS C (kVA)

225A

SPACE

MAIN BREAKER

SPACE

21.8 21.8 21.8

20041.5

41.5

41.5

SURFACE

HPU 1110

TR-D15

HPU 1513

PIER 15

PDP-D

WELDING RECEPTACLE

UNIT HEATER

100100

20OUTDOOR LIGHTING .7

.5

.7

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

TOTALS

1 23 3

BUS CONNECTION

BREAKER

AMP POLE

P W

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPS

LOCATION S/N

kVA kVA

A B

3 3

3 3

20193 60 3

2625SPARE 3

SPARE

480V PANEL PP-D16

480V

CB

133 14 20 3

BUS A (kVA)

BUS B (kVA)

TOTAL LOAD

BUS C (kVA)

225A

SPACE

MAIN BREAKER

SPACE

7.8 7.8 7.8

20027.5

27.5

27.5

82.5

99.4

SURFACE

TR-D16

HPU 1614

PIER 16

PDP-D

WELDING RECEPTACLE

UNIT HEATER

100100

20OUTDOOR LIGHTING .7

.5

.7

3 3

3/C #4/0 W/GRD

3/C #4/0 W/GRD

3/C #4/0 W/GRD

19.7 19.5 19.7

40 7.8

7.8

7.8

19.7 19.5 19.7

40 7.8

7.8

7.8

E-7032

E-7030

E-7034

SPARE

SPARE

SPARE

SPARE

2. ALL PANELS TO BE PROVIDED WITH INTERNAL PLUG-ON SURGE PROTECTION

1. PANEL ENCLOSURES SHALL BE NEMA TYPE 12.

NOTES:

TOP

TOP

TOP

124.5

124.5

E L

E C

T R

IC

S T

E M

V

W

N

S H

E

E-7040

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

N

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 21 20

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

240V PANEL LP-D10

CB

13 14 1

SPARE

TOTALS

SPARE

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

MAIN BREAKER

SPARE

120/208V

SURFACE

PIER 10

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 21 20

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

240V PANEL LP-D11

CB

13 14 1

1 20

TOTALS

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

MAIN BREAKER29.4

29.4

20.2

79.0

94.8

120/208V

SURFACE

PIER 11

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 2

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

240V PANEL LP-D13

CB

13 14

TOTALS

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

MAIN BREAKER29.4

29.4

20.2

79.0

94.8

120/208V

SURFACE

PIER 13

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 2

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

240V PANEL LP-D12

CB

13 14

TOTALS

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

MAIN BREAKER29.4

29.4

20.2

79.0

94.8

120/208V

SURFACE

PIER 12

4#6,#10GRD

TR-D10

4#6,#10GRD

TR-D11 TR-D13

4#6,#10GRD

TR-D12

4#6,#10GRD

INTERIOR LIGHTING

EXTERIOR LIGHTING

PIER ROOM LTNG

SPARE

SPARE

SPARE

RECEPTACLES

RECEPTACLES

PIER ROOM RECEPTACLES

SPARE

SPARE

SPARE

SPARE

20SPARE

SPARE

INTERIOR LIGHTING

EXTERIOR LIGHTING

PIER ROOM LTNG

SPARE

SPARE

SPARE

SPARE

RECEPTACLES

RECEPTACLES

PIER ROOM RECEPTACLES

SPARE

SPARE

SPARE

SPARE

1 20

1 20

1 20

1 20

20 1

20 1

20 1

20 1

20 1

20 1

20 1

SPARE

SPARE

INTERIOR LIGHTING

EXTERIOR LIGHTING

PIER ROOM LTNG

SPARE

SPARE

SPARE

SPARE

RECEPTACLES

RECEPTACLES

PIER ROOM RECEPTACLES

SPARE

SPARE

SPARE

SPARE

20 1

20 1

20 1

20 1

20 1

20 1

20 1

2 20

1 20

1 20

1 20

1 20

1 20

SPARE

SPARE

INTERIOR LIGHTING

EXTERIOR LIGHTING

PIER ROOM LTNG

SPARE

SPARE

SPARE

2 20

1 20

1 20

1 20

1 20

1 20

20 1

20 1

20 1

20 1

20 1

20 1

20 1

SPARE

RECEPTACLES

RECEPTACLES

PIER ROOM RECEPTACLES

SPARE

SPARE

SPARE

SPARE

E-7028

E-X7030

E-7032

E-7030

EXHAUST FAN

EXHAUST FAN EXHAUST FAN

EXHAUST FAN

2. PANELS TO BE PROVIDED WITH INTERNAL SURGE PROTECTION.

1. PANEL ENCLOSURES SHALL BE NEMA TYPE 12.

NOTES:

E L

E C

T R

IC

S T

E M

V

IG

N

S H

E

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X X

X X

X X

X

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

N

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 21 20

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

240V PANEL LP-D14

CB

13 14

TOTALS

SPARE

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

MAIN BREAKER29.4

29.4

20.2

79.0

94.8

SPARE

120/208V

SURFACE

PIER 14

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 2

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

240V PANEL LP-D15

CB

13 14

TOTALS

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

MAIN BREAKER29.4

29.4

20.2

79.0

94.8

120/208V

SURFACE

PIER 15

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 2

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

240V PANEL LP-D16

CB

13 14

TOTALS

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

MAIN BREAKER29.4

29.4

20.2

79.0

94.8

120/208V

SURFACE

PIER 16

DESCRIPTION

A C

BREAKER

POLE AMP

CKT

No

BUS

CONNECTION

SERVICE VOLTAGE

MOUNTING

BUS RATING LOCATION

DRAWING No.

CKT

No DESCRIPTION

1 21 20

BUS CONNECTION

BREAKER

AMP POLE

P W kVA kVA

A B

100A

CB

13 14

MOTORIZED LOUVER BATTERY CHARGER

3 30

TOTALS

LOCATION (TOP,BOTTOM)

FEEDER SIZE

SOURCE

AMPS. LINE AMPSBUS A (kVA)

BUS B (kVA) LOCATION S/NBOTTOM

TOTAL LOAD

BUS C (kVA)

100MAIN BREAKER29.4

29.4

20.2

79.0

94.8

120/208V

SURFACE

CONTROL BUILDING

ROOM LIGHTING 20

RECEPTACLES 1

OUTSIDE LIGHTING

EXHAUST FAN 1 20

UNIT HEATER

BULKHEAD WALKWAY LTNG

BULKHEAD FLOOD LTNG

ROOM LTNG

RECEPTACLES

TANKLESS WATER HTR

TANKLESS WATER HTR50 2

12019 20

MCC-CB

TR-D14

TR-D15

19 20

240V PANEL LP-DCB

REWORK EXISTING CKT INTO NEW PANEL IN MCC

INTERIOR LIGHTING

EXTERIOR LIGHTING

PIER ROOM LTNG

SPARE

SPARE

SPARE

SPARE

4#6,#10GRD

1 20

1 20

1 20

1 20

1 20

1 20

1 20

RECEPTACLES

RECEPTACLES

PIER ROOM RECEPTACLES

SPARE

SPARE

SPARE

SPARE

20 1

20 1

20 1

20 1

20 1

20 1

20 1

20 1

4#6,#10GRD

SPARE

INTERIOR LIGHTING

EXTERIOR LIGHTING

PIER ROOM LTNG

SPARE

SPARE

SPARE

SPARE

SPARE

RECEPTACLES

RECEPTACLES

PIER ROOM RECEPTACLES

SPARE

SPARE

SPARE

SPARE

20 1

20 1

20 1

20 1

20 1

20 1

20 1

20 1

20 1

1 20

1 20

1 20

1 20

1 20

1 20

1 20

1 20

4#6,#10GRD

SPARE

INTERIOR LIGHTING

EXTERIOR LIGHTING

PIER ROOM LTNG

SPARE

SPARE

SPARE

SPARE

1 20

1 20

1 20

1 20

1 20

1 20

1 20

1 20

20 1

20 1

20 1

20 1

20 1

20 1

20 1

20 1

20 1

SPARE

RECEPTACLES

RECEPTACLES

PIER ROOM RECEPTACLES

SPARE

SPARE

SPARE

SPARE

TR-D16

4#1,#8GRD

UPS-2 HMI ENCL.

UPS-1 HMI ENCL.

SPARE

SPARE

SPARE

SPARE

20 1

HMI ENCL.- HVAC

E-7032

E-7030

E-7034

E-7026

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

2. PANELS TO BE PROVDED WITH INTERNAL SURGE PROTECTION.

1. PANEL ENCLOSURES SHALL BE NEMA TYPE 12.

NOTES:

E L

E C

T R

IC

S T

E M

V

IG

N

S H

E E

T

E-7042

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X s

P A

U

B O

R E

N

P .E

R S

Z R

R G

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

N

E L

E C

T R

IC

S T

E M

C A

B

H E

D U

L E

S H

E E

T

E-7044-A

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

A

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

R E

V

IS

E N

D M

E

A U

G

J E

N

A U

G

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

3CABLE FROM FOR VOLTAGE

CABLE SCHEDULE

CONDUCTOR SIZETO

NOTES:

WITHIN THE ENTIRE DRAWING SET AND SPECIFICATIONS.

RESPONSIBLE FOR ALL WIRE AND CABLE REQUIRED

LISTED IN THIS SCHEDULE. THE CONTRACTOR IS

1. ONLY WIRE AND CABLE WITH A CABLE NAME IS

PP-D10 PANELBOARD HPU-1009 3 PHASE POWER

PP-D11 PANELBOARD HPU-1109 3 PHASE POWER

PP-D11 PANELBOARD HPU-1110 3 PHASE POWER

PP-D12 PANELBOARD HPU-1210 3 PHASE POWER

PP-D12 PANELBOARD HPU-1211 3 PHASE POWER

PP-D13 PANELBOARD HPU-1311 3 PHASE POWER

PP-D13 PANELBOARD HPU-1312 3 PHASE POWER

PP-D14 PANELBOARD HPU-1412 3 PHASE POWER

PP-D14 PANELBOARD HPU-1413 3 PHASE POWER

PP-D15 PANELBOARD HPU-1513 3 PHASE POWER

PP-D15 PANELBOARD HPU-1514 3 PHASE POWER

PP-D16 PANELBOARD HPU-1615 3 PHASE POWER

P1009

P1109

P1110

P1210

P1211

P1311

P1312

P1412

P1413

P1513

P1514

P1615

PPD10

PPD11

PPD12

PPD13

PPD14

PPD15

PPD16

PP-D10

PP-D11

PP-D12

PP-D13

PP-D14

PP-D15

PP-D16

PDP-D

PDP-D

PDP-D

PDP-D

PDP-D

PDP-D

PDP-D

3/C #4/0 W/GND, 2�"C

3/C #4/0 W/GND, 2�"C

3/C #4/0 W/GND, 2�"C

3/C #4/0 W/GND, 2�"C

3/C #4/0 W/GND, 2�"C

3/C #4/0 W/GND, 2�"C

3/C #4/0 W/GND, 2�"C

ATS

MCC

GEN

DF2

DF1

480V

480VMCC-CB

MCC-CB

PDP-D (PIER 10)

PDP-D (PIER 10) 3 PHASE POWER

3 PHASE POWER

PDP-D

PDP-D

BH

AUXC

BLKHD HOIST RAIL

AUX CRANE RAIL

3/C #2 W/GND, 2"C

3/C #2 W/GND, 2"C

480V

480V

480V

480V

480V

480V

480V

480V

480V

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

PTRD10

PTRD11

PTRD12

PTRD13

PTRD14

PTRD15

PTRD16

TR-D10

TR-D11

TR-D12

TR-D13

TR-D14

TR-D15

TR-D16

PP-D10

PP-D11

PP-D12

PP-D13

PP-D14

PP-D15

PP-D16

480V

480V

480V

480V

480V

480V

480V

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

PLPD10

PLPD11

PLPD12

PLPD13

PLPD14

PLPD15

PLPD16

TR-D10

TR-D11

TR-D12

TR-D13

TR-D14

TR-D15

TR-D16

LP-D10

LP-D11

LP-D12

LP-D13

LP-D14

LP-D15

LP-D16

480V3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

3 PHASE POWER

4#6,#10GND, 1�"C

480V4#6,#10GND, 1�"C

480V4#6,#10GND, 1�"C

480V4#6,#10GND, 1�"C

480V4#6,#10GND, 1�"C

480V4#6,#10GND, 1�"C

480V4#6,#10GND, 1�"C

PP-D10 PANELBOARD

PP-D11 PANELBOARD

PP-D12 PANELBOARD

PP-D13 PANELBOARD

PP-D14 PANELBOARD

PP-D15 PANELBOARD

PP-D16 PANELBOARD

LIGHTING

LIGHTING

LIGHTING

LIGHTING

LIGHTING

LIGHTING

LIGHTING

PIER 10 LIGHTING CONTACTOR ENCLOSURE

PIER 11 LIGHTING CONTACTOR ENCLOSURE

PIER 12 LIGHTING CONTACTOR ENCLOSURE

PIER 13 LIGHTING CONTACTOR ENCLOSURE

PIER 14 LIGHTING CONTACTOR ENCLOSURE

PIER 15 LIGHTING CONTACTOR ENCLOSURE

PIER 16 LIGHTING CONTACTOR ENCLOSURE

LCE10

LCE11

LCE12

LCE13

LCE14

LCE15

LCE16

3#12,#12GND, �"C

3#12,#12GND, �"C

3#12,#12GND, �"C

3#12,#12GND, �"C

3#12,#12GND, �"C

3#12,#12GND, �"C

3#12,#12GND, �"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

3#1,#8GND, 1�"C

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

480V

3#8,#10GND, 1"C

3#8,#10GND, 1"C

3#8,#10GND, 1"C

3#8,#10GND, 1"C

3#8,#10GND, 1"C

3#8,#10GND, 1"C

3#8,#10GND, 1"C

480V

480V

3 PHASE POWER

3 PHASE POWER

480V3 PHASE POWER

MAIN DISCONNECT SWITCH

ATS

ATS

ATS

MCC-CB

STAND-BY GENERATOR

(2)4#350KCMIL, #2/0GRD, 2-3"C

(2)4#350KCMIL, #2/0GRD, 2-3"C

(2)4#250KCMIL, #2/0GRD, 2-3"C

A(2)3#250KCMIL, #2GRD, 2�"C

(2)3#250KCMIL, #2GRD, 2�"C A

A

A

N

E L

E C

T R

IC

S T

E M

C A

B

H E

D U

L E

S H

E E

T

E-7045

O

E R

D A

A N

N E

L

G A

T E

M A

C H

IN

E

E C

T R

IC

P L

A C

E M

E N

T

E M

S W

O R

C

M S

Drawing Number:

Pittsburgh District of Engineers

US Army Corps

X X

X X

X

R S

Z R

R G s

P A

U

B O

R E

N

P .E

J

U L

D e s c r ip t io n D a t e

S y m b o l

A p p r

S E

C T

IE

F

D e s ig n b y

D w n b y

C k d b y

S u b m is s t e

S u b m it t e d b y

R e v is t e

U s e r

D a t e

P lo t

S c a le

P b le

C o lo r

T a b le u s e r n a m e s y t im e ip s c a le ip p e n t a b le c o lo r t a b le f i le n a m e

W

W N

B

COMMUNICATIONS

COMMUNICATIONS

FO10/9

FO11/9

PIER 11 FIBER OPTIC BREAKOUT ENCLOSURE

PIER 11 FIBER OPTIC BREAKOUT ENCLOSURE

COMMUNICATIONS

COMMUNICATIONS

PIER 11 FIBER OPTIC BREAKOUT ENCLOSURE

PIER 11 FIBER OPTIC BREAKOUT ENCLOSURE

COMMUNICATIONS

COMMUNICATIONS

PIER 13 FIBER OPTIC BREAKOUT ENCLOSURE

PIER 13 FIBER OPTIC BREAKOUT ENCLOSURE

COMMUNICATIONS

COMMUNICATIONS

PIER 13 FIBER OPTIC BREAKOUT ENCLOSURE

PIER 13 FIBER OPTIC BREAKOUT ENCLOSURE

COMMUNICATIONS

COMMUNICATIONS

PIER 15 FIBER OPTIC BREAKOUT ENCLOSURE

PIER 15 FIBER OPTIC BREAKOUT ENCLOSURE

COMMUNICATIONS

COMMUNICATIONS

PIER 15 FIBER OPTIC BREAKOUT ENCLOSURE

PIER 15 FIBER OPTIC BREAKOUT ENCLOSURE

FO11/10

FO12/10

FO12/11

FO13/11

FO13/12

FO14/12

FO14/13

FO15/13

FO15/14

FO16/14

COMMUNICATIONSCONTROL BUILDING FIBER OPTIC BREAKOUT ENCLOSURE PIER 11 FIBER OPTIC BREAKOUT ENCLOSURE 24 FIBER, BREAKOUT, 2"C

PIER 11 FIBER OPTIC BREAKOUT ENCLOSURE PIER 13 FIBER OPTIC BREAKOUT ENCLOSURE COMMUNICATIONS 24 FIBER, BREAKOUT, 2"C

PIER 13 FIBER OPTIC BREAKOUT ENCLOSURE PIER 15 FIBER OPTIC BREAKOUT ENCLOSURE COMMUNICATIONS 24 FIBER, BREAKOUT, 2"C

PIER 15 FIBER OPTIC BREAKOUT ENCLOSURE COMMUNICATIONS 24 FIBER, BREAKOUT, 2"CCONTROL BLDG. FIBER OPTIC BREAKOUT ENCLOSURE

LS4 LIMIT SWITCHES

LS8

CIMS1

CIMS2

HPU CONTROL ENCLOSURE HYDRAULIC CYLINDER CIMS UNIT 1 CYLINDER POSITION

HPU CONTROL ENCLOSURE HYDRAULIC CYLINDER CIMS UNIT 2 CYLINDER POSITION 1"C

HPU CONTROL ENCLOSURE

HPU CONTROL ENCLOSURE

4 PORT BASE UNIT

8 PORT BASE UNIT LIMIT SWITCHES

6/C, MOLDED

10/C, MOLDED

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

12 FIBER, BREAKOUT, 1�" C

2/C #12 W/GND, �"CLIGHTINGPIER 10 U/S FLOODLIGHTP10US

LIGHTINGPIER 10 D/S FLOODLIGHTP10DS

LIGHTINGPIER 10 GATE 9 FLOODLIGHTP10G9

LIGHTINGPIER 11 U/S FLOODLIGHTP11US

LIGHTINGPIER 11 D/S FLOODLIGHTP11DS

LIGHTINGPIER 11 GATE 10 FLOODLIGHTP11G10

LIGHTINGPIER 12 U/S FLOODLIGHTP12US

LIGHTINGPIER 12 D/S FLOODLIGHTP12DS

LIGHTINGPIER 12 GATE 11 FLOODLIGHTP12G11

LIGHTINGPIER 13 U/S FLOODLIGHTP13US

LIGHTINGPIER 13 D/S FLOODLIGHTP13DS

LIGHTINGPIER 13 GATE 12 FLOODLIGHTP13G12

LIGHTINGPIER 14 U/S FLOODLIGHTP14US

LIGHTINGPIER 14 D/S FLOODLIGHTP14DS

LIGHTINGPIER 14 GATE 13 FLOODLIGHTP14G13

LIGHTINGPIER 15 U/S FLOODLIGHTP15US

LIGHTINGPIER 15 D/S FLOODLIGHTP15DS

LIGHTINGPIER 15 GATE 14 FLOODLIGHTP15G14

LIGHTINGPIER 16 U/S FLOODLIGHTP16US

LIGHTINGPIER 16 D/S FLOODLIGHTP16DS

PER MANUFACTURER

TOCABLE FROM FOR VOLTAGE

CABLE SCHEDULE

CONDUCTOR SIZE

PIER 10 LIGHTING CONTACTOR ENCLOSURE

PIER 10 LIGHTING CONTACTOR ENCLOSURE

PIER 10 LIGHTING CONTACTOR ENCLOSURE

PIER 11 LIGHTING CONTACTOR ENCLOSURE

PIER 11 LIGHTING CONTACTOR ENCLOSURE

PIER 11 LIGHTING CONTACTOR ENCLOSURE

PIER 12 LIGHTING CONTACTOR ENCLOSURE

PIER 12 LIGHTING CONTACTOR ENCLOSURE

PIER 12 LIGHTING CONTACTOR ENCLOSURE

PIER 13 LIGHTING CONTACTOR ENCLOSURE

PIER 13 LIGHTING CONTACTOR ENCLOSURE

PIER 13 LIGHTING CONTACTOR ENCLOSURE

PIER 14 LIGHTING CONTACTOR ENCLOSURE

PIER 14 LIGHTING CONTACTOR ENCLOSURE

PIER 14 LIGHTING CONTACTOR ENCLOSURE

PIER 15 LIGHTING CONTACTOR ENCLOSURE

PIER 15 LIGHTING CONTACTOR ENCLOSURE

PIER 15 LIGHTING CONTACTOR ENCLOSURE

PIER 16 LIGHTING CONTACTOR ENCLOSURE

PIER 16 LIGHTING CONTACTOR ENCLOSURE

HPU-1009

HPU-1109

HPU-1110

HPU-1210

HPU-1211

HPU-1311

HPU-1312

HPU-1412

HPU-1413

HPU-1513

HPU-1514

HPU-1614

NOTES:

WITHIN THE ENTIRE DRAWING SET AND SPECIFICATIONS.

RESPONSIBLE FOR ALL WIRE AND CABLE REQUIRED

LISTED IN THIS SCHEDULE. THE CONTRACTOR IS

1. ONLY WIRE AND CABLE WITH A CABLE NAME IS

480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

2/C #12 W/GND, �"C 480V

FO-CB-11

FO-11-13

FO-13-15

FO-15-CB

AO37_LCH_0000COVER
AO37_LCH_0000COVER
Emsworth Back Channel
Coversheet1.pdf
Coversheet

File details come from the government source that posted it. Updated .